Planned power generators in the United States

Source: https://aidb.si/d/us-planned-power-generators — Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report.

IDPlantGeneratorEIA plant IDStateCountyDeveloper / operatorSectorTechnologyEnergy sourcePrime moverNameplate capacity (MW)Net summer capacity (MW)Planned startPlanned yearStatusBalancing authorityLatitudeLongitudeInventory month
64550/CVOWCCoastal Virginia Offshore Wind (CVOW) Commercial ProjectCVOWC64550VADominion Energy Inc.Electric UtilityOffshore Wind TurbineWNDWS264026402027-012027(U) Under construction, less than or equal to 50 percent completePJM36.907956-75.349072026-09
58987/II-AChokecherry and Sierra Madre WindII-A58987WYCarbonPower Company of Wyoming LLCIPP Non-CHPOnshore Wind TurbineWNDWT1303.21303.22032-122032(U) Under construction, less than or equal to 50 percent completeCISO41.683056-107.22026-09
68396/PGB45Sunstone SolarPGB4568396ORMorrowSunstone Solar, LLCIPP Non-CHPBatteriesMWHBA120012002027-122027(L) Regulatory approvals pending. Not under constructionBPAT45.605916-119.5632026-09
68396/PGR45Sunstone SolarPGR4568396ORMorrowSunstone Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV120012002027-122027(L) Regulatory approvals pending. Not under constructionBPAT45.605916-119.5632026-09
68367/PEHA1Pepper Hammock Solar and StoragePEHA168367GAWayneBrightNight PowerIPP Non-CHPSolar PhotovoltaicSUNPV120012002029-092029(L) Regulatory approvals pending. Not under constructionSOCO31.331-81.7592026-09
65301/SC1Steward Creek Solar Phase 1SC165301ILLeeTerraForm Power Operating, LLCIPP Non-CHPSolar PhotovoltaicSUNPV120012002029-122029(P) Planned for installation, but regulatory approvals not initiatedPJM41.814343-88.989882026-09
67551/VISTAVista Sands SolarVISTA67551WIPortageVista Sands Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV118211822028-122028(L) Regulatory approvals pending. Not under constructionMISO44.446256-89.576312026-09
69798/PMN1Project Matador NuclearPMN169798TXCarsonFermi NuclearIPP Non-CHPNuclearNUCST111711172031-122031(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69798/PMN3Project Matador NuclearPMN369798TXCarsonFermi NuclearIPP Non-CHPNuclearNUCST111711172031-122031(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69798/PMN2Project Matador NuclearPMN269798TXCarsonFermi NuclearIPP Non-CHPNuclearNUCST111711172032-122032(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69798/PMN4Project Matador NuclearPMN469798TXCarsonFermi NuclearIPP Non-CHPNuclearNUCST111711172032-122032(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
68763/DECH1Deschutes Solar and BESSDECH168763ORWascoDECH bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV100010002029-112029(L) Regulatory approvals pending. Not under constructionBPAT45.157-121.1362026-09
68763/DECH2Deschutes Solar and BESSDECH268763ORWascoDECH bn, LLCIPP Non-CHPBatteriesMWHBA100010002029-112029(L) Regulatory approvals pending. Not under constructionBPAT45.157-121.1362026-09
70359/SYRVSSycamore Riverside Energy, LLCSYRVS70359INSullivanInvenergy Services LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT9649642029-032029(P) Planned for installation, but regulatory approvals not initiatedPJM39.213906-87.547272026-09
67435/SRWNDSunrise WindSRWND67435NYSuffolkOrsted Wind Power North America LLCIPP Non-CHPOffshore Wind TurbineWNDWS9249242027-102027(U) Under construction, less than or equal to 50 percent completeNYIS40.977859-71.044542026-09
68367/PEHAPepper Hammock Solar and StoragePEHA68367GAWayneBrightNight PowerIPP Non-CHPSolar PhotovoltaicSUNPV9009002029-092029(L) Regulatory approvals pending. Not under constructionSOCO31.331-81.7592026-09
58987/I-BChokecherry and Sierra Madre WindI-B58987WYCarbonPower Company of Wyoming LLCIPP Non-CHPOnshore Wind TurbineWNDWT849.6849.62031-122031(U) Under construction, less than or equal to 50 percent completeCISO41.683056-107.22026-09
58987/I-AChokecherry and Sierra Madre WindI-A58987WYCarbonPower Company of Wyoming LLCIPP Non-CHPOnshore Wind TurbineWNDWT844.2844.22031-122031(U) Under construction, less than or equal to 50 percent completeCISO41.683056-107.22026-09
68443/EMP01Empire Wind 1EMP0168443NYKingsEmpire Offshore Wind LLCIPP Non-CHPOffshore Wind TurbineWNDWS8108102027-092027(V) Under construction, more than 50 percent completeNYIS40.32-73.422026-09
66011/PV1Cedar Island Solar LLCPV166011ORShermanCedar Island Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV8008002031-122031(L) Regulatory approvals pending. Not under constructionBPAT45.233717-120.89852026-09
68294/VIO1Viola Generating StationVIO168294KSSumnerEvergy Kansas Central, IncElectric UtilityNatural Gas Fired Combined CycleNGCS765693.22029-012029(T) Regulatory approvals received. Not under constructionSWPP37.331481-97.672026-09
68295/MCN1McNew Generating StationMCN168295KSRenoEvergy Kansas Central, IncElectric UtilityNatural Gas Fired Combined CycleNGCS765690.42030-012030(T) Regulatory approvals received. Not under constructionSWPP38.00595-97.921662026-09
68053/LEGLegend Power StationLEG68053TXJeffersonEntergy Texas Inc.Electric UtilityNatural Gas Fired Combined CycleNGCC7547232028-072028(L) Regulatory approvals pending. Not under constructionERCO29.880219-93.995732026-09
1364/5Mill Creek (KY)51364KYJeffersonLouisville Gas & Electric CoElectric UtilityNatural Gas Fired Combined CycleNGCS7406452027-062027(V) Under construction, more than 50 percent completeLGEE38.0525-85.91032026-09
69566/GEN1CPV Basin Ranch Energy CenterGEN169566TXWardCPV Basin RanchIPP Non-CHPNatural Gas Fired Combined CycleNGCS722.5672.42029-022029(U) Under construction, less than or equal to 50 percent completeERCO31.506094-103.48752026-09
69566/GEN2CPV Basin Ranch Energy CenterGEN269566TXWardCPV Basin RanchIPP Non-CHPNatural Gas Fired Combined CycleNGCS722.5672.42029-022029(U) Under construction, less than or equal to 50 percent completeERCO31.506094-103.48752026-09
68606/5Cedar Bayou 5568606TXChambersCedar Bayou 5 LLCIPP Non-CHPNatural Gas Fired Combined CycleNGCS7216742028-082028(U) Under construction, less than or equal to 50 percent completeERCO29.751132-94.921142026-09
65500/REVWDRevolution WindREVWD65500RIWashingtonOrsted Wind Power North America LLCIPP Non-CHPOffshore Wind TurbineWNDWS7157152026-112026(V) Under construction, more than 50 percent completeISNE41.15217-71.077832026-09
69857/LBRBSLibra SolarLBRBS69857NVLyonLibra Solar LLCIPP Non-CHPBatteriesMWHBA7007002027-122027(U) Under construction, less than or equal to 50 percent completeNEVP38.902103-118.96142026-09
69857/LBRPVLibra SolarLBRPV69857NVLyonLibra Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV7007002027-122027(U) Under construction, less than or equal to 50 percent completeNEVP38.902103-118.96142026-09
68202/ROMWIP Roman WindROMW68202TXDeaf SmithIntersect USA, LLCIPP Non-CHPOnshore Wind TurbineWNDWT670.5670.52028-092028(L) Regulatory approvals pending. Not under constructionERCO34.990891-102.60762026-09
70541/SPVSwan SolarSPV70541MOBatesSwan Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV6506502028-092028(U) Under construction, less than or equal to 50 percent completeSWPP38.322152-94.596222026-09
68504/SLES1Sandow Lakes Energy StationSLES168504TXLeeSL Energy Power Plant I, LLCIPP Non-CHPNatural Gas Fired Combined CycleNGCS6455902028-102028(P) Planned for installation, but regulatory approvals not initiatedERCO30.419441-97.191242026-09
68504/SLES2Sandow Lakes Energy StationSLES268504TXLeeSL Energy Power Plant I, LLCIPP Non-CHPNatural Gas Fired Combined CycleNGCS6455902028-122028(P) Planned for installation, but regulatory approvals not initiatedERCO30.419441-97.191242026-09
65855/TE1PVTehuacana Creek SolarTE1PV65855TXNavarroParliament Energy Holdings LLCIPP Non-CHPSolar PhotovoltaicSUNPV644.8644.82027-052027(V) Under construction, more than 50 percent completeERCO31.914062-96.413472026-09
62022/GEN1Lincoln Land Energy CenterGEN162022ILSangamonLincoln Land Energy Center LLCIPP Non-CHPNatural Gas Fired Combined CycleNGCS638.45202030-062030(P) Planned for installation, but regulatory approvals not initiatedMISO39.5788-89.579842026-09
62022/GEN2Lincoln Land Energy CenterGEN262022ILSangamonLincoln Land Energy Center LLCIPP Non-CHPNatural Gas Fired Combined CycleNGCS638.45202030-062030(P) Planned for installation, but regulatory approvals not initiatedMISO39.5788-89.579842026-09
63878/HAYHaymaker HybridHAY63878MTWheatlandHaymaker Energy Project LLCIPP Non-CHPOnshore Wind TurbineWNDWT6306302031-102031(P) Planned for installation, but regulatory approvals not initiatedNWMT46.357442-110.39582026-09
69764/HPWIllinois Generation LLCHPW69764ILLivingstonPattern Operators LPIPP Non-CHPOnshore Wind TurbineWNDWT616.5616.52028-042028(T) Regulatory approvals received. Not under constructionPJM41.06713-88.24972026-09
63802/G001Shady Hills Combined Cycle FacilityG00163802FLPascoShady Hills Energy Center, LLCIPP Non-CHPNatural Gas Fired Combined CycleNGCS612538.32026-112026(TS) Construction complete, but not yet in commercial operationFPC28.366667-82.558332026-09
68479/SHRTShort Creek SolarSHRT68479TXWichitaWichita Solar I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV606.46052028-032028(L) Regulatory approvals pending. Not under constructionERCO34.017622-98.80132026-09
68982/SGG01Singing Grass WindSGG0168982COKit CarsonPublic Service Co of ColoradoElectric UtilityOnshore Wind TurbineWNDWT6036002027-092027(U) Under construction, less than or equal to 50 percent completePSCO39.201143-102.85762026-09
66914/DANDanish Fields Solar, LLCDAN66914TXWhartonDanish Fields Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV6006002026-102026(TS) Construction complete, but not yet in commercial operationERCO29.013637-96.220542026-09
70135/SWNSNSwenson SolarSWNSN70135TXStonewallSwenson Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV6006002026-112026(U) Under construction, less than or equal to 50 percent completeERCO32.985403-100.02922026-09
65842/CFCBSClear Fork Creek Solar and BESS SLFCFCBS65842TXWilsonClear ForkIPP Non-CHPBatteriesMWHBA6006002027-032027(U) Under construction, less than or equal to 50 percent completeERCO29.263568-97.780552026-09
65842/CFCPVClear Fork Creek Solar and BESS SLFCFCPV65842TXWilsonClear ForkIPP Non-CHPSolar PhotovoltaicSUNPV6006002027-032027(U) Under construction, less than or equal to 50 percent completeERCO29.263568-97.780552026-09
69989/PB1Arkansas Cypress Solar StationPB169989ARJeffersonEntergy Arkansas LLCElectric UtilitySolar PhotovoltaicSUNPV6006002029-012029(P) Planned for installation, but regulatory approvals not initiatedMISO34.42-92.082026-09
68071/BELLFBellflower Solar (VA)BELLF68071VABrunswickDominion Renewable EnergyElectric UtilitySolar PhotovoltaicSUNPV6006002030-012030(P) Planned for installation, but regulatory approvals not initiatedPJM37-782026-09
64163/11111Hecate Energy Cider Solar LLC1111164163NYGeneseeGreenbacker Renewable Energy CorporationIPP Non-CHPSolar PhotovoltaicSUNPV5575572026-122026(U) Under construction, less than or equal to 50 percent completeNYIS43.097336-78.230412026-09
58987/II-BChokecherry and Sierra Madre WindII-B58987WYCarbonPower Company of Wyoming LLCIPP Non-CHPOnshore Wind TurbineWNDWT553.5553.52033-122033(U) Under construction, less than or equal to 50 percent completeCISO41.683056-107.22026-09
69684/70125Maricopa Solar7012569684AZMaricopaMaricopa SolarIPP Non-CHPBatteriesMWHBA5505502026-122026(U) Under construction, less than or equal to 50 percent completeAZPS33.46303-113.11012026-09
65310/DAWN1Renegade Solar Project (Dawn)DAWN165310TXDeaf SmithRenegade Renewables, LLCIPP Non-CHPSolar PhotovoltaicSUNPV5155152027-122027(T) Regulatory approvals received. Not under constructionERCO34.913-102.27062026-09
64234/19936Hecate Energy Harley Hand Solar LLC1993664234TXNolanHecate Energy Harley Hand Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV5145142028-112028(P) Planned for installation, but regulatory approvals not initiatedERCO32.468537-100.21642026-09
64847/CRTW1Rail Tie WindCRTW164847WYAlbanyRepsol Renewables NAIPP Non-CHPOnshore Wind TurbineWNDWT5045042029-062029(L) Regulatory approvals pending. Not under constructionWACM41.055833-105.49422026-09
65028/ROSESRoseland Solar Project, LLCROSES65028TXFallsEnel Green Power Roseland Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV5005002026-102026(TS) Construction complete, but not yet in commercial operationERCO31.461242-96.824932026-09
64209/26SBABellefield 2 Solar & Energy Storage Farm26SBA64209CAKern26SB 8me LLCIPP Non-CHPSolar PhotovoltaicSUNPV5005002026-122026(V) Under construction, more than 50 percent completeCISO35.017779-118.06872026-09
64209/26SBBBellefield 2 Solar & Energy Storage Farm26SBB64209CAKern26SB 8me LLCIPP Non-CHPBatteriesMWHBA5005002026-122026(V) Under construction, more than 50 percent completeCISO35.017779-118.06872026-09
69820/GRA1Grace Energy CenterGRA169820CARiversideGrace Orchard Interconnection, LLCIPP Non-CHPSolar PhotovoltaicSUNPV5005002027-082027(L) Regulatory approvals pending. Not under constructionCISO33.653564-114.6962026-09
69820/GRA2Grace Energy CenterGRA269820CARiversideGrace Orchard Interconnection, LLCIPP Non-CHPBatteriesMWHBA5005002027-102027(L) Regulatory approvals pending. Not under constructionCISO33.653564-114.6962026-09
66414/RMSYHecate Energy Ramsey StorageRMSY66414TXWhartonHecate Energy Ramsey Storage, LLCIPP Non-CHPBatteriesMWHBA5005002027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO29.02939-96.23622026-09
68204/MEITWIP Meitner WindMEITW68204TXRobertsIntersect USA, LLCIPP Non-CHPOnshore Wind TurbineWNDWT5002582028-022028(L) Regulatory approvals pending. Not under constructionERCO35.696972-100.82132026-09
68203/MEITSIP Meitner SolarMEITS68203TXGrayIntersect USA, LLCIPP Non-CHPSolar PhotovoltaicSUNPV5002142028-042028(L) Regulatory approvals pending. Not under constructionERCO35.562222-100.69412026-09
68201/ROMSIP Roman SolarROMS68201TXDeaf SmithIntersect USA, LLCIPP Non-CHPSolar PhotovoltaicSUNPV5005002028-062028(L) Regulatory approvals pending. Not under constructionERCO34.990891-102.60762026-09
70397/SRSP1Steel River Solar Phase 1SRSP170397ARMississippiCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV5005002028-082028(U) Under construction, less than or equal to 50 percent completeMISO35.578637-90.097632026-09
68354/LSPV1La Salle SolarLSPV168354TXLaSalleLa Salle Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV5005002028-092028(P) Planned for installation, but regulatory approvals not initiatedERCO28.092519-99.057012026-09
68034/SNSCBSunscape Renewable EnergySNSCB68034TXNuecesVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA5005002028-102028(P) Planned for installation, but regulatory approvals not initiatedERCO27.819197-97.799942026-09
68034/SNSCPSunscape Renewable EnergySNSCP68034TXNuecesVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV5005002028-102028(P) Planned for installation, but regulatory approvals not initiatedERCO27.819197-97.799942026-09
69584/3572Rising Star Solar357269584TXStarrRising Star Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV5005002028-122028(T) Regulatory approvals received. Not under constructionERCO26.382105-98.615442026-09
68353/LSBS1La Salle ESSLSBS168353TXLaSalleLa Salle ESS LLCIPP Non-CHPBatteriesMWHBA5005002029-072029(P) Planned for installation, but regulatory approvals not initiatedERCO28.094701-99.055542026-09
70398/SRSP2Steel River Solar Phase 2SRSP270398ARMississippiCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV5005002029-072029(U) Under construction, less than or equal to 50 percent completeMISO35.578637-90.097632026-09
70399/SRSP3Steel River Solar Phase 3SRSP370399ARMississippiCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV5005002030-072030(U) Under construction, less than or equal to 50 percent completeMISO35.578637-90.097632026-09
68635/KU1Kemmerer Unit 1KU168635WYLincolnUS SFR Owner LLCIPP Non-CHPNuclearNUCST500342.12030-122030(L) Regulatory approvals pending. Not under constructionPACE41.705993-110.56032026-09
68342/HOHI1Hop Hill Solar Generation and BESSHOHI168342WABentonHOHI bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV5005002031-092031(L) Regulatory approvals pending. Not under constructionBPAT46.324-119.8222026-09
68342/HOHI2Hop Hill Solar Generation and BESSHOHI268342WABentonHOHI bn, LLCIPP Non-CHPBatteriesMWHBA5005002031-092031(L) Regulatory approvals pending. Not under constructionBPAT46.324-119.8222026-09
63911/MECNMEC NorthMECN63911MICalhounMEC NorthIPP Non-CHPNatural Gas Fired Combined CycleNGCS5005002034-062034(T) Regulatory approvals received. Not under constructionMISO42.233559-84.962342026-09
63912/MECSMEC SouthMECS63912MICalhounMEC SouthIPP Non-CHPNatural Gas Fired Combined CycleNGCS5005002034-062034(L) Regulatory approvals pending. Not under constructionMISO42.237103-84.959152026-09
70522/SSLRHecate Energy Sunfish Solar LLCSSLR70522MICalhounHecate Energy Sunfish Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV4994992028-122028(L) Regulatory approvals pending. Not under constructionMISO42.376961-84.879732026-09
68317/DUTC1Dutchman Solar generation and BESSDUTC168317WYConverseDUTC bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4994992029-062029(L) Regulatory approvals pending. Not under constructionWACM42.871644-105.81762026-09
68317/DUTC2Dutchman Solar generation and BESSDUTC268317WYConverseDUTC bn, LLCIPP Non-CHPBatteriesMWHBA4994992029-062029(L) Regulatory approvals pending. Not under constructionWACM42.871644-105.81762026-09
69071/CT1Bison Generation StationCT169071NDWilliamsBasin Electric Power CoopElectric UtilityNatural Gas Fired Combined CycleNGCT4964092029-022029(L) Regulatory approvals pending. Not under constructionSWPP48.327932-103.31272026-09
69071/CT2Bison Generation StationCT269071NDWilliamsBasin Electric Power CoopElectric UtilityNatural Gas Fired Combined CycleNGCT4964092030-032030(L) Regulatory approvals pending. Not under constructionSWPP48.327932-103.31272026-09
68296/MC1Mullin Creek #1 Generating StationMC168296MONodawayEvergy Missouri WestElectric UtilityNatural Gas Fired Combustion TurbineNGGT489.7425.12030-012030(T) Regulatory approvals received. Not under constructionSWPP38.00595-97.921662026-09
728/8Yates8728GACowetaGeorgia Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT482.8418.42027-022027(V) Under construction, more than 50 percent completeSOCO33.4622-84.89862026-09
728/10Yates10728GACowetaGeorgia Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT482.8418.42027-122027(P) Planned for installation, but regulatory approvals not initiatedSOCO33.4622-84.89862026-09
728/9Yates9728GACowetaGeorgia Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT482.8418.42027-122027(P) Planned for installation, but regulatory approvals not initiatedSOCO33.4622-84.89862026-09
69184/WF5CTWaterford 5WF5CT69184LASt CharlesEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT4784202029-062029(T) Regulatory approvals received. Not under constructionMISO29.988583-90.485652026-09
69185/JPSCTJefferson Power StationJPSCT69185ARJeffersonEntergy Arkansas LLCElectric UtilityNatural Gas Fired Combined CycleNGCT4784202029-112029(L) Regulatory approvals pending. Not under constructionMISO34.427527-92.139962026-09
69445/CT1Waterford 6CT169445LASt CharlesEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT4784202030-062030(P) Planned for installation, but regulatory approvals not initiatedMISO29.988583-90.485652026-09
69223/GT1Vicksburg Advanced Power StationGT169223MSWarrenEntergy Mississippi LLCElectric UtilityNatural Gas Fired Combined CycleNGCT477.7422.82028-082028(U) Under construction, less than or equal to 50 percent completeMISO32.28526-90.925682026-09
70187/CT1Traceview Advanced Power StationCT170187MSMadisonEntergy Mississippi LLCElectric UtilityNatural Gas Fired Combined CycleNGCT477.7422.82028-082028(U) Under construction, less than or equal to 50 percent completeMISO32.405646-90.221142026-09
69426/CT1Westlake Power StationCT169426LACalcasieuEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT477.73902030-102030(P) Planned for installation, but regulatory approvals not initiatedMISO30.281105-93.301892026-09
67914/1ADelta Blues Advanced Power Station1A67914MSWashingtonEntergy Mississippi LLCElectric UtilityNatural Gas Fired Combined CycleNGCT477422.22028-052028(L) Regulatory approvals pending. Not under constructionMISO33.330476-91.130582026-09
69060/SNFASnowflake A Solar and BESSSNFA69060AZNavajoClenera DevCo LLCIPP Non-CHPSolar PhotovoltaicSUNPV4754752027-082027(L) Regulatory approvals pending. Not under constructionAZPS34.998055-110.12552026-09
69060/SNFBASnowflake A Solar and BESSSNFBA69060AZNavajoClenera DevCo LLCIPP Non-CHPBatteriesMWHBA4754752027-082027(L) Regulatory approvals pending. Not under constructionAZPS34.998055-110.12552026-09
69690/PG2Panther Grove 2PG269690ILLivingstonPanther Grove 2 LLCIPP Non-CHPOnshore Wind TurbineWNDWT472.5472.52027-122027(U) Under construction, less than or equal to 50 percent completePJM40.815283-88.861912026-09
68214/1AFranklin Farms 1&21A68214LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT469.3435.42028-122028(L) Regulatory approvals pending. Not under constructionMISO32.53246-91.627672026-09
68214/2AFranklin Farms 1&22A68214LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT469.3435.42028-122028(L) Regulatory approvals pending. Not under constructionMISO32.53246-91.627672026-09
69449/1ARichland Parish Power Station 1&21A69449LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT469.3435.42030-032030(P) Planned for installation, but regulatory approvals not initiatedMISO32.468339-91.680382026-09
69449/2ARichland Parish Power Station 1&22A69449LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT469.3435.42030-032030(P) Planned for installation, but regulatory approvals not initiatedMISO32.468339-91.680382026-09
69649/3ARichland Parish Power Station 33A69649LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT469.3435.42030-102030(P) Planned for installation, but regulatory approvals not initiatedMISO32.496716-91.698672026-09
69650/4ARichland Parish Power Station 44A69650LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT469.3435.42030-102030(P) Planned for installation, but regulatory approvals not initiatedMISO32.497782-91.69972026-09
69944/PC1APointe Coupee Power StationPC1A69944LAPointe CoupeeEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT469.3435.42031-102031(P) Planned for installation, but regulatory approvals not initiatedMISO30.739-91.3772026-09
69944/PC2APointe Coupee Power StationPC2A69944LAPointe CoupeeEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT469.3435.42031-112031(P) Planned for installation, but regulatory approvals not initiatedMISO30.739-91.3772026-09
69944/PC3APointe Coupee Power StationPC3A69944LAPointe CoupeeEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCT469.3435.42031-122031(P) Planned for installation, but regulatory approvals not initiatedMISO30.739-91.3772026-09
69077/1ALone Star Power Station1A69077TXSan JacintoEntergy Texas Inc.Electric UtilityNatural Gas Fired Combustion TurbineNGGT467.34322028-072028(L) Regulatory approvals pending. Not under constructionMISO30.414158-95.016712026-09
69750/1AIronwood Power Station1A69750ARHot SpringEntergy Arkansas LLCElectric UtilityNatural Gas Fired Combustion TurbineNGGT467.34322028-072028(L) Regulatory approvals pending. Not under constructionMISO34.433826-92.90422026-09
65851/HB2PVHollow Branch CreekHB2PV65851TXMadisonParliament Energy Holdings LLCIPP Non-CHPSolar PhotovoltaicSUNPV4604602027-082027(L) Regulatory approvals pending. Not under constructionERCO31.061726-96.056062026-09
68546/1Smarr Combined Cycle Energy Facility168546GAMonroeOglethorpe Power CorporationElectric UtilityNatural Gas Fired Combined CycleNGCC4594072029-062029(P) Planned for installation, but regulatory approvals not initiatedSOCO32.975936-83.843692026-09
65854/RDYPVRowdy Creek Solar and BESSRDYPV65854TXLamarParliament Energy Holdings LLCIPP Non-CHPSolar PhotovoltaicSUNPV4554552028-062028(U) Under construction, less than or equal to 50 percent completeERCO33.75694-95.64582026-09
3407/CTG1KingstonCTG13407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combined CycleNGCT454.8372.92027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3399/CTG2Cumberland (TN)CTG23399TNStewartTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combined CycleNGCT454.8372.92029-012029(P) Planned for installation, but regulatory approvals not initiatedTVA36.3903-87.65392026-09
3399/CTG1Cumberland (TN)CTG13399TNStewartTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combined CycleNGCT454.8372.92034-122034(U) Under construction, less than or equal to 50 percent completeTVA36.3903-87.65392026-09
66621/1AOrange County Advanced Power Station1A66621TXOrangeEntergy Texas Inc.Electric UtilityNatural Gas Fired Combined CycleNGCT453396.62026-102026(TS) Construction complete, but not yet in commercial operationMISO30.025251-93.871342026-09
66621/1BOrange County Advanced Power Station1B66621TXOrangeEntergy Texas Inc.Electric UtilityNatural Gas Fired Combined CycleNGCT453396.62026-102026(TS) Construction complete, but not yet in commercial operationMISO30.025251-93.871342026-09
66871/SOLARGulfStar Power, LLCSOLAR66871TXWhartonGulfStar Power, LLCIPP Non-CHPSolar PhotovoltaicSUNPV451.6451.62026-102026(TS) Construction complete, but not yet in commercial operationERCO29.191296-95.967522026-09
68772/CHALKChalk Bluff SolarCHALK68772ARSt FrancisChalk Bluff Solar Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV4504502027-062027(U) Under construction, less than or equal to 50 percent completeMISO35.051606-90.432542026-09
70175/ZSPVZSS SolarZSPV70175TXKnoxNextEra Energy Resources - ERCOTIPP Non-CHPSolar PhotovoltaicSUNPV4504502027-122027(T) Regulatory approvals received. Not under constructionERCO33.479935-99.674752026-09
67664/SOLEISoleilSOLEI67664TXClayCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV4504502028-122028(L) Regulatory approvals pending. Not under constructionERCO33.799253-98.045522026-09
68273/1Naples Power Plant168273TXMorrisArkansas Electric Coop CorpElectric UtilityNatural Gas Fired Combustion TurbineNGGT4504502028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP33.21964-94.705642026-09
68273/2Naples Power Plant268273TXMorrisArkansas Electric Coop CorpElectric UtilityNatural Gas Fired Combustion TurbineNGGT4504502028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP33.21964-94.705642026-09
69691/06Greens Bayou 60669691TXHarrisNRG Greens Bayou 6 LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT4474112028-052028(U) Under construction, less than or equal to 50 percent completeERCO29.821222-95.217862026-09
68607/PLJW1Pelicans Jaw Hybrid SolarPLJW168607CAKernPelicans Jaw Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV4404402027-042027(TS) Construction complete, but not yet in commercial operationCISO35.765183-119.74362026-09
69689/CT11Vast Sands PowerCT1169689TXWardPermian Power I LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT4404402027-052027(U) Under construction, less than or equal to 50 percent completeERCO31.584096-102.9582026-09
69689/CT12Vast Sands PowerCT1269689TXWardPermian Power I LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT4404402027-052027(U) Under construction, less than or equal to 50 percent completeERCO31.584096-102.9582026-09
69873/CRW02Cheyenne Ridge IICRW0269873COCheyennePublic Service Co of ColoradoElectric UtilityOnshore Wind TurbineWNDWT4384382027-072027(U) Under construction, less than or equal to 50 percent completePSCO38.997719-102.35932026-09
56/LEC3Lowman Energy CenterLEC356ALWashingtonPowerSouth Energy CooperativeElectric UtilityNatural Gas Fired Combustion TurbineNGGT4384092029-112029(L) Regulatory approvals pending. Not under constructionSOCO31.488019-87.910752026-09
68305/GWT1Gigawatt SolarGWT168305TXParkerGigawatt Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV4294292028-082028(P) Planned for installation, but regulatory approvals not initiatedERCO32.547389-97.597922026-09
63818/78787Panther Grove Wind, LLC7878763818ILWoodfordPanther Grove Wind, LLCIPP Non-CHPOnshore Wind TurbineWNDWT4234232026-122026(TS) Construction complete, but not yet in commercial operationPJM40.7129-89.17062026-09
68759/IPQ1BQuantum BESSIPQ1B68759TXHaskellIntersect USA, LLCIPP Non-CHPBatteriesMWHBA422.4323.62026-112026(TS) Construction complete, but not yet in commercial operationERCO33.0121-99.56042026-09
68761/IPQ2BQuantum II BESSIPQ2B68761TXHaskellIntersect USA, LLCIPP Non-CHPBatteriesMWHBA422.4323.62026-122026(TS) Construction complete, but not yet in commercial operationERCO33.135-99.57192026-09
67262/RP1Ripley Energy CenterRP167262OKPayneAssociated Electric Coop, IncElectric UtilityNatural Gas Fired Combustion TurbineNGGT419411.42027-042027(V) Under construction, more than 50 percent completeAECI36.116-96.9022026-09
67263/TN1Turney Energy CenterTN167263MOClintonAssociated Electric Coop, IncElectric UtilityNatural Gas Fired Combustion TurbineNGGT419411.42027-092027(U) Under construction, less than or equal to 50 percent completeAECI39.615-94.3512026-09
65855/TE1BSTehuacana Creek SolarTE1BS65855TXNavarroParliament Energy Holdings LLCIPP Non-CHPBatteriesMWHBA4184182026-122026(V) Under construction, more than 50 percent completeERCO31.914062-96.413472026-09
69272/SEQIIEnbridge Solar (Sequoia II)SEQII69272TXCallahanEnbridge Solar (Sequoia II), LLCIPP Non-CHPSolar PhotovoltaicSUNPV4154152026-122026(V) Under construction, more than 50 percent completeERCO32.341078-99.173082026-09
68369/STMOStarfire Mountain SolarSTMO68369KYPerryBrightNight PowerIPP Non-CHPSolar PhotovoltaicSUNPV4104102029-092029(L) Regulatory approvals pending. Not under constructionPJM37.4119-83.12062026-09
8059/2G1Comanche (OK)2G18059OKComanchePublic Service Co of OklahomaElectric UtilityNatural Gas Fired Combined CycleNGCT408.8368.12029-092029(P) Planned for installation, but regulatory approvals not initiatedSWPP34.5431-98.32442026-09
8059/3G1Comanche (OK)3G18059OKComanchePublic Service Co of OklahomaElectric UtilityNatural Gas Fired Combined CycleNGCT408.8368.12029-092029(P) Planned for installation, but regulatory approvals not initiatedSWPP34.5431-98.32442026-09
66912/HS1Hill Solar 1HS166912TXHillHill Solar 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4054052026-102026(TS) Construction complete, but not yet in commercial operationERCO32.139-97.062026-09
67984/FFLPAFirefly Solar PAFFLPA67984PALawrenceVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV401.6401.62027-122027(L) Regulatory approvals pending. Not under constructionPJM40.930281-80.432442026-09
67378/MBMineral Basin Solar PowerMB67378PAClearfieldMineral Basin Solar Power, LLCIPP Non-CHPSolar PhotovoltaicSUNPV401.6401.62028-122028(P) Planned for installation, but regulatory approvals not initiatedNYIS41.106469-78.294262026-09
66621/1COrange County Advanced Power Station1C66621TXOrangeEntergy Texas Inc.Electric UtilityNatural Gas Fired Combined CycleNGCA4003652026-102026(TS) Construction complete, but not yet in commercial operationMISO30.025251-93.871342026-09
68422/CALIICallisto II Energy CenterCALII68422TXHarrisCallisto II Energy Center LLCIPP Non-CHPBatteriesMWHBA4004002026-112026(V) Under construction, more than 50 percent completeERCO29.645345-95.450252026-09
67978/SSPV1Sierra Solar HybridSSPV167978NVChurchillSierra Pacific Power CoElectric UtilitySolar PhotovoltaicSUNPV4004002026-122026(TS) Construction complete, but not yet in commercial operationNEVP39.8536-119.03942026-09
68917/BSBeavertail SolarBS68917MOHenryBeavertail Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4004002027-042027(V) Under construction, more than 50 percent completeSPA38.311814-93.935462026-09
69509/1Gabriel169509CALos AngelesSan Gabriel Project LLCIPP Non-CHPBatteriesMWHBA4004002027-042027(V) Under construction, more than 50 percent completeCISO34.11-117.972026-09
67059/1Iron Belt167059TXBordenIron Belt Energy Storage Project, LLCIPP Non-CHPBatteriesMWHBA4004002027-062027(P) Planned for installation, but regulatory approvals not initiatedERCO32.5557-101.66012026-09
69508/1Marici169508CALos AngelesMarici Project LLCIPP Non-CHPBatteriesMWHBA4004002027-062027(V) Under construction, more than 50 percent completeCISO34.007751-117.94622026-09
69553/BCSBlacks Creek SolarBCS69553IDAdaBlacks Creek Energy Center, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4004002027-062027(U) Under construction, less than or equal to 50 percent completeIPCO43.499-116.19182026-09
64670/KOV4ABig Creek Solar LLCKOV4A64670ARLeeBig Creek Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV4004002027-072027(U) Under construction, less than or equal to 50 percent completeMISO34.870404-117.96562026-09
63782/RH1Rough HatRH163782NVClarkCandela Renewables, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4004002027-122027(L) Regulatory approvals pending. Not under constructionCISO36.09907-115.83372026-09
66805/LYCANLycan Solar ProjectLYCAN66805CARiversideEDF Renewables Development, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV4004002027-122027(L) Regulatory approvals pending. Not under constructionCISO33.621326-115.09592026-09
69056/CBBACO Bar Solar and BESSCBBA69056AZCoconinoClenera DevCo LLCIPP Non-CHPBatteriesMWHBA4004002027-122027(P) Planned for installation, but regulatory approvals not initiatedAZPS35.636594-111.88352026-09
69056/CBPVCO Bar Solar and BESSCBPV69056AZCoconinoClenera DevCo LLCIPP Non-CHPSolar PhotovoltaicSUNPV4004002027-122027(P) Planned for installation, but regulatory approvals not initiatedAZPS35.636594-111.88352026-09
69239/HSSHigh Spring Solar EnergyHSS69239OKMuskogeeHigh Spring Solar EnergyIPP Non-CHPSolar PhotovoltaicSUNPV400250.42027-122027(P) Planned for installation, but regulatory approvals not initiatedSWPP35.576674-95.658162026-09
70219/VALLEValley Farms Energy CenterVALLE70219AZPinalValley Farms Energy Center, LLCIPP Non-CHPBatteriesMWHBA4004002027-122027(U) Under construction, less than or equal to 50 percent completeSRP32.94793-111.45762026-09
68022/CLP20Cowboy Solar ICLP2068022WYLaramieCowboy Solar IIPP Non-CHPSolar PhotovoltaicSUNPV4004002028-032028(P) Planned for installation, but regulatory approvals not initiatedWACM41.032968-104.38162026-09
64208/30PNARed Antelope Solar & Energy Storage Farm30PNA64208AZCoconino302PN 8me LLCIPP Non-CHPSolar PhotovoltaicSUNPV4004002028-052028(P) Planned for installation, but regulatory approvals not initiatedAZPS36.7-111.282026-09
68287/EAGL1Eagle Eye Solar and StorageEAGL168287AZLa PazEAGL bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4004002028-052028(L) Regulatory approvals pending. Not under constructionWALC33.727-112.8812026-09
68287/EAGL2Eagle Eye Solar and StorageEAGL268287AZLa PazEAGL bn, LLCIPP Non-CHPBatteriesMWHBA4004002028-052028(L) Regulatory approvals pending. Not under constructionWALC33.727-112.8812026-09
68209/PSGBSPurple Sage Energy CenterPSGBS68209NVClarkNoble Solar LLCIPP Non-CHPBatteriesMWHBA4004002028-112028(P) Planned for installation, but regulatory approvals not initiatedCISO36.029139-115.80622026-09
68209/PSGPVPurple Sage Energy CenterPSGPV68209NVClarkNoble Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV4004002028-112028(P) Planned for installation, but regulatory approvals not initiatedCISO36.029139-115.80622026-09
63488/OBSLRObsidian Solar CenterOBSLR63488ORLakeObsidian Solar Center LLCIPP Non-CHPSolar PhotovoltaicSUNPV4004002028-122028(L) Regulatory approvals pending. Not under constructionBPAT43.312167-120.82182026-09
68022/CLPBSCowboy Solar ICLPBS68022WYLaramieCowboy Solar IIPP Non-CHPBatteriesMWHBA4004002028-122028(P) Planned for installation, but regulatory approvals not initiatedWACM41.032968-104.38162026-09
70331/MRASLMirasol Energy Center, LLC.MRASL70331COPuebloMirasol Energy Center, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4004002028-122028(T) Regulatory approvals received. Not under constructionPSCO38.11439-104.20172026-09
68367/PEHA2Pepper Hammock Solar and StoragePEHA268367GAWayneBrightNight PowerIPP Non-CHPBatteriesMWHBA4004002029-092029(L) Regulatory approvals pending. Not under constructionSOCO31.331-81.7592026-09
66805/LYCN2Lycan Solar ProjectLYCN266805CARiversideEDF Renewables Development, Inc.IPP Non-CHPBatteriesMWHBA4004002030-042030(P) Planned for installation, but regulatory approvals not initiatedCISO33.621326-115.09592026-09
67657/HANSOHansonHANSO67657TXColemanCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV3963962027-072027(L) Regulatory approvals pending. Not under constructionERCO31.690367-99.513892026-09
69877/CHPV1Charger SolarCHPV169877TXRefugioAP Solar 4 LLCIPP Non-CHPSolar PhotovoltaicSUNPV394.4394.42026-102026(TS) Construction complete, but not yet in commercial operationERCO28.416661-97.035192026-09
69057/CBDBACO Bar D Solar and BESSCBDBA69057AZCoconinoClenera DevCo LLCIPP Non-CHPBatteriesMWHBA3943942028-052028(P) Planned for installation, but regulatory approvals not initiatedAZPS35.636594-111.88352026-09
69057/CBDPVCO Bar D Solar and BESSCBDPV69057AZCoconinoClenera DevCo LLCIPP Non-CHPSolar PhotovoltaicSUNPV3943942028-052028(P) Planned for installation, but regulatory approvals not initiatedAZPS35.636594-111.88352026-09
69595/GTGENSaddleback Generation StationGTGEN69595AZMaricopaCopia PowerIPP Non-CHPNatural Gas Fired Combined CycleNGCT3753452030-122030(P) Planned for installation, but regulatory approvals not initiatedAZPS33.410034-113.16942026-09
69595/GTGN2Saddleback Generation StationGTGN269595AZMaricopaCopia PowerIPP Non-CHPNatural Gas Fired Combined CycleNGCT3753452030-122030(P) Planned for installation, but regulatory approvals not initiatedAZPS33.410034-113.16942026-09
60206/HCCT1Wolf Summit EnergyHCCT160206WVHarrisonWolf Summit Energy LLCIPP Non-CHPNatural Gas Fired Combined CycleNGCT371.5319.12028-122028(L) Regulatory approvals pending. Not under constructionPJM39.287039-80.322872026-09
65853/MIDPVBanita Creek- Spindlepop SolarMIDPV65853TXNacogdochesParliament Energy Holdings LLCIPP Non-CHPSolar PhotovoltaicSUNPV3713712028-062028(U) Under construction, less than or equal to 50 percent completeERCO31.5552-94.79192026-09
63841/ARIDAArida Solar (Hybrid)ARIDA63841NVClark326FW 8me LLCIPP Non-CHPSolar PhotovoltaicSUNPV3703702029-062029(P) Planned for installation, but regulatory approvals not initiatedCISO35.092036-114.68882026-09
63841/BESSArida Solar (Hybrid)BESS63841NVClark326FW 8me LLCIPP Non-CHPBatteriesMWHBA3703702029-062029(P) Planned for installation, but regulatory approvals not initiatedCISO35.092036-114.68882026-09
69189/C2PVCowboy Solar IIC2PV69189WYLaramieCowboy Solar IIIPP Non-CHPSolar PhotovoltaicSUNPV3653652027-122027(T) Regulatory approvals received. Not under constructionWACM41.032968-104.38162026-09
68760/IPQ1SQuantum SolarIPQ1S68760TXHaskellIntersect USA, LLCIPP Non-CHPSolar PhotovoltaicSUNPV362.8320.62026-122026(TS) Construction complete, but not yet in commercial operationERCO33.0129-99.56042026-09
68762/IPQ2SQuantum II SolarIPQ2S68762TXHaskellIntersect USA, LLCIPP Non-CHPSolar PhotovoltaicSUNPV362.8320.62026-122026(TS) Construction complete, but not yet in commercial operationERCO33.1377-99.572026-09
68745/SS2Sunfish Solar 2SS268745MICalhounConsumers Energy Co - (MI)Electric UtilitySolar PhotovoltaicSUNPV3603602026-122026(U) Under construction, less than or equal to 50 percent completeMISO42.24653-85.005592026-09
3122/CT5Homer City Generating StationCT53122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCT3603602028-072028(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CT6Homer City Generating StationCT63122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCT3603602028-072028(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CT2Homer City Generating StationCT23122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCT3603602028-112028(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CT3Homer City Generating StationCT33122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCT3603602028-112028(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CT7Homer City Generating StationCT73122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCT3603602029-032029(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CT4Homer City Generating StationCT43122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCT3603602029-072029(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CT1Homer City Generating StationCT13122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCT3603602029-112029(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
70200/64205Lucy Solar6420570200TXConchoConcho County Solar 1 LLCIPP Non-CHPSolar PhotovoltaicSUNPV351.3351.32027-062027(V) Under construction, more than 50 percent completeERCO31.472348-99.993282026-09
66915/CTWCottonwood Bayou SolarCTW66915TXBrazoriaCottonwood Bayou Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3503502026-102026(TS) Construction complete, but not yet in commercial operationERCO29.263123-95.2582026-09
67359/4666Funston Solar466667359TXJonesFunston Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3503502026-122026(V) Under construction, more than 50 percent completeERCO32.783669-99.720192026-09
68065/CHILSChillingham SolarCHILS68065TXBellChillingham Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV3503502026-122026(TS) Construction complete, but not yet in commercial operationERCO31.006-97.2622026-09
65854/RDYBSRowdy Creek Solar and BESSRDYBS65854TXLamarParliament Energy Holdings LLCIPP Non-CHPBatteriesMWHBA3503502027-052027(L) Regulatory approvals pending. Not under constructionERCO33.75694-95.64582026-09
69796/HARVSHarvey SolarHARVS69796OHLickingLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3503502028-082028(T) Regulatory approvals received. Not under constructionPJM40.273115-82.719622026-09
68039/ELISAElisabeth SolarELISA68039AZYumaLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3503502028-092028(L) Regulatory approvals pending. Not under constructionCISO32.95453-113.49542026-09
69989/PB2Arkansas Cypress Solar StationPB269989ARJeffersonEntergy Arkansas LLCElectric UtilityBatteriesMWHBA3503502029-012029(P) Planned for installation, but regulatory approvals not initiatedMISO34.42-92.082026-09
68546/2Smarr Combined Cycle Energy Facility268546GAMonroeOglethorpe Power CorporationElectric UtilityNatural Gas Fired Combined CycleNGCC3453042029-062029(P) Planned for installation, but regulatory approvals not initiatedSOCO32.975936-83.843692026-09
68940/CAPVCountry Acres Clean Power LLCCAPV68940CAPlacerClenera DevCo LLCIPP Non-CHPSolar PhotovoltaicSUNPV3443442027-022027(U) Under construction, less than or equal to 50 percent completeBANC38.751744-121.42212026-09
68305/GWT2Gigawatt SolarGWT268305TXParkerGigawatt Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV3443442028-082028(P) Planned for installation, but regulatory approvals not initiatedERCO32.547389-97.597922026-09
69661/IPD1SDarden I SolarIPD1S69661CAFresnoIPX Power USA, LLCIPP Non-CHPSolar PhotovoltaicSUNPV342.7287.52028-032028(T) Regulatory approvals received. Not under constructionCISO36.504106-120.21672026-09
69662/IPD2SDarden II SolarIPD2S69662CAFresnoIPX Power USA, LLCIPP Non-CHPSolar PhotovoltaicSUNPV342.7287.52028-032028(T) Regulatory approvals received. Not under constructionCISO36.457086-120.22482026-09
69663/IPD3SDarden III SolarIPD3S69663CAFresnoIPX Power USA, LLCIPP Non-CHPSolar PhotovoltaicSUNPV342.7287.52028-032028(T) Regulatory approvals received. Not under constructionCISO36.499703-120.19122026-09
69664/IPD4SDarden IV SolarIPD4S69664CAFresnoIPX Power USA, LLCIPP Non-CHPSolar PhotovoltaicSUNPV342.7287.52028-032028(T) Regulatory approvals received. Not under constructionCISO36.464339-120.18622026-09
69184/WF5STWaterford 5WF5ST69184LASt CharlesEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA3423102029-062029(T) Regulatory approvals received. Not under constructionMISO29.988583-90.485652026-09
69185/JPS1Jefferson Power StationJPS169185ARJeffersonEntergy Arkansas LLCElectric UtilityNatural Gas Fired Combined CycleNGCA3423102029-112029(L) Regulatory approvals pending. Not under constructionMISO34.427527-92.139962026-09
69445/ST1Waterford 6ST169445LASt CharlesEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA3423102030-062030(P) Planned for installation, but regulatory approvals not initiatedMISO29.988583-90.485652026-09
67914/1CDelta Blues Advanced Power Station1C67914MSWashingtonEntergy Mississippi LLCElectric UtilityNatural Gas Fired Combined CycleNGCA341.7291.52028-052028(L) Regulatory approvals pending. Not under constructionMISO33.330476-91.130582026-09
69223/ST1Vicksburg Advanced Power StationST169223MSWarrenEntergy Mississippi LLCElectric UtilityNatural Gas Fired Combined CycleNGCA341.7291.92028-082028(U) Under construction, less than or equal to 50 percent completeMISO32.28526-90.925682026-09
70187/ST1Traceview Advanced Power StationST170187MSMadisonEntergy Mississippi LLCElectric UtilityNatural Gas Fired Combined CycleNGCA341.7291.92028-082028(U) Under construction, less than or equal to 50 percent completeMISO32.405646-90.221142026-09
69426/CA1Westlake Power StationCA169426LACalcasieuEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA341.7341.72030-102030(P) Planned for installation, but regulatory approvals not initiatedMISO30.281105-93.301892026-09
62954/GEN1Alle-Catt Wind Energy LLCGEN162954NYAlleganyInvenergy Services LLCIPP Non-CHPOnshore Wind TurbineWNDWT3403402026-122026(V) Under construction, more than 50 percent completeNYIS42.262038-78.201542026-09
69040/ARY1Arroyo SolarARY169040COPuebloPublic Service Co of ColoradoElectric UtilitySolar PhotovoltaicSUNPV3353352026-102026(U) Under construction, less than or equal to 50 percent completePSCO38.161657-104.54882026-09
64999/CPNS1Pecan Prairie North SolarCPNS164999TXLeonRepsol Renewables NAIPP Non-CHPSolar PhotovoltaicSUNPV324.1324.12027-052027(U) Under construction, less than or equal to 50 percent completeERCO31.13718-96.269252026-09
64669/KOV4ANotch Peak Solar LLCKOV4A64669UTMillardNotch Peak Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV3243242028-092028(T) Regulatory approvals received. Not under constructionLDWP39.520131-112.66022026-09
3407/STG1KingstonSTG13407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combined CycleNGCA323296.62027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3399/STG2Cumberland (TN)STG23399TNStewartTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combined CycleNGCA323296.62029-012029(P) Planned for installation, but regulatory approvals not initiatedTVA36.3903-87.65392026-09
3399/STG1Cumberland (TN)STG13399TNStewartTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combined CycleNGCA323296.62034-122034(U) Under construction, less than or equal to 50 percent completeTVA36.3903-87.65392026-09
66910/MYRMyrtle Solar, LLCMYR66910TXBrazoriaMyrtle Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3133132026-122026(TS) Construction complete, but not yet in commercial operationERCO29.228486-95.427442026-09
68214/1BFranklin Farms 1&21B68214LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA311302.82028-122028(L) Regulatory approvals pending. Not under constructionMISO32.53246-91.627672026-09
68214/2BFranklin Farms 1&22B68214LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA311302.82028-122028(L) Regulatory approvals pending. Not under constructionMISO32.53246-91.627672026-09
69449/1BRichland Parish Power Station 1&21B69449LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA311302.82030-032030(P) Planned for installation, but regulatory approvals not initiatedMISO32.468339-91.680382026-09
69449/2BRichland Parish Power Station 1&22B69449LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA311302.82030-032030(P) Planned for installation, but regulatory approvals not initiatedMISO32.468339-91.680382026-09
69649/3BRichland Parish Power Station 33B69649LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA311302.82030-102030(P) Planned for installation, but regulatory approvals not initiatedMISO32.496716-91.698672026-09
69650/4BRichland Parish Power Station 44B69650LARichlandEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA311302.82030-102030(P) Planned for installation, but regulatory approvals not initiatedMISO32.497782-91.69972026-09
69944/PC1BPointe Coupee Power StationPC1B69944LAPointe CoupeeEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA311302.82031-102031(P) Planned for installation, but regulatory approvals not initiatedMISO30.739-91.3772026-09
69944/PC2BPointe Coupee Power StationPC2B69944LAPointe CoupeeEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA311302.82031-112031(P) Planned for installation, but regulatory approvals not initiatedMISO30.739-91.3772026-09
69944/PC3BPointe Coupee Power StationPC3B69944LAPointe CoupeeEntergy Louisiana LLCElectric UtilityNatural Gas Fired Combined CycleNGCA311302.82031-122031(P) Planned for installation, but regulatory approvals not initiatedMISO30.739-91.3772026-09
69930/MS2Milford Solar Phase IIMS269930UTBeaverMilford Solar Phase II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3103102027-092027(U) Under construction, less than or equal to 50 percent completeLDWP38.522442-113.01482026-09
67776/GRS2BCuchillas PV and BESSGRS2B67776TXWebbGransolar Texas Two LLCIPP Non-CHPBatteriesMWHBA306.9306.92028-122028(L) Regulatory approvals pending. Not under constructionERCO27.644178-99.184452026-09
66391/BESSAsh Creek BESSBESS66391TXHillACTX BESS Project LLCIPP Non-CHPBatteriesMWHBA3063062028-032028(P) Planned for installation, but regulatory approvals not initiatedERCO31.900218-97.016422026-09
67776/GRS2PCuchillas PV and BESSGRS2P67776TXWebbGransolar Texas Two LLCIPP Non-CHPSolar PhotovoltaicSUNPV305.6305.62028-122028(L) Regulatory approvals pending. Not under constructionERCO27.644178-99.184452026-09
66691/BRIGGBriggs Solar, LLCBRIGG66691TXHaskellIntersect USA, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3053052027-122027(L) Regulatory approvals pending. Not under constructionERCO33.144326-99.559772026-09
69661/IPD1BDarden I SolarIPD1B69661CAFresnoIPX Power USA, LLCIPP Non-CHPBatteriesMWHBA303.7287.52028-032028(T) Regulatory approvals received. Not under constructionCISO36.504106-120.21672026-09
69662/IPD2BDarden II SolarIPD2B69662CAFresnoIPX Power USA, LLCIPP Non-CHPBatteriesMWHBA303.7287.52028-032028(T) Regulatory approvals received. Not under constructionCISO36.457086-120.22482026-09
69663/IPD3BDarden III SolarIPD3B69663CAFresnoIPX Power USA, LLCIPP Non-CHPBatteriesMWHBA303.7287.52028-032028(T) Regulatory approvals received. Not under constructionCISO36.499703-120.19122026-09
69664/IPD4BDarden IV SolarIPD4B69664CAFresnoIPX Power USA, LLCIPP Non-CHPBatteriesMWHBA303.7287.52028-032028(T) Regulatory approvals received. Not under constructionCISO36.464339-120.18622026-09
65853/MIDBSBanita Creek- Spindlepop SolarMIDBS65853TXNacogdochesParliament Energy Holdings LLCIPP Non-CHPBatteriesMWHBA302.9302.92027-042027(L) Regulatory approvals pending. Not under constructionERCO31.5552-94.79192026-09
68739/UVAPVUva Creek SolarUVAPV68739TXBordenRed River Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV3013012028-082028(T) Regulatory approvals received. Not under constructionERCO32.679762-101.50442026-09
63798/ATL01AtlasATL0163798AZLa Paz174 Power Global Corp.IPP Non-CHPSolar PhotovoltaicSUNPV3003002026-092026(V) Under construction, more than 50 percent completeAZPS33.94345-113.79172026-09
66545/MMTHSMammoth South Solar ProjectMMTHS66545INPulaskiMammoth South LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002026-102026(V) Under construction, more than 50 percent completePJM41.095334-86.691572026-09
69055/ALTS4ATLAS SOLAR IVALTS469055AZLa PazATLAS SOLAR IV, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002026-102026(TS) Construction complete, but not yet in commercial operationCISO33.582903-113.57692026-09
66546/MMTHCMammoth Central Solar ProjectMMTHC66546INPulaskiMammoth Central LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002026-112026(U) Under construction, less than or equal to 50 percent completePJM41.090899-86.712832026-09
68514/MC201Mammoth Central II Solar FacilityMC20168514INPulaskiMammoth Central II LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002026-112026(U) Under construction, less than or equal to 50 percent completePJM41.090053-86.693982026-09
69479/KSHKSKoshkonong Solar Energy Center LLCKSHKS69479WIDaneInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002026-122026(V) Under construction, more than 50 percent completeMISO42.976875-89.072092026-09
69299/4519Singer Solar451969299LABeauregardSinger Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-032027(U) Under construction, less than or equal to 50 percent completeMISO30.694644-93.333812026-09
68328/ORCH1Pioneer Clean Energy CenterORCH168328AZYumaYuma bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-042027(U) Under construction, less than or equal to 50 percent completeAZPS32.549081-114.59742026-09
68328/ORCH2Pioneer Clean Energy CenterORCH268328AZYumaYuma bn, LLCIPP Non-CHPBatteriesMWHBA3003002027-042027(U) Under construction, less than or equal to 50 percent completeAZPS32.549081-114.59742026-09
68184/COLESColes WindCOLES68184ILColesColes Wind, LLCIPP Non-CHPOnshore Wind TurbineWNDWT3003002027-052027(U) Under construction, less than or equal to 50 percent completeMISO39.605953-88.180262026-09
69480/HGHNNHigh Noon Solar Energy LLCHGHNN69480WIColumbiaInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-092027(U) Under construction, less than or equal to 50 percent completeMISO43.35326-89.347382026-09
70020/1Pinopolis BESS170020SCBerkeleyPinopolis BESS LLCIPP Non-CHPBatteriesMWHBA3003002027-092027(L) Regulatory approvals pending. Not under constructionSC33.246764-79.985172026-09
68030/RDHLWRed Hollow Renewable EnergyRDHLW68030TXArcherVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-102027(P) Planned for installation, but regulatory approvals not initiatedERCO33.564936-98.6122026-09
68030/RHLWBRed Hollow Renewable EnergyRHLWB68030TXArcherVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA3003002027-102027(P) Planned for installation, but regulatory approvals not initiatedERCO33.564936-98.6122026-09
69364/REDEGRed EgretREDEG69364TXGalvestonRed Egret, LLCIPP Non-CHPBatteriesMWHBA3003002027-102027(U) Under construction, less than or equal to 50 percent completeERCO29.4229-95.00492026-09
70097/SWBSherco BESSSWB70097MNSherburneNorthern States Power Co - MinnesotaElectric UtilityBatteriesMWHBA3003002027-112027(U) Under construction, less than or equal to 50 percent completeMISO45.372125-93.899782026-09
60070/GENNolin HillsGEN60070ORUmatillaNolin Hills Wind, LLCIPP Non-CHPOnshore Wind TurbineWNDWT3003002027-122027(P) Planned for installation, but regulatory approvals not initiatedBPAT45.55455-119.11432026-09
60070/GEN2Nolin HillsGEN260070ORUmatillaNolin Hills Wind, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-122027(P) Planned for installation, but regulatory approvals not initiatedBPAT45.55455-119.11432026-09
65850/ELIBSElio Energy LLCELIBS65850TXBrazoriaElio Energy LLCIPP Non-CHPBatteriesMWHBA3003002027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO29.247678-95.685462026-09
66309/UVPV2Uvalde Solar 2UVPV266309TXUvaldeRWE Americas, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO29.225768-99.699132026-09
66426/1EUSUtah Solar 11EUS66426UTMillardECG Utah Solar1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-122027(P) Planned for installation, but regulatory approvals not initiatedLDWP39.504761-112.50772026-09
66908/BZPVBonanza Solar and Storage ProjectBZPV66908NVClarkEDF Renewables Development, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV3003002027-122027(L) Regulatory approvals pending. Not under constructionCISO36.558-115.7992026-09
68033/SNRSESunrose Renewable EnergySNRSE68033TXAustinVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO29.674226-96.121372026-09
68033/SRSEBSunrose Renewable EnergySRSEB68033TXAustinVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA3003002027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO29.674226-96.121372026-09
69963/YLWWDYellow Wood Solar Energy LLCYLWWD69963OHClintonInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-122027(U) Under construction, less than or equal to 50 percent completePJM39.271465-83.79042026-09
70097/SSBSherco BESSSSB70097MNSherburneNorthern States Power Co - MinnesotaElectric UtilityBatteriesMWHBA3003002027-122027(U) Under construction, less than or equal to 50 percent completeMISO45.372125-93.899782026-09
70204/CANPVCantaloupe SolarCANPV70204TXReevesCantaloupe Solar - ERCOTIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-122027(U) Under construction, less than or equal to 50 percent completeERCO31.05668-103.66342026-09
70238/RDHSRoadhouse Energy CenterRDHS70238CASan BernardinoRoadhouse Energy StorageIPP Non-CHPBatteriesMWHBA3003002027-122027(L) Regulatory approvals pending. Not under constructionCISO34.0065-117.56962026-09
70330/BRSPVBighorn Ridge SolarBRSPV70330TXPecosNextEra Energy Resources - ERCOTIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-122027(T) Regulatory approvals received. Not under constructionERCO30.956251-103.0282026-09
70583/HLS01Highland Solar I, LLC - (CO)HLS0170583COPuebloHighland Solar I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002027-122027(L) Regulatory approvals pending. Not under constructionPSCO38.41955-104.22772026-09
68076/ROCKYRocky Run SolarROCKY68076VABrunswickDominion Renewable EnergyElectric UtilitySolar PhotovoltaicSUNPV3003002028-012028(P) Planned for installation, but regulatory approvals not initiatedPJM37-782026-09
68758/IPEA3Easley SolarIPEA368758CARiversideIPX Power USA, LLCIPP Non-CHPBatteriesMWHBA3003002028-032028(T) Regulatory approvals received. Not under constructionCISO33.722655-115.3262026-09
64208/30PNBRed Antelope Solar & Energy Storage Farm30PNB64208AZCoconino302PN 8me LLCIPP Non-CHPBatteriesMWHBA3003002028-052028(P) Planned for installation, but regulatory approvals not initiatedAZPS36.7-111.282026-09
68813/VITEXVitex StorageVITEX68813NVClarkCypress Creek RenewablesIPP Non-CHPBatteriesMWHBA3003002028-062028(L) Regulatory approvals pending. Not under constructionNEVP36.382286-114.91022026-09
63113/BESSSouthern Bighorn Solar HybridBESS63113NVClark300MS 8me LLCIPP Non-CHPBatteriesMWHBA3003002028-072028(P) Planned for installation, but regulatory approvals not initiatedNEVP36.304793-114.47282026-09
63113/SBSSouthern Bighorn Solar HybridSBS63113NVClark300MS 8me LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002028-072028(P) Planned for installation, but regulatory approvals not initiatedNEVP36.304793-114.47282026-09
69763/HPSHeritage Prairie Solar LLCHPS69763ILKankakeePattern Operators LPIPP Non-CHPSolar PhotovoltaicSUNPV3003002028-092028(T) Regulatory approvals received. Not under constructionPJM41.06713-88.24972026-09
68283/DESADesert Sand BESSDESA68283AZMaricopaDESA bn, LLCIPP Non-CHPBatteriesMWHBA3003002028-122028(L) Regulatory approvals pending. Not under constructionAZPS33.497049-113.05142026-09
68283/DESA1Desert Sand BESSDESA168283AZMaricopaDESA bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002028-122028(L) Regulatory approvals pending. Not under constructionAZPS33.497049-113.05142026-09
70367/OBAESO'Bannion Energy StorageOBAES70367TXJackO'Bannion Energy Storage, LLCIPP Non-CHPBatteriesMWHBA3003002028-122028(T) Regulatory approvals received. Not under constructionERCO33.041-98.3392026-09
68298/THSI1THREE SISTERS Solar Generation and BESSTHSI168298AZPinalTHSI bn, LLCIPP Non-CHPBatteriesMWHBA3003002029-042029(L) Regulatory approvals pending. Not under constructionAZPS32.053732-109.8232026-09
68298/THSI2THREE SISTERS Solar Generation and BESSTHSI268298AZPinalTHSI bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002029-042029(L) Regulatory approvals pending. Not under constructionAZPS32.053732-109.8232026-09
68371/REBURed Butte Solar and StorageREBU68371UTIronBrightNight PowerIPP Non-CHPSolar PhotovoltaicSUNPV3003002029-042029(L) Regulatory approvals pending. Not under constructionPACE37.6134-113.6442026-09
68371/REBU2Red Butte Solar and StorageREBU268371UTIronBrightNight PowerIPP Non-CHPBatteriesMWHBA3003002029-042029(L) Regulatory approvals pending. Not under constructionPACE37.6134-113.6442026-09
67649/AMERAAmeradaAMERA67649TXFreestoneCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV3003002029-072029(L) Regulatory approvals pending. Not under constructionERCO31.861926-96.114632026-09
65703/HEHUMHumidor Storage IHEHUM65703CALos AngelesHecate Grid Humidor Storage 1 LLCIPP Non-CHPBatteriesMWHBA3003002029-092029(P) Planned for installation, but regulatory approvals not initiatedCISO34.29116-118.75182026-09
68344/LOSN1Lower Snake Solar Generation BESSLOSN168344WAGarfieldLOSN, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002029-102029(L) Regulatory approvals pending. Not under constructionBPAT46.502392-117.82632026-09
68344/LOSN2Lower Snake Solar Generation BESSLOSN268344WAGarfieldLOSN, LLCIPP Non-CHPBatteriesMWHBA3003002029-102029(L) Regulatory approvals pending. Not under constructionBPAT46.502392-117.82632026-09
67819/CRSB1Robinson SolarCRSB167819NVWhite PineRepsol Renewables NAIPP Non-CHPBatteriesMWHBA3003002029-122029(P) Planned for installation, but regulatory approvals not initiatedNEVP39.298603-115.21922026-09
67819/CRSS1Robinson SolarCRSS167819NVWhite PineRepsol Renewables NAIPP Non-CHPSolar PhotovoltaicSUNPV3003002029-122029(P) Planned for installation, but regulatory approvals not initiatedNEVP39.298603-115.21922026-09
69640/73509Cazadores Solar7350969640TXDuvalCazadores Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002029-122029(P) Planned for installation, but regulatory approvals not initiatedERCO27.392246-98.501072026-09
61170/33UI8Gale 1 Solar33UI861170UTMillard33UI 8me LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002030-082030(P) Planned for installation, but regulatory approvals not initiatedLDWP39.523-112.5462026-09
69643/60215Deep Space Solar6021569643COKiowaDeep Space Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002030-122030(P) Planned for installation, but regulatory approvals not initiatedPSCO38.402141-103.2862026-09
69644/58441Pease River Solar5844169644TXFoardPease River Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV3003002030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO33.991957-99.692772026-09
68186/FIREFirelands WindFIRE68186OHHuronFirelands Wind, LLCIPP Non-CHPOnshore Wind TurbineWNDWT2972972027-052027(U) Under construction, less than or equal to 50 percent completePJM41.210325-82.779082026-09
68339/1Abercrombie Solar168339NDRichlandOtter Tail Power CoElectric UtilitySolar PhotovoltaicSUNPV295.1295.12028-082028(L) Regulatory approvals pending. Not under constructionMISO46.4277-96.82592026-09
69150/SYPRTSypert Branch SolarSYPRT69150TXMilamSypert Branch Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV293.92602026-122026(U) Under construction, less than or equal to 50 percent completeERCO30.877895-97.19442026-09
68758/IPEA1Easley SolarIPEA168758CARiversideIPX Power USA, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2902902026-102026(TS) Construction complete, but not yet in commercial operationCISO33.722655-115.3262026-09
59243/CHAN1Changing WindsCHAN159243TXCastroInvenergy Services LLCIPP Non-CHPOnshore Wind TurbineWNDWT2882882028-032028(L) Regulatory approvals pending. Not under constructionERCO34.511944-102.05192026-09
69606/7496Monarch Creek Wind, LLC749669606TXThrockmortonMonarch Creek Wind, LLCIPP Non-CHPOnshore Wind TurbineWNDWT287.6287.62027-022027(V) Under construction, more than 50 percent completeERCO33.183899-99.422392026-09
68507/EECExcelsior Energy CenterEEC68507NYGeneseeExcelsior Energy Center, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2802802026-112026(TS) Construction complete, but not yet in commercial operationNYIS43.064852-78.076812026-09
69496/PDRAPiedra SolarPDRA69496TXFreestonePiedra Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2802802026-122026(TS) Construction complete, but not yet in commercial operationERCO31.648989-96.345172026-09
8059/2S1Comanche (OK)2S18059OKComanchePublic Service Co of OklahomaElectric UtilityNatural Gas Fired Combined CycleNGCA277.62672029-092029(P) Planned for installation, but regulatory approvals not initiatedSWPP34.5431-98.32442026-09
8059/3S1Comanche (OK)3S18059OKComanchePublic Service Co of OklahomaElectric UtilityNatural Gas Fired Combined CycleNGCA277.62672029-092029(P) Planned for installation, but regulatory approvals not initiatedSWPP34.5431-98.32442026-09
67542/BHWPBlue Hills Wind ProjectBHWP67542TXVal VerdeGreenalia Wind Power Blue Hills, LLCIPP Non-CHPOnshore Wind TurbineWNDWT2762762029-122029(L) Regulatory approvals pending. Not under constructionERCO30.233597-101.36362026-09
69778/HK1SOHashknife Energy Center LLCHK1SO69778AZNavajoInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV2752752026-112026(V) Under construction, more than 50 percent completeAZPS34.574259-110.49462026-09
69778/HK1STHashknife Energy Center LLCHK1ST69778AZNavajoInvenergy Services LLCIPP Non-CHPBatteriesMWHBA2752752026-112026(V) Under construction, more than 50 percent completeAZPS34.574259-110.49462026-09
66786/ELVMTElevate MiddletownELVMT66786CTMiddlesexLighthouse Middletown, LLCIPP Non-CHPBatteriesMWHBA2752752027-122027(P) Planned for installation, but regulatory approvals not initiatedISNE41.554321-72.578322026-09
69588/YCWTYellow Cat Wind, LLCYCWT69588TXNavarroRWE Americas, LLCIPP Non-CHPOnshore Wind TurbineWNDWT2702702026-122026(V) Under construction, more than 50 percent completeERCO32.07-96.832026-09
64911/CSRS1South Ripley SolarCSRS164911NYChautauquaRepsol Renewables NAIPP Non-CHPSolar PhotovoltaicSUNPV2702702027-122027(L) Regulatory approvals pending. Not under constructionNYIS42.198116-79.757892026-09
3122/CA5Homer City Generating StationCA53122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCA2682682028-072028(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CA6Homer City Generating StationCA63122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCA2682682028-072028(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CA2Homer City Generating StationCA23122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCA2682682028-112028(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CA3Homer City Generating StationCA33122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCA2682682028-112028(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CA7Homer City Generating StationCA73122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCA2682682029-032029(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CA4Homer City Generating StationCA43122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCA2682682029-072029(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
3122/CA1Homer City Generating StationCA13122PAIndianaHomer City Generation, L.P.IPP Non-CHPNatural Gas Fired Combined CycleNGCA2682682029-112029(P) Planned for installation, but regulatory approvals not initiatedPJM40.512825-79.196112026-09
69403/GOOD2Goodnight Wind IIGOOD269403TXArmstrongFGE Goodnight II, LLCIPP Non-CHPOnshore Wind TurbineWNDWT265.5265.52027-052027(U) Under construction, less than or equal to 50 percent completeERCO34.937162-101.43392026-09
69808/CT1Princeton Road StationCT169808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Fired Combustion TurbineNGGT265.4239.62029-122029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/CT2Princeton Road StationCT269808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Fired Combustion TurbineNGGT265.4239.62029-122029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
68873/BIGSBig Sampson WindBIGS68873TXCrockettBig Sampson Wind Project, LLCIPP Non-CHPOnshore Wind TurbineWNDWT2652652026-122026(TS) Construction complete, but not yet in commercial operationERCO30.981883-101.85052026-09
64547/3Turtle Creek364547NESarpyOmaha Public Power DistrictElectric UtilityNatural Gas Fired Combustion TurbineNGGT2642212028-082028(T) Regulatory approvals received. Not under constructionSWPP41.092238-96.168312026-09
55972/CT-3Cass CountyCT-355972NECassOmaha Public Power DistrictElectric UtilityNatural Gas Fired Combustion TurbineNGGT2642212029-022029(T) Regulatory approvals received. Not under constructionSWPP40.947913-95.964032026-09
55972/CT-4Cass CountyCT-455972NECassOmaha Public Power DistrictElectric UtilityNatural Gas Fired Combustion TurbineNGGT2642212029-022029(T) Regulatory approvals received. Not under constructionSWPP40.947913-95.964032026-09
55972/CT-5Cass CountyCT-555972NECassOmaha Public Power DistrictElectric UtilityNatural Gas Fired Combustion TurbineNGGT2642212029-022029(T) Regulatory approvals received. Not under constructionSWPP40.947913-95.964032026-09
69071/CA1Bison Generation StationCA169071NDWilliamsBasin Electric Power CoopElectric UtilityNatural Gas Fired Combined CycleNGCA2633202029-022029(L) Regulatory approvals pending. Not under constructionSWPP48.327932-103.31272026-09
69071/CA2Bison Generation StationCA269071NDWilliamsBasin Electric Power CoopElectric UtilityNatural Gas Fired Combined CycleNGCA2633202030-032030(L) Regulatory approvals pending. Not under constructionSWPP48.327932-103.31272026-09
7916/7Talbot County Energy77916GATalbotOglethorpe Power CorporationElectric UtilityNatural Gas Fired Combustion TurbineNGGT2622412029-012029(P) Planned for installation, but regulatory approvals not initiatedSOCO32.5892-84.69172026-09
69635/74964Peach Wood Solar7496469635GAMitchellPeach WoodSolar LLCIPP Non-CHPSolar PhotovoltaicSUNPV2612612030-122030(P) Planned for installation, but regulatory approvals not initiatedSOCO31.343419-84.212692026-09
70419/RSBARoyal SlopeRSBA70419WAGrantRoyal Slope Solar LLCIPP Non-CHPBatteriesMWHBA2602602027-102027(T) Regulatory approvals received. Not under constructionBPAT46.883147-119.92072026-09
70419/RSPVRoyal SlopeRSPV70419WAGrantRoyal Slope Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV2602602027-102027(T) Regulatory approvals received. Not under constructionBPAT46.883147-119.92072026-09
65893/OCIROOCI SunRoperOCIRO65893TXWhartonOCI Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV2602602027-122027(L) Regulatory approvals pending. Not under constructionERCO29.240399-96.011542026-09
69799/F1G01Project Matador Gas Plant (PMG)F1G0169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT260242.72028-092028(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/F1G02Project Matador Gas Plant (PMG)F1G0269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT260242.72028-092028(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/F1G03Project Matador Gas Plant (PMG)F1G0369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT260242.72028-092028(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/F2G01Project Matador Gas Plant (PMG)F2G0169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT260242.72028-092028(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/F2G02Project Matador Gas Plant (PMG)F2G0269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT260242.72028-092028(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/F2G03Project Matador Gas Plant (PMG)F2G0369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT260242.72028-092028(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
70407/RSSRoy SolarRSS70407OKStephensRoy Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2582582027-122027(U) Under construction, less than or equal to 50 percent completeSPA34.309919-96.779352026-09
67837/RAYRSRay Ranch SolarRAYRS67837TXGoliadRay Ranch Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV255.2255.22026-122026(TS) Construction complete, but not yet in commercial operationERCO28.628-97.7242026-09
66411/RMSYHecate Grid East Valley StorageRMSY66411TXCameronHecate Grid East Valley Storage, LLCIPP Non-CHPBatteriesMWHBA2552552027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO25.94113-97.532762026-09
70299/814Pioneer Creek Wind, LLC81470299KSFordNextEra Energy Resources, LLCIPP Non-CHPOnshore Wind TurbineWNDWT2522522027-032027(V) Under construction, more than 50 percent completeSWPP37.735053-99.805562026-09
64835/NASilver Queen Wind FarmNA64835IACrawfordSilver Queen Wind Farm, LLCIPP Non-CHPOnshore Wind TurbineWNDWT2522522028-102028(L) Regulatory approvals pending. Not under constructionSWPP42.002397-95.13162026-09
69892/OAKOak Valley SolarOAK69892TXEllisOak Valley Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV251.3251.32029-092029(P) Planned for installation, but regulatory approvals not initiatedERCO32.012951-96.499742026-09
69681/DRAKEMallard Energy StorageDRAKE69681TXCollinMallard Energy Storage, LLCIPP Non-CHPBatteriesMWHBA2502502026-102026(U) Under construction, less than or equal to 50 percent completeERCO33.064274-96.450512026-09
69968/RUSRumble SolarRUS69968OKGradyRumble Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502026-102026(U) Under construction, less than or equal to 50 percent completeSWPP35.338721-97.989012026-09
68325/SMSShow Me State SolarSMS68325MOCallawayShow Me State Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502026-112026(TS) Construction complete, but not yet in commercial operationMISO38.958702-91.944792026-09
65880/ZEYAZeyaZEYA65880TXGalvestonEngie North AmericaIPP Non-CHPBatteriesMWHBA2502502026-122026(U) Under construction, less than or equal to 50 percent completeERCO29.388758-94.947932026-09
67357/4666Tiger Solar466667357TXJonesVaca Del Sol, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502026-122026(V) Under construction, more than 50 percent completeERCO32.796921-99.880892026-09
70137/DL250Dry Land Prairie Energy StorageDL25070137COCheyenneDry Land Prairie Energy Storage, LLCIPP Non-CHPBatteriesMWHBA2502502026-122026(U) Under construction, less than or equal to 50 percent completePSCO38.99974-102.49432026-09
70053/SP250South Platte StorageSP25070053COMorganSouth Platte Storage, LLCIPP Non-CHPBatteriesMWHBA2502502027-062027(U) Under construction, less than or equal to 50 percent completePSCO40.12-103.422026-09
70300/USADCAdams Creek Solar ProjectUSADC70300TXWilbargerAdams Creek Solar Project, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502027-062027(T) Regulatory approvals received. Not under constructionERCO34.15382-98.963332026-09
69887/PRTGSPortage Solar, LLCPRTGS69887WIPortageGeronimo PowerIPP Non-CHPSolar PhotovoltaicSUNPV2502502027-072027(U) Under construction, less than or equal to 50 percent completeMISO44.456358-89.544012026-09
70178/CBLTCobaltCBLT70178CARiversideRE Cobalt LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502027-082027(U) Under construction, less than or equal to 50 percent completeCISO33.571-118.17892026-09
66706/11101Patoka Solar1110166706INPoseyStrata Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV2502502027-092027(P) Planned for installation, but regulatory approvals not initiatedMISO38.14033-87.775672026-09
66707/11102Prairie Oak Solar1110266707ILShelbyStrata Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV2502502027-092027(P) Planned for installation, but regulatory approvals not initiatedMISO39.542799-89.031532026-09
67552/ELMBAElm Flats SolarELMBA67552TXNavarroHeadwater Energy, LLCIPP Non-CHPBatteriesMWHBA2502502027-092027(U) Under construction, less than or equal to 50 percent completeERCO32.113579-96.304762026-09
68583/RRBRock N' RollRRB68583TXBrazoriaLydian EnergyIPP Non-CHPBatteriesMWHBA2502502027-102027(L) Regulatory approvals pending. Not under constructionERCO29.299371-95.422182026-09
67226/ROCKHRock House SolarROCKH67226GAMcDuffieEDF Renewables Development, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV2502502027-112027(P) Planned for installation, but regulatory approvals not initiatedSOCO33.4481-82.40392026-09
63202/701TREX US Red Holly70163202TXLynnTREX US Red Holly LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502027-122027(L) Regulatory approvals pending. Not under constructionERCO32.952-101.7372026-09
69721/BESS1Energizar BESSBESS169721MASuffolkEnergizar Storage LLCIPP Non-CHPBatteriesMWHBA2502502027-122027(L) Regulatory approvals pending. Not under constructionISNE42.39556-71.022182026-09
70047/SSPVSelenite Springs SolarSSPV70047TXPecosNextEra Energy Resources - ERCOTIPP Non-CHPSolar PhotovoltaicSUNPV2502502027-122027(L) Regulatory approvals pending. Not under constructionERCO30.992503-103.05712026-09
70462/PAWSPawnee Solar & BESSPAWS70462COMorganPublic Service Co of ColoradoElectric UtilitySolar PhotovoltaicSUNPV2502502027-122027(U) Under construction, less than or equal to 50 percent completePSCO40.127571-103.72492026-09
70034/ESEvlou Solar, LLCES70034TXEl PasoEvlou Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502028-012028(U) Under construction, less than or equal to 50 percent completeEPE31.507744-106.05342026-09
70034/ESSEvlou Solar, LLCESS70034TXEl PasoEvlou Solar, LLCIPP Non-CHPBatteriesMWHBA2502502028-012028(U) Under construction, less than or equal to 50 percent completeEPE31.507744-106.05342026-09
67987/MYSPBMystic Springs Renewable Energy (Hybrid)MYSPB67987TXKaufmanVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA2502502028-032028(P) Planned for installation, but regulatory approvals not initiatedERCO32.821255-96.190422026-09
67987/MYSPSMystic Springs Renewable Energy (Hybrid)MYSPS67987TXKaufmanVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502028-032028(P) Planned for installation, but regulatory approvals not initiatedERCO32.821255-96.190422026-09
70258/H2SLRHawkeye Solar II, LLCH2SLR70258IAClintonHawkeye Solar II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502028-032028(L) Regulatory approvals pending. Not under constructionMISO41.835204-90.699662026-09
67982/ATHS1Athens Solar I (Hybrid)ATHS167982CAPlacerVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502028-062028(P) Planned for installation, but regulatory approvals not initiatedCISO35.754889-121.40712026-09
67982/ATHSBAthens Solar I (Hybrid)ATHSB67982CAPlacerVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA2502502028-062028(P) Planned for installation, but regulatory approvals not initiatedCISO35.754889-121.40712026-09
68883/STBASawtooth SolarSTBA68883AZPinalEDF Renewables Development, Inc.IPP Non-CHPBatteriesMWHBA2502502028-062028(L) Regulatory approvals pending. Not under constructionAZPS32.728-111.6292026-09
68883/STPVSawtooth SolarSTPV68883AZPinalEDF Renewables Development, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV2502502028-062028(L) Regulatory approvals pending. Not under constructionAZPS32.728-111.6292026-09
66684/HL001Intermountain Pumped Storage ProjectHL00166684UTMillardPremium Energy HoldingsIPP Non-CHPHydroelectric Pumped StorageWATPS2502502028-072028(P) Planned for installation, but regulatory approvals not initiatedLDWP39.414705-112.44042026-09
66684/HL002Intermountain Pumped Storage ProjectHL00266684UTMillardPremium Energy HoldingsIPP Non-CHPHydroelectric Pumped StorageWATPS2502502028-072028(P) Planned for installation, but regulatory approvals not initiatedLDWP39.414705-112.44042026-09
66684/HL003Intermountain Pumped Storage ProjectHL00366684UTMillardPremium Energy HoldingsIPP Non-CHPHydroelectric Pumped StorageWATPS2502502028-072028(P) Planned for installation, but regulatory approvals not initiatedLDWP39.414705-112.44042026-09
66684/HL004Intermountain Pumped Storage ProjectHL00466684UTMillardPremium Energy HoldingsIPP Non-CHPHydroelectric Pumped StorageWATPS2502502028-072028(P) Planned for installation, but regulatory approvals not initiatedLDWP39.414705-112.44042026-09
66686/HL001Haiwee Pumped Storage ProjectHL00166686CAInyoPremium Energy HoldingsIPP Non-CHPHydroelectric Pumped StorageWATPS2502502028-072028(P) Planned for installation, but regulatory approvals not initiatedLDWP36.233105-117.96252026-09
66686/HL002Haiwee Pumped Storage ProjectHL00266686CAInyoPremium Energy HoldingsIPP Non-CHPHydroelectric Pumped StorageWATPS2502502028-072028(P) Planned for installation, but regulatory approvals not initiatedLDWP36.233105-117.96252026-09
66686/HL003Haiwee Pumped Storage ProjectHL00366686CAInyoPremium Energy HoldingsIPP Non-CHPHydroelectric Pumped StorageWATPS2502502028-072028(P) Planned for installation, but regulatory approvals not initiatedLDWP36.233105-117.96252026-09
66686/HL004Haiwee Pumped Storage ProjectHL00466686CAInyoPremium Energy HoldingsIPP Non-CHPHydroelectric Pumped StorageWATPS2502502028-072028(P) Planned for installation, but regulatory approvals not initiatedLDWP36.233105-117.96252026-09
70397/SRSB1Steel River Solar Phase 1SRSB170397ARMississippiCypress Creek RenewablesIPP Non-CHPBatteriesMWHBA2502502028-082028(U) Under construction, less than or equal to 50 percent completeMISO35.578637-90.097632026-09
70515/PV1Burt County Solar (Sandhills Energy)PV170515NEBurtBurt County Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502028-102028(U) Under construction, less than or equal to 50 percent completeSWPP41.712811-96.159622026-09
64912/CMPS1Mill Point SolarCMPS164912NYMontgomeryRepsol Renewables NAIPP Non-CHPSolar PhotovoltaicSUNPV2502502028-122028(P) Planned for installation, but regulatory approvals not initiatedNYIS42.919098-74.341162026-09
68491/FPSFreedom Pine SolarFPS68491MEYorkFreedom Pine Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502029-012029(P) Planned for installation, but regulatory approvals not initiatedISNE43.34779-70.89742026-09
3797/CERC1ChesterfieldCERC13797VAChesterfieldVirginia Electric & Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT250233.92029-062029(L) Regulatory approvals pending. Not under constructionPJM37.3822-77.38332026-09
3797/CERC2ChesterfieldCERC23797VAChesterfieldVirginia Electric & Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT250233.92029-062029(L) Regulatory approvals pending. Not under constructionPJM37.3822-77.38332026-09
3797/CERC3ChesterfieldCERC33797VAChesterfieldVirginia Electric & Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT250233.92029-062029(L) Regulatory approvals pending. Not under constructionPJM37.3822-77.38332026-09
3797/CERC4ChesterfieldCERC43797VAChesterfieldVirginia Electric & Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT250233.92029-062029(L) Regulatory approvals pending. Not under constructionPJM37.3822-77.38332026-09
68351/CLAPVClairemont SolarCLAPV68351TXKentClairemont Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502029-072029(P) Planned for installation, but regulatory approvals not initiatedERCO33.371565-100.97582026-09
68356/LUBA2Lazy U ESS 2LUBA268356TXHardemanLazy U ESS 2 LLCIPP Non-CHPBatteriesMWHBA2502502029-072029(P) Planned for installation, but regulatory approvals not initiatedERCO34.265496-99.872142026-09
68357/LUPV1Lazy U Solar 1LUPV168357TXHardemanLazy U Solar 1 LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502029-072029(P) Planned for installation, but regulatory approvals not initiatedERCO34.265496-99.872142026-09
68358/LUPV2Lazy U Solar 2LUPV268358TXHardemanLazy U Solar 2 LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502029-072029(P) Planned for installation, but regulatory approvals not initiatedERCO34.265496-99.872142026-09
70398/SRSB2Steel River Solar Phase 2SRSB270398ARMississippiCypress Creek RenewablesIPP Non-CHPBatteriesMWHBA2502502029-072029(U) Under construction, less than or equal to 50 percent completeMISO35.578637-90.097632026-09
68355/LUBA1Lazy U ESS 1LUBA168355TXHardemanLazy U ESS 1 LLCIPP Non-CHPBatteriesMWHBA2502502030-072030(P) Planned for installation, but regulatory approvals not initiatedERCO34.265496-99.872142026-09
70399/SRSB3Steel River Solar Phase 3SRSB370399ARMississippiCypress Creek RenewablesIPP Non-CHPBatteriesMWHBA2502502030-072030(U) Under construction, less than or equal to 50 percent completeMISO35.578637-90.097632026-09
67950/MFS1Moonlight Flats Solar Power 1MFS167950PAClearfieldMoonlight Flats Solar Power, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2502502030-122030(P) Planned for installation, but regulatory approvals not initiatedNYIS41.092288-78.179892026-09
69595/STGENSaddleback Generation StationSTGEN69595AZMaricopaCopia PowerIPP Non-CHPNatural Gas Fired Combined CycleNGCA2502302030-122030(P) Planned for installation, but regulatory approvals not initiatedAZPS33.410034-113.16942026-09
69595/STGN2Saddleback Generation StationSTGN269595AZMaricopaCopia PowerIPP Non-CHPNatural Gas Fired Combined CycleNGCA2502302030-122030(P) Planned for installation, but regulatory approvals not initiatedAZPS33.410034-113.16942026-09
63850/CHERYCherryCHERY63850CAKingsWestlands Cherry, LLCIPP Non-CHPSolar PhotovoltaicSUNPV249.7249.72027-072027(T) Regulatory approvals received. Not under constructionCISO36.122457-119.92322026-09
67862/SOLARKingstree East 230 Solar ProjectSOLAR67862SCGeorgetownKingstree East 230 LLCIPP Non-CHPSolar PhotovoltaicSUNPV2492492029-122029(T) Regulatory approvals received. Not under constructionSC33.563633-79.463262026-09
68370/SALMSalmonfly Solar and StorageSALM68370ORJeffersonBrightNight PowerIPP Non-CHPSolar PhotovoltaicSUNPV2472472029-022029(L) Regulatory approvals pending. Not under constructionPGE44.6157-121.34362026-09
68370/SALM2Salmonfly Solar and StorageSALM268370ORJeffersonBrightNight PowerIPP Non-CHPBatteriesMWHBA2472472029-022029(L) Regulatory approvals pending. Not under constructionPGE44.6157-121.34362026-09
66701/BB1Buffalo Branch Wind and Solar LLCBB166701MODadeBuffalo Branch Wind and Solar LLCIPP Non-CHPOnshore Wind TurbineWNDWT2472472029-122029(P) Planned for installation, but regulatory approvals not initiatedAECI37.38332-93.929992026-09
63851/GRAPEGrapeGRAPE63851CAKingsWestlands Grape, LLCIPP Non-CHPSolar PhotovoltaicSUNPV246.4246.42027-032027(V) Under construction, more than 50 percent completeCISO36.145687-119.90512026-09
68302/LAKETLake Trout SolarLAKET68302INBlackfordLake Trout SolarIPP Non-CHPSolar PhotovoltaicSUNPV2452452027-122027(P) Planned for installation, but regulatory approvals not initiatedPJM40.524925-85.303332026-09
69506/GAIPVGail Mountain SolarGAIPV69506TXBordenRed River Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV244.4244.42028-082028(T) Regulatory approvals received. Not under constructionERCO32.714612-101.52742026-09
66896/LP2PVLupinus Solar 2, LLCLP2PV66896TXFranklinSunraycer Assets I LLCIPP Non-CHPSolar PhotovoltaicSUNPV2442442027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO30.303385-95.256922026-09
70453/CT4Red Oak Ridge Energy Center LLCCT470453WIKenoshaInvenergy Services LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT2422422029-122029(L) Regulatory approvals pending. Not under constructionMISO42.631839-87.966252026-09
70453/CT5Red Oak Ridge Energy Center LLCCT570453WIKenoshaInvenergy Services LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT2422422029-122029(L) Regulatory approvals pending. Not under constructionMISO42.631839-87.966252026-09
70453/RDOR1Red Oak Ridge Energy Center LLCRDOR170453WIKenoshaInvenergy Services LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT2422422029-122029(P) Planned for installation, but regulatory approvals not initiatedMISO42.631839-87.966252026-09
70453/RDOR2Red Oak Ridge Energy Center LLCRDOR270453WIKenoshaInvenergy Services LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT2422422029-122029(P) Planned for installation, but regulatory approvals not initiatedMISO42.631839-87.966252026-09
70453/RDOR3Red Oak Ridge Energy Center LLCRDOR370453WIKenoshaInvenergy Services LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT2422422029-122029(P) Planned for installation, but regulatory approvals not initiatedMISO42.631839-87.966252026-09
66168/GEN01Cattlemen Solar ParkGEN0166168TXMilamCattlemen Solar Park LLCIPP Non-CHPSolar PhotovoltaicSUNPV2402402026-102026(TS) Construction complete, but not yet in commercial operationERCO31.045676-96.858632026-09
68785/DHS1Dolet Hills SolarDHS168785LADeSotoDolet Hills SolarIPP Non-CHPSolar PhotovoltaicSUNPV2402402026-122026(V) Under construction, more than 50 percent completeMISO31.95595-93.626412026-09
68264/12345Rich Road Solar Energy Center1234568264NYSt LawrenceRich Road Solar Energy CenterIPP Non-CHPSolar PhotovoltaicSUNPV2402402028-052028(L) Regulatory approvals pending. Not under constructionNYIS44.567518-75.196542026-09
6112/7Fort St Vrain76112COWeldPublic Service Co of ColoradoElectric UtilityNatural Gas Fired Combustion TurbineNGGT239177.92027-122027(U) Under construction, less than or equal to 50 percent completePSCO40.2461-104.87422026-09
6112/8Fort St Vrain86112COWeldPublic Service Co of ColoradoElectric UtilityNatural Gas Fired Combustion TurbineNGGT239177.92027-122027(U) Under construction, less than or equal to 50 percent completePSCO40.2461-104.87422026-09
68607/PJBS1Pelicans Jaw Hybrid SolarPJBS168607CAKernPelicans Jaw Solar LLCIPP Non-CHPBatteriesMWHBA238.5238.52027-042027(TS) Construction complete, but not yet in commercial operationCISO35.765183-119.74362026-09
4041/11South Oak Creek114041WIMilwaukeeWisconsin Electric Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT236.3227.62028-022028(L) Regulatory approvals pending. Not under constructionMISO42.8457-87.82942026-09
4041/12South Oak Creek124041WIMilwaukeeWisconsin Electric Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT236.3227.62028-022028(L) Regulatory approvals pending. Not under constructionMISO42.8457-87.82942026-09
4041/13South Oak Creek134041WIMilwaukeeWisconsin Electric Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT236.3227.62028-022028(L) Regulatory approvals pending. Not under constructionMISO42.8457-87.82942026-09
4041/14South Oak Creek144041WIMilwaukeeWisconsin Electric Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT236.3227.62028-022028(L) Regulatory approvals pending. Not under constructionMISO42.8457-87.82942026-09
4041/15South Oak Creek154041WIMilwaukeeWisconsin Electric Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT236.3227.62028-022028(L) Regulatory approvals pending. Not under constructionMISO42.8457-87.82942026-09
66421/GRS13Despain SolarGRS1366421TXKinneyGransolar Texas Thirteen, LLCIPP Non-CHPSolar PhotovoltaicSUNPV236.22362027-122027(L) Regulatory approvals pending. Not under constructionERCO29.282259-100.20982026-09
69295/DFBSSDuffy BESSDFBSS69295TXMatagordaDuffy Energy Storage LLCIPP Non-CHPBatteriesMWHBA235.9235.92026-122026(V) Under construction, more than 50 percent completeERCO28.854592-96.086062026-09
6085/20R M Schahfer206085INJasperNorthern Indiana Pub Serv CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT233.8234.42027-122027(T) Regulatory approvals received. Not under constructionMISO41.2164-87.02612026-09
69004/ADELIAdelite Storage Project LLCADELI69004TXMilamAcciona Energy USA Global, LLCIPP Non-CHPBatteriesMWHBA2302302028-032028(T) Regulatory approvals received. Not under constructionERCO30.622383-97.21052026-09
68579/AC2SAC Ranch IIAC2S68579NMLeaLydian EnergyIPP Non-CHPSolar PhotovoltaicSUNPV2302302029-062029(L) Regulatory approvals pending. Not under constructionSWPP32.732263-103.27482026-09
68079/STAS1Stagecoach LRESTAS168079COPuebloLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2302302029-122029(T) Regulatory approvals received. Not under constructionPSCO38.17739-104.50122026-09
62437/WTDodge County WindWT62437MNDodgeDodge County Wind, LLCIPP Non-CHPOnshore Wind TurbineWNDWT2282282027-122027(T) Regulatory approvals received. Not under constructionMISO44.005633-92.950392026-09
67783/GRS12Ventures BESSGRS1267783TXMatagordaGransolar Texas Twelve LLCIPP Non-CHPBatteriesMWHBA226.8226.82028-092028(L) Regulatory approvals pending. Not under constructionERCO28.974482-95.993812026-09
69658/NS2New Salem Wind IINS269658NDMortonNew Salem Wind IIIPP Non-CHPOnshore Wind TurbineWNDWT22695.32028-122028(P) Planned for installation, but regulatory approvals not initiatedMISO46.797929-101.43442026-09
67356/6794Throckmorton Wind679467356TXHaskellThrockmorton Wind, LLCIPP Non-CHPOnshore Wind TurbineWNDWT225.6225.62026-122026(V) Under construction, more than 50 percent completeERCO33.213466-99.476122026-09
67767/BECBABramble Energy CenterBECBA67767TXZavalaMission Clean Energy Devco LLCIPP Non-CHPBatteriesMWHBA225.1225.12029-042029(P) Planned for installation, but regulatory approvals not initiatedERCO28.955627-99.723182026-09
70193/REC01Romero Energy CenterREC0170193AZMaricopaRomero Energy Center, LLCIPP Non-CHPBatteriesMWHBA2252252027-062027(U) Under construction, less than or equal to 50 percent completeAZPS33.509114-113.0082026-09
68417/1Hallsville168417TXHarrisonSouthwestern Electric Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT2252002027-122027(P) Planned for installation, but regulatory approvals not initiatedSWPP32.4607-94.48522026-09
68417/2Hallsville268417TXHarrisonSouthwestern Electric Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT2252002027-122027(P) Planned for installation, but regulatory approvals not initiatedSWPP32.4607-94.48522026-09
69198/ATL10ATLAS Solar X, LLCATL1069198AZLa PazATLAS Solar Manager, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2252252027-122027(P) Planned for installation, but regulatory approvals not initiatedCISO33.546706-113.55622026-09
70194/REC02Romero Energy Center II, LLCREC0270194AZMaricopaRomero Energy Center II, LLCIPP Non-CHPBatteriesMWHBA2252252028-062028(U) Under construction, less than or equal to 50 percent completeAZPS33.509114-113.0082026-09
64634/90FI8Kingsley Solar Farm90FI864634CAImperial90FI 8me, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2252252028-122028(P) Planned for installation, but regulatory approvals not initiatedCISO32.742036-115.73542026-09
69450/GEN01Emerald Bluffs Solar ParkGEN0169450WIJuneauEmerald Bluffs Solar Park LLCIPP Non-CHPSolar PhotovoltaicSUNPV2252252028-122028(L) Regulatory approvals pending. Not under constructionMISO43.764276-90.013982026-09
2951/11Horseshoe Lake112951OKOklahomaOklahoma Gas & Electric CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT2242242026-102026(TS) Construction complete, but not yet in commercial operationSWPP35.50866-97.179692026-09
2951/12Horseshoe Lake122951OKOklahomaOklahoma Gas & Electric CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT2242242026-102026(TS) Construction complete, but not yet in commercial operationSWPP35.50866-97.179692026-09
2951/13Horseshoe Lake132951OKOklahomaOklahoma Gas & Electric CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT2242242029-022029(T) Regulatory approvals received. Not under constructionSWPP35.50866-97.179692026-09
2951/14Horseshoe Lake142951OKOklahomaOklahoma Gas & Electric CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT2242242029-022029(T) Regulatory approvals received. Not under constructionSWPP35.50866-97.179692026-09
66138/INMA1Mayapple Solar 1INMA166138INPulaskiLightsource Renewable Energy Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2242242029-032029(T) Regulatory approvals received. Not under constructionPJM41.055223-86.713232026-09
63193/UNIT1AliraUNIT163193TXAndrewsLuminant Generation Company LLCIPP Non-CHPSolar PhotovoltaicSUNPV222.8222.82030-012030(L) Regulatory approvals pending. Not under constructionERCO32.347392-102.96772026-09
61331/BA2NISA Electric Generation ProjectBA261331NYKingsNYC Energy LLCIPP Non-CHPBatteriesMWHBA220.1220.12028-102028(T) Regulatory approvals received. Not under constructionNYIS40.7065-73.97022026-09
63028/GEN1Tip Top Solar Energy Center LLCGEN163028NMLeaInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV2202202026-122026(V) Under construction, more than 50 percent completeSWPP32.133136-103.32352026-09
67759/TCHECTrenton Channel Energy CenterTCHEC67759MIWayneDTE Electric CompanyElectric UtilityBatteriesMWHBA2202202027-012027(TS) Construction complete, but not yet in commercial operationMISO42.124423-83.185712026-09
69520/AMDRBAmador BESSAMDRB69520TXVan ZandtBT Amador Storage LLCIPP Non-CHPBatteriesMWHBA2202202027-042027(V) Under construction, more than 50 percent completeERCO32.479347-96.03212026-09
69590/HC1Hollis Creek SolarHC169590LASabineHollis Creek PV I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2202002027-052027(V) Under construction, more than 50 percent completeMISO31.661627-93.473612026-09
68744/LSECLiberty Solar Energy CenterLSEC68744MIKalamazooConsumers Energy Co - (MI)Electric UtilitySolar PhotovoltaicSUNPV2202202027-122027(U) Under construction, less than or equal to 50 percent completeMISO42.3631-85.4742026-09
68668/RIC90Coke BESSRIC9068668TXCokeRIC Development, LLCIPP Non-CHPBatteriesMWHBA2202202028-042028(P) Planned for installation, but regulatory approvals not initiatedERCO31.862499-100.76382026-09
69108/COT01Eastern Cottontail SolarCOT0169108OHFairfieldEDF Renewables Development, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV220254.52028-122028(L) Regulatory approvals pending. Not under constructionPJM39.844172-82.494532026-09
69149/ANSN2Anson 2 SolarANSN269149TXJonesAnson Solar Center 2, LLCIPP Non-CHPSolar PhotovoltaicSUNPV218.52002026-122026(V) Under construction, more than 50 percent completeERCO32.805609-99.919012026-09
67996/SEPASLeuven Solar LLCSEPAS67996TXNolanBelgian Renewable Energy Group (BREG)IPP Non-CHPSolar PhotovoltaicSUNPV2172172029-122029(P) Planned for installation, but regulatory approvals not initiatedERCO32.49301-100.24632026-09
67576/1Castle Bluff Energy Center167576MOSt LouisUnion Electric Co - (MO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT2161752027-102027(P) Planned for installation, but regulatory approvals not initiatedMISO38.4017-90.33582026-09
67576/2Castle Bluff Energy Center267576MOSt LouisUnion Electric Co - (MO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT2161752027-102027(P) Planned for installation, but regulatory approvals not initiatedMISO38.4017-90.33582026-09
67576/3Castle Bluff Energy Center367576MOSt LouisUnion Electric Co - (MO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT2161752027-102027(P) Planned for installation, but regulatory approvals not initiatedMISO38.4017-90.33582026-09
66559/TXJC1Jones City 1 SolarTXJC166559TXJonesLightsource Renewable Energy Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2152152026-102026(TS) Construction complete, but not yet in commercial operationERCO32.781168-100.00652026-09
69654/ZEUBZeus BESSZEUB69654CASan JoaquinZeus BESS LLCIPP Non-CHPBatteriesMWHBA213.62002031-092031(P) Planned for installation, but regulatory approvals not initiatedCISO37.711754-121.48842026-09
64672/BLUJSBlue Jay Solar I, LLCBLUJS64672TXGrimesBlue Jay Solar I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2102102026-102026(TS) Construction complete, but not yet in commercial operationERCO30.705329-96.069832026-09
68323/ALT8AAtlas VIIIALT8A68323AZLa PazAtlas VIII LLCIPP Non-CHPBatteriesMWHBA2102102026-122026(V) Under construction, more than 50 percent completeCISO33.582903-113.57692026-09
69956/S10BSSanborn Hybrid 3S10BS69956CAKernTerra-Gen Operating Co-HybridIPP Non-CHPBatteriesMWHBA2102102026-122026(U) Under construction, less than or equal to 50 percent completeCISO34.996-118.1142026-09
69956/S10PVSanborn Hybrid 3S10PV69956CAKernTerra-Gen Operating Co-HybridIPP Non-CHPSolar PhotovoltaicSUNPV2102102026-122026(U) Under construction, less than or equal to 50 percent completeCISO34.996-118.1142026-09
69537/1Lyon County Generating Station169537MNLyonNorthern States Power Co - MinnesotaElectric UtilityNatural Gas Fired Combustion TurbineNGGT210193.32028-122028(L) Regulatory approvals pending. Not under constructionMISO44.226167-95.753622026-09
69537/2Lyon County Generating Station269537MNLyonNorthern States Power Co - MinnesotaElectric UtilityNatural Gas Fired Combustion TurbineNGGT210193.32028-122028(L) Regulatory approvals pending. Not under constructionMISO44.226167-95.753622026-09
68040/SYCAMSycamore Cross SolarSYCAM68040VAIsle of WightAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV208.2208.22029-062029(P) Planned for installation, but regulatory approvals not initiatedPJM37.017425-76.743992026-09
8224/CT3North ValmyCT38224NVHumboldtSierra Pacific Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT2082082028-052028(U) Under construction, less than or equal to 50 percent completeNEVP40.881317-117.15162026-09
8224/CT4North ValmyCT48224NVHumboldtSierra Pacific Power CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT2082082028-052028(U) Under construction, less than or equal to 50 percent completeNEVP40.881317-117.15162026-09
60206/HCCA1Wolf Summit EnergyHCCA160206WVHarrisonWolf Summit Energy LLCIPP Non-CHPNatural Gas Fired Combined CycleNGCA207.4205.42028-122028(L) Regulatory approvals pending. Not under constructionPJM39.287039-80.322872026-09
70237/MULE1Mule Shoe Energy StorageMULE170237TXYoakumMule Shoe Energy Storage LLCIPP Non-CHPBatteriesMWHBA2072072028-082028(T) Regulatory approvals received. Not under constructionSWPP33.125909-102.762026-09
69589/BEEK1Beekman SolarBEEK169589LAMorehouseBeekman PV I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV206.81852027-022027(V) Under construction, more than 50 percent completeMISO32.989386-91.942882026-09
70514/GEN1Hoyte SolarGEN170514TXMilamMilano Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV206.8206.82027-072027(V) Under construction, more than 50 percent completeERCO30.722496-96.773522026-09
69468/PSVSPPoseyville Solar ParkPSVSP69468MIMidlandDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV206.41172028-042028(U) Under construction, less than or equal to 50 percent completeMISO43.5178-84.22542026-09
69507/NHKRYNew Hickory SolarNHKRY69507TXJacksonNew Hickory Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV2062062026-112026(TS) Construction complete, but not yet in commercial operationERCO29.069747-96.87822026-09
69058/CBCBACO Bar C Solar and BESSCBCBA69058AZCoconinoClenera DevCo LLCIPP Non-CHPBatteriesMWHBA2062062027-082027(P) Planned for installation, but regulatory approvals not initiatedAZPS35.636594-111.88352026-09
69058/CBCPVCO Bar C Solar and BESSCBCPV69058AZCoconinoClenera DevCo LLCIPP Non-CHPSolar PhotovoltaicSUNPV2062062027-082027(P) Planned for installation, but regulatory approvals not initiatedAZPS35.636594-111.88352026-09
66651/C2-92Arco Wind and Solar ProjectC2-9266651IDBonnevillePacifiCorpElectric UtilityOnshore Wind TurbineWNDWT2062062028-122028(T) Regulatory approvals received. Not under constructionPACE43.557-112.44152026-09
68511/CHC1Henry SolarCHC168511OHHenryRepsol Renewables NAIPP Non-CHPSolar PhotovoltaicSUNPV2062062028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM41.474421-84.112712026-09
67543/DOGSPDonegal Solar ProjectDOGSP67543TXDickensHE-Cottonwood Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV204.2204.22028-102028(T) Regulatory approvals received. Not under constructionERCO33.796247-100.87282026-09
67341/NOSPVSGT Hoskins Solar Project HybridNOSPV67341TXLamarSGT Hoskins Solar Project, LLCIPP Non-CHPSolar PhotovoltaicSUNPV204.1204.12027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO33.63124-95.337852026-09
68853/LMWODLimewood Bell Renewables SolarLMWOD68853TXBellModal Power LLCIPP Non-CHPSolar PhotovoltaicSUNPV2042042026-112026(TS) Construction complete, but not yet in commercial operationERCO31.129365-97.261392026-09
67353/4666Erath County Solar466667353TXErathErath County Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV2042042028-122028(P) Planned for installation, but regulatory approvals not initiatedERCO32.089488-98.178532026-09
67917/CHMPNChampaign BESS, LLCCHMPN67917TXGlasscockSamsung C&T Renewables, LLCIPP Non-CHPBatteriesMWHBA202.7202.72027-062027(P) Planned for installation, but regulatory approvals not initiatedERCO31.871567-101.73842026-09
65049/CPCW1Pike Creek WindCPCW165049ILLoganRepsol Renewables NAIPP Non-CHPOnshore Wind TurbineWNDWT202.5202.52027-122027(P) Planned for installation, but regulatory approvals not initiatedMISO40.059-89.5372026-09
69659/RBWRed Butte WindRBW69659NDMortonRed Butte WindIPP Non-CHPOnshore Wind TurbineWNDWT202842027-122027(P) Planned for installation, but regulatory approvals not initiatedMISO47.063928-101.47532026-09
68275/1Erin168275TXWhartonErin Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV2022022029-102029(P) Planned for installation, but regulatory approvals not initiatedERCO29.163-96.0132026-09
69879/N3884Ninnescah Flats SolarN388469879KSPrattNextera Energy ResourcesIPP Non-CHPSolar PhotovoltaicSUNPV201.6201.62026-122026(TS) Construction complete, but not yet in commercial operationSWPP37.628817-98.593112026-09
67918/DIOSDios BESS, LLCDIOS67918TXJacksonSamsung C&T Renewables, LLCIPP Non-CHPBatteriesMWHBA201.6201.62027-082027(P) Planned for installation, but regulatory approvals not initiatedERCO29.012998-96.50512026-09
65948/PNW01Plum Nellie Wind Farm LLCPNW0165948KSCloudPlum Nellie Wind Farm LLCIPP Non-CHPOnshore Wind TurbineWNDWT201.6201.62027-102027(P) Planned for installation, but regulatory approvals not initiatedSWPP39.376786-97.556492026-09
65462/AXTONAxton SolarAXTON65462VAHenryVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV201.1201.12028-092028(L) Regulatory approvals pending. Not under constructionPJM36.671684-79.686062026-09
62892/SONRIEDPR CA Solar Park VI LLC (CA) HybridSONRI62892CAFresnoEDPR CA Solar Park VI LLCIPP Non-CHPSolar PhotovoltaicSUNPV2012002026-102026(TS) Construction complete, but not yet in commercial operationCISO36.62543-120.37892026-09
67575/NZRTHTX Nazareth SolarNZRTH67575TXSwisherVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV2012012027-082027(T) Regulatory approvals received. Not under constructionERCO34.49-101.972026-09
68902/ECHPVEchols Grove SolarECHPV68902TXLamarEchols Grove LLCIPP Non-CHPSolar PhotovoltaicSUNPV2012012027-122027(L) Regulatory approvals pending. Not under constructionERCO33.616471-95.458372026-09
67535/ASHU1Bell Creek BESS LLCASHU167535TXBrazoriaNexus Renewables U.S. Inc.IPP Non-CHPBatteriesMWHBA200.9200.92028-112028(P) Planned for installation, but regulatory approvals not initiatedERCO29.137519-95.667972026-09
68168/KAHBAKahla StorageKAHBA68168TXLeonBelltown Power Texas 2, LLCIPP Non-CHPBatteriesMWHBA200.9200.92028-122028(L) Regulatory approvals pending. Not under constructionERCO31.325705-96.260712026-09
69120/RESBSResaca Oasis StorageRESBS69120TXCameronRed River Clean EnergyIPP Non-CHPBatteriesMWHBA200.7200.72028-092028(T) Regulatory approvals received. Not under constructionERCO25.978783-97.372632026-09
67558/RIC96Blackcat BESSRIC9667558TXMatagordaRIC Development, LLCIPP Non-CHPBatteriesMWHBA200.6200.62028-042028(P) Planned for installation, but regulatory approvals not initiatedERCO28.974879-95.994992026-09
70021/STACBStaccato BESSSTACB70021TXFayetteSunraycer Assets I LLCIPP Non-CHPBatteriesMWHBA200.5200.52027-042027(U) Under construction, less than or equal to 50 percent completeERCO30.053062-96.921222026-09
68179/TEMPWTempleton WindTEMPW68179INBentonTempleton Wind Energy Center, LLCElectric UtilityOnshore Wind TurbineWNDWT200.2200.22027-062027(T) Regulatory approvals received. Not under constructionMISO40.519676-87.150392026-09
67976/GEN01Cattlemen Solar IIGEN0167976TXMilamCattlemen Solar Park II LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002026-102026(TS) Construction complete, but not yet in commercial operationERCO31.083559-96.857322026-09
68481/HS2Hill Solar IIHS268481TXHillHill Solar II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002026-102026(TS) Construction complete, but not yet in commercial operationERCO32.115203-97.067832026-09
68914/12343Padua 31234368914TXBexarPadua 3IPP Non-CHPBatteriesMWHBA2002002026-102026(TS) Construction complete, but not yet in commercial operationERCO29.325064-98.325622026-09
70344/RSPVRush Springs SolarRSPV70344OKStephensRush Springs Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002026-102026(V) Under construction, more than 50 percent completeSWPP34.469189-97.894412026-09
68425/TWPIITidwell Prairie IITWPII68425TXRobertsonTidwell Prairie IIA LLCIPP Non-CHPBatteriesMWHBA2002002026-112026(V) Under construction, more than 50 percent completeERCO31.103064-96.664942026-09
69155/AHBA1Apache Hill Energy CenterAHBA169155TXHoodApache Hill Energy CenterIPP Non-CHPBatteriesMWHBA2002002026-112026(V) Under construction, more than 50 percent completeERCO32.380005-97.727822026-09
65870/CASTRCastorCASTR65870TXBrazoriaEngie North AmericaIPP Non-CHPBatteriesMWHBA2002002026-122026(U) Under construction, less than or equal to 50 percent completeERCO29.150279-95.651182026-09
66968/BFW00Blackford WindBFW0066968INBlackfordLeeward Asset Management, LLCIPP Non-CHPOnshore Wind TurbineWNDWT2002002026-122026(V) Under construction, more than 50 percent completePJM40.402078-85.300582026-09
68089/TS03Twelvemile Solar 3TS0368089OKMayesLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002026-122026(V) Under construction, more than 50 percent completeSWPP36.331569-95.229312026-09
68341/GREEGreenwater BESSGREE68341WAPierceGREE bn, LLCIPP Non-CHPBatteriesMWHBA2002002026-122026(V) Under construction, more than 50 percent completePSEI47.236485-122.22712026-09
68515/GREERGreer Solar PlantGREER68515MSWashingtonGreer Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002026-122026(U) Under construction, less than or equal to 50 percent completeMISO33.115544-90.830772026-09
69477/PLSNTPleasant Prairie Solar Energy LLCPLSNT69477OHFranklinInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002026-122026(V) Under construction, more than 50 percent completePJM39.944801-83.203972026-09
69549/DLE1Dry Lake East Energy CenterDLE169549NVClarkDry Lake East Energy CenterIPP Non-CHPSolar PhotovoltaicSUNPV2002002026-122026(V) Under construction, more than 50 percent completeNEVP36.401094-114.86522026-09
70408/WCBWillow Creek Energy StorageWCB70408OKPawneeWillow Creek Energy Storage, LLCIPP Non-CHPBatteriesMWHBA2002002026-122026(U) Under construction, less than or equal to 50 percent completeSPA36.389624-97.027812026-09
70513/3988Delta Bobcat Solar398870513MOCape GirardeauDelta Bobcat Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002026-122026(V) Under construction, more than 50 percent completeMISO37.222603-89.71762026-09
64290/ATHB2SE Athos II, LLCATHB264290CARiversideSE Athos II, LLCIPP Non-CHPBatteriesMWHBA2002002027-012027(U) Under construction, less than or equal to 50 percent completeCISO33.751283-115.3552026-09
69392/BBIABarton Branch IABBIA69392TXRobertsonBarton Branch IA LLCIPP Non-CHPBatteriesMWHBA2002002027-012027(U) Under construction, less than or equal to 50 percent completeERCO31.103064-96.664942026-09
64744/TC001Turkey Creek Solar ProjectTC00164744COPueblo174 Power Global Corp.IPP Non-CHPSolar PhotovoltaicSUNPV2002002027-022027(U) Under construction, less than or equal to 50 percent completeWACM38.382137-104.91412026-09
66893/TXJS2Jones City 2 SolarTXJS266893TXJonesLightsource Renewable Energy Asset Management, LLCIPP Non-CHPBatteriesMWHBA2002002027-032027(U) Under construction, less than or equal to 50 percent completeERCO32.794928-99.992932026-09
67249/RRESRock Rose Energy StorageRRES67249TXFort BendRock Rose Energy Storage LLCIPP Non-CHPBatteriesMWHBA2002002027-032027(U) Under construction, less than or equal to 50 percent completeERCO29.395241-95.735352026-09
69779/HK2SOHashknife Energy Center II LLCHK2SO69779AZNavajoInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-032027(V) Under construction, more than 50 percent completeAZPS34.574259-110.49462026-09
69779/HK2STHashknife Energy Center II LLCHK2ST69779AZNavajoInvenergy Services LLCIPP Non-CHPBatteriesMWHBA2002002027-032027(V) Under construction, more than 50 percent completeAZPS34.574259-110.49462026-09
68568/TULLASR TullahomaTULLA68568TNMooreSR Tullahoma, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-042027(V) Under construction, more than 50 percent completeTVA35.360002-86.275322026-09
69723/BESS1Taft BESSBESS169723MAWorcesterFE Taft LLCIPP Non-CHPBatteriesMWHBA2002002027-042027(V) Under construction, more than 50 percent completeISNE42.03383-71.603742026-09
66852/HILL3Hillsboro Solar 3HILL366852ALLawrenceUrban Grid SolarIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-052027(L) Regulatory approvals pending. Not under constructionTVA34.669883-87.23322026-09
65964/URSAUrsa Solar, LLCURSA65964WIColumbiaSamsung C&T Renewables, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-062027(P) Planned for installation, but regulatory approvals not initiatedMISO43.504285-89.113142026-09
69169/FWSFreshwater Solar, LLCFWS69169MIMontcalmFreshwater Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-062027(V) Under construction, more than 50 percent completeMISO43.338197-85.040132026-09
70400/BEE1ABee Branch IABEE1A70400TXRobertsonBee Branch IA, LLCIPP Non-CHPBatteriesMWHBA2002002027-062027(U) Under construction, less than or equal to 50 percent completeERCO31.104838-96.664772026-09
63784/PLMNOPalomino SolarPLMNO63784OHHighlandPalomino Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-072027(U) Under construction, less than or equal to 50 percent completePJM39.2158-83.77712026-09
66685/WH001Whale Rock Pumped Storage Hydro ProjectWH00166685CASan Luis ObispoPremium Energy HoldingsIPP Non-CHPHydroelectric Pumped StorageWATPS2002002027-072027(P) Planned for installation, but regulatory approvals not initiatedCISO35.454196-120.86712026-09
66685/WH002Whale Rock Pumped Storage Hydro ProjectWH00266685CASan Luis ObispoPremium Energy HoldingsIPP Non-CHPHydroelectric Pumped StorageWATPS2002002027-072027(P) Planned for installation, but regulatory approvals not initiatedCISO35.454196-120.86712026-09
66685/WH003Whale Rock Pumped Storage Hydro ProjectWH00366685CASan Luis ObispoPremium Energy HoldingsIPP Non-CHPHydroelectric Pumped StorageWATPS2002002027-072027(P) Planned for installation, but regulatory approvals not initiatedCISO35.454196-120.86712026-09
68348/ACESSAlamo City ESSACESS68348TXBexarAlamo City ESS LLCIPP Non-CHPBatteriesMWHBA2002002027-072027(P) Planned for installation, but regulatory approvals not initiatedERCO29.345305-98.319482026-09
68911/27288Flint2728868911OHFranklinFlintIPP Non-CHPBatteriesMWHBA2002002027-072027(U) Under construction, less than or equal to 50 percent completePJM40.09639-82.733612026-09
68906/PFBA2Pine Forest Solar IPFBA268906TXHopkinsPine Forest Solar I, LLCIPP Non-CHPBatteriesMWHBA2002002027-082027(U) Under construction, less than or equal to 50 percent completeDOPD33.100779-95.392292026-09
67768/CECBACumbia Energy CenterCECBA67768TXNuecesMission Clean Energy Devco LLCIPP Non-CHPBatteriesMWHBA2002002027-092027(P) Planned for installation, but regulatory approvals not initiatedERCO27.739083-97.449552026-09
66401/OHLPVOCI HillsboroOHLPV66401TXHillHEC Renewable Energy America LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-102027(P) Planned for installation, but regulatory approvals not initiatedERCO31.941-97.0212026-09
65821/HNYSRHoney Creek SolarHNYSR65821INWhiteLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-122027(P) Planned for installation, but regulatory approvals not initiatedPJM40.7971-86.85722026-09
66401/OHLBSOCI HillsboroOHLBS66401TXHillHEC Renewable Energy America LLCIPP Non-CHPBatteriesMWHBA2002002027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO31.941-97.0212026-09
66904/LBTNLumberton PV I, LLCLBTN66904TXHardinLumberton PV I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-122027(P) Planned for installation, but regulatory approvals not initiatedMISO30.298323-94.276312026-09
67354/5698Waco Solar II569867354TXLimestoneWaco Solar II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO31.71062-96.79142026-09
67652/BHALUBhaluBHALU67652TXHowardCypress Creek RenewablesIPP Non-CHPBatteriesMWHBA2002002027-122027(L) Regulatory approvals pending. Not under constructionERCO32.31219-101.33782026-09
68031/SCPSBScopus SolarSCPSB68031MOBollingerVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA2002002027-122027(P) Planned for installation, but regulatory approvals not initiatedMISO37.392178-89.899292026-09
68031/SCPSRScopus SolarSCPSR68031MOBollingerVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-122027(P) Planned for installation, but regulatory approvals not initiatedMISO37.392178-89.899292026-09
68036/VCHSBVichy SolarVCHSB68036MOMariesVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA2002002027-122027(P) Planned for installation, but regulatory approvals not initiatedMISO38.167934-91.825522026-09
68036/VCHSRVichy SolarVCHSR68036MOMariesVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-122027(P) Planned for installation, but regulatory approvals not initiatedMISO38.167934-91.825522026-09
68299/TUALTualatin Battery Energy Storage SystemTUAL68299ORWashingtonTUAL bn, LLCIPP Non-CHPBatteriesMWHBA2002002027-122027(L) Regulatory approvals pending. Not under constructionPGE45-1222026-09
68315/ARFL1Anthelope Hills Solar Generation BESSARFL168315MTBeaverheadARFL bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-122027(L) Regulatory approvals pending. Not under constructionNWMT45.05029-113.05882026-09
68315/ARFL2Anthelope Hills Solar Generation BESSARFL268315MTBeaverheadARFL bn, LLCIPP Non-CHPBatteriesMWHBA2002002027-122027(L) Regulatory approvals pending. Not under constructionNWMT45.05029-113.05882026-09
69189/C2BSCowboy Solar IIC2BS69189WYLaramieCowboy Solar IIIPP Non-CHPBatteriesMWHBA2002002027-122027(P) Planned for installation, but regulatory approvals not initiatedWACM41.032968-104.38162026-09
69199/ATL11ATLAS Solar XI, LLCATL1169199AZLa PazATLAS Solar Manager, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-122027(P) Planned for installation, but regulatory approvals not initiatedCISO33.553361-113.58032026-09
69982/3569Diamondback Solar356969982TXStarrDiamondback Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-122027(T) Regulatory approvals received. Not under constructionERCO26.426684-98.701022026-09
70297/BWTSBlackwater Solar Center - NMBWTS70297NMRooseveltBlackwater Solar Center, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-122027(T) Regulatory approvals received. Not under constructionSWPP34.292324-103.16572026-09
70341/TW200Thunder Wolf II, LLCTW20070341COPuebloThunder Wolf II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002027-122027(T) Regulatory approvals received. Not under constructionWACM38.94808-104.23572026-09
70462/PAWBPawnee Solar & BESSPAWB70462COMorganPublic Service Co of ColoradoElectric UtilityBatteriesMWHBA2002002027-122027(U) Under construction, less than or equal to 50 percent completePSCO40.127571-103.72492026-09
66858/SPRV2Spring Valley Solar 2SPRV266858ALColbertUrban Grid SolarIPP Non-CHPSolar PhotovoltaicSUNPV2002002028-022028(L) Regulatory approvals pending. Not under constructionTVA34.674983-87.663732026-09
67945/JCSIBJuniper Creek StorageJCSIB67945CASacramentoVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA2002002028-032028(T) Regulatory approvals received. Not under constructionCISO38.554073-121.20662026-09
67985/HRNT2Hornet Solar II (TX) (Hybrid)HRNT267985TXSwisherVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002028-032028(L) Regulatory approvals pending. Not under constructionERCO34.483406-101.96992026-09
67985/HRT2BHornet Solar II (TX) (Hybrid)HRT2B67985TXSwisherVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA2002002028-032028(L) Regulatory approvals pending. Not under constructionERCO34.483406-101.96992026-09
70257/H1SLRHawkeye Solar, LLCH1SLR70257IAClintonHawkeye Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002028-032028(L) Regulatory approvals pending. Not under constructionMISO41.835204-90.699662026-09
68490/BLSBroadleaf SolarBLS68490CTHartfordBroadleaf Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002028-042028(L) Regulatory approvals pending. Not under constructionISNE41.9241-72.78242026-09
67250/ALIBSAlina Energy LLCALIBS67250TXWilsonAlina Energy LLCIPP Non-CHPBatteriesMWHBA2002002028-062028(P) Planned for installation, but regulatory approvals not initiatedERCO29.161128-98.089882026-09
67250/ALIPVAlina Energy LLCALIPV67250TXWilsonAlina Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002028-062028(P) Planned for installation, but regulatory approvals not initiatedERCO29.161128-98.089882026-09
68604/DALPVDahlia EnergyDALPV68604TXLa SalleDahlia Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002028-062028(P) Planned for installation, but regulatory approvals not initiatedERCO28.369598-98.967622026-09
65847/ELDBSEldora Energy LLCELDBS65847TXMatagordaEldora Energy LLCIPP Non-CHPBatteriesMWHBA2002002028-072028(P) Planned for installation, but regulatory approvals not initiatedERCO28.865989-96.121692026-09
65847/ELDPVEldora Energy LLCELDPV65847TXMatagordaEldora Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002028-072028(P) Planned for installation, but regulatory approvals not initiatedERCO28.865989-96.121692026-09
68347/ABPV1Abeja Solar FarmABPV168347TXBeeAbeja Solar Farm LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002028-072028(P) Planned for installation, but regulatory approvals not initiatedERCO28.288244-97.840192026-09
68362/SABS1Sun Angel ESSSABS168362TXAngelinaSun Angel ESS LLCIPP Non-CHPBatteriesMWHBA2002002028-072028(P) Planned for installation, but regulatory approvals not initiatedERCO31.345947-94.667852026-09
69470/SVCSPSilver Creek Solar ParkSVCSP69470MIHuronDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV2002002028-082028(U) Under construction, less than or equal to 50 percent completeMISO43.837206-83.054812026-09
69952/CH1Cypress Harvest Solar StationCH169952LAIbervilleEntergy Louisiana LLCElectric UtilitySolar PhotovoltaicSUNPV2002002028-082028(P) Planned for installation, but regulatory approvals not initiatedMISO30.237835-91.264862026-09
69776/DKVSPDeckerville Solar ParkDKVSP69776MISanilacDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV2002002028-112028(U) Under construction, less than or equal to 50 percent completeMISO44.5521-82.76492026-09
61687/PLMCKPlum CreekPLMCK61687MNCottonwoodGeronimo PowerIPP Non-CHPOnshore Wind TurbineWNDWT2002002028-122028(L) Regulatory approvals pending. Not under constructionMISO44.14504-95.382722026-09
64632/99MT8Sienna Solar Farm99MT864632CASan Bernardino99MT 8me, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002028-122028(P) Planned for installation, but regulatory approvals not initiatedCISO34.493659-116.9152026-09
64632/99MTBSienna Solar Farm99MTB64632CASan Bernardino99MT 8me, LLCIPP Non-CHPBatteriesMWHBA2002002028-122028(P) Planned for installation, but regulatory approvals not initiatedCISO34.493659-116.9152026-09
68282/CENTCentralia Battery Energy Storage SystemCENT68282WAThurstonCENT bn, LLCIPP Non-CHPBatteriesMWHBA2002002028-122028(L) Regulatory approvals pending. Not under constructionPSEI46.779823-122.88482026-09
68485/22SVARexford 2 Solar Farm22SVA68485CATulare22SV 8ME LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002028-122028(P) Planned for installation, but regulatory approvals not initiatedCISO35.893525-119.08052026-09
68485/22SVBRexford 2 Solar Farm22SVB68485CATulare22SV 8ME LLCIPP Non-CHPBatteriesMWHBA2002002028-122028(P) Planned for installation, but regulatory approvals not initiatedCISO35.893525-119.08052026-09
69657/NS1New Salem Wind INS169657NDMortonNew Salem Wind IIPP Non-CHPOnshore Wind TurbineWNDWT20083.12028-122028(P) Planned for installation, but regulatory approvals not initiatedMISO46.730181-101.30542026-09
69990/BW1Bogalusa West Solar StationBW169990LAWashingtonEntergy Louisiana LLCElectric UtilitySolar PhotovoltaicSUNPV2002002028-122028(P) Planned for installation, but regulatory approvals not initiatedMISO30.84-89.862026-09
68090/WILLOWillow Beach WindWILLO68090TXBrazoriaAES Clean EnergyIPP Non-CHPOnshore Wind TurbineWNDWT2002002029-022029(L) Regulatory approvals pending. Not under constructionERCO29.249522-95.134162026-09
67655/ELKRNElk RunELKRN67655COLas AnimasCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV2002002029-062029(L) Regulatory approvals pending. Not under constructionPSCO37.454588-104.48872026-09
68292/GGSOGage SolarGGSO68292KYMcCrackenGGSO, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002029-062029(L) Regulatory approvals pending. Not under constructionLGEE37.0967-88.77912026-09
70138/CRAW1Crawfish Creek Energy StorageCRAW170138ALJacksonCrawfish Creek Energy Storage LLCIPP Non-CHPBatteriesMWHBA2002002029-062029(T) Regulatory approvals received. Not under constructionTVA34.83057-85.668452026-09
68349/AVBS1Avant Prairie ESSAVBS168349TXFreestoneAvant Prairie ESS LLCIPP Non-CHPBatteriesMWHBA2002002029-072029(P) Planned for installation, but regulatory approvals not initiatedERCO31.625891-96.122222026-09
68350/BESS1Bravo ESSBESS168350TXZapataBravo ESS LLCIPP Non-CHPBatteriesMWHBA2002002029-072029(P) Planned for installation, but regulatory approvals not initiatedERCO27.285037-99.411872026-09
68360/PRESSProst ESSPRESS68360TXAustinProst ESS LLCIPP Non-CHPBatteriesMWHBA2002002029-072029(P) Planned for installation, but regulatory approvals not initiatedERCO29.957853-96.533312026-09
68363/SSESSSunShiner ESSSSESS68363TXZavalaSunShiner ESS LLCIPP Non-CHPBatteriesMWHBA2002002029-072029(P) Planned for installation, but regulatory approvals not initiatedERCO28.937123-99.834072026-09
68364/TBESSTex-Bar ESSTBESS68364TXMadisonTex-Bar ESS LLCIPP Non-CHPBatteriesMWHBA2002002029-072029(P) Planned for installation, but regulatory approvals not initiatedERCO30.930573-96.030372026-09
69952/CH2Cypress Harvest Solar StationCH269952LAIbervilleEntergy Louisiana LLCElectric UtilityBatteriesMWHBA2002002029-092029(P) Planned for installation, but regulatory approvals not initiatedMISO30.237835-91.264862026-09
68368/MYSOMayfield Solar and StorageMYSO68368KYMcCrackenBrightNight PowerIPP Non-CHPSolar PhotovoltaicSUNPV2002002029-102029(L) Regulatory approvals pending. Not under constructionMISO36.8864-88.6592026-09
64904/1Elliot Solar LLC164904INGibsonElliot Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002029-122029(U) Under construction, less than or equal to 50 percent completeMISO38.316297-87.427932026-09
65808/SVECSacramento Valley Energy Center, LLCSVEC65808CASacramentoSacramento Valley Energy Center, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002029-122029(U) Under construction, less than or equal to 50 percent completeBANC38.57147-121.18452026-09
68084/MLBMorrow Lake BESSMLB68084TXFrioLeeward Asset Management, LLCIPP Non-CHPBatteriesMWHBA2002002029-122029(P) Planned for installation, but regulatory approvals not initiatedERCO28.936239-99.083182026-09
68288/MAHIFlag Run SolarMAHI68288INClarkMAHI bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002029-122029(L) Regulatory approvals pending. Not under constructionMISO38.556-85.2012026-09
68290/DYSPDyers Spring SolarDYSP68290KYBreckinridgeDYSP, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002029-122029(L) Regulatory approvals pending. Not under constructionLGEE37.688411-86.269272026-09
68332/DEGA1Dega Solar and StorageDEGA168332ALTalladegaDEGA bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002029-122029(L) Regulatory approvals pending. Not under constructionSOCO33.537201-86.08552026-09
68332/DEGA2Dega Solar and StorageDEGA268332ALTalladegaDEGA bn, LLCIPP Non-CHPBatteriesMWHBA2002002029-122029(L) Regulatory approvals pending. Not under constructionSOCO33.537201-86.08552026-09
68843/TLCPTupper Lake WindTLCP68843MIIoniaTupper LakeIPP Non-CHPOnshore Wind TurbineWNDWT2001982029-122029(L) Regulatory approvals pending. Not under constructionMISO42.829-85.1382026-09
69633/99757Lion Solar9975769633ARJeffersonLion Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002029-122029(P) Planned for installation, but regulatory approvals not initiatedMISO34.324581-91.92532026-09
70186/SOLBSSolstice Solar LLCSOLBS70186OKLe FloreClenera DevCo LLCIPP Non-CHPBatteriesMWHBA2002002029-122029(P) Planned for installation, but regulatory approvals not initiatedSWPP35.291043-94.778912026-09
70186/SOLPVSolstice Solar LLCSOLPV70186OKLe FloreClenera DevCo LLCIPP Non-CHPSolar PhotovoltaicSUNPV2002002029-122029(P) Planned for installation, but regulatory approvals not initiatedSWPP35.291043-94.778912026-09
58652/1La Paz Solar Tower158652AZLa PazEnviromission, IncIPP Non-CHPSolar Thermal without Energy StorageSUNOT2002002030-062030(P) Planned for installation, but regulatory approvals not initiatedWALC33.917222-114.26752026-09
69637/28152Oakley BESS2815269637TXDentonOakley BESS LLCIPP Non-CHPBatteriesMWHBA2002002030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO33.41854-97.188092026-09
69641/49453Metro BESS4945369641TXCaldwellMetro BESS LLCIPP Non-CHPBatteriesMWHBA2002002030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO30.003245-97.677942026-09
70136/MORL1Morel Energy StorageMORL170136COMoffatMorel Energy Storage LLCIPP Non-CHPBatteriesMWHBA2002002030-122030(T) Regulatory approvals received. Not under constructionSWPP40.469217-107.60322026-09
68342/HOHIHop Hill Solar Generation and BESSHOHI68342WABentonHOHI bn, LLCIPP Non-CHPOnshore Wind TurbineWNDWT2002002031-092031(L) Regulatory approvals pending. Not under constructionBPAT46.324-119.8222026-09
68361/RUESSRush ESSRUESS68361TXBexarRush ESS LLCIPP Non-CHPBatteriesMWHBA2002002031-122031(P) Planned for installation, but regulatory approvals not initiatedERCO29.307639-98.296732026-09
58835/ELK4Elk StationELK458835TXHaleGolden Spread Electric Cooperative, IncElectric UtilityNatural Gas Fired Combustion TurbineNGGT199.82012027-032027(U) Under construction, less than or equal to 50 percent completeSWPP33.865-101.84332026-09
68767/BRGSPGreenalia Solar Power Blackwelder RanchBRGSP68767TXPecosGreenalia Solar Power Blackwelder Ranch, LLCIPP Non-CHPSolar PhotovoltaicSUNPV199.7199.72030-062030(P) Planned for installation, but regulatory approvals not initiatedERCO30.81256-102.18652026-09
69946/SBASpindle BESSSBA69946COWeldSpindle Battery LLCIPP Non-CHPBatteriesMWHBA1991992026-122026(TS) Construction complete, but not yet in commercial operationPSCO40.092401-104.90122026-09
68510/CFC1Ritter SolarCFC168510OHFultonRepsol Renewables NAIPP Non-CHPSolar PhotovoltaicSUNPV1991992027-122027(P) Planned for installation, but regulatory approvals not initiatedPJM41.694902-84.316822026-09
69278/1Fortress 1169278COMorganFortress Solar 1 LLCIPP Non-CHPSolar PhotovoltaicSUNPV1991992028-032028(L) Regulatory approvals pending. Not under constructionPSCO40.26-103.572026-09
68153/BA1Fremont SolarBA168153UTIronFremont Solar, LLCIPP Non-CHPBatteriesMWHBA1981982027-122027(U) Under construction, less than or equal to 50 percent completePACE37.9789-112.77612026-09
69780/OCPV1Oystercatcher SolarOCPV169780TXEllisCardinal Investment Company, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV1971972027-032027(V) Under construction, more than 50 percent completeERCO32.192556-96.918672026-09
70259/CHCS2Cunningham Solar IICHCS270259NMLeaSouthwestern Public Service CoElectric UtilitySolar PhotovoltaicSUNPV1961962027-042027(T) Regulatory approvals received. Not under constructionSWPP32.786412-103.35072026-09
66908/BZESBonanza Solar and Storage ProjectBZES66908NVClarkEDF Renewables Development, Inc.IPP Non-CHPBatteriesMWHBA1951952027-122027(L) Regulatory approvals pending. Not under constructionCISO36.558-115.7992026-09
67798/GRS7Steelhead Energy StorageGRS767798TXFanninGRS BESS Texas Seven, LLCIPP Non-CHPBatteriesMWHBA193.7190.12027-092027(L) Regulatory approvals pending. Not under constructionERCO33.633102-96.157892026-09
67233/SOL1Lawrence County SolarSOL167233ALLawrenceTennessee Valley AuthorityElectric UtilitySolar PhotovoltaicSUNPV1931932027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA34.63928-87.250982026-09
66673/66666Accalia Point Solar, LLC6666666673TXCameronAccalia Point Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV190.5190.52028-052028(P) Planned for installation, but regulatory approvals not initiatedERCO26.098075-97.837522026-09
68461/KEYBBKey Energy StorageKEYBB68461CAFresnoKey Energy Storage LLCIPP Non-CHPBatteriesMWHBA1901902027-042027(T) Regulatory approvals received. Not under constructionCISO36.13681-120.13122026-09
68029/PSPPenton Solar PlantPSP68029MSDeSotoEntergy Mississippi LLCElectric UtilitySolar PhotovoltaicSUNPV1901902028-032028(P) Planned for installation, but regulatory approvals not initiatedMISO34.861567-90.2632026-09
67777/GRS4BHarryoung PV and BESSGRS4B67777TXCameronGransolar Texas Four LLCIPP Non-CHPBatteriesMWHBA1901902028-052028(L) Regulatory approvals pending. Not under constructionERCO26.276027-97.632492026-09
67777/GRS4PHarryoung PV and BESSGRS4P67777TXCameronGransolar Texas Four LLCIPP Non-CHPSolar PhotovoltaicSUNPV1901902028-052028(L) Regulatory approvals pending. Not under constructionERCO26.276027-97.632492026-09
59047/GEN 1Gallegos Wind Farm, Phase 1GEN 159047NMUnionGallegos Wind Farm LLCIPP Non-CHPOnshore Wind TurbineWNDWT1901902028-112028(P) Planned for installation, but regulatory approvals not initiatedPNM36.580281-103.8492026-09
64658/AFSAEUG Fleming Solar, LLCAFS64658KYFlemingAcciona Energy USA Global, LLCIPP Non-CHPSolar PhotovoltaicSUNPV188.5188.52028-052028(U) Under construction, less than or equal to 50 percent completePJM38.429925-83.771562026-09
68411/NORPVNoor SolarNORPV68411TXChambersIndustrial Kilo Project, LLCIPP Non-CHPSolar PhotovoltaicSUNPV188.21852028-032028(L) Regulatory approvals pending. Not under constructionERCO29.909115-94.967562026-09
67555/RIC98Zephyr StorageRIC9867555TXBrownRIC Development, LLCIPP Non-CHPBatteriesMWHBA185.6185.62028-032028(P) Planned for installation, but regulatory approvals not initiatedERCO31.707049-98.857462026-09
67556/RIC97Serrano BESSRIC9767556TXMaverickRIC Development, LLCIPP Non-CHPBatteriesMWHBA185.6185.62028-042028(P) Planned for installation, but regulatory approvals not initiatedERCO28.837905-100.54872026-09
66893/TXJC2Jones City 2 SolarTXJC266893TXJonesLightsource Renewable Energy Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1851852026-102026(TS) Construction complete, but not yet in commercial operationERCO32.794928-99.992932026-09
65935/14Vermillion Rise Solar1465935INVermillionVermillion Rise Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1851852027-122027(P) Planned for installation, but regulatory approvals not initiatedMISO39.83182-87.428952026-09
69467/PETSPPeatville Solar ParkPETSP69467MISanilacDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV1851852028-072028(U) Under construction, less than or equal to 50 percent completeMISO43.64-82.82026-09
68319/NIMNimbus Wind FarmNIM68319ARCarrollNimbus Wind Farm LLCIPP Non-CHPOnshore Wind TurbineWNDWT1831832026-102026(TS) Construction complete, but not yet in commercial operationMISO36.27118-93.406822026-09
69579/HMWTHoney Mesquite Wind, LLCHMWT69579TXSterlingRWE Americas, LLCIPP Non-CHPOnshore Wind TurbineWNDWT180.5180.52026-122026(TS) Construction complete, but not yet in commercial operationERCO32.030383-101.16722026-09
67559/RIC95Dunlay SolarRIC9567559TXMedinaRIC Development, LLCIPP Non-CHPSolar PhotovoltaicSUNPV180.4150.52030-052030(P) Planned for installation, but regulatory approvals not initiatedERCO29.314674-99.097252026-09
69151/ARY_BArroyo StorageARY_B69151TXCameronBT Cantwell Solar, LLCIPP Non-CHPBatteriesMWHBA1801802026-112026(TS) Construction complete, but not yet in commercial operationERCO26.264311-97.611562026-09
69245/NTFLNightfall SolarNTFL69245TXUvaldeSol SystemsIPP Non-CHPSolar PhotovoltaicSUNPV1801802026-122026(U) Under construction, less than or equal to 50 percent completeERCO29.259299-99.725132026-09
66891/245BSIndigo Solar & Storage245BS66891TXFisherInnovative Solar 245 LLCIPP Non-CHPBatteriesMWHBA1801802027-052027(P) Planned for installation, but regulatory approvals not initiatedERCO32.628061-100.2362026-09
67173/HLW00Hoosier Line SolarHLW0067173INWhiteLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1801802027-102027(P) Planned for installation, but regulatory approvals not initiatedPJM40.851153-86.944752026-09
70183/FSPVFlatland SolarFSPV70183TXScurryFlatland Solar Energy, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1801802027-112027(L) Regulatory approvals pending. Not under constructionERCO32.618367-100.97892026-09
62846/WWE1Water Valley Wind EnergyWWE162846TXTom GreenTri Global Energy, LLCIPP Non-CHPOnshore Wind TurbineWNDWT1801802027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO31.611223-100.81332026-09
63096/GEN1Horseshoe Solar EnergyGEN163096NYLivingstonInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV1801802028-112028(L) Regulatory approvals pending. Not under constructionNYIS42.570762-77.452962026-09
68814/ASHU2Brazos River BESS LLCASHU268814TXBrazoriaNexus Renewables U.S. Inc.IPP Non-CHPBatteriesMWHBA1801802028-112028(P) Planned for installation, but regulatory approvals not initiatedERCO29.150409-95.621242026-09
66238/1SPSSculpin Solar1SPS66238INDeKalbRWE Americas, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1801802028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM41.364556-84.843812026-09
69761/DBBESDawn Break SolarDBBES69761WIWausharaDawn Break Solar, LLCIPP Non-CHPBatteriesMWHBA1801802029-092029(L) Regulatory approvals pending. Not under constructionMISO44.140833-89.464722026-09
69761/DBSOLDawn Break SolarDBSOL69761WIWausharaDawn Break Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1801802029-092029(L) Regulatory approvals pending. Not under constructionMISO44.140833-89.464722026-09
65975/TXSD2Starr Solar RanchTXSD265975TXStarrLightsource Renewable Energy Asset Management, LLCIPP Non-CHPBatteriesMWHBA1801802031-122031(L) Regulatory approvals pending. Not under constructionERCO26.523359-99.017112026-09
68413/OTOld Town WindOT68413ILMarshallOld Town Wind LLCIPP Non-CHPOnshore Wind TurbineWNDWT1781782029-102029(P) Planned for installation, but regulatory approvals not initiatedMISO40.988976-89.173262026-09
68176/WILBAWillis StorageWILBA68176TXRainsBelltown Power Texas 2, LLCIPP Non-CHPBatteriesMWHBA176.1176.12027-092027(L) Regulatory approvals pending. Not under constructionERCO32.870406-95.747852026-09
68165/BROBABrotherton StorageBROBA68165TXAndersonBelltown Power Texas 2, LLCIPP Non-CHPBatteriesMWHBA176.1176.12027-122027(L) Regulatory approvals pending. Not under constructionERCO31.687913-95.739882026-09
68171/MCMBAMcmurtre StorageMCMBA68171TXHuntBelltown Power Texas 2, LLCIPP Non-CHPBatteriesMWHBA176.1176.12027-122027(L) Regulatory approvals pending. Not under constructionERCO33.179664-95.809222026-09
68178/YOOBAYooperlite StorageYOOBA68178TXWiseBelltown Power Texas 2, LLCIPP Non-CHPBatteriesMWHBA175.7175.72027-122027(L) Regulatory approvals pending. Not under constructionERCO33.033186-97.880312026-09
64349/6666Armadillo Solar Center666664349TXNavarroAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1751752027-042027(U) Under construction, less than or equal to 50 percent completeERCO32.00014-96.20272026-09
65425/KWOODKingwood SolarKWOOD65425OHGreeneVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV1751752027-122027(P) Planned for installation, but regulatory approvals not initiatedPJM39.782-83.832026-09
69984/6059Hackberry Creek Solar605969984TXMitchellHackberry Creek Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1751752028-032028(T) Regulatory approvals received. Not under constructionERCO32.393074-100.87022026-09
68459/5961Bob Creek Wind, LLC596168459TXSterlingBob Creek Wind, LLCIPP Non-CHPOnshore Wind TurbineWNDWT1751752028-042028(P) Planned for installation, but regulatory approvals not initiatedERCO31.868813-101.22752026-09
69462/AUGSPAu Gres Solar ParkAUGSP69462MIArenacDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV1751752028-082028(U) Under construction, less than or equal to 50 percent completeMISO44.118-83.7942026-09
68323/ALT8BAtlas VIIIALT8B68323AZLa PazAtlas VIII LLCIPP Non-CHPBatteriesMWHBA172.4172.42027-012027(V) Under construction, more than 50 percent completeCISO33.582903-113.57692026-09
68940/CABSCountry Acres Clean Power LLCCABS68940CAPlacerClenera DevCo LLCIPP Non-CHPBatteriesMWHBA1721722027-022027(V) Under construction, more than 50 percent completeBANC38.751744-121.42212026-09
67956/CONPVConcho Pearl Solar and StorageCONPV67956TXConchoRed River Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV171.9171.92027-102027(T) Regulatory approvals received. Not under constructionERCO31.465492-99.934352026-09
69110/CONEFConeflower Storage Project LLCCONEF69110TXChambersAcciona Energy USA Global, LLCIPP Non-CHPBatteriesMWHBA170.9170.92028-072028(L) Regulatory approvals pending. Not under constructionERCO29.8547-94.92542026-09
66390/GDYPVMRG Goody Solar Project HybridGDYPV66390TXLamarNexus Renewable Power, LLCIPP Non-CHPSolar PhotovoltaicSUNPV170.8170.82026-102026(V) Under construction, more than 50 percent completeERCO33.639193-95.629052026-09
66397/TOKIOTokio SolarTOKIO66397TXMcLennanGransolar Texas Eight, LLCIPP Non-CHPSolar PhotovoltaicSUNPV170.41682028-052028(P) Planned for installation, but regulatory approvals not initiatedERCO31.427419-97.310862026-09
69967/FTSFoxtail Flats Solar, LLCFTS69967NMSan JuanFoxtail Flats Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1701702027-052027(U) Under construction, less than or equal to 50 percent completePNM36.8685-108.2772026-09
67222/1Yellow Viking Solar167222TXSomervellLydian EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1701702027-102027(L) Regulatory approvals pending. Not under constructionERCO32.31664-97.628892026-09
68082/BBPBluebonnet Prairie WindBBP68082TXNavarroLeeward Asset Management, LLCIPP Non-CHPOnshore Wind TurbineWNDWT1701702027-122027(U) Under construction, less than or equal to 50 percent completeERCO32.143863-96.300972026-09
68366/AGATAGATE BESSAGAT68366WAKitsapBrightNight PowerIPP Non-CHPBatteriesMWHBA1701702029-022029(L) Regulatory approvals pending. Not under constructionPSEI47.76879-122.60782026-09
69991/SN1Segno Solar StationSN169991TXPolkEntergy Louisiana LLCElectric UtilitySolar PhotovoltaicSUNPV1701702029-032029(P) Planned for installation, but regulatory approvals not initiatedMISO30.577-94.6862026-09
68769/M3GSPGreenalia Solar Power Misae IIIM3GSP68769TXChildressGreenlia Solar Power Misae III, LLCIPP Non-CHPSolar PhotovoltaicSUNPV169.6169.62027-092027(T) Regulatory approvals received. Not under constructionERCO34.343755-100.06682026-09
68397/I168MIronwood SolarI168M68397AZYumaArizona Public Service CoElectric UtilitySolar PhotovoltaicSUNPV1681682026-122026(TS) Construction complete, but not yet in commercial operationAZPS32.915556-113.57782026-09
69722/BESS1Salt Cod BESSBESS169722MABristolSomerset Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1681682028-122028(L) Regulatory approvals pending. Not under constructionISNE41.73722-71.14892026-09
66976/WAPPACarol Wind, LLCWAPPA66976TXPotterCarol Wind, LLCIPP Non-CHPOnshore Wind TurbineWNDWT167.8167.82027-122027(T) Regulatory approvals received. Not under constructionERCO35.259819-102.06432026-09
69148/BESS1Allen 2 BESSBESS169148NCGastonDuke Energy Carolinas, LLCElectric UtilityBatteriesMWHBA1671672027-072027(P) Planned for installation, but regulatory approvals not initiatedDUK35.192096-81.010132026-09
66312/CHSLCourthouse SolarCHSL66312VACharlotteDominion Energy Inc.Electric UtilitySolar PhotovoltaicSUNPV1671672030-102030(U) Under construction, less than or equal to 50 percent completePJM37.04-78.582026-09
70441/PALO2Palo Duro Energy Storage IIPALO270441TXOchiltreePalo Duro Energy Center, LLCIPP Non-CHPBatteriesMWHBA165.7165.72029-052029(P) Planned for installation, but regulatory approvals not initiatedSWPP36.410697-101.01492026-09
66895/LP1PVLupinus Solar 1, LLCLP1PV66895TXFranklinSunraycer Assets I LLCIPP Non-CHPSolar PhotovoltaicSUNPV1651652027-092027(U) Under construction, less than or equal to 50 percent completeERCO30.303385-95.256922026-09
67936/GS1Goshen SolarGS167936WYGoshenGoshen Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1631632030-122030(T) Regulatory approvals received. Not under constructionWACM41.853445-104.50322026-09
67956/CONBSConcho Pearl Solar and StorageCONBS67956TXConchoRed River Clean EnergyIPP Non-CHPBatteriesMWHBA162.4162.42027-102027(T) Regulatory approvals received. Not under constructionERCO31.465492-99.934352026-09
63342/BKIIMcCrae Wind Energy IIBKII63342TXGlasscockMcCrae Wind Energy II, LLCIPP Non-CHPOnshore Wind TurbineWNDWT162.1162.12026-122026(TS) Construction complete, but not yet in commercial operationERCO31.754037-101.67522026-09
68993/ENX40MPG SolarENX4068993PACentreMPG Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1621622028-072028(T) Regulatory approvals received. Not under constructionPJM41.060649-78.041932026-09
68907/1Vidal Energy Center168907CASan BernardinoCDH Vidal LLCIPP Non-CHPBatteriesMWHBA1601602026-122026(V) Under construction, more than 50 percent completeCISO34.084796-114.47072026-09
68907/2Vidal Energy Center268907CASan BernardinoCDH Vidal LLCIPP Non-CHPSolar PhotovoltaicSUNPV1601602026-122026(V) Under construction, more than 50 percent completeCISO34.084796-114.47072026-09
68559/MAGNASR MagnoliaMAGNA68559MSMonroeSR Magnolia, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1601602027-062027(V) Under construction, more than 50 percent completeTVA33.856467-88.674882026-09
69582/CSTPChester Solar Technology Park, LLCCSTP69582VAChesterfieldChester Solar Technology Park, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1601602027-102027(L) Regulatory approvals pending. Not under constructionPJM37.317-77.4662026-09
70256/DCESDry Creek Energy Storage, LLCDCES70256CASacramentoDry Creek Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1601602027-112027(T) Regulatory approvals received. Not under constructionBANC38.347139-121.12092026-09
68584/YBSYellow Barn SolarYBS68584NYTompkinsLydian EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1601602028-092028(P) Planned for installation, but regulatory approvals not initiatedNYIS42.56495-76.439072026-09
67653/CARRICarrigerCARRI67653WAKlickitatCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV1601602028-112028(L) Regulatory approvals pending. Not under constructionBPAT45.8777-120.88652026-09
69638/11767Landshark Energy Generation Facility1176769638MSCalhounLandshark Energy Generation Facility LLCIPP Non-CHPSolar PhotovoltaicSUNPV1601602030-122030(P) Planned for installation, but regulatory approvals not initiatedMISO33.898797-89.145772026-09
67774/GRS3Pecan BESSGRS367774TXLeonGransolar Texas Three, LLCIPP Non-CHPBatteriesMWHBA157.1157.12028-122028(L) Regulatory approvals pending. Not under constructionERCO31.078667-96.223282026-09
68667/RIC89Chimney Rock BESSRIC8968667TXTaylorRIC Development, LLCIPP Non-CHPBatteriesMWHBA1561562028-042028(P) Planned for installation, but regulatory approvals not initiatedERCO32.387494-99.848462026-09
70584/SOSBASOSA Energy CenterSOSBA70584TXMadisonSOSA Energy Center, LLCIPP Non-CHPBatteriesMWHBA155.81502027-072027(U) Under construction, less than or equal to 50 percent completeERCO30.927401-96.07382026-09
65900/SPRINSpringwater Solar, LLCSPRIN65900OHMadisonSpringwater Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1551552027-042027(U) Under construction, less than or equal to 50 percent completePJM39.82972-83.24982026-09
70022/DCYSODecoy Solar Energy LLCDCYSO70022ARArkansasInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV1551552027-122027(U) Under construction, less than or equal to 50 percent completeMISO34.463496-91.520532026-09
67078/GRS3Quarter Ranch SolarGRS367078TXWebbGransolar Texas Three, LLCIPP Non-CHPSolar PhotovoltaicSUNPV154.11542028-102028(L) Regulatory approvals pending. Not under constructionERCO27.301064-99.430412026-09
69945/WTRTNWatertown SolarWTRTN69945MISanilacWatertown Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1541542027-042027(U) Under construction, less than or equal to 50 percent completeMISO43.399794-82.814252026-09
67581/CIRSACairos Solar and StorageCIRSA67581TXKinneySamsung C&T Renewables, LLCIPP Non-CHPSolar PhotovoltaicSUNPV153.3153.32027-062027(P) Planned for installation, but regulatory approvals not initiatedERCO29.269974-100.19752026-09
66651/37565Arco Wind and Solar Project3756566651IDBonnevillePacifiCorpElectric UtilityOnshore Wind TurbineWNDWT1531532027-122027(T) Regulatory approvals received. Not under constructionPACE43.557-112.44152026-09
59971/ESTR1EasterESTR159971TXCastroEnbridge Wind (Easter), LLCIPP Non-CHPOnshore Wind TurbineWNDWT1521522027-032027(V) Under construction, more than 50 percent completeERCO34.668882-102.35172026-09
63584/NY2NY2 BatteryNY263584NYOrangeKey Capture EnergyIPP Non-CHPBatteriesMWHBA151.5151.52028-072028(L) Regulatory approvals pending. Not under constructionNYIS41.52667-74.142262026-09
66905/SOLARAbles Springs Solar & StorageSOLAR66905TXKaufmanAbles Springs Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1511512026-102026(TS) Construction complete, but not yet in commercial operationERCO32.819566-96.184842026-09
68478/DRKDarkwood SolarDRK68478TXComancheMustang Creek Solar I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV150.7150.72027-102027(L) Regulatory approvals pending. Not under constructionERCO31.928528-98.42412026-09
68866/SANSanta Teresa SolarSAN68866NMDona AnaSanta Teresa SolarIPP Non-CHPBatteriesMWHBA1501502026-102026(TS) Construction complete, but not yet in commercial operationEPE31.805525-106.69892026-09
69540/RCS01Rock Creek SolarRCS0169540IAClintonRock Creek Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502026-102026(TS) Construction complete, but not yet in commercial operationMISO41.771603-90.357512026-09
66960/BLKSLBlackford SolarBLKSL66960INBlackfordLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502026-112026(V) Under construction, more than 50 percent completePJM40.41608-85.259792026-09
67964/A400MAgaveA400M67964AZMaricopaArizona Public Service CoElectric UtilityBatteriesMWHBA1501502026-112026(TS) Construction complete, but not yet in commercial operationAZPS33.32389-112.83972026-09
69874/BHSFBee Hollow Solar, LLCBHSF69874ILSt ClairGeronimo PowerIPP Non-CHPSolar PhotovoltaicSUNPV1501502026-112026(V) Under construction, more than 50 percent completeMISO38.323-89.752026-09
64215/45MGAAratina Solar Center 245MGA64215CAKern45MG 8me LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502026-122026(TS) Construction complete, but not yet in commercial operationCISO35.062965-118.08782026-09
67347/OF1Osagrove Flats WindOF167347ILLaSalleAvangrid Power LLCIPP Non-CHPOnshore Wind TurbineWNDWT1501502026-122026(TS) Construction complete, but not yet in commercial operationPJM40.941383-88.971522026-09
67755/LTRSPLittle Trout SolarLTRSP67755MIPresque IsleDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV1501502026-122026(TS) Construction complete, but not yet in commercial operationMISO45.334045-83.751172026-09
69277/GR001Gunnar Reliability ProjectGR00169277TXHidalgoGunnar Reliability Project LLCIPP Non-CHPBatteriesMWHBA1501502026-122026(U) Under construction, less than or equal to 50 percent completeERCO26.315571-98.148512026-09
69605/TENNTennyson SolarTENN69605TXCokeBNB Tennyson Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502026-122026(U) Under construction, less than or equal to 50 percent completeERCO31.726229-100.27712026-09
68932/OSBAOvernight SolarOSBA68932CASan BernardinoOvernight Solar LLCIPP Non-CHPBatteriesMWHBA1501502027-012027(V) Under construction, more than 50 percent completeCISO35.016197-117.3572026-09
68932/OSPVOvernight SolarOSPV68932CASan BernardinoOvernight Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-012027(V) Under construction, more than 50 percent completeCISO35.016197-117.3572026-09
67995/PWSPiney Woods SolarPWS67995TXWalkerPiney Woods Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-022027(V) Under construction, more than 50 percent completeMISO30.718683-95.669652026-09
68321/ALT4Atlas BESS IV LLCALT468321AZLa PazATLAS BESS IV, LLCIPP Non-CHPBatteriesMWHBA1501502027-032027(V) Under construction, more than 50 percent completeCISO33.582903-113.57692026-09
66891/IS245Indigo Solar & StorageIS24566891TXFisherInnovative Solar 245 LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-052027(P) Planned for installation, but regulatory approvals not initiatedERCO32.628061-100.2362026-09
69929/WC001Weirs CreekWC00169929KYHopkinsWeirs Creek Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-052027(U) Under construction, less than or equal to 50 percent completeMISO37.423648-87.690482026-09
70377/BESBoxcar Energy StorageBES70377TXCollinBoxcar Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1501502027-052027(V) Under construction, more than 50 percent completeERCO33.018516-96.520032026-09
66671/CONEZConez Solar, LLCCONEZ66671GAEmanuelSamsung C&T Renewables, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-062027(P) Planned for installation, but regulatory approvals not initiatedSOCO32.458353-82.394572026-09
67231/HSHinds Solar, LLCHS67231MSHindsHinds Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-072027(U) Under construction, less than or equal to 50 percent completeMISO32.416186-90.388862026-09
66672/AG239Stark Solar, LLCAG23966672OHStarkSamsung C&T Renewables, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-082027(P) Planned for installation, but regulatory approvals not initiatedPJM40.852661-81.157012026-09
68901/PVCLACedar Range SolarPVCLA68901TXHopkinsCedar Range LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-092027(L) Regulatory approvals pending. Not under constructionERCO33.057483-95.827012026-09
69660/HSEl PatrimonioHS69660TXBexarHeritage Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-092027(L) Regulatory approvals pending. Not under constructionERCO29.240499-98.510062026-09
69974/CRZN1Corazon Energy StorageCRZN169974NMBernalilloCorazon Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1501502027-092027(U) Under construction, less than or equal to 50 percent completePNM35.003482-106.7422026-09
60272/WT1Cone Renewable Energy Project, LLCWT160272TXCrosbyCone Renewable Energy Project, LLCIPP Non-CHPOnshore Wind TurbineWNDWT1501502027-112027(L) Regulatory approvals pending. Not under constructionERCO33.8093-101.34242026-09
70195/MAMM1Mammoth Plains Energy StorageMAMM170195OKDeweyMammoth Plains Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1501502027-112027(P) Planned for installation, but regulatory approvals not initiatedSPA35.981842-98.706722026-09
70199/PALO1Palo Duro Energy StoragePALO170199TXOchiltreePalo Duro Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1501502027-112027(P) Planned for installation, but regulatory approvals not initiatedSWPP36.4106-101.01022026-09
66558/LAMO1Mowata SolarLAMO166558LAAcadiaLightsource Renewable Energy Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-122027(L) Regulatory approvals pending. Not under constructionMISO30.3918-92.40442026-09
67358/4670Lake Whitney Solar467067358TXBosqueLake Whitney Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO31.837644-97.398442026-09
67874/ENX32Parks Valley Energy LLCENX3267874WVHampshireParks Valley Energy LLCIPP Non-CHPBatteriesMWHBA1501502027-122027(P) Planned for installation, but regulatory approvals not initiatedPJM39.288816-78.474812026-09
69972/SP150South Platte SolarSP15069972COMorganSouth Platte SolarIPP Non-CHPSolar PhotovoltaicSUNPV1501502027-122027(U) Under construction, less than or equal to 50 percent completePSCO40.194947-103.70882026-09
70218/SEL1BSelma Energy CenterSEL1B70218AZPinalSelma Energy Center, LLCIPP Non-CHPBatteriesMWHBA1501502027-122027(U) Under construction, less than or equal to 50 percent completeDOPD32.849821-111.52512026-09
70544/GBESSGreer Energy StorageGBESS70544MSWashingtonGreer Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1501502027-122027(L) Regulatory approvals pending. Not under constructionMISO33.113983-90.830662026-09
69278/2Fortress 1269278COMorganFortress Solar 1 LLCIPP Non-CHPBatteriesMWHBA1501502028-032028(L) Regulatory approvals pending. Not under constructionPSCO40.26-103.572026-09
65665/HEPU1Hecate Energy Pulaski 1HEPU165665VAPulaskiAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1501502028-042028(L) Regulatory approvals pending. Not under constructionPJM37.139595-80.687412026-09
67986/MSPRBMeadow Springs Renewable Energy (Hybrid)MSPRB67986ILWhiteVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA1501502028-062028(P) Planned for installation, but regulatory approvals not initiatedMISO38.029-88.2842026-09
67986/MSPREMeadow Springs Renewable Energy (Hybrid)MSPRE67986ILWhiteVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502028-062028(P) Planned for installation, but regulatory approvals not initiatedMISO38.029-88.2842026-09
68480/LS1Laurens SolarLS168480GALaurensLaurens Solar I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502028-062028(L) Regulatory approvals pending. Not under constructionSOCO32.577504-83.112162026-09
66132/TXTR1Trinity River Solar 1TXTR166132TXLibertyLightsource Renewable Energy Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502028-072028(L) Regulatory approvals pending. Not under constructionERCO30.010255-94.486312026-09
68061/GEMPVGemstone Solar LLCGEMPV68061MICassClenera DevCo LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502028-102028(T) Regulatory approvals received. Not under constructionPJM41.896754-86.04882026-09
69577/SPRORSuperior Solar Project, LLCSPROR69577MIMarquetteInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501002028-122028(P) Planned for installation, but regulatory approvals not initiatedMISO46.455-87.4662026-09
70055/AA1Allen Acres SolarAA170055ILLaSalleAvangrid Power LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502029-052029(P) Planned for installation, but regulatory approvals not initiatedPJM41.11792-88.640382026-09
68333/CROSCrossroads Solar - GACROS68333GALibertyCrossroads bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502029-072029(L) Regulatory approvals pending. Not under constructionSOCO31.71-81.662026-09
68105/JASPSR JasperJASP68105MSJasperSR Jasper, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502029-122029(T) Regulatory approvals received. Not under constructionSOCO32.048427-88.944192026-09
67894/51LVABellefield 3 Solar and Battery Storage51LVA67894CAKern51LV 8me, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502030-052030(P) Planned for installation, but regulatory approvals not initiatedCISO35.029153-117.99262026-09
67894/51LVBBellefield 3 Solar and Battery Storage51LVB67894CAKern51LV 8me, LLCIPP Non-CHPBatteriesMWHBA1501502030-052030(P) Planned for installation, but regulatory approvals not initiatedCISO35.029153-117.99262026-09
61170/33UI9Gale 1 Solar33UI961170UTMillard33UI 8me LLCIPP Non-CHPBatteriesMWHBA1501502030-082030(P) Planned for installation, but regulatory approvals not initiatedLDWP39.523-112.5462026-09
67352/CPVCLCPV County Line Solar, LLCCPVCL67352VACharlotteCPV County Line Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1501502030-122030(P) Planned for installation, but regulatory approvals not initiatedPJM37.190161-78.682282026-09
70236/SLRN1Sierra Luna Energy StorageSLRN170236AZMaricopaSierra Luna Energy Storage LLCIPP Non-CHPBatteriesMWHBA1501502030-122030(P) Planned for installation, but regulatory approvals not initiatedSRP33.408834-112.30422026-09
70340/CAR15Carousel Energy Storage, LLCCAR1570340COKit CarsonCarousel Energy Storage, LLCIPP Non-CHPBatteriesMWHBA149.6149.62027-122027(T) Regulatory approvals received. Not under constructionSWPP39.213298-102.10362026-09
68194/RIVERRiverstone SolarRIVER68194VABuckinghamRiverstone Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV149.5149.52027-102027(T) Regulatory approvals received. Not under constructionPJM37.72839-78.451882026-09
68738/CANPVCannibal Draw Solar and StorageCANPV68738TXGlasscockRed River Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV149.5149.52028-042028(T) Regulatory approvals received. Not under constructionERCO32.023861-101.2842026-09
68900/BSSBadger State Solar LLCBSS68900WIJeffersonBadger State Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1491492027-102027(V) Under construction, more than 50 percent completeMISO43.012287-88.863562026-09
67773/GRS20Cosper SolarGRS2067773TXBellGransolar Texas Twenty LLCIPP Non-CHPSolar PhotovoltaicSUNPV148.21482027-112027(L) Regulatory approvals pending. Not under constructionERCO30.994225-97.795882026-09
68078/CHIPVChisme Solar and StorageCHIPV68078TXBrownRed River Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1471472027-072027(U) Under construction, less than or equal to 50 percent completeERCO31.568929-98.821952026-09
68078/CHIBSChisme Solar and StorageCHIBS68078TXBrownRed River Clean EnergyIPP Non-CHPBatteriesMWHBA1461462027-072027(U) Under construction, less than or equal to 50 percent completeERCO31.568929-98.821952026-09
67567/WEGSPWensowitch Solar ParkWEGSP67567TXNavarroGreenalia Solar Power Wensowitch, LLCIPP Non-CHPSolar PhotovoltaicSUNPV145.6145.62028-112028(T) Regulatory approvals received. Not under constructionERCO32.300261-96.371232026-09
69464/CDFSPCedar Field Solar ParkCDFSP69464MIGladwinDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV1451452027-072027(V) Under construction, more than 50 percent completeMISO43.95-84.552026-09
65344/66148Noria Hondo Solar (Hybrid)6614865344TXKlebergNexus Renewable Power, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1451452027-122027(L) Regulatory approvals pending. Not under constructionERCO27.553355-97.675282026-09
68876/6339Okolona Solar633968876MSHendersonOkolona Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1451452027-122027(L) Regulatory approvals pending. Not under constructionMISO37.693-87.5492026-09
68876/6340Okolona Solar634068876MSHendersonOkolona Solar, LLCIPP Non-CHPBatteriesMWHBA1451452028-082028(T) Regulatory approvals received. Not under constructionMISO37.693-87.5492026-09
68665/RIC87Summerhill BESSRIC8768665TXTaylorRIC Development, LLCIPP Non-CHPBatteriesMWHBA1431432028-122028(P) Planned for installation, but regulatory approvals not initiatedERCO32.51289-99.795632026-09
67784/GRS11Vial BESSGRS1167784TXHillGransolar Texas Eleven LLCIPP Non-CHPBatteriesMWHBA141.4141.42027-092027(L) Regulatory approvals pending. Not under constructionERCO31.953772-97.062482026-09
69993/VT1Votaw Solar StationVT169993TXHardinEntergy Louisiana LLCElectric UtilitySolar PhotovoltaicSUNPV1411412029-052029(P) Planned for installation, but regulatory approvals not initiatedMISO30.4355-94.6732026-09
67999/SCAECSpring Creek Agri-Energy CenterSCAEC67999MICalhounConsumers Energy Co - (MI)Electric UtilitySolar PhotovoltaicSUNPV1401402026-122026(U) Under construction, less than or equal to 50 percent completeMISO42.2024-85.238032026-09
69878/5869Emmons-Logan Energy Storage586969878NDEmmonsEmmons-Logan Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1401402026-122026(V) Under construction, more than 50 percent completeMISO46.372883-99.97842026-09
70455/BESCity Breeze Energy StorageBES70455TXMatagordaCity Breeze Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1401402027-062027(V) Under construction, more than 50 percent completeERCO29.011-95.972026-09
66703/11103Austin Creek Solar1110366703ILAdamsStrata Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1401402027-092027(P) Planned for installation, but regulatory approvals not initiatedMISO39.790103-91.315082026-09
64857/C0513Canyonland SolarC051364857COMontezumaCanyonland Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1401402027-122027(P) Planned for installation, but regulatory approvals not initiatedWACM37.431-108.7242026-09
69482/BBS1Bluebird SolarBBS169482WAKlickitatAvangrid Power LLCIPP Non-CHPSolar PhotovoltaicSUNPV1401402027-122027(T) Regulatory approvals received. Not under constructionBPAT45.896375-120.30312026-09
67661/OXHILOxbow HillOXHIL67661NYNiagaraCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV1401402029-052029(L) Regulatory approvals pending. Not under constructionNYIS42.9711-75.735532026-09
68766/PFGWPPioneer Field Wind PowerPFGWP68766TXTom GreenGreenalia Wind Power Pioneer Field, LLCIPP Non-CHPOnshore Wind TurbineWNDWT136.2163.22030-112030(P) Planned for installation, but regulatory approvals not initiatedERCO31.19494-100.21182026-09
70098/BEBBlue Lake BESSBEB70098MNScottNorthern States Power Co - MinnesotaElectric UtilityBatteriesMWHBA135.5135.52027-052027(U) Under construction, less than or equal to 50 percent completeMISO44.786793-93.42692026-09
66409/GWNTHecate Grid Gwent Storage 1GWNT66409CAVenturaHecate Grid Gwent Storage 1, LLCIPP Non-CHPBatteriesMWHBA1351352028-122028(P) Planned for installation, but regulatory approvals not initiatedCISO34.28093-118.9032026-09
68666/RIC88Stonewall BESSRIC8868666TXStonewallRIC Development, LLCIPP Non-CHPBatteriesMWHBA1351352029-122029(P) Planned for installation, but regulatory approvals not initiatedERCO33.2466-100.39822026-09
64981/CPSS1Pecan Prairie South SolarCPSS164981TXLeonRepsol Renewables NAIPP Non-CHPSolar PhotovoltaicSUNPV132.9132.92027-052027(U) Under construction, less than or equal to 50 percent completeERCO31.05001-96.2212026-09
69101/MLB03Millers Branch SolarMLB0369101TXHaskellSouthern Power CoIPP Non-CHPSolar PhotovoltaicSUNPV1321322026-122026(U) Under construction, less than or equal to 50 percent completeERCO33.22132-99.586522026-09
68252/QUVALSR Quincy ValleyQUVAL68252WAGrantSR Quincy Valley, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1301302026-122026(V) Under construction, more than 50 percent completeGCPD47.27998-119.70462026-09
70450/PV1Wheatridge Optimization IIPV170450ORMorrowWheatridge Optimization II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1301302027-122027(U) Under construction, less than or equal to 50 percent completeBPAT45.559975-119.62922026-09
65141/BS301Boulder Solar III LLCBS30165141NVClark174 Power Global Corp.IPP Non-CHPSolar PhotovoltaicSUNPV1281282027-062027(P) Planned for installation, but regulatory approvals not initiatedNEVP35.838769-114.96422026-09
65141/BS3ESBoulder Solar III LLCBS3ES65141NVClark174 Power Global Corp.IPP Non-CHPBatteriesMWHBA1281282027-062027(P) Planned for installation, but regulatory approvals not initiatedNEVP35.838769-114.96422026-09
69965/RSRoccasecca BESS LLCRS69965NVClarkRoccasecca BESS LLCIPP Non-CHPBatteriesMWHBA126.5126.52027-022027(TS) Construction complete, but not yet in commercial operationCISO35.83-115.01282026-09
68173/SANPVSandford Solar and StorageSANPV68173TXWiseBelltown Power Texas 2, LLCIPP Non-CHPSolar PhotovoltaicSUNPV126.2126.22028-122028(L) Regulatory approvals pending. Not under constructionERCO33.30726-97.527772026-09
68191/HRTGHeritage WindHRTG68191NYOrleansHeritage Wind, LLCIPP Non-CHPOnshore Wind TurbineWNDWT1261262028-062028(P) Planned for installation, but regulatory approvals not initiatedNYIS43.170976-78.174542026-09
62263/GEN1Saddle Mountain East Wind FarmGEN162263WAAdamsEDP Renewables North America LLCIPP Non-CHPOnshore Wind TurbineWNDWT1261262029-102029(P) Planned for installation, but regulatory approvals not initiatedAVA46.789-119.3462026-09
68166/DOLBADolomite StorageDOLBA68166TXEllisBelltown Power Texas 2, LLCIPP Non-CHPBatteriesMWHBA125.7125.72028-072028(L) Regulatory approvals pending. Not under constructionERCO32.456144-96.737742026-09
68410/BRAZBrazoria Solar IBRAZ68410TXBrazoriaBrazoria Solar i, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1251252026-102026(TS) Construction complete, but not yet in commercial operationERCO29.138777-95.371082026-09
68410/BRAZ2Brazoria Solar IBRAZ268410TXBrazoriaBrazoria Solar i, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1251252026-102026(TS) Construction complete, but not yet in commercial operationERCO29.138777-95.371082026-09
1355/BESSE W BrownBESS1355KYMercerKentucky Utilities CoElectric UtilityBatteriesMWHBA1251252027-052027(V) Under construction, more than 50 percent completeLGEE37.78831-84.712572026-09
67552/ELMFLElm Flats SolarELMFL67552TXNavarroHeadwater Energy, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1251252027-092027(U) Under construction, less than or equal to 50 percent completeERCO32.113579-96.304762026-09
66663/EMPIREmpire Solar (NY)EMPIR66663NYChautauquaAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1251252027-122027(P) Planned for installation, but regulatory approvals not initiatedNYIS42.2596-79.61422026-09
67937/FLOSOFlora SolarFLOSO67937ILClayFlora Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1251252027-122027(P) Planned for installation, but regulatory approvals not initiatedPJM38.648852-88.514442026-09
68316/BIGL1Biglow Solar Generation and BESSBIGL168316ORShermanBIGL bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1251252027-122027(L) Regulatory approvals pending. Not under constructionPGE45.606-120.6252026-09
68316/BIGL2Biglow Solar Generation and BESSBIGL268316ORShermanBIGL bn, LLCIPP Non-CHPBatteriesMWHBA1251252027-122027(L) Regulatory approvals pending. Not under constructionPGE45.606-120.6252026-09
70218/SEL1SSelma Energy CenterSEL1S70218AZPinalSelma Energy Center, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1251252027-122027(U) Under construction, less than or equal to 50 percent completeDOPD32.849821-111.52512026-09
68673/OESLWSand Luis WestOESLW68673CAFresnoOrigis Energy USA, IncIPP Non-CHPSolar PhotovoltaicSUNPV1251252028-112028(T) Regulatory approvals received. Not under constructionCISO36.1676-120.0542026-09
65590/OCTNSOctansOCTNS65590TXPecosEngie North AmericaIPP Non-CHPBatteriesMWHBA1251252028-122028(U) Under construction, less than or equal to 50 percent completeERCO31.000575-102.67992026-09
68671/RIC91Houston County BESSRIC9168671TXHoustonRIC Development, LLCIPP Non-CHPBatteriesMWHBA1251252029-042029(P) Planned for installation, but regulatory approvals not initiatedERCO31.239009-95.576992026-09
70492/WRES1Willow Rock Energy Storage CenterWRES170492CAKernGEM A-CAES LLCIPP Non-CHPMWHCE1251252030-072030(P) Planned for installation, but regulatory approvals not initiatedCISO34.912528-118.15762026-09
70492/WRES2Willow Rock Energy Storage CenterWRES270492CAKernGEM A-CAES LLCIPP Non-CHPMWHCE1251252030-072030(P) Planned for installation, but regulatory approvals not initiatedCISO34.912528-118.15762026-09
70492/WRES3Willow Rock Energy Storage CenterWRES370492CAKernGEM A-CAES LLCIPP Non-CHPMWHCE1251252030-072030(P) Planned for installation, but regulatory approvals not initiatedCISO34.912528-118.15762026-09
70492/WRES4Willow Rock Energy Storage CenterWRES470492CAKernGEM A-CAES LLCIPP Non-CHPMWHCE1251252030-072030(P) Planned for installation, but regulatory approvals not initiatedCISO34.912528-118.15762026-09
68925/MIDBMidway BESSMIDB68925CAFresnoMidway BESS LLCIPP Non-CHPBatteriesMWHBA124.6119.92027-062027(V) Under construction, more than 50 percent completeCISO36.652653-120.57832026-09
68765/HUGSPHutcherson SolarHUGSP68765TXWilbargerGreenalia Solar Power Hutcherson, LLCIPP Non-CHPSolar PhotovoltaicSUNPV123.3123.32030-012030(P) Planned for installation, but regulatory approvals not initiatedERCO34.02533-99.265682026-09
68155/RIOLARio Lago SolarRIOLA68155TXBanderaModal Power LLCIPP Non-CHPSolar PhotovoltaicSUNPV1231232026-112026(TS) Construction complete, but not yet in commercial operationERCO29.756134-99.095242026-09
66896/LP2BALupinus Solar 2, LLCLP2BA66896TXFranklinSunraycer Assets I LLCIPP Non-CHPBatteriesMWHBA122.9122.92027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO30.303385-95.256922026-09
69167/BCKBNBackbone Creek BESSBCKBN69167TXBurnetBackbone BESS LLCIPP Non-CHPBatteriesMWHBA1211212026-122026(V) Under construction, more than 50 percent completeERCO30.550207-98.256872026-09
66778/HS1Hart Solar ProjectHS166778MIOceanaHart Solar Partners, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1201202026-102026(U) Under construction, less than or equal to 50 percent completeMISO43.692866-86.320972026-09
68968/ENX37Border Basin SolarENX3768968OHHancockBorder Basin, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1201202026-102026(V) Under construction, more than 50 percent completePJM41.107431-83.57222026-09
67870/ENX34Clermont SolarENX3467870PAMcKeanClermont Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1201202026-112026(U) Under construction, less than or equal to 50 percent completePJM41.656025-78.567312026-09
68898/ECS1Eagle Creek Solar Park LLCECS168898MISaginawEagle Creek Solar Park LLCIPP Non-CHPSolar PhotovoltaicSUNPV1201202027-032027(L) Regulatory approvals pending. Not under constructionMISO43.308523-84.218952026-09
68359/OCPSFPepper Solar FarmOCPSF68359TXMcLennanPepper Solar Farm, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1201202027-082027(P) Planned for installation, but regulatory approvals not initiatedERCO31.678359-97.045952026-09
68293/FRONFrontier SolarFRON68293KYWashingtonFRON bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1201202027-102027(T) Regulatory approvals received. Not under constructionLGEE37.605063-85.248222026-09
68877/WLDC1Wildcat Ranch Energy StorageWLDC168877TXCochranWildcat Ranch Energy Storage, LLCIPP Non-CHPBatteriesMWHBA120107.52027-112027(P) Planned for installation, but regulatory approvals not initiatedPNM33.524176-102.87732026-09
65051/TSECTracy Solar Energy CenterTSEC65051NYJeffersonEDF Renewables Development, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV1191192027-112027(L) Regulatory approvals pending. Not under constructionNYIS44.175939-75.985132026-09
67884/ENX27Two Oaks Solar and Storage LLCENX2767884VALouisaTwo Oaks Solar and StorageIPP Non-CHPSolar PhotovoltaicSUNPV1181182029-112029(P) Planned for installation, but regulatory approvals not initiatedPJM38.013053-77.931172026-09
70547/PV-1Rippon Energy FacilityPV-170547WVJeffersonTorch Operating Company, LLCIPP Non-CHPSolar PhotovoltaicSUNPV117.1117.12028-032028(T) Regulatory approvals received. Not under constructionPJM39.198017-77.860532026-09
68080/GRS8BMarcos PV and BESSGRS8B68080TXVictoriaGRS BESS Texas Eight LLCIPP Non-CHPBatteriesMWHBA115.91152029-082029(L) Regulatory approvals pending. Not under constructionERCO28.904979-97.710172026-09
68080/GRS8PMarcos PV and BESSGRS8P68080TXVictoriaGRS BESS Texas Eight LLCIPP Non-CHPSolar PhotovoltaicSUNPV115.91152029-082029(L) Regulatory approvals pending. Not under constructionERCO28.904979-97.710172026-09
66675/ALOAKAlfred Oaks Solar, LLCALOAK66675NYAlleganyAlfred Oaks Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV115.2115.22029-122029(P) Planned for installation, but regulatory approvals not initiatedNYIS42.21-77.822026-09
68086/SBSSouth Branch SolarSBS68086OHHancockLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1151152027-062027(L) Regulatory approvals pending. Not under constructionPJM41.128477-83.515172026-09
68553/BACN2SR Bacon IIBACN268553GABaconSR Bacon II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1151152027-122027(T) Regulatory approvals received. Not under constructionSOCO31.511392-82.336832026-09
64543/1Cedar Creek Solar164543DENew CastleFPS Cedar Creek Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1141142028-072028(L) Regulatory approvals pending. Not under constructionPJM39.37259-75.564552026-09
67779/GRS5Hayrick BESSGRS567779TXCokeGransolar Texas Five LLCIPP Non-CHPBatteriesMWHBA113.9113.92028-032028(L) Regulatory approvals pending. Not under constructionERCO32.022914-100.29262026-09
64215/45MGBAratina Solar Center 245MGB64215CAKern45MG 8me LLCIPP Non-CHPBatteriesMWHBA1131132026-122026(TS) Construction complete, but not yet in commercial operationCISO35.062965-118.08782026-09
65977/BF1PVBoulder Flats SolarBF1PV65977NVClarkBoulder Flats Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1131132028-122028(V) Under construction, more than 50 percent completeNEVP35.878865-114.98332026-09
65458/ANOD1Anode (Springville) BESSANOD165458CATulareSouthern California Edison CoElectric UtilityBatteriesMWHBA112.5112.52027-032027(TS) Construction complete, but not yet in commercial operationCISO36.107903-118.94092026-09
65458/ANOD2Anode (Springville) BESSANOD265458CATulareSouthern California Edison CoElectric UtilityBatteriesMWHBA112.5112.52027-032027(TS) Construction complete, but not yet in commercial operationCISO36.107903-118.94092026-09
68768/BRGWPBlackwelder Ranch WindBRGWP68768TXPecosGreenalia Wind Power Blackwelder Ranch, LLCIPP Non-CHPOnshore Wind TurbineWNDWT110.4110.42030-062030(P) Planned for installation, but regulatory approvals not initiatedERCO30.81256-102.18652026-09
66341/EGSSEagle Springs HybridEGSS66341TXDeltaSunraycer Assets I LLCIPP Non-CHPSolar PhotovoltaicSUNPV110.1110.12026-122026(V) Under construction, more than 50 percent completeERCO33.433264-95.574442026-09
70463/WSTBAWestminster Reliability Project, LLCWSTBA70463CAOrangeRWE Americas, LLCIPP Non-CHPBatteriesMWHBA1101102026-122026(V) Under construction, more than 50 percent completeCISO33.773169-118.01162026-09
63850/BESS2CherryBESS263850CAKingsWestlands Cherry, LLCIPP Non-CHPBatteriesMWHBA1101102027-072027(T) Regulatory approvals received. Not under constructionCISO36.122457-119.92322026-09
68099/COPESR CopelandCOPE68099TNCumberlandSR Copeland, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1101102027-122027(T) Regulatory approvals received. Not under constructionTVA36.035453-85.109912026-09
70420/PV1Wheatridge Optimization IPV170420ORMorrowWheatridge Optimization I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1101102027-122027(U) Under construction, less than or equal to 50 percent completeBPAT45.560054-119.62242026-09
69481/FXTRTFoxtrot Solar Energy LLCFXTRT69481MOJasperEvergy Missouri WestElectric UtilitySolar PhotovoltaicSUNPV108.9108.92027-032027(V) Under construction, more than 50 percent completeSWPP37.352-94.6062026-09
65338/UNIS1Union Ridge SolarUNIS165338OHMontgomeryRWE Americas, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1081082026-102026(TS) Construction complete, but not yet in commercial operationPJM39.984126-82.64132026-09
70360/FNDRDFoundry Ridge Energy Center LLCFNDRD70360WIWalworthInvenergy Services LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT1081082028-082028(P) Planned for installation, but regulatory approvals not initiatedMISO42.583072-88.724612026-09
70360/FNRD2Foundry Ridge Energy Center LLCFNRD270360WIWalworthInvenergy Services LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT1081082028-082028(P) Planned for installation, but regulatory approvals not initiatedMISO42.583072-88.724612026-09
70360/FNRD3Foundry Ridge Energy Center LLCFNRD370360WIWalworthInvenergy Services LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT1081082028-082028(P) Planned for installation, but regulatory approvals not initiatedMISO42.583072-88.724612026-09
68563/NORWDSR NorwoodNORWD68563GAWarrenSR Norwood, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1071072027-122027(T) Regulatory approvals received. Not under constructionTVA33.435993-82.763612026-09
67564/REGSPReis Solar ParkREGSP67564TXAtascosaGreenalia Solar Power Reis, LLCIPP Non-CHPSolar PhotovoltaicSUNPV105.5105.52029-052029(T) Regulatory approvals received. Not under constructionERCO28.652762-98.453692026-09
69799/F1S01Project Matador Gas Plant (PMG)F1S0169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA105104.62027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/F1S02Project Matador Gas Plant (PMG)F1S0269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA105104.62027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/F1S03Project Matador Gas Plant (PMG)F1S0369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA105104.62027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/F2S01Project Matador Gas Plant (PMG)F2S0169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA105104.62027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/F2S02Project Matador Gas Plant (PMG)F2S0269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA105104.62027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/F2S03Project Matador Gas Plant (PMG)F2S0369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA105104.62027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/FBS01Project Matador Gas Plant (PMG)FBS0169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA105101.82027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES001Project Matador Gas Plant (PMG)ES00169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES002Project Matador Gas Plant (PMG)ES00269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES003Project Matador Gas Plant (PMG)ES00369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES004Project Matador Gas Plant (PMG)ES00469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES005Project Matador Gas Plant (PMG)ES00569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES006Project Matador Gas Plant (PMG)ES00669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES007Project Matador Gas Plant (PMG)ES00769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES008Project Matador Gas Plant (PMG)ES00869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES009Project Matador Gas Plant (PMG)ES00969799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES010Project Matador Gas Plant (PMG)ES01069799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES011Project Matador Gas Plant (PMG)ES01169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES012Project Matador Gas Plant (PMG)ES01269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES013Project Matador Gas Plant (PMG)ES01369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES014Project Matador Gas Plant (PMG)ES01469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES015Project Matador Gas Plant (PMG)ES01569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/ES016Project Matador Gas Plant (PMG)ES01669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS001Project Matador Gas Plant (PMG)MS00169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS002Project Matador Gas Plant (PMG)MS00269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS003Project Matador Gas Plant (PMG)MS00369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS004Project Matador Gas Plant (PMG)MS00469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS005Project Matador Gas Plant (PMG)MS00569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS006Project Matador Gas Plant (PMG)MS00669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS007Project Matador Gas Plant (PMG)MS00769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS008Project Matador Gas Plant (PMG)MS00869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS009Project Matador Gas Plant (PMG)MS00969799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS010Project Matador Gas Plant (PMG)MS01069799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS011Project Matador Gas Plant (PMG)MS01169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS012Project Matador Gas Plant (PMG)MS01269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS013Project Matador Gas Plant (PMG)MS01369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS014Project Matador Gas Plant (PMG)MS01469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS015Project Matador Gas Plant (PMG)MS01569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MS016Project Matador Gas Plant (PMG)MS01669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCA1051052030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
67346/Q1335Hoffman Falls Wind 2Q133567346NYMadisonLiberty Renewables IncorporatedIPP Non-CHPOnshore Wind TurbineWNDWT103.5102.52029-032029(P) Planned for installation, but regulatory approvals not initiatedNYIS42.964628-75.753712026-09
68428/GTSBYGatsby Energy Storage ProjectGTSBY68428TXPecosGatsby Energy Storage LLCIPP Non-CHPBatteriesMWHBA103.4103.42027-032027(U) Under construction, less than or equal to 50 percent completeERCO30.664176-101.78012026-09
62894/WTHigh Bridge Wind ProjectWT62894NYChenangoHigh Bridge Wind, LLCIPP Non-CHPOnshore Wind TurbineWNDWT103.2103.22027-122027(P) Planned for installation, but regulatory approvals not initiatedNYIS42.437923-75.480562026-09
68334/EVCRKEvans Creek Energy Storage ProjectEVCRK68334TXVal VerdeEvans Creek Energy Storage LLCIPP Non-CHPBatteriesMWHBA1031032026-092026(V) Under construction, more than 50 percent completeERCO29.746007-101.14062026-09
69956/S9Sanborn Hybrid 3S969956CAKernTerra-Gen Operating Co-HybridIPP Non-CHPSolar PhotovoltaicSUNPV1031032026-122026(U) Under construction, less than or equal to 50 percent completeCISO34.996-118.1142026-09
65326/SS1Sunset SolarSS165326ORWascoAvangrid Power LLCIPP Non-CHPSolar PhotovoltaicSUNPV1031032028-122028(T) Regulatory approvals received. Not under constructionBPAT45.165062-120.88042026-09
64290/ATH1SSE Athos II, LLCATH1S64290CARiversideSE Athos II, LLCIPP Non-CHPBatteriesMWHBA102.3102.32027-012027(U) Under construction, less than or equal to 50 percent completeCISO33.751283-115.3552026-09
66396/NDUAHNaduah SolarNDUAH66396TXLimestoneGransolar Texas Fifteen, LLCIPP Non-CHPSolar PhotovoltaicSUNPV102.377.62027-102027(P) Planned for installation, but regulatory approvals not initiatedERCO31.521467-96.673852026-09
70531/PV100Newman BufferPV10070531TXEl PasoEl Paso Electric CoElectric UtilitySolar PhotovoltaicSUNPV102.21002027-022027(L) Regulatory approvals pending. Not under constructionEPE31.98-106.442026-09
67341/NOSESSGT Hoskins Solar Project HybridNOSES67341TXLamarSGT Hoskins Solar Project, LLCIPP Non-CHPBatteriesMWHBA102.1102.12027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO33.63124-95.337852026-09
69969/PASPanhandle SolarPAS69969OKTexasPanhandle Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1021022026-122026(U) Under construction, less than or equal to 50 percent completeSWPP36.609029-101.47432026-09
67919/DOLCEDolce BESS, LLCDOLCE67919TXMitchellSamsung C&T Renewables, LLCIPP Non-CHPBatteriesMWHBA101.4101.42028-042028(P) Planned for installation, but regulatory approvals not initiatedERCO32.484063-100.90182026-09
70443/MAMM2Mammoth Plains Energy Storage IIMAMM270443OKDeweyMammoth Plains Energy Center, LLCIPP Non-CHPBatteriesMWHBA101.2101.22029-052029(P) Planned for installation, but regulatory approvals not initiatedSWPP35.97972-98.706062026-09
66894/ALBPVAlbatross Solar, LLCALBPV66894TXMcLennanSunraycer Assets I LLCIPP Non-CHPSolar PhotovoltaicSUNPV1011012027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO31.484342-97.422392026-09
66958/NOPR1Northern Prairie 1NOPR166958WISt CroixLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1011012028-122028(T) Regulatory approvals received. Not under constructionMISO45.131813-92.316862026-09
68172/MYEPVMyers Solar and StorageMYEPV68172TXGoliadBelltown Power Texas 2, LLCIPP Non-CHPSolar PhotovoltaicSUNPV100.9100.92028-082028(L) Regulatory approvals pending. Not under constructionERCO28.420043-97.709342026-09
68173/SANBTSandford Solar and StorageSANBT68173TXWiseBelltown Power Texas 2, LLCIPP Non-CHPBatteriesMWHBA100.9100.92028-122028(L) Regulatory approvals pending. Not under constructionERCO33.30726-97.527772026-09
68014/BRDFSBradford Solar PABRDFS68014PABradfordVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV100.5100.52027-122027(L) Regulatory approvals pending. Not under constructionPJM41.721657-76.536632026-09
68851/HSPV1Hermes Solar PVHSPV168851TXBellBell 1 Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV100.41002026-102026(V) Under construction, more than 50 percent completeERCO30.989842-97.149822026-09
68852/HSBE1Hermes Storage BESSHSBE168852TXBellBell 1 Storage, LLCIPP Non-CHPBatteriesMWHBA100.41002026-102026(V) Under construction, more than 50 percent completeERCO30.981595-97.14292026-09
68149/RAVEBRaven StorageRAVEB68149TXWhartonRaven Storage, LLCIPP Non-CHPBatteriesMWHBA1001002026-102026(V) Under construction, more than 50 percent completeERCO29.575617-96.088722026-09
69156/GEN01Duff Solar ParkGEN0169156INDuboisDuff Solar Park LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002026-102026(TS) Construction complete, but not yet in commercial operationMISO38.31341-87.020632026-09
69054/ALT2ATLAS IIALT269054AZLa PazATLAS Solar II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002026-112026(TS) Construction complete, but not yet in commercial operationCISO33.582903-113.57692026-09
63386/3RIVSThree Rivers Solar Power, LLC3RIVS63386MEHancockThree Rivers Solar Power, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002026-122026(V) Under construction, more than 50 percent completeISNE44.711644-68.112026-09
65043/DUSODulles Solar and StorageDUSO65043VALoudounDominion Energy Inc.Electric UtilitySolar PhotovoltaicSUNPV1001002026-122026(V) Under construction, more than 50 percent completePJM38.95-77.52026-09
68452/KITTBKitt SolarKITTB68452AZPinal301AK 8me LLCIPP Non-CHPBatteriesMWHBA1001002026-122026(V) Under construction, more than 50 percent completeAZPS32.73353-111.56912026-09
68452/KITTSKitt SolarKITTS68452AZPinal301AK 8me LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002026-122026(V) Under construction, more than 50 percent completeAZPS32.73353-111.56912026-09
69027/SSBAStoneridge Solar, LLCSSBA69027TXMilamRWE Americas, LLCIPP Non-CHPBatteriesMWHBA1001002026-122026(TS) Construction complete, but not yet in commercial operationERCO30.569447-97.110432026-09
69497/SLBStar Light Energy CenterSLB69497NMValenciaStar Light Energy CenterIPP Non-CHPBatteriesMWHBA1001002026-122026(U) Under construction, less than or equal to 50 percent completePNM34.739572-106.79282026-09
69497/SLSStar Light Energy CenterSLS69497NMValenciaStar Light Energy CenterIPP Non-CHPSolar PhotovoltaicSUNPV1001002026-122026(U) Under construction, less than or equal to 50 percent completePNM34.739572-106.79282026-09
69517/BV3BABuena Vista Energy Center IIIBV3BA69517NMOteroBuena Vista Energy Center III, LLCIPP Non-CHPBatteriesMWHBA1001002026-122026(U) Under construction, less than or equal to 50 percent completeEPE32.06659-106.28532026-09
69517/BV3SOBuena Vista Energy Center IIIBV3SO69517NMOteroBuena Vista Energy Center III, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002026-122026(U) Under construction, less than or equal to 50 percent completeEPE32.06659-106.28532026-09
69586/GPSGreat Plains Solar, LLCGPS69586ILPerryGreat Plains Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002026-122026(V) Under construction, more than 50 percent completeMISO38.177944-89.552892026-09
69594/SPSSwitchgrass Plains Solar, LLCSPS69594ILFayetteSwitchgrass Plains Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002026-122026(V) Under construction, more than 50 percent completeMISO39.172414-89.057872026-09
69809/5756Northern Divide Energy Storage575669809NDBurkeNorthern Divide Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1001002026-122026(V) Under construction, more than 50 percent completeSWPP48.769875-102.76782026-09
70188/WES01Weld Energy StorageWES0170188COWeldWeld Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1001002026-122026(V) Under construction, more than 50 percent completeSWPP40.613467-104.84672026-09
64290/ATH1NSE Athos II, LLCATH1N64290CARiversideSE Athos II, LLCIPP Non-CHPBatteriesMWHBA1001002027-012027(U) Under construction, less than or equal to 50 percent completeCISO33.751283-115.3552026-09
68426/VOYGRVoyager Energy StorageVOYGR68426MIWashtenawVoyager Energy Storage LLCIPP Non-CHPBatteriesMWHBA1001002027-012027(V) Under construction, more than 50 percent completeMISO42.153167-83.83332026-09
69393/PHIECPamela Heights I Energy CenterPHIEC69393TXHarrisPamela Heights I Energy Center LLCIPP Non-CHPBatteriesMWHBA1001002027-012027(U) Under construction, less than or equal to 50 percent completeERCO29.645345-95.450212026-09
66441/INCV1Crossvine SolarINCV166441INDuboisCrossvine Solar 1 LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-032027(U) Under construction, less than or equal to 50 percent completeMISO38.264271-87.001892026-09
66658/NOTTNottingham SolarNOTT66658OHHarrisonNottingham Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-032027(U) Under construction, less than or equal to 50 percent completePJM40.189455-81.041112026-09
69356/PWLNBPowerline Energy StoragePWLNB69356FLCitrusDuke Energy Florida, LLCElectric UtilityBatteriesMWHBA1001002027-032027(U) Under construction, less than or equal to 50 percent completeFPC28.96684-82.617512026-09
70403/GRBS1Grand Basin Energy StorageGRBS170403MIJacksonGrand Basin Energy Storage, LLCIPP Non-CHPBatteriesMWHBA1001002027-032027(U) Under construction, less than or equal to 50 percent completeMISO42.420211-84.487522026-09
69059/COBACrimson Orchard Solar and BESSCOBA69059IDElmoreClenera DevCo LLCIPP Non-CHPBatteriesMWHBA1001002027-042027(L) Regulatory approvals pending. Not under constructionIPCO43.181239-115.74652026-09
69059/COPVCrimson Orchard Solar and BESSCOPV69059IDElmoreClenera DevCo LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-042027(L) Regulatory approvals pending. Not under constructionIPCO43.181239-115.74652026-09
70033/WT001White Tank Energy StorageWT00170033AZMaricopaWhite Tank Energy Storage LLCIPP Non-CHPBatteriesMWHBA1001002027-042027(U) Under construction, less than or equal to 50 percent completeAZPS33.498-112.31762026-09
68897/PVSINew Frontiers SolarPVSI68897KYBreckinridgeClover Creek Solar Project LLC d/b/a New Frontiers Solar ParkIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-062027(L) Regulatory approvals pending. Not under constructionMISO37.79502-86.50682026-09
68909/ISSBAImperial Sun SolarISSBA68909CAImperialImperial Sun Solar LLCIPP Non-CHPBatteriesMWHBA1001002027-072027(L) Regulatory approvals pending. Not under constructionIID32.6851-115.29772026-09
68909/ISSPVImperial Sun SolarISSPV68909CAImperialImperial Sun Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-072027(L) Regulatory approvals pending. Not under constructionIID32.6851-115.29772026-09
69966/FMMFour Mile Mesa Solar, LLCFMM69966NMSan JuanFour Mile Mesa Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-072027(U) Under construction, less than or equal to 50 percent completePNM36.8685-108.2772026-09
69966/FMMSFour Mile Mesa Solar, LLCFMMS69966NMSan JuanFour Mile Mesa Solar, LLCIPP Non-CHPBatteriesMWHBA1001002027-072027(U) Under construction, less than or equal to 50 percent completePNM36.8685-108.2772026-09
68473/BROOKBrookside SolarBROOK68473NYFranklinAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-092027(L) Regulatory approvals pending. Not under constructionNYIS44.932-74.13022026-09
69687/L7SFLucky 7 Solar Farm LLCL7SF69687TXHopkinsLucky 7 Solar Farm LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-102027(U) Under construction, less than or equal to 50 percent completeERCO33.082-95.7212026-09
67667/3COASThird Coast BESS, LLC3COAS67667TXJacksonCypress Creek RenewablesIPP Non-CHPBatteriesMWHBA1001002027-112027(T) Regulatory approvals received. Not under constructionERCO28.852327-96.556422026-09
64216/201LCRockmont Solar and Storage Project201LC64216NMSan Juan201LC 8me LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-122027(L) Regulatory approvals pending. Not under constructionPNM36.776579-108.37512026-09
65471/RGS23Rose Gold SolarRGS2365471INJayLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-122027(P) Planned for installation, but regulatory approvals not initiatedPJM40.404357-85.197162026-09
66113/NEBE1Big Elk SolarNEBE166113NEWashingtonLightsource Renewable Energy Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-122027(L) Regulatory approvals pending. Not under constructionSWPP41.475678-96.293092026-09
66216/BESSYaupon Solar Project (Hybrid)BESS66216TXMilamYaupon Solar, LLCIPP Non-CHPBatteriesMWHBA1001002027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO31.0444-96.85142026-09
68554/BACN3SR Bacon IIIBACN368554GABaconSR Bacon III, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-122027(T) Regulatory approvals received. Not under constructionSOCO31.511392-82.336832026-09
68555/CORDVSR CordovaCORDV68555SCOrangeburgSR Cordova, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-122027(T) Regulatory approvals received. Not under constructionSCEG33.45963-80.888972026-09
68903/MUSPVSolex Ridge SolarMUSPV68903TXHendersonSolex Ridge, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-122027(L) Regulatory approvals pending. Not under constructionERCO32.169946-95.58032026-09
68939/COGPVCoggon Solar LLCCOGPV68939IALinnClenera DevCo LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-122027(U) Under construction, less than or equal to 50 percent completeMISO42.290594-91.572662026-09
69170/FW2Freshwater Solar II, LLCFW269170MIMontcalmFreshwater Solar II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002027-122027(U) Under construction, less than or equal to 50 percent completeMISO43.310581-85.051592026-09
70583/HES01Highland Solar I, LLC - (CO)HES0170583COPuebloHighland Solar I, LLCIPP Non-CHPBatteriesMWHBA1001002027-122027(L) Regulatory approvals pending. Not under constructionPSCO38.41955-104.22772026-09
67090/FMSFlint Mine SolarFMS67090NYGreeneFlint Mine Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-032028(T) Regulatory approvals received. Not under constructionNYIS42.313611-73.845562026-09
70050/DRENNDrennan Energy StorageDRENN70050COEl PasoDrennan Energy Storage LLCIPP Non-CHPBatteriesMWHBA1001002028-032028(L) Regulatory approvals pending. Not under constructionSWPP38.772896-104.66712026-09
66922/59957Timber Cove Solar5995766922TXFreestoneFreestone Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-052028(P) Planned for installation, but regulatory approvals not initiatedERCO31.870589-96.152472026-09
69973/OSON1Oso NegroOSON169973NMBernalilloOso Negro, LLCIPP Non-CHPBatteriesMWHBA1001002028-052028(T) Regulatory approvals received. Not under constructionPNM35.111657-106.72052026-09
68032/SKLRESkylight Renewable EnergySKLRE68032CASutterVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-062028(P) Planned for installation, but regulatory approvals not initiatedWALC38.947494-121.47922026-09
68032/SKREBSkylight Renewable EnergySKREB68032CASutterVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA1001002028-062028(P) Planned for installation, but regulatory approvals not initiatedWALC38.947494-121.47922026-09
68205/GRNWDGreenwood Solar IGRNWD68205VACulpeperGreenwood Solar I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-062028(T) Regulatory approvals received. Not under constructionPJM38.427261-77.907872026-09
68604/DALBSDahlia EnergyDALBS68604TXLa SalleDahlia Energy LLCIPP Non-CHPBatteriesMWHBA1001002028-062028(P) Planned for installation, but regulatory approvals not initiatedERCO28.369598-98.967622026-09
69762/425LMSouthern Bighorn Solar 2425LM69762NVClark425LM 8ME LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-072028(L) Regulatory approvals pending. Not under constructionNEVP36.56117-114.74132026-09
69762/BESS2Southern Bighorn Solar 2BESS269762NVClark425LM 8ME LLCIPP Non-CHPBatteriesMWHBA1001002028-072028(L) Regulatory approvals pending. Not under constructionNEVP36.56117-114.74132026-09
64659/AMSAEUG Madison Solar, LLCAMS64659KYMadisonAcciona Energy USA Global, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-092028(U) Under construction, less than or equal to 50 percent completePJM37.822029-84.300522026-09
64848/BEF1Bedington Energy Facility, LLCBEF164848WVBerkeleyBedington Energy Facility, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-102028(L) Regulatory approvals pending. Not under constructionPJM39.531839-77.887092026-09
69021/RH1PVRustic Hills Solar IRH1PV69021INWarrickClenera DevCo LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-102028(T) Regulatory approvals received. Not under constructionMISO37.96707-87.307392026-09
69022/RH2PVRustic Hills Solar II LLCRH2PV69022INWarrickClenera DevCo LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-102028(T) Regulatory approvals received. Not under constructionMISO37.974259-87.321972026-09
66114/INRD1Merrillville SolarINRD166114INLakeLightsource Renewable Energy Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-112028(P) Planned for installation, but regulatory approvals not initiatedMISO41.462794-87.272852026-09
68352/GIPV1Girasol Solar FarmGIPV168352MSSunflowerGirasol Solar Farm LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-122028(P) Planned for installation, but regulatory approvals not initiatedMISO33.676092-90.642872026-09
69608/SNSPISinnissippi Solar Energy LLCSNSPI69608WIJeffersonInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002028-122028(P) Planned for installation, but regulatory approvals not initiatedMISO43.12592-88.670982026-09
69775/STBSPStrasburg Solar ParkSTBSP69775MIMonroeDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV1001002028-122028(U) Under construction, less than or equal to 50 percent completeMISO41.971933-83.459752026-09
67896/229HDHolstein 2 Battery Storage229HD67896TXNolan229HD 8me, LLCIPP Non-CHPBatteriesMWHBA1001002029-052029(P) Planned for installation, but regulatory approvals not initiatedERCO32.081901-100.1592026-09
67325/NYRIVRiverside Solar LLCNYRIV67325NYSt LawrenceAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1001002029-072029(P) Planned for installation, but regulatory approvals not initiatedNYIS44.06585-76.12222026-09
67324/NYSOMSomerset Solar LLCNYSOM67324NYNiagaraAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1001252029-102029(P) Planned for installation, but regulatory approvals not initiatedNYIS43.352072-78.610362026-09
68343/GRVA1Grand Valley Solar Generation and BESSGRVA168343COMesaGRVA bn, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002029-102029(L) Regulatory approvals pending. Not under constructionPSCO39.1987-108.7822026-09
68343/GRVA2Grand Valley Solar Generation and BESSGRVA268343COMesaGRVA bn, LLCIPP Non-CHPBatteriesMWHBA1001002029-102029(L) Regulatory approvals pending. Not under constructionPSCO39.1987-108.7822026-09
65808/BSVECSacramento Valley Energy Center, LLCBSVEC65808CASacramentoSacramento Valley Energy Center, LLCIPP Non-CHPBatteriesMWHBA1001002029-122029(U) Under construction, less than or equal to 50 percent completeBANC38.57147-121.18452026-09
69636/69363Main Horn Solar6936369636TXNavarroMain Horn Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002029-122029(P) Planned for installation, but regulatory approvals not initiatedERCO31.984498-96.365582026-09
69642/96513Arkana Solar9651369642ARColumbiaArkana Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002029-122029(P) Planned for installation, but regulatory approvals not initiatedMISO33.04521-93.448412026-09
69639/16777Triune Solar1677769639TXTrinityTriune Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1001002030-122030(P) Planned for installation, but regulatory approvals not initiatedMISO30.996927-95.123842026-09
64531/KOV4ANoosa Energy Storage LLCKOV4A64531CASan JoaquinEngie North AmericaIPP Non-CHPBatteriesMWHBA99992026-122026(U) Under construction, less than or equal to 50 percent completeCISO37.756292-121.14812026-09
4050/BESS1EdgewaterBESS14050WISheboyganWisconsin Power & Light CoElectric UtilityBatteriesMWHBA99992027-042027(U) Under construction, less than or equal to 50 percent completeMISO43.715142-87.705862026-09
69981/GRNTSGrant Solar, LLCGRNTS69981SDMcCookGeronimo PowerIPP Non-CHPSolar PhotovoltaicSUNPV99992027-102027(L) Regulatory approvals pending. Not under constructionMISO43.550003-97.267382026-09
68153/PV1Fremont SolarPV168153UTIronFremont Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV99992027-122027(U) Under construction, less than or equal to 50 percent completePACE37.9789-112.77612026-09
68228/Q1448Agricola WindQ144868228NYCayugaLiberty Renewables IncorporatedIPP Non-CHPOnshore Wind TurbineWNDWT99972029-042029(P) Planned for installation, but regulatory approvals not initiatedNYIS42.755287-76.539022026-09
68738/CANBSCannibal Draw Solar and StorageCANBS68738TXGlasscockRed River Clean EnergyIPP Non-CHPBatteriesMWHBA98.698.62028-042028(T) Regulatory approvals received. Not under constructionERCO32.023861-101.2842026-09
69742/PV3Cooperative Solar Three-MarionPV369742KYMarionEast Kentucky Power Coop, IncElectric UtilitySolar PhotovoltaicSUNPV96962027-082027(T) Regulatory approvals received. Not under constructionPJM37.605113-85.248242026-09
65293/OEMS4Covington (MS)OEMS465293MSCovingtonOrigis Energy USA, IncIPP Non-CHPSolar PhotovoltaicSUNPV96962028-032028(T) Regulatory approvals received. Not under constructionMISO31.4395-89.48462026-09
67568/WIGSPWittig Solar ParkWIGSP67568TXWhartonGreenalia Solar Power Wittig, LLCIPP Non-CHPSolar PhotovoltaicSUNPV96962029-122029(T) Regulatory approvals received. Not under constructionERCO29.245055-95.874772026-09
69629/BIGM1Big Muddy SolarBIGM169629ILJacksonBig Muddy Solar Project, LLCIPP Non-CHPSolar PhotovoltaicSUNPV95952026-102026(V) Under construction, more than 50 percent completeMISO37.86-89.32026-09
68073/BLUERBlue Ridge SolarBLUER68073VAPittsylvaniaDominion Renewable EnergyElectric UtilitySolar PhotovoltaicSUNPV95952027-052027(U) Under construction, less than or equal to 50 percent completePJM36.790101-79.428752026-09
68085/RMS1Red Maple LRERMS168085ILDeKalbLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV95952028-092028(L) Regulatory approvals pending. Not under constructionPJM41.886064-88.727252026-09
66484/GCAGlen Canyon Solar A, LLCGCA66484UTKaneAES Distributed EnergyIPP Non-CHPSolar PhotovoltaicSUNPV95952028-122028(U) Under construction, less than or equal to 50 percent completePACE37.091539-111.72552026-09
68271/SWLS1Sweetleaf Solar LLCSWLS168271NCHalifaxCleanChoice EnergyIPP Non-CHPSolar PhotovoltaicSUNPV93932027-122027(T) Regulatory approvals received. Not under constructionPJM36.220711-77.688632026-09
67650/BEARRBear RidgeBEARR67650NYNiagaraCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV93932028-052028(L) Regulatory approvals pending. Not under constructionNYIS43.14244-78.791062026-09
69648/RSBARosamond South IIRSBA69648CAKernGolden Fields Solar VI, LLCIPP Non-CHPBatteriesMWHBA92922027-032027(V) Under construction, more than 50 percent completeCISO34.852326-118.43122026-09
67544/LEGSPLeitrim Solar ParkLEGSP67544TXHillGreenalia Solar Power Leitrim, LLCIPP Non-CHPSolar PhotovoltaicSUNPV91.291.22030-102030(T) Regulatory approvals received. Not under constructionERCO31.79623-97.202782026-09
64253/S1Mohawk SolarS164253NYMontgomeryAvangrid Power LLCIPP Non-CHPSolar PhotovoltaicSUNPV90.590.52027-122027(L) Regulatory approvals pending. Not under constructionNYIS42.887133-74.637812026-09
68253/ROCH1SR Rochelle IROCH168253GAWilcoxSR Rochelle I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV90902026-122026(V) Under construction, more than 50 percent completeSOCO31.923234-83.454272026-09
69524/WLSWindy Lane Energy CenterWLS69524NMDe BacaWindy Lane Energy Center, LLCIPP Non-CHPSolar PhotovoltaicSUNPV90902026-122026(U) Under construction, less than or equal to 50 percent completePNM34.587619-104.03122026-09
64428/JVR1AJVR Energy Park LLCJVR1A64428CASan DiegoJVR Energy Park LLCIPP Non-CHPSolar PhotovoltaicSUNPV90902027-032027(V) Under construction, more than 50 percent completeCISO32.625903-116.17492026-09
65052/HSECHomer Solar Energy CenterHSEC65052NYCortlandEDF Renewables Development, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV90902027-112027(L) Regulatory approvals pending. Not under constructionNYIS42.658652-76.099932026-09
67561/RIC93Callan SolarRIC9367561TXMcCullochRIC Development, LLCIPP Non-CHPSolar PhotovoltaicSUNPV90902028-042028(P) Planned for installation, but regulatory approvals not initiatedERCO30.990928-99.601182026-09
68585/YRSYork Run SolarYRS68585NYChautauquaLydian EnergyIPP Non-CHPSolar PhotovoltaicSUNPV90902028-092028(L) Regulatory approvals pending. Not under constructionNYIS42.011319-79.22432026-09
64849/WILDCWildcat Solar Power Plant LLCWILDC64849NMMcKinleySolariant Capital, LLCIPP Non-CHPSolar PhotovoltaicSUNPV90902028-122028(P) Planned for installation, but regulatory approvals not initiatedPNM35.580453-108.90232026-09
70405/BA-1Winchester Solar I, LLCBA-170405AZCochiseTorch Operating Company, LLCIPP Non-CHPBatteriesMWHBA87.887.82027-032027(V) Under construction, more than 50 percent completeTEPC32.186372-109.95312026-09
70405/PV-1Winchester Solar I, LLCPV-170405AZCochiseTorch Operating Company, LLCIPP Non-CHPSolar PhotovoltaicSUNPV87.887.82027-032027(V) Under construction, more than 50 percent completeTEPC32.186372-109.95312026-09
70406/BA-2Winchester Solar II, LLCBA-270406AZCochiseTorch Operating Company, LLCIPP Non-CHPBatteriesMWHBA87.887.82027-052027(V) Under construction, more than 50 percent completeWALC32.207126-109.94352026-09
70406/PV-2Winchester Solar II, LLCPV-270406AZCochiseTorch Operating Company, LLCIPP Non-CHPSolar PhotovoltaicSUNPV87.887.82027-052027(V) Under construction, more than 50 percent completeWALC32.207126-109.94352026-09
70559/GEN1MammothGEN170559WVKanawhaMN8 Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV86862028-122028(L) Regulatory approvals pending. Not under constructionPJM38.20845-81.308932026-09
69795/KEABEKeamukuKEABE69795HIHawaiiAES Clean EnergyIPP Non-CHPBatteriesMWHBA86862030-052030(L) Regulatory approvals pending. Not under constructionHECO19.8799-155.73732026-09
69795/KEAMUKeamukuKEAMU69795HIHawaiiAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV86862030-052030(L) Regulatory approvals pending. Not under constructionHECO19.8799-155.73732026-09
68226/BACONSR BaconBACON68226GABaconSR Bacon, LLCIPP Non-CHPSolar PhotovoltaicSUNPV85852026-122026(V) Under construction, more than 50 percent completeSOCO31.511392-82.336832026-09
70089/MURCHMurch Solar, LLCMURCH70089MIVan BurenMurch Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV85852027-012027(V) Under construction, more than 50 percent completePJM42.401-86.032026-09
69925/SWBA1Stellar Wright BESSSWBA169925CAMercedStellar Renewable PowerIPP Non-CHPBatteriesMWHBA84.8802026-112026(V) Under construction, more than 50 percent completeCISO37.007998-120.96372026-09
67782/GS22BRedSun PV and BESSGS22B67782TXBurnetGransolar Texas Twenty Two LLCIPP Non-CHPBatteriesMWHBA84842028-072028(L) Regulatory approvals pending. Not under constructionERCO30.784886-98.202172026-09
67782/GS22PRedSun PV and BESSGS22P67782TXBurnetGransolar Texas Twenty Two LLCIPP Non-CHPSolar PhotovoltaicSUNPV84842028-072028(L) Regulatory approvals pending. Not under constructionERCO30.784886-98.202172026-09
69147/G1New CaledoniaG169147MSLowndesTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT84812028-122028(P) Planned for installation, but regulatory approvals not initiatedTVA33.649272-88.31462026-09
69147/G2New CaledoniaG269147MSLowndesTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT84812028-122028(P) Planned for installation, but regulatory approvals not initiatedTVA33.649272-88.31462026-09
69147/G3New CaledoniaG369147MSLowndesTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT84812028-122028(P) Planned for installation, but regulatory approvals not initiatedTVA33.649272-88.31462026-09
69147/G4New CaledoniaG469147MSLowndesTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT84812028-122028(P) Planned for installation, but regulatory approvals not initiatedTVA33.649272-88.31462026-09
69147/G5New CaledoniaG569147MSLowndesTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT84812028-122028(P) Planned for installation, but regulatory approvals not initiatedTVA33.649272-88.31462026-09
69147/G6New CaledoniaG669147MSLowndesTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT84812028-122028(P) Planned for installation, but regulatory approvals not initiatedTVA33.649272-88.31462026-09
66895/LP1BALupinus Solar 1, LLCLP1BA66895TXFranklinSunraycer Assets I LLCIPP Non-CHPBatteriesMWHBA83832027-092027(U) Under construction, less than or equal to 50 percent completeERCO30.303385-95.256922026-09
67566/ROGSPRoscommon Solar ParkROGSP67566TXLamarGreenalia Solar Power Roscommon, LLCIPP Non-CHPSolar PhotovoltaicSUNPV82.882.82029-102029(T) Regulatory approvals received. Not under constructionERCO33.631719-95.695872026-09
68002/FOLEYFoley Solar, LLCFOLEY68002ALBaldwinNofar USA Energy Investments and Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV80802026-102026(TS) Construction complete, but not yet in commercial operationSOCO30.377488-87.727512026-09
69197/HALIFHalifax County SolarHALIF69197NCHalifaxAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV80802026-102026(U) Under construction, less than or equal to 50 percent completePJM36.2537-77.68842026-09
70235/68372Mulqueeney Wind Energy6837270235CAAlamedaMulqueeney Wind Energy LLCIPP Non-CHPOnshore Wind TurbineWNDWT80802026-102026(V) Under construction, more than 50 percent completeCISO37.69742-121.58912026-09
67998/KSECKarn Solar Energy CenterKSEC67998MIBayConsumers Energy Co - (MI)Electric UtilitySolar PhotovoltaicSUNPV80802026-122026(U) Under construction, less than or equal to 50 percent completeMISO43.644996-83.840072026-09
70084/ACAlligator Creek SolarAC70084GAWheelerAlligator Creek Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV80802026-122026(V) Under construction, more than 50 percent completeSOCO32.104-82.8442026-09
70364/GEN1Walker SolarGEN170364PAJuniataMN8 Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV80802026-122026(U) Under construction, less than or equal to 50 percent completePJM40.585531-77.345372026-09
70302/22Gum Swamp Solar, LLC2270302NCScotlandHeadwater Energy, LLCIPP Non-CHPSolar PhotovoltaicSUNPV80802027-032027(U) Under construction, less than or equal to 50 percent completeCPLE34.867-79.5992026-09
70035/NSESNorth Star Energy Storage, LLCNSES70035MNChisagoNorth Star Energy Storage, LLCIPP Non-CHPBatteriesMWHBA80802027-042027(U) Under construction, less than or equal to 50 percent completeMISO45.480911-92.908142026-09
69967/FTBFoxtail Flats Solar, LLCFTB69967NMSan JuanFoxtail Flats Solar, LLCIPP Non-CHPBatteriesMWHBA80802027-052027(U) Under construction, less than or equal to 50 percent completePNM36.8685-108.2772026-09
69463/BCRSPBeecher Solar ParkBCRSP69463MILenaweeDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV80802027-062027(U) Under construction, less than or equal to 50 percent completeMISO41.923-83.9172026-09
67663/SGROVScotch Grove SolarSGROV67663NCScotlandCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV80802027-092027(L) Regulatory approvals pending. Not under constructionCPLE34.84957-79.446562026-09
67665/SDAVISouth DavidsonSDAVI67665NCDavidsonCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV80802027-102027(L) Regulatory approvals pending. Not under constructionDUK35.618203-80.107972026-09
68057/BAMA1Alabama Creek SolarBAMA168057ALDallasAlabama Creek Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV80802027-102027(T) Regulatory approvals received. Not under constructionSOCO32.315548-87.223122026-09
70271/OKFL1Fiddle Leaf Solar, LLCOKFL170271OKDelawareLightsource Renewable Energy Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV80762027-102027(T) Regulatory approvals received. Not under constructionSWPP36.256047-94.586532026-09
70304/24Sleepy Creek Solar, LLC2470304NCBladenHeadwater Energy, LLCIPP Non-CHPSolar PhotovoltaicSUNPV80802027-102027(U) Under construction, less than or equal to 50 percent completeCPLE34.592-78.3262026-09
66363/GEN1Black Walnut Solar, LLCGEN166363NCJonesCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV80802027-112027(L) Regulatory approvals pending. Not under constructionDUK35.050032-77.152182026-09
66383/GEN1Hyco Solar LLCGEN166383NCPersonCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV80802027-112027(L) Regulatory approvals pending. Not under constructionDUK36.484574-79.133112026-09
67989/PGR28Drawhorn SolarPGR2867989GAHancockDrawhorn Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV80802027-112027(L) Regulatory approvals pending. Not under constructionSOCO33.214449-83.042062026-09
68028/DSPDelta Solar PlantDSP68028LABolivarEntergy Mississippi LLCElectric UtilitySolar PhotovoltaicSUNPV80802027-112027(P) Planned for installation, but regulatory approvals not initiatedMISO33.794007-90.713922026-09
63653/SNDHCSand Hill CSNDHC63653CAAlamedaViracocha Wind LLCIPP Non-CHPOnshore Wind TurbineWNDWT80802027-122027(L) Regulatory approvals pending. Not under constructionCISO37.769695-121.59612026-09
67990/BM1Bright Mountain SolarBM167990KYPerryAvangrid Power LLCIPP Non-CHPSolar PhotovoltaicSUNPV80802027-122027(P) Planned for installation, but regulatory approvals not initiatedPJM37.29003-83.282862026-09
68104/HPHULSR Hope HullHPHUL68104ALMontgomerySR Hope Hull, LLCIPP Non-CHPSolar PhotovoltaicSUNPV80802027-122027(T) Regulatory approvals received. Not under constructionSOCO32.2555-86.31942026-09
66385/GEN1Panther Branch Solar, LLCGEN166385NCDuplinCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV80802028-082028(L) Regulatory approvals pending. Not under constructionDUK35.145344-78.159632026-09
68043/ROBESRobeson Solar IROBES68043NCRobesonAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV80802028-122028(P) Planned for installation, but regulatory approvals not initiatedCPLE34.614574-78.934682026-09
68871/TIMILTimber Mill SolarTIMIL68871NCJonesCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV80802028-122028(P) Planned for installation, but regulatory approvals not initiatedCPLE34.96634-77.212992026-09
65325/98936High Top Solar9893665325WAYakimaCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV80802029-012029(T) Regulatory approvals received. Not under constructionPACW46.522974-119.95862026-09
58175/JWPIJawbone Wind ProjectJWPI58175MTWheatlandTriple Oak Power LLCIPP Non-CHPOnshore Wind TurbineWNDWT80802029-122029(U) Under construction, less than or equal to 50 percent completeNWMT46.508056-109.72782026-09
68812/STVMLStevens Mill SolarSTVML68812NCWayneCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV80802030-062030(L) Regulatory approvals pending. Not under constructionCPLE35.35546-78.11922026-09
61331/BA1NISA Electric Generation ProjectBA161331NYKingsNYC Energy LLCIPP Non-CHPBatteriesMWHBA79.979.92028-102028(T) Regulatory approvals received. Not under constructionNYIS40.7065-73.97022026-09
68249/METTRSR HorusMETTR68249KYSimpsonSR Horus, LLCIPP Non-CHPSolar PhotovoltaicSUNPV79.779.72027-092027(V) Under construction, more than 50 percent completeTVA36.661-86.5342026-09
68969/ENX39Strinestown SolarENX3968969PAYorkStrinestown Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV79.679.62027-122027(T) Regulatory approvals received. Not under constructionPJM40.090105-76.739552026-09
66862/NY29KCE NY 29, LLCNY2966862NYSuffolkKey Capture EnergyIPP Non-CHPBatteriesMWHBA79792030-032030(P) Planned for installation, but regulatory approvals not initiatedNYIS40.81278-73.217292026-09
67563/RAGSPRatcliff Solar ParkRAGSP67563TXFreestoneGreenalia Solar Power Ratcliff, LLCIPP Non-CHPSolar PhotovoltaicSUNPV78.878.82029-082029(T) Regulatory approvals received. Not under constructionERCO30.217058-95.816022026-09
67581/CIRSBCairos Solar and StorageCIRSB67581TXKinneySamsung C&T Renewables, LLCIPP Non-CHPBatteriesMWHBA77.377.32027-062027(P) Planned for installation, but regulatory approvals not initiatedERCO29.269974-100.19752026-09
66315/CCSOClover Creek SolarCCSO66315VAHalifaxDominion Energy Inc.Electric UtilitySolar PhotovoltaicSUNPV77.277.22027-062027(U) Under construction, less than or equal to 50 percent completePJM36.816641-78.692622026-09
69351/HNYBSHoneycomb Solar and StorageHNYBS69351TXBeeHoneycomb Solar Holdco, LLCIPP Non-CHPBatteriesMWHBA76.576.52026-112026(V) Under construction, more than 50 percent completeERCO28.184344-97.771692026-09
66398/EYTCHEytcheson SolarEYTCH66398TXNavarroGransolar Texas Fourteen, LLCIPP Non-CHPSolar PhotovoltaicSUNPV76.476.22028-012028(P) Planned for installation, but regulatory approvals not initiatedERCO31.872617-96.72026-09
69823/CABOKCabokenze Energy StorageCABOK69823GABurkeCabokenze Energy Storage, LLCIPP Non-CHPBatteriesMWHBA76762027-112027(P) Planned for installation, but regulatory approvals not initiatedSOCO33.037636-82.119242026-09
70220/RSP1Robinson Solar PlantRSP170220SCChesterfieldDuke Energy Carolinas, LLCElectric UtilitySolar PhotovoltaicSUNPV76762027-122027(L) Regulatory approvals pending. Not under constructionCPLE34.4168-80.19182026-09
68172/MYEBTMyers Solar and StorageMYEBT68172TXGoliadBelltown Power Texas 2, LLCIPP Non-CHPBatteriesMWHBA75.775.72028-082028(L) Regulatory approvals pending. Not under constructionERCO28.420043-97.709342026-09
68461/KEYBAKey Energy StorageKEYBA68461CAFresnoKey Energy Storage LLCIPP Non-CHPBatteriesMWHBA75752026-122026(U) Under construction, less than or equal to 50 percent completeCISO36.13681-120.13122026-09
68578/AC1SAC Ranch IAC1S68578NMLeaLydian EnergyIPP Non-CHPSolar PhotovoltaicSUNPV75752027-052027(U) Under construction, less than or equal to 50 percent completeSWPP32.732263-103.27482026-09
67676/GEN01Zeta Solar & StorageGEN0167676CAMercedZeta Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV75752027-062027(U) Under construction, less than or equal to 50 percent completeCISO36.911894-120.81012026-09
67676/GEN02Zeta Solar & StorageGEN0267676CAMercedZeta Solar, LLCIPP Non-CHPBatteriesMWHBA75752027-062027(U) Under construction, less than or equal to 50 percent completeCISO36.911894-120.81012026-09
70023/EDGCMEdgecombe Solar LLCEDGCM70023NCEdgecombeInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV75752027-092027(U) Under construction, less than or equal to 50 percent completePJM35.949381-77.659262026-09
68337/LOTUSLotus SolarLOTUS68337SCDarlingtonModal Power LLCIPP Non-CHPSolar PhotovoltaicSUNPV75752027-102027(T) Regulatory approvals received. Not under constructionCPLE34.447832-80.103562026-09
68995/ENX38Dover Solar (PA)ENX3868995PAYorkDover Solar, LLC (PA)IPP Non-CHPSolar PhotovoltaicSUNPV75752027-112027(T) Regulatory approvals received. Not under constructionPJM40.01169-76.82342026-09
65344/66149Noria Hondo Solar (Hybrid)6614965344TXKlebergNexus Renewable Power, LLCIPP Non-CHPBatteriesMWHBA75752027-122027(L) Regulatory approvals pending. Not under constructionERCO27.553355-97.675282026-09
66851/FAIR1Fairview Solar (AR)FAIR166851ARAshleyUrban Grid SolarIPP Non-CHPSolar PhotovoltaicSUNPV75752027-122027(L) Regulatory approvals pending. Not under constructionMISO33.342883-91.894952026-09
70545/WBESSWildwood Energy StorageWBESS70545MSTallahatchieWildwood Energy Storage, LLCIPP Non-CHPBatteriesMWHBA75752027-122027(L) Regulatory approvals pending. Not under constructionMISO33.93316-90.339082026-09
70454/BESS1Big Bend III Battery StorageBESS170454FLHillsboroughTampa Electric CoElectric UtilityBatteriesMWHBA75752028-062028(T) Regulatory approvals received. Not under constructionTEC27.795-82.4032026-09
70365/BODESBodkin BESSBODES70365TXBrazoriaBodkin BESS LLCIPP Non-CHPBatteriesMWHBA75752028-122028(T) Regulatory approvals received. Not under constructionERCO29.292-95.3012026-09
70366/BHBESBoot Hill Energy StorageBHBES70366KSFordBoot Hill Energy Storage LLCIPP Non-CHPBatteriesMWHBA75752028-122028(T) Regulatory approvals received. Not under constructionSWPP37.704-99.9772026-09
61511/BCNEBurt County WindBCNE61511NEBurtRWE Americas, LLCIPP Non-CHPOnshore Wind TurbineWNDWT75752029-092029(L) Regulatory approvals pending. Not under constructionSWPP41.886-96.3452026-09
68331/CVSOCaverns SolarCVSO68331FLJacksonCVSO, LLCIPP Non-CHPSolar PhotovoltaicSUNPV75752029-122029(L) Regulatory approvals pending. Not under constructionFPL30.871983-85.294252026-09
67666/SUNDNSundance (CO)SUNDN67666COElbertCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV74.974.92026-102026(U) Under construction, less than or equal to 50 percent completePSCO39.414779-104.44812026-09
67723/SOLARKingstree West 115SOLAR67723SCWilliamsburgKingstree West 115 LLCIPP Non-CHPSolar PhotovoltaicSUNPV74.974.92026-102026(TS) Construction complete, but not yet in commercial operationCPLE33.693976-79.954042026-09
62181/23B & K Solar2362181SCDarlingtonB & K SolarIPP Non-CHPSolar PhotovoltaicSUNPV74.974.92026-112026(V) Under construction, more than 50 percent completeCPLE34.423425-80.062132026-09
70223/TPSP1Turnpike Solar PlantTPSP170223FLOsceolaDuke Energy Florida, LLCElectric UtilitySolar PhotovoltaicSUNPV74.974.92027-022027(V) Under construction, more than 50 percent completeFPC28.063296-81.223052026-09
62184/27Big Fork Solar2762184SCBarnwellBig Fork SolarIPP Non-CHPBatteriesMWHBA74.974.92027-042027(T) Regulatory approvals received. Not under constructionSCEG33.135275-81.239112026-09
62234/48Juniper Solar4862234SCChesterfieldJuniper SolarIPP Non-CHPSolar PhotovoltaicSUNPV74.974.92027-042027(T) Regulatory approvals received. Not under constructionCPLE34.638189-79.861212026-09
70222/LCSP1Lonesome Camp Solar PlantLCSP170222FLOsceolaDuke Energy Florida, LLCElectric UtilitySolar PhotovoltaicSUNPV74.974.92027-042027(V) Under construction, more than 50 percent completeFPC28.079121-81.240292026-09
64345/1112Highland Solar North111264345FLHighlandsPlacid Solar II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV74.974.92027-052027(L) Regulatory approvals pending. Not under constructionFPC27.2821-81.42562026-09
62221/33Culpepper Solar3362221SCDarlingtonCulpepper SolarIPP Non-CHPSolar PhotovoltaicSUNPV74.974.92027-112027(T) Regulatory approvals received. Not under constructionCPLE34.465864-79.960442026-09
62295/67Rollins Solar6762295SCDarlingtonRollins SolarIPP Non-CHPSolar PhotovoltaicSUNPV74.974.92027-112027(T) Regulatory approvals received. Not under constructionCPLE34.353572-80.016182026-09
62296/68Ross Solar6862296SCDarlingtonRoss SolarIPP Non-CHPSolar PhotovoltaicSUNPV74.974.92027-112027(T) Regulatory approvals received. Not under constructionCPLE34.444756-79.851732026-09
62184/26Big Fork Solar2662184SCBarnwellBig Fork SolarIPP Non-CHPSolar PhotovoltaicSUNPV74.974.92028-112028(T) Regulatory approvals received. Not under constructionSCEG33.135275-81.239112026-09
62188/30Colleton Solar3062188SCColletonColleton SolarIPP Non-CHPSolar PhotovoltaicSUNPV74.974.92028-112028(T) Regulatory approvals received. Not under constructionSCEG33.123794-80.842482026-09
68075/PINESPineside SolarPINES68075VABuckinghamDominion Renewable EnergyElectric UtilitySolar PhotovoltaicSUNPV74.974.92030-012030(P) Planned for installation, but regulatory approvals not initiatedPJM37.5-78.52026-09
69351/HNYPVHoneycomb Solar and StorageHNYPV69351TXBeeHoneycomb Solar Holdco, LLCIPP Non-CHPSolar PhotovoltaicSUNPV74.874.82026-112026(V) Under construction, more than 50 percent completeERCO28.184344-97.771692026-09
69474/SWTSUSweet Sue SolarSWTSU69474VAKing WilliamDominion Renewable EnergyIPP Non-CHPSolar PhotovoltaicSUNPV74.874.82028-032028(V) Under construction, more than 50 percent completePJM37.762-77.1912026-09
69461/1Keene Branch Solar169461FLHillsboroughTampa Electric CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52026-122026(V) Under construction, more than 50 percent completeTEC27.658706-82.26572026-09
69626/SMFFRP Miller SolarSMF69626FLDuvalFRP Miller Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV74.574.52026-122026(U) Under construction, less than or equal to 50 percent completeJEA30.320634-81.912742026-09
68828/1Tangelo168828FLOkeechobeeFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-012027(U) Under construction, less than or equal to 50 percent completeFPL27.507993-80.736512026-09
68834/1Hendry168834FLHendryFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-012027(U) Under construction, less than or equal to 50 percent completeFPL26.410345-81.031892026-09
68824/1Middle Lake168824FLMadisonFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-042027(U) Under construction, less than or equal to 50 percent completeFPL30.380511-83.340742026-09
68829/1Ambersweet168829FLIndian RiverFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-042027(U) Under construction, less than or equal to 50 percent completeFPL27.567468-80.627822026-09
68832/1County Line168832FLDeSotoFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-042027(U) Under construction, less than or equal to 50 percent completeFPL27.110556-81.800832026-09
68830/1Catfish168830FLOkeechobeeFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-072027(U) Under construction, less than or equal to 50 percent completeFPL27.277731-80.788542026-09
68831/1Cocoplum168831FLHendryFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-072027(U) Under construction, less than or equal to 50 percent completeFPL26.762027-81.19072026-09
68833/1Hardwood Hammock168833FLWaltonFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-072027(U) Under construction, less than or equal to 50 percent completeFPL27.282662-81.775222026-09
68836/1Maple Trail168836FLBakerFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-072027(U) Under construction, less than or equal to 50 percent completeFPL30.314392-82.185012026-09
68825/1Pinecone168825FLCalhounFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-102027(U) Under construction, less than or equal to 50 percent completeFPL30.439415-85.254992026-09
68826/1Saddle168826FLCalhounFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-102027(U) Under construction, less than or equal to 50 percent completeFPL30.439415-85.254992026-09
68827/1Spanish Moss168827FLSt LucieFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-102027(U) Under construction, less than or equal to 50 percent completeFPL27.509782-80.564472026-09
68835/1Joshua Creek168835FLDeSotoFlorida Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV74.574.52027-102027(U) Under construction, less than or equal to 50 percent completeFPL27.282662-81.775222026-09
65708/WMSSWarren Meadow Solar StationWMSS65708MEKnoxWarren Meadow Solar Station, LLCIPP Non-CHPSolar PhotovoltaicSUNPV74.574.52028-032028(T) Regulatory approvals received. Not under constructionISNE44.16061-69.223412026-09
62229/43Holliday Solar I4362229SCHorryHolliday Solar IIPP Non-CHPSolar PhotovoltaicSUNPV74742028-112028(T) Regulatory approvals received. Not under constructionSC34.054128-79.206632026-09
62309/73Shining Sun Solar7362309SCOrangeburgShining Sun SolarIPP Non-CHPSolar PhotovoltaicSUNPV7474.42028-112028(T) Regulatory approvals received. Not under constructionSC33.5425-80.572192026-09
64634/90FIBKingsley Solar Farm90FIB64634CAImperial90FI 8me, LLCIPP Non-CHPBatteriesMWHBA74742028-122028(P) Planned for installation, but regulatory approvals not initiatedCISO32.742036-115.73542026-09
64167/GENHornet SolarGEN64167NCGastonHornet Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV73732026-122026(TS) Construction complete, but not yet in commercial operationDUK35.387-81.0292026-09
67195/GENMaple Leaf SolarGEN67195NCJohnstonCapital Power CorporationIPP Non-CHPSolar PhotovoltaicSUNPV73732027-042027(T) Regulatory approvals received. Not under constructionDUK35.595-78.3172026-09
6085/19AR M Schahfer19A6085INJasperNorthern Indiana Pub Serv CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT71.549.62027-122027(T) Regulatory approvals received. Not under constructionMISO41.2164-87.02612026-09
6085/19BR M Schahfer19B6085INJasperNorthern Indiana Pub Serv CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT71.549.62027-122027(T) Regulatory approvals received. Not under constructionMISO41.2164-87.02612026-09
6085/19CR M Schahfer19C6085INJasperNorthern Indiana Pub Serv CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT71.549.62027-122027(T) Regulatory approvals received. Not under constructionMISO41.2164-87.02612026-09
62262/GEN1Rolling Upland Wind Farm LLCGEN162262NYMadisonRolling Upland Wind Farm LLCIPP Non-CHPOnshore Wind TurbineWNDWT71.471.42029-122029(P) Planned for installation, but regulatory approvals not initiatedNYIS42.524607-75.277442026-09
70221/HPSP1Hudson Place Solar PlantHPSP170221SCNewberryDuke Energy Carolinas, LLCElectric UtilitySolar PhotovoltaicSUNPV70.770.72028-012028(L) Regulatory approvals pending. Not under constructionDUK34.2391-81.69222026-09
66691/BRUGGBriggs Solar, LLCBRUGG66691TXHaskellIntersect USA, LLCIPP Non-CHPBatteriesMWHBA70.570.52027-122027(L) Regulatory approvals pending. Not under constructionERCO33.144326-99.559772026-09
68000/BLUMNBlue MoonBLUMN68000KYHarrisonBlue Moon Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV70702026-102026(V) Under construction, more than 50 percent completePJM38.37118-84.25782026-09
66787/ELVPSElevate Pier SELVPS66787CALos AngelesLighthouse Pier S, LLCIPP Non-CHPBatteriesMWHBA70702026-122026(L) Regulatory approvals pending. Not under constructionCISO33.764993-118.22372026-09
69947/GEN05EDPR Scarlet IIIGEN0569947CAFresnoEDPR Scarlet III LLCIPP Non-CHPBatteriesMWHBA70702026-122026(TS) Construction complete, but not yet in commercial operationCISO36.608742-120.35112026-09
64428/JVR1BJVR Energy Park LLCJVR1B64428CASan DiegoJVR Energy Park LLCIPP Non-CHPBatteriesMWHBA70702027-032027(V) Under construction, more than 50 percent completeCISO32.625903-116.17492026-09
50736/FSS17Pure Hedge LLCFSS1750736CTWindhamPure Hedge LLCIPP Non-CHPSolar PhotovoltaicSUNPV70702027-102027(U) Under construction, less than or equal to 50 percent completeISNE41.712448-71.822252026-09
70109/JASMIJasmineJASMI70109CAKernAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV70702027-122027(V) Under construction, more than 50 percent completeCISO35.1006-119.11872026-09
67560/RIC94Edens SolarRIC9467560TXHillRIC Development, LLCIPP Non-CHPSolar PhotovoltaicSUNPV70702028-092028(P) Planned for installation, but regulatory approvals not initiatedERCO32.063132-97.111042026-09
66124/SSPVSwitchgrass Solar, LLCSSPV66124VASuffolk CityRWE Americas, LLCIPP Non-CHPSolar PhotovoltaicSUNPV70702028-102028(P) Planned for installation, but regulatory approvals not initiatedPJM36.676484-76.585882026-09
70559/BESS1MammothBESS170559WVKanawhaMN8 Energy LLCIPP Non-CHPBatteriesMWHBA70702029-062029(L) Regulatory approvals pending. Not under constructionPJM38.20845-81.308932026-09
201/4Thomas Fitzhugh4201ARFranklinArkansas Electric Coop CorpElectric UtilityNatural Gas Fired Combustion TurbineNGGT69.346.52026-112026(TS) Construction complete, but not yet in commercial operationSWPP35.462382-93.804932026-09
69524/WLBWindy Lane Energy CenterWLB69524NMDe BacaWindy Lane Energy Center, LLCIPP Non-CHPBatteriesMWHBA68682026-122026(U) Under construction, less than or equal to 50 percent completePNM34.587619-104.03122026-09
68416/CTS1Crooked Trail SolarCTS168416MEPenobscotVCP Realty, LLCIPP Non-CHPSolar PhotovoltaicSUNPV68682029-102029(P) Planned for installation, but regulatory approvals not initiatedISNE45.144194-68.586032026-09
67379/1Whitetail Wind Farm167379WIGrantInvenergy Services LLCIPP Non-CHPOnshore Wind TurbineWNDWT67.267.22027-122027(T) Regulatory approvals received. Not under constructionMISO42.951448-90.44072026-09
68175/SYMPVSymank SolarSYMPV68175TXBosqueBelltown Power Texas 2, LLCIPP Non-CHPSolar PhotovoltaicSUNPV66.666.62027-122027(L) Regulatory approvals pending. Not under constructionERCO31.626039-97.642112026-09
68926/BLUEJBlue Jay Road Solar, LLCBLUEJ68926MORallsBirch Creek DevelopmentIPP Non-CHPSolar PhotovoltaicSUNPV66662026-112026(U) Under construction, less than or equal to 50 percent completeMISO39.380782-91.532062026-09
68556/DURHMSR DurhamvilleDURHM68556TNHaywoodSR Durhamville, LLCIPP Non-CHPSolar PhotovoltaicSUNPV66662027-122027(T) Regulatory approvals received. Not under constructionTVA35.626611-89.461622026-09
3407/G1KingstonG13407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G10KingstonG103407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G11KingstonG113407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G12KingstonG123407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G13KingstonG133407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G14KingstonG143407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G15KingstonG153407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G16KingstonG163407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G2KingstonG23407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G3KingstonG33407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G4KingstonG43407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G5KingstonG53407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G6KingstonG63407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G7KingstonG73407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G8KingstonG83407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
3407/G9KingstonG93407TNRoaneTennessee Valley AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT65.8452027-122027(P) Planned for installation, but regulatory approvals not initiatedTVA35.8992-84.51942026-09
69631/SFS01Sunflower Sky Energy CenterSFS0169631KSWilsonEvergy Missouri WestElectric UtilitySolar PhotovoltaicSUNPV65652027-052027(V) Under construction, more than 50 percent completeSWPP37.502223-95.648682026-09
70420/BA1Wheatridge Optimization IBA170420ORMorrowWheatridge Optimization I, LLCIPP Non-CHPBatteriesMWHBA65652027-122027(U) Under construction, less than or equal to 50 percent completeBPAT45.560054-119.62242026-09
62280/58Melsam Solar5862280SCDillonMelsam SolarIPP Non-CHPSolar PhotovoltaicSUNPV65652028-112028(T) Regulatory approvals received. Not under constructionCPLE34.344878-79.374562026-09
68672/OECHAChalanOECHA68672CAKernOrigis Energy USA, IncIPP Non-CHPSolar PhotovoltaicSUNPV64.964.92026-122026(V) Under construction, more than 50 percent completeCISO35.7803-119.9112026-09
70109/JASBEJasmineJASBE70109CAKernAES Clean EnergyIPP Non-CHPBatteriesMWHBA64.464.42027-122027(V) Under construction, more than 50 percent completeCISO35.1006-119.11872026-09
68074/CERULCerulean SolarCERUL68074VARichmondDominion Renewable EnergyElectric UtilitySolar PhotovoltaicSUNPV62622026-122026(V) Under construction, more than 50 percent completePJM37.867194-76.589872026-09
69773/GT1Mohave Energy ParkGT169773AZMohaveArizona Electric Pwr Coop IncElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.5432027-122027(L) Regulatory approvals pending. Not under constructionWALC34.932499-114.5482026-09
69773/GT2Mohave Energy ParkGT269773AZMohaveArizona Electric Pwr Coop IncElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.5432027-122027(L) Regulatory approvals pending. Not under constructionWALC34.932499-114.5482026-09
69773/GT3Mohave Energy ParkGT369773AZMohaveArizona Electric Pwr Coop IncElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.5432027-122027(L) Regulatory approvals pending. Not under constructionWALC34.932499-114.5482026-09
69773/GT4Mohave Energy ParkGT469773AZMohaveArizona Electric Pwr Coop IncElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.5432027-122027(L) Regulatory approvals pending. Not under constructionWALC34.932499-114.5482026-09
66478/GEN1NTEC Gas PlantGEN166478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN10NTEC Gas PlantGEN1066478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN11NTEC Gas PlantGEN1166478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN12NTEC Gas PlantGEN1266478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN13NTEC Gas PlantGEN1366478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN14NTEC Gas PlantGEN1466478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN15NTEC Gas PlantGEN1566478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN16NTEC Gas PlantGEN1666478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN17NTEC Gas PlantGEN1766478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN18NTEC Gas PlantGEN1866478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN2NTEC Gas PlantGEN266478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN3NTEC Gas PlantGEN366478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN4NTEC Gas PlantGEN466478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN5NTEC Gas PlantGEN566478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN6NTEC Gas PlantGEN666478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN7NTEC Gas PlantGEN766478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN8NTEC Gas PlantGEN866478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
66478/GEN9NTEC Gas PlantGEN966478NMSan JuanNavajo Transitional Energy CompanyElectric UtilityNatural Gas Fired Combustion TurbineNGGT60.537.62028-062028(L) Regulatory approvals pending. Not under constructionPNM36.682944-108.45022026-09
67871/ENX29Gladys Solar LLCENX2967871VACampbellGladys Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV60.460.42027-102027(P) Planned for installation, but regulatory approvals not initiatedPJM37.143719-79.142072026-09
67781/GRS7Lampe SolarGRS767781TXWashingtonGransolar Texas Seven LLCIPP Non-CHPSolar PhotovoltaicSUNPV60.260.22027-122027(L) Regulatory approvals pending. Not under constructionERCO30.310524-96.478872026-09
67562/RIC92Stonewall SolarRIC9267562TXStonewallRIC Development, LLCIPP Non-CHPSolar PhotovoltaicSUNPV60.260.22028-042028(P) Planned for installation, but regulatory approvals not initiatedERCO33.174177-100.23082026-09
66313/MOCOMoon Corner SolarMOCO66313VARichmondDominion Energy Inc.Electric UtilitySolar PhotovoltaicSUNPV60602026-122026(U) Under construction, less than or equal to 50 percent completePJM37.89-76.542026-09
68495/BDOG1Bird Dog Energy StorageBDOG168495TXSan PatricioVESI 37 LLCIPP Non-CHPBatteriesMWHBA60602026-122026(V) Under construction, more than 50 percent completeERCO28.158672-97.862312026-09
62310/74Shorthorn Solar7462310SCLeeShorthorn SolarIPP Non-CHPSolar PhotovoltaicSUNPV60602027-112027(T) Regulatory approvals received. Not under constructionCPLE34.246975-80.157822026-09
68810/MORAMora SolarMORA68810PACarbonCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV60602027-122027(P) Planned for installation, but regulatory approvals not initiatedPJM41.062982-75.634352026-09
70450/BA1Wheatridge Optimization IIBA170450ORMorrowWheatridge Optimization II, LLCIPP Non-CHPBatteriesMWHBA60602027-122027(U) Under construction, less than or equal to 50 percent completeBPAT45.559975-119.62922026-09
63567/WSMTRWestminister NCWSMTR63567NCRutherfordEcoplexus, IncIPP Non-CHPSolar PhotovoltaicSUNPV60602028-122028(T) Regulatory approvals received. Not under constructionDUK35.452-81.9192026-09
64767/TC001Pigeon Run Solar ProjectTC00164767VACampbellPigeon Run Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV60602029-072029(P) Planned for installation, but regulatory approvals not initiatedPJM37.158473-79.055642026-09
64768/TC001Zenith SolarTC00164768VAPittsylvaniaZenith Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV60602030-072030(P) Planned for installation, but regulatory approvals not initiatedPJM36.817763-79.233282026-09
68924/IROBIron BESSIROB68924CAFresnoPanoche BESS LLCIPP Non-CHPBatteriesMWHBA59.5572027-042027(V) Under construction, more than 50 percent completeCISO36.652653-120.57832026-09
69541/VACBVaca BESSVACB69541CASolanoVaca Dixon BESS LLCIPP Non-CHPBatteriesMWHBA59.5572027-072027(L) Regulatory approvals pending. Not under constructionCISO38.398379-121.9242026-09
65823/PARBParowan SolarPARB65823UTIronLeeward Asset Management, LLCIPP Non-CHPBatteriesMWHBA58582028-022028(P) Planned for installation, but regulatory approvals not initiatedPACE37.875795-112.88852026-09
65823/PARS0Parowan SolarPARS065823UTIronLeeward Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV58582028-022028(P) Planned for installation, but regulatory approvals not initiatedPACE37.875795-112.88852026-09
708/5Hammond5708GAFloydGeorgia Power CoElectric UtilityBatteriesMWHBA57.557.52026-102026(V) Under construction, more than 50 percent completeSOCO34.2528-85.34562026-09
6249/5Winyah56249SCGeorgetownSouth Carolina Public Service AuthorityElectric UtilityPetroleum LiquidsDFOGT57442027-122027(P) Planned for installation, but regulatory approvals not initiatedSC33.33184-79.357242026-09
6249/6Winyah66249SCGeorgetownSouth Carolina Public Service AuthorityElectric UtilityPetroleum LiquidsDFOGT57442027-122027(P) Planned for installation, but regulatory approvals not initiatedSC33.33184-79.357242026-09
69799/EG001Project Matador Gas Plant (PMG)EG00169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG002Project Matador Gas Plant (PMG)EG00269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG003Project Matador Gas Plant (PMG)EG00369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG004Project Matador Gas Plant (PMG)EG00469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG005Project Matador Gas Plant (PMG)EG00569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG006Project Matador Gas Plant (PMG)EG00669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG007Project Matador Gas Plant (PMG)EG00769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG008Project Matador Gas Plant (PMG)EG00869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG009Project Matador Gas Plant (PMG)EG00969799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG010Project Matador Gas Plant (PMG)EG01069799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG011Project Matador Gas Plant (PMG)EG01169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG012Project Matador Gas Plant (PMG)EG01269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG013Project Matador Gas Plant (PMG)EG01369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG014Project Matador Gas Plant (PMG)EG01469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG015Project Matador Gas Plant (PMG)EG01569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG016Project Matador Gas Plant (PMG)EG01669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG017Project Matador Gas Plant (PMG)EG01769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG018Project Matador Gas Plant (PMG)EG01869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG019Project Matador Gas Plant (PMG)EG01969799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG020Project Matador Gas Plant (PMG)EG02069799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG021Project Matador Gas Plant (PMG)EG02169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG022Project Matador Gas Plant (PMG)EG02269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG023Project Matador Gas Plant (PMG)EG02369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG024Project Matador Gas Plant (PMG)EG02469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG025Project Matador Gas Plant (PMG)EG02569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG026Project Matador Gas Plant (PMG)EG02669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG027Project Matador Gas Plant (PMG)EG02769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG028Project Matador Gas Plant (PMG)EG02869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG029Project Matador Gas Plant (PMG)EG02969799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG030Project Matador Gas Plant (PMG)EG03069799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG031Project Matador Gas Plant (PMG)EG03169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG032Project Matador Gas Plant (PMG)EG03269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG033Project Matador Gas Plant (PMG)EG03369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG034Project Matador Gas Plant (PMG)EG03469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG035Project Matador Gas Plant (PMG)EG03569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG036Project Matador Gas Plant (PMG)EG03669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG037Project Matador Gas Plant (PMG)EG03769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG038Project Matador Gas Plant (PMG)EG03869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG039Project Matador Gas Plant (PMG)EG03969799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG040Project Matador Gas Plant (PMG)EG04069799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG041Project Matador Gas Plant (PMG)EG04169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG042Project Matador Gas Plant (PMG)EG04269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG043Project Matador Gas Plant (PMG)EG04369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG044Project Matador Gas Plant (PMG)EG04469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG045Project Matador Gas Plant (PMG)EG04569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG046Project Matador Gas Plant (PMG)EG04669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG047Project Matador Gas Plant (PMG)EG04769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/EG048Project Matador Gas Plant (PMG)EG04869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG001Project Matador Gas Plant (PMG)MG00169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG002Project Matador Gas Plant (PMG)MG00269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG003Project Matador Gas Plant (PMG)MG00369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG004Project Matador Gas Plant (PMG)MG00469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG005Project Matador Gas Plant (PMG)MG00569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG006Project Matador Gas Plant (PMG)MG00669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG007Project Matador Gas Plant (PMG)MG00769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG008Project Matador Gas Plant (PMG)MG00869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG009Project Matador Gas Plant (PMG)MG00969799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG010Project Matador Gas Plant (PMG)MG01069799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG011Project Matador Gas Plant (PMG)MG01169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG012Project Matador Gas Plant (PMG)MG01269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG013Project Matador Gas Plant (PMG)MG01369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG014Project Matador Gas Plant (PMG)MG01469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG015Project Matador Gas Plant (PMG)MG01569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG016Project Matador Gas Plant (PMG)MG01669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG017Project Matador Gas Plant (PMG)MG01769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG018Project Matador Gas Plant (PMG)MG01869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG019Project Matador Gas Plant (PMG)MG01969799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG020Project Matador Gas Plant (PMG)MG02069799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG021Project Matador Gas Plant (PMG)MG02169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG022Project Matador Gas Plant (PMG)MG02269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG023Project Matador Gas Plant (PMG)MG02369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG024Project Matador Gas Plant (PMG)MG02469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG025Project Matador Gas Plant (PMG)MG02569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG026Project Matador Gas Plant (PMG)MG02669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG027Project Matador Gas Plant (PMG)MG02769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG028Project Matador Gas Plant (PMG)MG02869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG029Project Matador Gas Plant (PMG)MG02969799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG030Project Matador Gas Plant (PMG)MG03069799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG031Project Matador Gas Plant (PMG)MG03169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG032Project Matador Gas Plant (PMG)MG03269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG033Project Matador Gas Plant (PMG)MG03369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG034Project Matador Gas Plant (PMG)MG03469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG035Project Matador Gas Plant (PMG)MG03569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG036Project Matador Gas Plant (PMG)MG03669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG037Project Matador Gas Plant (PMG)MG03769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG038Project Matador Gas Plant (PMG)MG03869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG039Project Matador Gas Plant (PMG)MG03969799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG040Project Matador Gas Plant (PMG)MG04069799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG041Project Matador Gas Plant (PMG)MG04169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG042Project Matador Gas Plant (PMG)MG04269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG043Project Matador Gas Plant (PMG)MG04369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG044Project Matador Gas Plant (PMG)MG04469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG045Project Matador Gas Plant (PMG)MG04569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG046Project Matador Gas Plant (PMG)MG04669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG047Project Matador Gas Plant (PMG)MG04769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/MG048Project Matador Gas Plant (PMG)MG04869799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT57572030-122030(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
67785/GRS19Whistle SolarGRS1967785TXNavarroGransolar Texas Nineteen LLCIPP Non-CHPSolar PhotovoltaicSUNPV56.356.32028-052028(L) Regulatory approvals pending. Not under constructionERCO31.985-96.436582026-09
69119/NHBA1New Hill 1 BatteryNHBA169119NCWakeDuke Energy Progress - (NC)Electric UtilityBatteriesMWHBA56562027-092027(U) Under construction, less than or equal to 50 percent completeCPLE35.659692-78.944122026-09
67157/PV1Powell SolarPV167157ORCrookInvenergy Services LLCIPP Non-CHPSolar PhotovoltaicSUNPV55.955.92027-122027(T) Regulatory approvals received. Not under constructionPACW44.258414-120.88952026-09
66341/EGSBEagle Springs HybridEGSB66341TXDeltaSunraycer Assets I LLCIPP Non-CHPBatteriesMWHBA55.155.12026-122026(V) Under construction, more than 50 percent completeERCO33.433264-95.574442026-09
69956/S8Sanborn Hybrid 3S869956CAKernTerra-Gen Operating Co-HybridIPP Non-CHPSolar PhotovoltaicSUNPV55552026-102026(V) Under construction, more than 50 percent completeCISO34.996-118.1142026-09
68561/MIDDNSR MiddletonMIDDN68561TNHardemanSR Middleton, LLCIPP Non-CHPSolar PhotovoltaicSUNPV55552027-072027(V) Under construction, more than 50 percent completeTVA35.176939-88.878672026-09
66382/GEN1Healing Springs Solar, LLCGEN166382NCDavidsonCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV55552027-122027(L) Regulatory approvals pending. Not under constructionDUK35.623627-80.159722026-09
68486/44STASienna 2 Solar and Storage Project44STA68486CASan Bernardino44ST 8ME LLCIPP Non-CHPSolar PhotovoltaicSUNPV55552029-032029(P) Planned for installation, but regulatory approvals not initiatedCISO34.506711-116.89012026-09
68486/44STBSienna 2 Solar and Storage Project44STB68486CASan Bernardino44ST 8ME LLCIPP Non-CHPBatteriesMWHBA55552029-032029(P) Planned for installation, but regulatory approvals not initiatedCISO34.506711-116.89012026-09
68923/ENTBEnterprise BESSENTB68923CASan DiegoEnterprise BESS LLCIPP Non-CHPBatteriesMWHBA54.1522027-122027(T) Regulatory approvals received. Not under constructionCISO33.12181-117.11742026-09
69523/1Mattaniah Solar169523FLPolkTampa Electric CoElectric UtilitySolar PhotovoltaicSUNPV52522026-122026(U) Under construction, less than or equal to 50 percent completeTEC27.893214-82.046142026-09
7887/5Terry Bundy Generating Station57887NELancasterLincoln Electric SystemElectric UtilityNatural Gas Fired Combustion TurbineNGGT5246.92029-062029(L) Regulatory approvals pending. Not under constructionSWPP40.909653-96.613092026-09
7887/6Terry Bundy Generating Station67887NELancasterLincoln Electric SystemElectric UtilityNatural Gas Fired Combustion TurbineNGGT5246.92029-062029(L) Regulatory approvals pending. Not under constructionSWPP40.909653-96.613092026-09
68380/ISCPVIsaac SolarISCPV68380TXMatagordaIndustrial Bravo Project, LLCIPP Non-CHPSolar PhotovoltaicSUNPV51.4502026-122026(U) Under construction, less than or equal to 50 percent completeERCO28.797223-95.937172026-09
69793/HEPV1Henderson County SolarHEPV169793KYHendersonStellar Renewable PowerIPP Non-CHPSolar PhotovoltaicSUNPV51.1502027-092027(U) Under construction, less than or equal to 50 percent completeMISO37.799412-87.623252026-09
66390/GDYESMRG Goody Solar Project HybridGDYES66390TXLamarNexus Renewable Power, LLCIPP Non-CHPBatteriesMWHBA50.450.42026-102026(V) Under construction, more than 50 percent completeERCO33.639193-95.629052026-09
66894/ALBBAAlbatross Solar, LLCALBBA66894TXMcLennanSunraycer Assets I LLCIPP Non-CHPBatteriesMWHBA50.450.42027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO31.484342-97.422392026-09
67778/GR16BFindley PV and BESSGR16B67778TXLimestoneGransolar Texas Sixteen, LLCIPP Non-CHPBatteriesMWHBA50.350.32028-012028(L) Regulatory approvals pending. Not under constructionERCO31.643389-96.779612026-09
67778/GR16PFindley PV and BESSGR16P67778TXLimestoneGransolar Texas Sixteen, LLCIPP Non-CHPSolar PhotovoltaicSUNPV50.350.32028-012028(L) Regulatory approvals pending. Not under constructionERCO31.643389-96.779612026-09
68970/HOFELHo-Fel SolarHOFEL68970VAIsle of WightHo-Fel Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV50.250.22026-112026(TS) Construction complete, but not yet in commercial operationPJM36.673032-76.882012026-09
70485/GT01White Cloud GeneratingGT0170485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
70485/GT02White Cloud GeneratingGT0270485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
70485/GT03White Cloud GeneratingGT0370485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
70485/GT04White Cloud GeneratingGT0470485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
70485/GT05White Cloud GeneratingGT0570485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
70485/GT06White Cloud GeneratingGT0670485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
70485/GT07White Cloud GeneratingGT0770485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
70485/GT08White Cloud GeneratingGT0870485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
70485/GT09White Cloud GeneratingGT0970485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
70485/GT10White Cloud GeneratingGT1070485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
70485/GT11White Cloud GeneratingGT1170485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
70485/GT12White Cloud GeneratingGT1270485MONodawayWhite Cloud Generating, LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT50.247.82028-122028(P) Planned for installation, but regulatory approvals not initiatedSWPP40.228497-94.851652026-09
67666/SUNBASundance (CO)SUNBA67666COElbertCypress Creek RenewablesIPP Non-CHPBatteriesMWHBA50502026-102026(U) Under construction, less than or equal to 50 percent completePSCO39.414779-104.44812026-09
68850/GRTSPGratiot Solar ParkGRTSP68850MIGratiotDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV50502026-102026(TS) Construction complete, but not yet in commercial operationMISO43.436999-84.498452026-09
68929/RUBYRuby Solar, LLCRUBY68929ILClintonBirch Creek DevelopmentIPP Non-CHPSolar PhotovoltaicSUNPV50502026-102026(V) Under construction, more than 50 percent completeMISO38.595759-89.169832026-09
68938/OHJE1Juliet Energy Project, LLCOHJE168938OHWoodLightsource Renewable Energy Asset Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502026-102026(TS) Construction complete, but not yet in commercial operationPJM41.343803-83.815982026-09
67215/ENX25Sun Ridge SolarENX2567215VARockinghamSun Ridge Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502026-112026(V) Under construction, more than 50 percent completePJM38.314898-78.744632026-09
65043/DUSTDulles Solar and StorageDUST65043VALoudounDominion Energy Inc.Electric UtilityBatteriesMWHBA50502026-122026(V) Under construction, more than 50 percent completePJM38.95-77.52026-09
68247/GRGTNSR GeorgetownGRGTN68247SCGeorgetownSR Georgetown. LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502026-122026(V) Under construction, more than 50 percent completeDUK33.333354-79.513252026-09
68340/1Solway Solar168340MNBeltramiOtter Tail Power CoElectric UtilitySolar PhotovoltaicSUNPV50502026-122026(U) Under construction, less than or equal to 50 percent completeMISO47.546501-95.132026-09
68953/KB1Kifer BESS 1KB168953CASanta ClaraKifer Energy Storage, LLCIPP Non-CHPBatteriesMWHBA50502026-122026(U) Under construction, less than or equal to 50 percent completeCISO37.376214-121.9522026-09
69548/SFEFRP Forest Trail SolarSFE69548FLDuvalFRP Forest Trail Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502026-122026(U) Under construction, less than or equal to 50 percent completeJEA30.440764-81.834232026-09
69626/BMFFRP Miller SolarBMF69626FLDuvalFRP Miller Solar LLCIPP Non-CHPBatteriesMWHBA50502026-122026(U) Under construction, less than or equal to 50 percent completeJEA30.320634-81.912742026-09
70107/MSPMills Solar ProjectMSP70107IAMillsMidAmerican Energy CoElectric UtilitySolar PhotovoltaicSUNPV50502026-122026(U) Under construction, less than or equal to 50 percent completeMISO41.033333-95.451922026-09
70345/SFESSteele Flats Energy StorageSFES70345NEJeffersonSteele Flats Energy Storage, LLCIPP Non-CHPBatteriesMWHBA50502026-122026(V) Under construction, more than 50 percent completeSWPP40.051306-96.951782026-09
68930/ENX36MC SolarENX3668930PAMercerMC Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502027-012027(U) Under construction, less than or equal to 50 percent completePJM41.412805-80.432452026-09
69770/BRSRyan StorageBRS69770TXCoryellRyan Storage LLCIPP Non-CHPBatteriesMWHBA50502027-022027(U) Under construction, less than or equal to 50 percent completeERCO31.53576-97.798742026-09
69964/BALBEBaldy Mesa StorageBALBE69964CASan BernardinoAES Clean EnergyIPP Non-CHPBatteriesMWHBA50502027-022027(V) Under construction, more than 50 percent completeCISO34.6029-117.4492026-09
63846/RACERaceway SolarRACE63846DEKentFreepoint Commodities LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502027-072027(U) Under construction, less than or equal to 50 percent completePJM38.909956-75.588192026-09
69194/MCBAMaiden Creek BatteryMCBA69194NCCatawbaDuke Energy Carolinas, LLCElectric UtilityBatteriesMWHBA50502027-072027(U) Under construction, less than or equal to 50 percent completeDUK35.613673-81.187072026-09
68564/PURYRSR PuryearPURYR68564TNHenrySR Puryear, LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502027-082027(V) Under construction, more than 50 percent completeTVA36.449856-88.301072026-09
67988/PGR28Sandersville SolarPGR2867988GAWashingtonSandersville Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502027-102027(L) Regulatory approvals pending. Not under constructionSOCO32.987105-82.752542026-09
67884/ENX28Two Oaks Solar and Storage LLCENX2867884VALouisaTwo Oaks Solar and StorageIPP Non-CHPBatteriesMWHBA50502027-112027(P) Planned for installation, but regulatory approvals not initiatedPJM38.013053-77.931172026-09
70197/LORE1Lorenzo Energy StorageLORE170197TXCrosbyLorenzo Energy Storage, LLCIPP Non-CHPBatteriesMWHBA50502027-112027(P) Planned for installation, but regulatory approvals not initiatedSWPP33.749367-101.48292026-09
56998/BA7Pueblo Airport Generating StationBA756998COPuebloBlack Hills Service Company LLCIPP Non-CHPBatteriesMWHBA50502027-122027(L) Regulatory approvals pending. Not under constructionPSCO38.320833-104.52642026-09
63202/701-STREX US Red Holly701-S63202TXLynnTREX US Red Holly LLCIPP Non-CHPBatteriesMWHBA50502027-122027(L) Regulatory approvals pending. Not under constructionERCO32.952-101.7372026-09
65407/BEAR1Beartooth Energy Storage LLCBEAR165407MTYellowstoneBeartooth Energy Storage, LLCIPP Non-CHPBatteriesMWHBA50502027-122027(L) Regulatory approvals pending. Not under constructionNWMT45.7843-108.71782026-09
68562/MTPLTSR Mount PleasantMTPLT68562MSMarshallSR Mount Pleasant, LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502027-122027(T) Regulatory approvals received. Not under constructionTVA34.951675-89.582822026-09
68565/ROCH2SR Rochelle IIROCH268565GAWilcoxSR Rochelle II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502027-122027(T) Regulatory approvals received. Not under constructionTVA32.030665-83.5062026-09
69799/FBG01Project Matador Gas Plant (PMG)FBG0169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT5049.42027-122027(U) Under construction, less than or equal to 50 percent completeERCO35.283762-101.5692026-09
69799/FBG02Project Matador Gas Plant (PMG)FBG0269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT5049.42027-122027(U) Under construction, less than or equal to 50 percent completeERCO35.283762-101.5692026-09
69799/FBG03Project Matador Gas Plant (PMG)FBG0369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT5049.42027-122027(U) Under construction, less than or equal to 50 percent completeERCO35.283762-101.5692026-09
69799/FBG04Project Matador Gas Plant (PMG)FBG0469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT5049.42027-122027(U) Under construction, less than or equal to 50 percent completeERCO35.283762-101.5692026-09
69799/FBG05Project Matador Gas Plant (PMG)FBG0569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT5049.42027-122027(U) Under construction, less than or equal to 50 percent completeERCO35.283762-101.5692026-09
69799/FBG06Project Matador Gas Plant (PMG)FBG0669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combined CycleNGCT5049.42027-122027(U) Under construction, less than or equal to 50 percent completeERCO35.283762-101.5692026-09
67983/AURRBAurora Renewable Energy (Hybrid)AURRB67983CAStanislausVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA50502028-042028(P) Planned for installation, but regulatory approvals not initiatedBANC37.628805-121.07142026-09
67983/AURREAurora Renewable Energy (Hybrid)AURRE67983CAStanislausVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502028-042028(P) Planned for installation, but regulatory approvals not initiatedBANC37.628805-121.07142026-09
62190/32Crossroads Solar3262190SCBarnwellCrossroads SolarIPP Non-CHPSolar PhotovoltaicSUNPV50502028-112028(T) Regulatory approvals received. Not under constructionSCEG33.368886-81.364972026-09
62217/40GEB Solar4062217SCDarlingtonGEB SolarIPP Non-CHPSolar PhotovoltaicSUNPV50502028-112028(T) Regulatory approvals received. Not under constructionCPLE34.412367-80.041922026-09
62299/66Quest Solar6662299SCAllendaleQuest SolarIPP Non-CHPSolar PhotovoltaicSUNPV50502028-112028(T) Regulatory approvals received. Not under constructionSCEG32.976531-81.226812026-09
64849/ATMWSWildcat Solar Power Plant LLCATMWS64849NMMcKinleySolariant Capital, LLCIPP Non-CHPBatteriesMWHBA50502028-122028(P) Planned for installation, but regulatory approvals not initiatedPNM35.580453-108.90232026-09
65286/ENX18Caden Energix Piney River LLCENX1865286VAAmherstCaden Energix Piney River LLCIPP Non-CHPSolar PhotovoltaicSUNPV50502028-122028(L) Regulatory approvals pending. Not under constructionPJM37.696818-79.023062026-09
68019/RICBARichwood Solar and StorageRICBA68019OHUnionSamsung C&T Renewables, LLCIPP Non-CHPBatteriesMWHBA50502028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM40.353175-83.331172026-09
68213/1Panton168213VTAddisonViridis SolarIPP Non-CHPSolar PhotovoltaicSUNPV50502028-122028(L) Regulatory approvals pending. Not under constructionISNE44.1328-73.311512026-09
69099/HEWA1Orion - HelionHEWA169099WAChelanHelion Energy, Inc.IPP Non-CHPAll OtherH2OT50502028-122028(L) Regulatory approvals pending. Not under constructionCHPD47.3368-120.10432026-09
60670/1CE&P Imperial Valley 1160670CAImperialCalifornia Ethanol Power, LLCIndustrial CHPAll OtherOTHCC50502029-062029(T) Regulatory approvals received. Not under constructionIID32.912778-115.51832026-09
65445/RBESSRidgely Energy FarmRBESS65445TNLakeLeeward Asset Management, LLCIPP Non-CHPBatteriesMWHBA50502029-122029(P) Planned for installation, but regulatory approvals not initiatedTVA36.306319-89.462022026-09
67838/NY30KCE NY 30, LLCNY3067838NYSuffolkKey Capture EnergyIPP Non-CHPBatteriesMWHBA50502030-122030(P) Planned for installation, but regulatory approvals not initiatedNYIS40.69477-73.351822026-09
67839/NY31KCE NY 31, LLCNY3167839NYSuffolkKey Capture EnergyIPP Non-CHPBatteriesMWHBA50502031-052031(P) Planned for installation, but regulatory approvals not initiatedNYIS40.9581-72.866542026-09
69278/3Fortress 1369278COMorganFortress Solar 1 LLCIPP Non-CHPBatteriesMWHBA49.949.92028-032028(L) Regulatory approvals pending. Not under constructionPSCO40.26-103.572026-09
56964/BESS1Bayonne Energy CenterBESS156964NJHudsonBayonne Energy Center LLCIPP Non-CHPBatteriesMWHBA49.849.82027-082027(U) Under construction, less than or equal to 50 percent completeNYIS40.652834-74.091552026-09
56948/COE19Coolidge Generation StationCOE1956948AZPinalSalt River ProjectElectric UtilityNatural Gas Fired Combustion TurbineNGGT49.5422027-072027(U) Under construction, less than or equal to 50 percent completeSRP32.917399-111.50332026-09
56948/COE20Coolidge Generation StationCOE2056948AZPinalSalt River ProjectElectric UtilityNatural Gas Fired Combustion TurbineNGGT49.5422027-072027(U) Under construction, less than or equal to 50 percent completeSRP32.917399-111.50332026-09
56948/COE21Coolidge Generation StationCOE2156948AZPinalSalt River ProjectElectric UtilityNatural Gas Fired Combustion TurbineNGGT49.5422027-072027(U) Under construction, less than or equal to 50 percent completeSRP32.917399-111.50332026-09
56948/COE22Coolidge Generation StationCOE2256948AZPinalSalt River ProjectElectric UtilityNatural Gas Fired Combustion TurbineNGGT49.5422027-072027(U) Under construction, less than or equal to 50 percent completeSRP32.917399-111.50332026-09
56948/COE23Coolidge Generation StationCOE2356948AZPinalSalt River ProjectElectric UtilityNatural Gas Fired Combustion TurbineNGGT49.5422027-072027(U) Under construction, less than or equal to 50 percent completeSRP32.917399-111.50332026-09
56948/COE24Coolidge Generation StationCOE2456948AZPinalSalt River ProjectElectric UtilityNatural Gas Fired Combustion TurbineNGGT49.5422027-072027(U) Under construction, less than or equal to 50 percent completeSRP32.917399-111.50332026-09
55455/CT10Red HawkCT1055455AZMaricopaArizona Public Service CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT49452027-102027(U) Under construction, less than or equal to 50 percent completeSRP33.334562-112.84062026-09
55455/CT3Red HawkCT355455AZMaricopaArizona Public Service CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT49452027-102027(U) Under construction, less than or equal to 50 percent completeSRP33.334562-112.84062026-09
55455/CT4Red HawkCT455455AZMaricopaArizona Public Service CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT49452027-102027(U) Under construction, less than or equal to 50 percent completeSRP33.334562-112.84062026-09
55455/CT5Red HawkCT555455AZMaricopaArizona Public Service CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT49452027-102027(U) Under construction, less than or equal to 50 percent completeSRP33.334562-112.84062026-09
55455/CT6Red HawkCT655455AZMaricopaArizona Public Service CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT49452027-102027(U) Under construction, less than or equal to 50 percent completeSRP33.334562-112.84062026-09
55455/CT7Red HawkCT755455AZMaricopaArizona Public Service CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT49452027-102027(U) Under construction, less than or equal to 50 percent completeSRP33.334562-112.84062026-09
55455/CT8Red HawkCT855455AZMaricopaArizona Public Service CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT49452027-102027(U) Under construction, less than or equal to 50 percent completeSRP33.334562-112.84062026-09
55455/CT9Red HawkCT955455AZMaricopaArizona Public Service CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT49452027-102027(U) Under construction, less than or equal to 50 percent completeSRP33.334562-112.84062026-09
7903/MGS3McCartneyMGS37903MOGreeneCity Utilities of Springfield - (MO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48.947.42027-012027(U) Under construction, less than or equal to 50 percent completeSWPP37.248431-93.170842026-09
7903/MGS4McCartneyMGS47903MOGreeneCity Utilities of Springfield - (MO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48.947.42027-012027(U) Under construction, less than or equal to 50 percent completeSWPP37.248431-93.170842026-09
7903/MGS5McCartneyMGS57903MOGreeneCity Utilities of Springfield - (MO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48.947.42027-012027(U) Under construction, less than or equal to 50 percent completeSWPP37.248431-93.170842026-09
69648/BSBA2Rosamond South IIBSBA269648CAKernGolden Fields Solar VI, LLCIPP Non-CHPBatteriesMWHBA48482027-032027(V) Under construction, more than 50 percent completeCISO34.852326-118.43122026-09
68705/H01HorizonH0168705COEl PasoCity of Colorado Springs - (CO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48372028-072028(P) Planned for installation, but regulatory approvals not initiatedWACM38.775-104.66682026-09
68705/H02HorizonH0268705COEl PasoCity of Colorado Springs - (CO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48372028-072028(P) Planned for installation, but regulatory approvals not initiatedWACM38.775-104.66682026-09
68705/H03HorizonH0368705COEl PasoCity of Colorado Springs - (CO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48372028-072028(P) Planned for installation, but regulatory approvals not initiatedWACM38.775-104.66682026-09
68705/H04HorizonH0468705COEl PasoCity of Colorado Springs - (CO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48372028-072028(P) Planned for installation, but regulatory approvals not initiatedWACM38.775-104.66682026-09
68705/H05HorizonH0568705COEl PasoCity of Colorado Springs - (CO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48372028-072028(P) Planned for installation, but regulatory approvals not initiatedWACM38.775-104.66682026-09
68705/H06HorizonH0668705COEl PasoCity of Colorado Springs - (CO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48372028-072028(P) Planned for installation, but regulatory approvals not initiatedWACM38.775-104.66682026-09
68705/H07HorizonH0768705COEl PasoCity of Colorado Springs - (CO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48372028-072028(P) Planned for installation, but regulatory approvals not initiatedWACM38.775-104.66682026-09
68705/H08HorizonH0868705COEl PasoCity of Colorado Springs - (CO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48372028-072028(P) Planned for installation, but regulatory approvals not initiatedWACM38.775-104.66682026-09
68705/H09HorizonH0968705COEl PasoCity of Colorado Springs - (CO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48372028-072028(P) Planned for installation, but regulatory approvals not initiatedWACM38.775-104.66682026-09
68705/H10HorizonH1068705COEl PasoCity of Colorado Springs - (CO)Electric UtilityNatural Gas Fired Combustion TurbineNGGT48372028-072028(P) Planned for installation, but regulatory approvals not initiatedWACM38.775-104.66682026-09
64073/GBSGreat Bear Solar, LLCGBS64073OHVan WertAvangrid Power LLCIPP Non-CHPSolar PhotovoltaicSUNPV46462027-122027(P) Planned for installation, but regulatory approvals not initiatedPJM40.9397-84.58282026-09
69772/BRSP1Bush River Solar PlantBRSP169772SCLaurensDuke Energy Carolinas, LLCElectric UtilitySolar PhotovoltaicSUNPV45452028-012028(L) Regulatory approvals pending. Not under constructionCPLW34.3861-81.79442026-09
66879/CT1KCE CT 1, LLCCT166879CTWindhamKey Capture EnergyIPP Non-CHPBatteriesMWHBA45452031-042031(P) Planned for installation, but regulatory approvals not initiatedISNE41.882568-71.894812026-09
6761/GRawhideG6761COLarimerPlatte River Power AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT44.644.62028-032028(P) Planned for installation, but regulatory approvals not initiatedPSCO40.860905-105.02122026-09
6761/HRawhideH6761COLarimerPlatte River Power AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT44.644.62028-032028(P) Planned for installation, but regulatory approvals not initiatedPSCO40.860905-105.02122026-09
6761/LM3RawhideLM36761COLarimerPlatte River Power AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT44.644.62028-032028(P) Planned for installation, but regulatory approvals not initiatedPSCO40.860905-105.02122026-09
6761/LM4RawhideLM46761COLarimerPlatte River Power AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT44.644.62028-032028(P) Planned for installation, but regulatory approvals not initiatedPSCO40.860905-105.02122026-09
6761/LM5RawhideLM56761COLarimerPlatte River Power AuthorityElectric UtilityNatural Gas Fired Combustion TurbineNGGT44.644.62028-032028(P) Planned for installation, but regulatory approvals not initiatedPSCO40.860905-105.02122026-09
67772/GRS9Braswell SolarGRS967772TXMcLennanGransolar Texas Nine LLCIPP Non-CHPSolar PhotovoltaicSUNPV44.242.62028-032028(L) Regulatory approvals pending. Not under constructionERCO31.34904-97.217862026-09
70343/WAGT1GPI WACO PowerWAGT170343TXMcLennanGraphic Packaging International - WACOIndustrial Non-CHPNatural Gas Fired Combustion TurbineNGGT43.443.42027-012027(U) Under construction, less than or equal to 50 percent completeERCO31.47682-97.187662026-09
6211/GEN4Dynegy Oakland Power PlantGEN46211CAAlamedaDynegy Oakland, LLCIPP Non-CHPBatteriesMWHBA43.343.32028-052028(P) Planned for installation, but regulatory approvals not initiatedCISO37.79675-122.28192026-09
68068/CP1G2Cape Generating StationCP1G268068UTBeaverCape HoldCo LLCIPP Non-CHPGeothermalGEOBT43302027-012027(TS) Construction complete, but not yet in commercial operationLDWP38.506706-112.91752026-09
68068/CP1G3Cape Generating StationCP1G368068UTBeaverCape HoldCo LLCIPP Non-CHPGeothermalGEOBT43302027-012027(V) Under construction, more than 50 percent completeLDWP38.506706-112.91752026-09
66657/STEUBSteubenville SolarSTEUB66657OHJeffersonBQ Energy DevelopmentIPP Non-CHPSolar PhotovoltaicSUNPV43432028-062028(P) Planned for installation, but regulatory approvals not initiatedPJM40.351722-80.670362026-09
68229/DEMRKSR DenmarkDEMRK68229TNMadisonSR Denmark, LLCIPP Non-CHPSolar PhotovoltaicSUNPV42422026-122026(V) Under construction, more than 50 percent completeTVA35.563633-88.932542026-09
64188/PVShepherd's Run SolarPV64188NYColumbiaShepherd's Run SolarIPP Non-CHPSolar PhotovoltaicSUNPV42422027-112027(P) Planned for installation, but regulatory approvals not initiatedNYIS42.16141-73.574532026-09
69294/OTSOregon Trail SolarOTS69294ORGilliamAvangrid Power LLCIPP Non-CHPSolar PhotovoltaicSUNPV41412027-032027(V) Under construction, more than 50 percent completeBPAT45.553436-120.18612026-09
70225/SESShutler Energy StorageSES70225ORGilliamAvangrid Power LLCIPP Non-CHPBatteriesMWHBA41412028-032028(U) Under construction, less than or equal to 50 percent completeAVRN45.54-120.182026-09
62892/SONR2EDPR CA Solar Park VI LLC (CA) HybridSONR262892CAFresnoEDPR CA Solar Park VI LLCIPP Non-CHPBatteriesMWHBA40402026-102026(TS) Construction complete, but not yet in commercial operationCISO36.62543-120.37892026-09
68054/SNSBSunnyside Solar Energy CenterSNSB68054WIDaneMadison Gas & Electric CoElectric UtilityBatteriesMWHBA40402026-112026(V) Under construction, more than 50 percent completeMISO42.985244-89.436072026-09
69522/1Brewster Solar169522FLPolkTampa Electric CoElectric UtilitySolar PhotovoltaicSUNPV40402026-122026(V) Under construction, more than 50 percent completeTEC27.74188-81.961872026-09
70306/21Westfield Solar, LLC2170306NCHokeHeadwater Energy, LLCIPP Non-CHPSolar PhotovoltaicSUNPV40402026-122026(U) Under construction, less than or equal to 50 percent completeCPLE34.943-79.2422026-09
70092/2BLUETwo Blues Solar, LLC2BLUE70092ILPerryTwo Blues Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV40402027-012027(V) Under construction, more than 50 percent completeMISO38.1633-89.372026-09
69539/TRABTracy BESSTRAB69539CASan JoaquinMiddle River PowerIPP Non-CHPBatteriesMWHBA40402027-052027(U) Under construction, less than or equal to 50 percent completeCISO37.711459-121.48952026-09
69799/G6B01Project Matador Gas Plant (PMG)G6B0169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT4038.72027-062027(T) Regulatory approvals received. Not under constructionERCO35.283762-101.5692026-09
69799/G6B02Project Matador Gas Plant (PMG)G6B0269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT4038.72027-062027(T) Regulatory approvals received. Not under constructionERCO35.283762-101.5692026-09
69799/G6B03Project Matador Gas Plant (PMG)G6B0369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT4038.72027-062027(T) Regulatory approvals received. Not under constructionERCO35.283762-101.5692026-09
69978/STPVStation SolarSTPV69978ILMercerBirch Creek DevelopmentIPP Non-CHPSolar PhotovoltaicSUNPV40402027-082027(U) Under construction, less than or equal to 50 percent completeMISO41.0777-90.552026-09
63806/PGR28West River Solar, LLCPGR2863806NCGuilfordWest River Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV40402027-102027(U) Under construction, less than or equal to 50 percent completeDUK36.043671-79.641742026-09
68035/SYTOBSyracuse and Tours Renewable EnergySYTOB68035CAKernVesper Energy Development LLCIPP Non-CHPBatteriesMWHBA40402027-112027(T) Regulatory approvals received. Not under constructionCISO34.951078-118.30832026-09
68035/SYTORSyracuse and Tours Renewable EnergySYTOR68035CAKernVesper Energy Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV40402027-112027(T) Regulatory approvals received. Not under constructionCISO34.951078-118.30832026-09
69741/PV2Cooperative Solar Two-FayettePV269741KYFayetteEast Kentucky Power Coop, IncElectric UtilitySolar PhotovoltaicSUNPV40402027-112027(U) Under construction, less than or equal to 50 percent completePJM38.035403-84.315792026-09
69771/CCSP1Clark Creek Solar PlantCCSP169771NCLincolnDuke Energy Carolinas, LLCElectric UtilitySolar PhotovoltaicSUNPV40402028-022028(L) Regulatory approvals pending. Not under constructionCPLW35.532689-81.248662026-09
69743/KUIHEKuihelani Phase 2KUIHE69743HIMauiAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV40402028-112028(L) Regulatory approvals pending. Not under constructionHECO20.8026-156.49842026-09
57703/02BCheyenne Prairie Generating Station02B57703WYLaramieBlack Hills Service Company LLCElectric UtilityNatural Gas Fired Combustion TurbineNGGT40402028-122028(P) Planned for installation, but regulatory approvals not initiatedWACM41.123611-104.722026-09
57703/03ACheyenne Prairie Generating Station03A57703WYLaramieBlack Hills Service Company LLCElectric UtilityNatural Gas Fired Combustion TurbineNGGT40402028-122028(P) Planned for installation, but regulatory approvals not initiatedWACM41.123611-104.722026-09
57703/03BCheyenne Prairie Generating Station03B57703WYLaramieBlack Hills Service Company LLCElectric UtilityNatural Gas Fired Combustion TurbineNGGT40402028-122028(P) Planned for installation, but regulatory approvals not initiatedWACM41.123611-104.722026-09
67221/NY128Foothills Solar (NY)NY12867221NYFultonBoralex US Operations LLCIPP Non-CHPSolar PhotovoltaicSUNPV40402030-122030(P) Planned for installation, but regulatory approvals not initiatedNYIS43.113678-74.245032026-09
67966/NEWJ1New Jay PV & BESSNEWJ167966INJayHodson Greendefine Jay Desoto LLCIPP Non-CHPSolar PhotovoltaicSUNPV39392028-092028(P) Planned for installation, but regulatory approvals not initiatedPJM40.369376-85.183922026-09
69890/UNIT3Marshall Energy CenterUNIT369890MOSalineMissouri Jnt Muni.Pwr Elec. Ut. Comm.IPP Non-CHPNatural Gas Fired Combustion TurbineNGGT3833.72028-122028(T) Regulatory approvals received. Not under constructionSWPP39.12358-93.205922026-09
69890/UNIT4Marshall Energy CenterUNIT469890MOSalineMissouri Jnt Muni.Pwr Elec. Ut. Comm.IPP Non-CHPNatural Gas Fired Combustion TurbineNGGT3833.72028-122028(T) Regulatory approvals received. Not under constructionSWPP39.12358-93.205922026-09
69869/UNIT1Hannibal Energy CenterUNIT169869MOMarionMissouri Jnt Muni.Pwr Elec. Ut. Comm.IPP Non-CHPNatural Gas Fired Combustion TurbineNGGT3832.22029-062029(P) Planned for installation, but regulatory approvals not initiatedMISO39.70965-91.440262026-09
69869/UNIT2Hannibal Energy CenterUNIT269869MOMarionMissouri Jnt Muni.Pwr Elec. Ut. Comm.IPP Non-CHPNatural Gas Fired Combustion TurbineNGGT3832.22029-062029(P) Planned for installation, but regulatory approvals not initiatedMISO39.70965-91.440262026-09
69102/U1Toronto Power PlantU169102SDDeuelWestern Minnesota Mun Pwr AgnyElectric UtilityNatural Gas Fired Combustion TurbineNGGT36.335.62029-122029(L) Regulatory approvals pending. Not under constructionMISO44.594752-96.622192026-09
69102/U2Toronto Power PlantU269102SDDeuelWestern Minnesota Mun Pwr AgnyElectric UtilityNatural Gas Fired Combustion TurbineNGGT36.335.62029-122029(L) Regulatory approvals pending. Not under constructionMISO44.594752-96.622192026-09
69102/U3Toronto Power PlantU369102SDDeuelWestern Minnesota Mun Pwr AgnyElectric UtilityNatural Gas Fired Combustion TurbineNGGT36.335.62029-122029(L) Regulatory approvals pending. Not under constructionMISO44.594752-96.622192026-09
69102/U4Toronto Power PlantU469102SDDeuelWestern Minnesota Mun Pwr AgnyElectric UtilityNatural Gas Fired Combustion TurbineNGGT36.335.62029-122029(L) Regulatory approvals pending. Not under constructionMISO44.594752-96.622192026-09
70093/WSPV1Wallace Solar - (TX)WSPV170093TXCulbersonDelaware Ranch Solar, LLCIndustrial Non-CHPSolar PhotovoltaicSUNPV36362027-032027(TS) Construction complete, but not yet in commercial operationERCO31.917641-104.31482026-09
61364/HHBHu Honua Bioenergy FacilityHHB61364HIHawaiiHu Honua Bioenergy, LLCIPP Non-CHPOther Waste BiomassOBSST36322027-122027(V) Under construction, more than 50 percent completeHECO19.843504-155.08712026-09
69977/BBPVBlue Branch SolarBBPV69977ILJohnsonBirch Creek DevelopmentIPP Non-CHPSolar PhotovoltaicSUNPV35.935.92027-012027(U) Under construction, less than or equal to 50 percent completeMISO37.467778-88.968892026-09
68461/KEYBCKey Energy StorageKEYBC68461CAFresnoKey Energy Storage LLCIPP Non-CHPBatteriesMWHBA35352027-042027(T) Regulatory approvals received. Not under constructionCISO36.13681-120.13122026-09
1167/10Muscatine Plant #1101167IAMuscatineBoard of Water Electric & CommunicationsElectric UtilityNatural Gas Fired Combustion TurbineNGGT3532.82027-112027(T) Regulatory approvals received. Not under constructionMISO41.3917-91.05692026-09
67977/QUACRQuaker Creek Farm SolarQUACR67977NCAlamanceQuaker Creek Farm Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV34.934.92027-012027(U) Under construction, less than or equal to 50 percent completeDUK36.156688-79.322922026-09
64168/GENBear Branch SolarGEN64168NCStokesBear Branch Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV34.534.52027-012027(TS) Construction complete, but not yet in commercial operationDUK36.340427-80.129742026-09
66850/BEAC1Beaver Creek SolarBEAC166850PAFranklinUrban Grid SolarIPP Non-CHPSolar PhotovoltaicSUNPV34.234.22027-062027(L) Regulatory approvals pending. Not under constructionPJM40.086625-77.662832026-09
66363/GEN1BBlack Walnut Solar, LLCGEN1B66363NCJonesCypress Creek RenewablesIPP Non-CHPBatteriesMWHBA32322028-122028(P) Planned for installation, but regulatory approvals not initiatedDUK35.050032-77.152182026-09
68871/TIMIBTimber Mill SolarTIMIB68871NCJonesCypress Creek RenewablesIPP Non-CHPBatteriesMWHBA32322028-122028(P) Planned for installation, but regulatory approvals not initiatedCPLE34.96634-77.212992026-09
66385/GEN1BPanther Branch Solar, LLCGEN1B66385NCDuplinCypress Creek RenewablesIPP Non-CHPBatteriesMWHBA32322029-122029(P) Planned for installation, but regulatory approvals not initiatedDUK35.145344-78.159632026-09
68673/SLW_SSand Luis WestSLW_S68673CAFresnoOrigis Energy USA, IncIPP Non-CHPBatteriesMWHBA31.331.32028-112028(T) Regulatory approvals received. Not under constructionCISO36.1676-120.0542026-09
2161/BAT1James River Power StationBAT12161MOGreeneCity Utilities of Springfield - (MO)Electric UtilityBatteriesMWHBA31312027-012027(V) Under construction, more than 50 percent completeSWPP37.108611-93.261942026-09
60434/PV1Baxter Creek SolarPV160434NCDavieDuke Energy Carolinas, LLCIPP Non-CHPSolar PhotovoltaicSUNPV30302026-102026(V) Under construction, more than 50 percent completeDUK35.865502-80.553092026-09
66066/WAIBAAES Waiawa Phase 2 SolarWAIBA66066HIHonoluluAES Distributed EnergyIPP Non-CHPBatteriesMWHBA30302026-102026(V) Under construction, more than 50 percent completeHECO21.43026-157.97792026-09
66066/WAIPVAES Waiawa Phase 2 SolarWAIPV66066HIHonoluluAES Distributed EnergyIPP Non-CHPSolar PhotovoltaicSUNPV30302026-102026(V) Under construction, more than 50 percent completeHECO21.43026-157.97792026-09
64216/309SJRockmont Solar and Storage Project309SJ64216NMSan Juan201LC 8me LLCIPP Non-CHPBatteriesMWHBA30302027-122027(L) Regulatory approvals pending. Not under constructionPNM36.776579-108.37512026-09
65930/10Redbud Run Solar1065930VAFrederickDominion Renewable EnergyElectric UtilitySolar PhotovoltaicSUNPV30302028-102028(P) Planned for installation, but regulatory approvals not initiatedPJM39.21157-78.084172026-09
65981/TXSD2Second Division SolarTXSD265981TXBrazoriaLightsource Renewable Energy Asset Management, LLCIPP Non-CHPBatteriesMWHBA30302031-122031(L) Regulatory approvals pending. Not under constructionERCO29.170545-95.741572026-09
70090/SNPDRSnapdragon Solar, LLCSNPDR70090ILPerrySnapdragon Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV28282026-122026(TS) Construction complete, but not yet in commercial operationMISO38.1703-89.55322026-09
68043/ROBSSRobeson Solar IROBSS68043NCRobesonAES Clean EnergyIPP Non-CHPBatteriesMWHBA28282028-122028(P) Planned for installation, but regulatory approvals not initiatedCPLE34.614574-78.934682026-09
59969/GEN01Windhub Solar B, LLCGEN0159969CAKernWindhub Solar B, LLCIPP Non-CHPSolar PhotovoltaicSUNPV26.4202026-102026(V) Under construction, more than 50 percent completeCISO35.0133-118.26982026-09
67669/ABESSArlington Battery Energy Storage SystemABESS67669WASnohomishPUD No 1 of Snohomish County - (WA)Electric UtilityBatteriesMWHBA25252026-102026(V) Under construction, more than 50 percent completeBPAT48.15617-122.14372026-09
68672/CHA_BChalanCHA_B68672CAKernOrigis Energy USA, IncIPP Non-CHPBatteriesMWHBA25252026-122026(V) Under construction, more than 50 percent completeCISO35.7803-119.9112026-09
70303/20Midfield Solar, LLC2070303NCColumbusHeadwater Energy, LLCIPP Non-CHPSolar PhotovoltaicSUNPV25252026-122026(U) Under construction, less than or equal to 50 percent completeCPLE34.394-78.7712026-09
69024/GLNB1Glenarm BESS PlantGLNB169024CALos AngelesGlenarm BESS LLCElectric UtilityBatteriesMWHBA25252027-062027(L) Regulatory approvals pending. Not under constructionCISO34.12739-118.14772026-09
70049/NUCPVSierra SolarNUCPV70049AZMohaveSierra Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV25252027-062027(T) Regulatory approvals received. Not under constructionWALC35.129649-114.08032026-09
66695/HRSPNHorsepen Branch SolarHRSPN66695VALouisaHorsepen Branch SolarIPP Non-CHPSolar PhotovoltaicSUNPV25252028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.961-77.7922026-09
68528/77Dynamo Solar LLC7768528CANapaLaketricity USA Inc.IPP Non-CHPSolar PhotovoltaicSUNPV24.524.52027-122027(L) Regulatory approvals pending. Not under constructionCISO38.229106-122.29372026-09
68240/SS3PVSolar Star 3SS3PV68240CAKernSolar Star 3, LLCIPP Non-CHPSolar PhotovoltaicSUNPV24242026-102026(V) Under construction, more than 50 percent completeCISO34.84166-118.45512026-09
68241/SS4PVSolar Star 4SS4PV68241CAKernSolar Star 4, LLCIPP Non-CHPSolar PhotovoltaicSUNPV24242026-102026(V) Under construction, more than 50 percent completeCISO34.84166-118.45512026-09
66978/MS1MPW Solar 1MS166978IAMuscatineMPW Solar 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV24242028-012028(T) Regulatory approvals received. Not under constructionMISO41.3849-91.09642026-09
70261/WS02Westside - (NM)WS0270261NMSan JuanSaddle Butte Energy Farmington, LLCIPP Non-CHPNatural Gas Internal Combustion EngineNGIC24242028-012028(U) Under construction, less than or equal to 50 percent completeSWPP36.752288-108.31482026-09
69890/UNIT1Marshall Energy CenterUNIT169890MOSalineMissouri Jnt Muni.Pwr Elec. Ut. Comm.IPP Non-CHPNatural Gas Fired Combustion TurbineNGGT23.119.92026-122026(V) Under construction, more than 50 percent completeSWPP39.12358-93.205922026-09
69890/UNIT2Marshall Energy CenterUNIT269890MOSalineMissouri Jnt Muni.Pwr Elec. Ut. Comm.IPP Non-CHPNatural Gas Fired Combustion TurbineNGGT23.119.92026-122026(V) Under construction, more than 50 percent completeSWPP39.12358-93.205922026-09
68240/SS3BTSolar Star 3SS3BT68240CAKernSolar Star 3, LLCIPP Non-CHPBatteriesMWHBA23232026-112026(V) Under construction, more than 50 percent completeCISO34.84166-118.45512026-09
68241/SS4BTSolar Star 4SS4BT68241CAKernSolar Star 4, LLCIPP Non-CHPBatteriesMWHBA23232026-112026(V) Under construction, more than 50 percent completeCISO34.84166-118.45512026-09
70546/JAR-3Jarratt Energy FacilityJAR-370546VAGreensvilleTorch Operating Company, LLCIPP Non-CHPSolar PhotovoltaicSUNPV22.422.42027-112027(T) Regulatory approvals received. Not under constructionPJM36.822306-77.513452026-09
69628/GBPV1GBG SOLARGBPV169628TXMidlandGreater Bryant G Solar, LLCIndustrial Non-CHPSolar PhotovoltaicSUNPV22.217.72026-102026(TS) Construction complete, but not yet in commercial operationERCO31.92835-102.16172026-09
69806/GWBS1Gaskell West Storage 1, LLCGWBS169806CAKernMatrix RenewablesIPP Non-CHPBatteriesMWHBA21.621.62026-112026(TS) Construction complete, but not yet in commercial operationCISO34.833541-118.54692026-09
70495/WEL02Welcome Solar IIWEL0270495PACrawfordWelcome Solar II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV21212026-102026(TS) Construction complete, but not yet in commercial operationPJM41.527468-80.404192026-09
70496/WEL03Welcome Solar IIIWEL0370496PACrawfordWelcome Solar III, LLCIPP Non-CHPSolar PhotovoltaicSUNPV21212026-102026(TS) Construction complete, but not yet in commercial operationPJM41.530575-80.392292026-09
70240/PFNONPF Onsite BESSPFNON70240PALuzernePF Onsite Generation LLCIPP Non-CHPBatteriesMWHBA21212027-062027(L) Regulatory approvals pending. Not under constructionPJM40.918616-76.079342026-09
63088/ROONRRooney RanchROONR63088CAAlamedaViracocha Wind LLCIPP Non-CHPOnshore Wind TurbineWNDWT21212027-122027(L) Regulatory approvals pending. Not under constructionCISO37.737366-121.65212026-09
69760/RIG1Rock Island Generation ProjectRIG169760TXColoradoKerrville Public Utility Board Public Facility CorpElectric UtilityNatural Gas Internal Combustion EngineNGIC20.319.92027-092027(L) Regulatory approvals pending. Not under constructionERCO29.55068-96.536752026-09
69760/RIG2Rock Island Generation ProjectRIG269760TXColoradoKerrville Public Utility Board Public Facility CorpElectric UtilityNatural Gas Internal Combustion EngineNGIC20.319.92027-092027(L) Regulatory approvals pending. Not under constructionERCO29.55068-96.536752026-09
69760/RIG3Rock Island Generation ProjectRIG369760TXColoradoKerrville Public Utility Board Public Facility CorpElectric UtilityNatural Gas Internal Combustion EngineNGIC20.319.92027-092027(L) Regulatory approvals pending. Not under constructionERCO29.55068-96.536752026-09
69760/RIG4Rock Island Generation ProjectRIG469760TXColoradoKerrville Public Utility Board Public Facility CorpElectric UtilityNatural Gas Internal Combustion EngineNGIC20.319.92027-092027(L) Regulatory approvals pending. Not under constructionERCO29.55068-96.536752026-09
69760/RIG5Rock Island Generation ProjectRIG569760TXColoradoKerrville Public Utility Board Public Facility CorpElectric UtilityNatural Gas Internal Combustion EngineNGIC20.319.92027-092027(L) Regulatory approvals pending. Not under constructionERCO29.55068-96.536752026-09
69760/RIG6Rock Island Generation ProjectRIG669760TXColoradoKerrville Public Utility Board Public Facility CorpElectric UtilityNatural Gas Internal Combustion EngineNGIC20.319.92027-092027(L) Regulatory approvals pending. Not under constructionERCO29.55068-96.536752026-09
69535/NS1Nutes SolarNS169535NHStraffordWalden Renewables Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202026-102026(U) Under construction, less than or equal to 50 percent completeISNE43.375125-71.0232026-09
70232/EVERGEvergreen Energy Center, LLCEVERG70232VALoudounEast Point Energy, LLCIPP Non-CHPBatteriesMWHBA20202026-102026(V) Under construction, more than 50 percent completePJM39.044885-77.581912026-09
68054/SNSSSunnyside Solar Energy CenterSNSS68054WIDaneMadison Gas & Electric CoElectric UtilitySolar PhotovoltaicSUNPV20202026-112026(V) Under construction, more than 50 percent completeMISO42.985244-89.436072026-09
64255/VBESSVonore Battery Energy Storage SystemVBESS64255TNMonroeTennessee Valley AuthorityElectric UtilityBatteriesMWHBA20202026-122026(U) Under construction, less than or equal to 50 percent completeTVA35.61543-84.274892026-09
70231/BETHLBethlehem Energy Center, LLC - (VA)BETHL70231VAPrince WilliamEast Point Energy, LLCIPP Non-CHPBatteriesMWHBA20202026-122026(U) Under construction, less than or equal to 50 percent completePJM38.781889-77.54262026-09
70233/RAILRRailroad Energy Center, LLCRAILR70233VAPrince WilliamEast Point Energy, LLCIPP Non-CHPBatteriesMWHBA20202026-122026(U) Under construction, less than or equal to 50 percent completePJM38.781689-77.542022026-09
70234/REIDReid Energy Center, LLCREID70234VAPrince WilliamEast Point Energy, LLCIPP Non-CHPBatteriesMWHBA20202026-122026(U) Under construction, less than or equal to 50 percent completePJM38.729874-77.592422026-09
62823/Q584SunEast Dog Corners Solar ProjectQ58462823NYCayugaAltus Power America Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202027-012027(V) Under construction, more than 50 percent completeNYIS42.744301-76.665312026-09
63862/Q#828SunEast Valley Solar ProjectQ#82863862NYTiogaAltus Power America Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202027-052027(U) Under construction, less than or equal to 50 percent completeNYIS42.083795-76.24772026-09
62816/Q670SunEast Skyline Solar ProjectQ67062816NYOneidaSunEast Skyline Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202027-062027(P) Planned for installation, but regulatory approvals not initiatedNYIS43.063069-75.451952026-09
64037/Q#913SunEast Manchester Solar ProjectQ#91364037NYOntarioSunEast Manchester Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202027-062027(T) Regulatory approvals received. Not under constructionNYIS42.958318-77.195032026-09
63901/Q#865SunEast Flat Hill Solar ProjectQ#86563901NYHerkimerAltus Power America Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202027-072027(V) Under construction, more than 50 percent completeNYIS43.044363-74.796322026-09
50736/FSS13Pure Hedge LLCFSS1350736CTWindhamPure Hedge LLCIPP Non-CHPBatteriesMWHBA20202027-102027(U) Under construction, less than or equal to 50 percent completeISNE41.712448-71.822252026-09
62895/Q581SunEast Hills Solar ProjectQ58162895NYHerkimerHills Solar NY LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202027-102027(T) Regulatory approvals received. Not under constructionNYIS43.068296-74.849232026-09
63863/Q#885SunEast Grassy Knoll Solar ProjectQ#88563863NYHerkimerGrassy Knoll Solar NY LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202027-102027(T) Regulatory approvals received. Not under constructionNYIS43.065379-74.843722026-09
70395/BESS1Pace Road Battery StorageBESS170395FLPolkTampa Electric CoElectric UtilityBatteriesMWHBA20202027-102027(T) Regulatory approvals received. Not under constructionTEC28.136235-81.829782026-09
62896/Q586SunEast Watkins Road Solar ProjectQ58662896NYHerkimerWatkins Road Solar NY LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202027-112027(T) Regulatory approvals received. Not under constructionNYIS43.06127-75.055842026-09
65901/6Hatchery Solar665901NYLivingstonHatchery Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202027-112027(T) Regulatory approvals received. Not under constructionNYIS42.976583-77.769742026-09
64911/CSRB1South Ripley SolarCSRB164911NYChautauquaRepsol Renewables NAIPP Non-CHPBatteriesMWHBA20202027-122027(L) Regulatory approvals pending. Not under constructionNYIS42.198116-79.757892026-09
65821/HNYBAHoney Creek SolarHNYBA65821INWhiteLeeward Asset Management, LLCIPP Non-CHPBatteriesMWHBA20202027-122027(P) Planned for installation, but regulatory approvals not initiatedPJM40.7971-86.85722026-09
65931/3Clear View Solar365931NYSteubenClear View Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202027-122027(L) Regulatory approvals pending. Not under constructionNYIS42.57062-77.463782026-09
68278/21066Greater Wise Solar Project2106668278VAWiseBQ Energy DevelopmentIPP Non-CHPSolar PhotovoltaicSUNPV20202027-122027(P) Planned for installation, but regulatory approvals not initiatedLGEE36.932469-82.67692026-09
69667/FHS1Fair Haven SolarFHS169667VTRutlandFreepoint Commodities LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202028-032028(T) Regulatory approvals received. Not under constructionISNE43.636-73.2792026-09
70261/WS03Westside - (NM)WS0370261NMSan JuanSaddle Butte Energy Farmington, LLCIPP Non-CHPNatural Gas Internal Combustion EngineNGIC20202028-052028(U) Under construction, less than or equal to 50 percent completeSWPP36.752288-108.31482026-09
64036/ENX08Caden Energix New Kent, LLCENX0864036VANew KentCaden Energix New Kent, LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202028-082028(L) Regulatory approvals pending. Not under constructionPJM37.49004-77.06162026-09
66682/NY10KCE NY 10, LLCNY1066682NYErieKey Capture EnergyIPP Non-CHPBatteriesMWHBA20202028-102028(P) Planned for installation, but regulatory approvals not initiatedNYIS42.907908-78.660112026-09
68072/BRIDLBridleton SolarBRIDL68072VAHenricoDominion Renewable EnergyElectric UtilitySolar PhotovoltaicSUNPV20202028-102028(L) Regulatory approvals pending. Not under constructionPJM37.46-77.272026-09
64064/SHAFTShaftsbury SolarSHAFT64064VTBenningtonFreepoint Commodities LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202028-122028(L) Regulatory approvals pending. Not under constructionISNE42.96463-73.168412026-09
65934/7Highbanks Solar765934NYLivingstonHighbanks Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV20202029-092029(P) Planned for installation, but regulatory approvals not initiatedNYIS42.737227-77.914312026-09
65709/TRNRTurner Meadow Solar StationTRNR65709MEAndroscogginTurner Meadow Solar Station, LLCIPP Non-CHPSolar PhotovoltaicSUNPV19.819.82028-122028(T) Regulatory approvals received. Not under constructionISNE44.229478-70.280272026-09
69799/TM001Project Matador Gas Plant (PMG)TM00169799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT18.9182027-092027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/TM002Project Matador Gas Plant (PMG)TM00269799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT18.9182027-092027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/TM003Project Matador Gas Plant (PMG)TM00369799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT18.9182027-092027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/TM004Project Matador Gas Plant (PMG)TM00469799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT18.9182027-092027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/TM005Project Matador Gas Plant (PMG)TM00569799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT18.9182027-092027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/TM006Project Matador Gas Plant (PMG)TM00669799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT18.9182027-092027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
69799/TM007Project Matador Gas Plant (PMG)TM00769799TXCarsonFermi AmericaIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT18.9182027-092027(P) Planned for installation, but regulatory approvals not initiatedERCO35.283762-101.5692026-09
68453/1KYMEA Energy Center I168453KYHopkinsKentucky Municipal Energy AgencyElectric UtilityNatural Gas Internal Combustion EngineNGIC18.818.82027-062027(V) Under construction, more than 50 percent completeLGEE37.319733-87.551112026-09
68453/2KYMEA Energy Center I268453KYHopkinsKentucky Municipal Energy AgencyElectric UtilityNatural Gas Internal Combustion EngineNGIC18.818.82027-062027(V) Under construction, more than 50 percent completeLGEE37.319733-87.551112026-09
68453/3KYMEA Energy Center I368453KYHopkinsKentucky Municipal Energy AgencyElectric UtilityNatural Gas Internal Combustion EngineNGIC18.818.82027-062027(V) Under construction, more than 50 percent completeLGEE37.319733-87.551112026-09
68453/4KYMEA Energy Center I468453KYHopkinsKentucky Municipal Energy AgencyElectric UtilityNatural Gas Internal Combustion EngineNGIC18.818.82027-062027(V) Under construction, more than 50 percent completeLGEE37.319733-87.551112026-09
389/RICE1El Centro HybridRICE1389CAImperialImperial Irrigation DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.818.62029-092029(P) Planned for installation, but regulatory approvals not initiatedIID32.802222-115.542026-09
389/RICE2El Centro HybridRICE2389CAImperialImperial Irrigation DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.818.62029-092029(P) Planned for installation, but regulatory approvals not initiatedIID32.802222-115.542026-09
389/RICE3El Centro HybridRICE3389CAImperialImperial Irrigation DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.818.62029-092029(P) Planned for installation, but regulatory approvals not initiatedIID32.802222-115.542026-09
389/RICE4El Centro HybridRICE4389CAImperialImperial Irrigation DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.818.62029-092029(P) Planned for installation, but regulatory approvals not initiatedIID32.802222-115.542026-09
389/RICE5El Centro HybridRICE5389CAImperialImperial Irrigation DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.818.62029-092029(P) Planned for installation, but regulatory approvals not initiatedIID32.802222-115.542026-09
389/RICE6El Centro HybridRICE6389CAImperialImperial Irrigation DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.818.62029-092029(P) Planned for installation, but regulatory approvals not initiatedIID32.802222-115.542026-09
69726/L1Liberty StationL169726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69726/L10Liberty StationL1069726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69726/L11Liberty StationL1169726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69726/L12Liberty StationL1269726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69726/L2Liberty StationL269726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69726/L3Liberty StationL369726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69726/L4Liberty StationL469726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69726/L5Liberty StationL569726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69726/L6Liberty StationL669726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69726/L7Liberty StationL769726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69726/L8Liberty StationL869726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69726/L9Liberty StationL969726KYCaseyEast Kentucky Power Coop, IncElectric UtilityNatural Gas Internal Combustion EngineNGIC18.117.82028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM37.369331-84.957672026-09
69808/R01Princeton Road StationR0169808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/R02Princeton Road StationR0269808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/R03Princeton Road StationR0369808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/R04Princeton Road StationR0469808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/R05Princeton Road StationR0569808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/R06Princeton Road StationR0669808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/R07Princeton Road StationR0769808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/R08Princeton Road StationR0869808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/R09Princeton Road StationR0969808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/R10Princeton Road StationR1069808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/R11Princeton Road StationR1169808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
69808/R12Princeton Road StationR1269808NELancasterNebraska Public Power DistrictElectric UtilityNatural Gas Internal Combustion EngineNGIC18.118.12029-062029(P) Planned for installation, but regulatory approvals not initiatedSWPP40.570394-96.786472026-09
70108/PIKEPIKE SolarPIKE70108ILFayettePike Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV18182026-112026(V) Under construction, more than 50 percent completeMISO38.9577-89.1692026-09
70260/SCIPIScipio SolarSCIPI70260NYCayugaAltus Power America Management, LLCIPP Non-CHPSolar PhotovoltaicSUNPV18182027-012027(V) Under construction, more than 50 percent completeNYIS42.78732-76.323782026-09
69782/CW216Cartwright Solar IICW21669782ORCrookCartwright Solar II LLCIPP Non-CHPSolar PhotovoltaicSUNPV17.617.62026-112026(TS) Construction complete, but not yet in commercial operationBPAT44.244-120.9382026-09
65305/BESSPowells Creek Solar - HybridBESS65305VAHalifaxPowells Creek Farm Solar, LLCIPP Non-CHPBatteriesMWHBA17.517.52027-062027(P) Planned for installation, but regulatory approvals not initiatedPJM36.55467-79.02862026-09
65369/TMSSTopsham Meadow Solar StationTMSS65369MESagadahocTopsham Meadow Solar Station LLCIPP Non-CHPSolar PhotovoltaicSUNPV17.217.22028-102028(L) Regulatory approvals pending. Not under constructionISNE43.975183-70.01132026-09
65371/WBSSWest Baldwin Solar StationWBSS65371MECumberlandWest Baldwin Solar Station LLCIPP Non-CHPSolar PhotovoltaicSUNPV17.117.12028-122028(T) Regulatory approvals received. Not under constructionISNE43.867403-70.78662026-09
50666/GEN2Pasco Cnty Solid Waste Resource RecoveryGEN250666FLPascoPasco County - (FL)IPP Non-CHPMunicipal Solid WasteMSWST17152027-042027(U) Under construction, less than or equal to 50 percent completeFPC28.3681-82.55832026-09
63652/SNDHBSand Hill BSNDHB63652CAAlamedaViracocha Wind LLCIPP Non-CHPOnshore Wind TurbineWNDWT17172027-122027(L) Regulatory approvals pending. Not under constructionCISO37.755007-121.59682026-09
55478/IC01Lange Generating StationIC0155478SDPenningtonBlack Hills Power, Inc.Electric UtilityNatural Gas Internal Combustion EngineNGIC16.616.32026-122026(V) Under construction, more than 50 percent completeWACM44.1218-103.26412026-09
55478/IC02Lange Generating StationIC0255478SDPenningtonBlack Hills Power, Inc.Electric UtilityNatural Gas Internal Combustion EngineNGIC16.616.32026-122026(V) Under construction, more than 50 percent completeWACM44.1218-103.26412026-09
55478/IC03Lange Generating StationIC0355478SDPenningtonBlack Hills Power, Inc.Electric UtilityNatural Gas Internal Combustion EngineNGIC16.616.32026-122026(V) Under construction, more than 50 percent completeWACM44.1218-103.26412026-09
55478/IC04Lange Generating StationIC0455478SDPenningtonBlack Hills Power, Inc.Electric UtilityNatural Gas Internal Combustion EngineNGIC16.616.32026-122026(V) Under construction, more than 50 percent completeWACM44.1218-103.26412026-09
55478/IC05Lange Generating StationIC0555478SDPenningtonBlack Hills Power, Inc.Electric UtilityNatural Gas Internal Combustion EngineNGIC16.616.32026-122026(V) Under construction, more than 50 percent completeWACM44.1218-103.26412026-09
55478/IC06Lange Generating StationIC0655478SDPenningtonBlack Hills Power, Inc.Electric UtilityNatural Gas Internal Combustion EngineNGIC16.616.32026-122026(V) Under construction, more than 50 percent completeWACM44.1218-103.26412026-09
69868/UNIT1Fulton Energy CenterUNIT169868MOCallawayMissouri Jnt Muni.Pwr Elec. Ut. Comm.IPP Non-CHPNatural Gas Fired Combustion TurbineNGGT16.515.12027-122027(P) Planned for installation, but regulatory approvals not initiatedMISO38.8676-91.947782026-09
65366/EMSSEmery Meadow Solar StationEMSS65366MEYorkEmery Meadow Solar Station, LLCIPP Non-CHPSolar PhotovoltaicSUNPV16.416.42027-122027(T) Regulatory approvals received. Not under constructionISNE43.643433-70.558372026-09
1024/8Crawfordsville Power Plant81024INMontgomeryCrawfordsville Energy LLCIPP Non-CHPNatural Gas Fired Combined CycleNGCS16.316.32027-032027(T) Regulatory approvals received. Not under constructionMISO40.048889-86.89922026-09
70546/JAR-1Jarratt Energy FacilityJAR-170546VAGreensvilleTorch Operating Company, LLCIPP Non-CHPSolar PhotovoltaicSUNPV16.316.32027-112027(T) Regulatory approvals received. Not under constructionPJM36.822306-77.513452026-09
3338/3Aberdeen CT33338SDBrownNorthWestern Energy - (SD)Electric UtilityNatural Gas Fired Combustion TurbineNGGT16152026-102026(V) Under construction, more than 50 percent completeSWPP45.429884-98.493962026-09
3338/4Aberdeen CT43338SDBrownNorthWestern Energy - (SD)Electric UtilityNatural Gas Fired Combustion TurbineNGGT16152026-102026(V) Under construction, more than 50 percent completeSWPP45.429884-98.493962026-09
69602/90918Essex VT BESS 19091869602VTChittendenEssex VT BESS 1 LLCIPP Non-CHPBatteriesMWHBA16162026-122026(U) Under construction, less than or equal to 50 percent completeISNE44.483701-73.107172026-09
70261/WS01Westside - (NM)WS0170261NMSan JuanSaddle Butte Energy Farmington, LLCIPP Non-CHPNatural Gas Internal Combustion EngineNGIC16162027-032027(U) Under construction, less than or equal to 50 percent completeSWPP36.752288-108.31482026-09
59572/PV1Cotton SolarPV159572SCDillonCotton Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV16162027-062027(T) Regulatory approvals received. Not under constructionCPLE34.455-79.410282026-09
67954/BRPV1BAI-Boyles Run-Phase IBRPV167954PANorthumberlandBoyles Run Solar I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV15.915.92028-092028(P) Planned for installation, but regulatory approvals not initiatedPJM40.771847-76.781192026-09
67955/BRPV2BAI-Boyles Run-Phase 2BRPV267955PANorthumberlandBoyles Run Solar II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV15.915.92028-092028(P) Planned for installation, but regulatory approvals not initiatedPJM40.771847-76.781192026-09
66785/ELVAKElevate Arthur KillELVAK66785NYRichmondLighthouse Arthur Kill, LLCIPP Non-CHPBatteriesMWHBA15.115.12026-102026(TS) Construction complete, but not yet in commercial operationNYIS40.590066-74.198362026-09
68560/MARJTSR Marion JunctionMARJT68560ALDallasSR Marion Junction, LLCIPP Non-CHPSolar PhotovoltaicSUNPV15152027-122027(T) Regulatory approvals received. Not under constructionTVA32.418685-87.361712026-09
10328/GEN11T B Simon Power PlantGEN1110328MIInghamMichigan State UniversityCommercial CHPNatural Gas Fired Combustion TurbineNGGT15152028-012028(U) Under construction, less than or equal to 50 percent completeMISO42.7178-84.48362026-09
67879/ENX26Stony Creek SolarENX2667879PASomersetStony Creek Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV15152028-102028(T) Regulatory approvals received. Not under constructionPJM40.222386-78.88122026-09
70546/JAR-2Jarratt Energy FacilityJAR-270546VAGreensvilleTorch Operating Company, LLCIPP Non-CHPSolar PhotovoltaicSUNPV14.914.92027-112027(T) Regulatory approvals received. Not under constructionPJM36.822306-77.513452026-09
60642/1M&G Resins USA160642TXNuecesCC Polymers LLCIndustrial Non-CHPAll OtherWHOT14.311.72028-122028(U) Under construction, less than or equal to 50 percent completeERCO27.833756-97.496522026-09
60642/2M&G Resins USA260642TXNuecesCC Polymers LLCIndustrial Non-CHPAll OtherWHOT14.311.72028-122028(U) Under construction, less than or equal to 50 percent completeERCO27.833756-97.496522026-09
70203/GEN1Bealeton SolarGEN170203VAFauquierTerraForm Power Operating, LLCIPP Non-CHPSolar PhotovoltaicSUNPV14.2142028-112028(L) Regulatory approvals pending. Not under constructionPJM38.555832-77.778282026-09
61912/MHSOLMcGinness Hills 3MHSOL61912NVLanderOrmat Nevada IncIPP Non-CHPSolar PhotovoltaicSUNPV14142027-052027(U) Under construction, less than or equal to 50 percent completeNEVP39.5963-116.89422026-09
69771/CCBS1Clark Creek Solar PlantCCBS169771NCLincolnDuke Energy Carolinas, LLCElectric UtilityBatteriesMWHBA14142028-022028(L) Regulatory approvals pending. Not under constructionCPLW35.532689-81.248662026-09
1239/13Riverton131239KSCherokeeEmpire District Electric CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT13.513.62026-102026(TS) Construction complete, but not yet in commercial operationSWPP37.072616-94.69872026-09
1239/14Riverton141239KSCherokeeEmpire District Electric CoElectric UtilityNatural Gas Fired Combustion TurbineNGGT13.513.62026-102026(TS) Construction complete, but not yet in commercial operationSWPP37.072616-94.69872026-09
63126/SNDHASand Hill ASNDHA63126CAAlamedaViracocha Wind LLCIPP Non-CHPOnshore Wind TurbineWNDWT13.513.52027-122027(L) Regulatory approvals pending. Not under constructionCISO37.743809-121.60782026-09
70409/ENX41Hera SolarENX4170409VATazewellHera Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV13.313.32028-062028(L) Regulatory approvals pending. Not under constructionPJM36.167141-81.503362026-09
70296/MTBATMilltown Onsite BESSMTBAT70296NJMiddlesexMilltown Onsite Generation, LLCIPP Non-CHPBatteriesMWHBA13.213.22026-102026(V) Under construction, more than 50 percent completePJM40.453346-74.435022026-09
67836/GSP1Gibson Solar Project - HybridGSP167836CAYoloEmeren US, LLCIPP Non-CHPSolar PhotovoltaicSUNPV13132027-122027(T) Regulatory approvals received. Not under constructionCISO38.678386-121.98762026-09
67836/GSP2Gibson Solar Project - HybridGSP267836CAYoloEmeren US, LLCIPP Non-CHPBatteriesMWHBA13132027-122027(T) Regulatory approvals received. Not under constructionCISO38.678386-121.98762026-09
65302/BESSSalt City Solar Project - HybridBESS65302OHRossSalt City Solar LLCIPP Non-CHPBatteriesMWHBA12.512.52027-062027(P) Planned for installation, but regulatory approvals not initiatedPJM39.41473-82.962852026-09
65304/BESSENGIE Solidago Solar Project - HybridBESS65304DENew CastleENGIE Solidago Solar LLCIPP Non-CHPBatteriesMWHBA12.512.52027-062027(P) Planned for installation, but regulatory approvals not initiatedPJM39.395187-75.75352026-09
65307/SUNBSunnybrook Solar Project - HybridSUNB65307VAHalifaxSunnybrook Farm Solar, LLCIPP Non-CHPBatteriesMWHBA12.512.52027-062027(P) Planned for installation, but regulatory approvals not initiatedPJM36.798717-78.839612026-09
67253/761Cherry Valley76167253ILBooneGreenbacker Renewable Energy CorporationIPP Non-CHPSolar PhotovoltaicSUNPV12.512.52027-122027(U) Under construction, less than or equal to 50 percent completeMISO42.240017-88.930762026-09
70410/ENX42Willow SolarENX4270410VAFranklinWillow Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV12122027-062027(L) Regulatory approvals pending. Not under constructionPJM36.968749-79.930012026-09
58639/BESS8KRS I Anahola Solar HybridBESS858639HIKauaiKauai Island Utility CooperativeElectric UtilityBatteriesMWHBA12122027-072027(P) Planned for installation, but regulatory approvals not initiated22.131667-159.30312026-09
58640/BESS7KRS II Koloa SolarBESS758640HIKauaiKauai Island Utility CooperativeElectric UtilityBatteriesMWHBA12122027-072027(P) Planned for installation, but regulatory approvals not initiated21.900833-159.452026-09
57472/CTGTBE-Montgomery LLCCTG57472NYOrangeTBE Montgomery LLCIPP Non-CHPOther Waste BiomassOBGCT1211.62039-122039(U) Under construction, less than or equal to 50 percent completeNYIS41.4885-74.22622026-09
69870/BAT1Parkwood BESSBAT169870NCUnionNorth Carolina El Member CorpElectric UtilityBatteriesMWHBA11.611.62026-122026(V) Under construction, more than 50 percent completeDUK34.891701-80.632552026-09
66870/DAVSDavis Solar (WV)DAVS66870WVTuckerMonongahela Power CoElectric UtilitySolar PhotovoltaicSUNPV11.511.52028-122028(L) Regulatory approvals pending. Not under constructionPJM39.155005-79.443342026-09
69552/90916Danville VA BESS 29091669552VAPittsylvaniaDanville VA BESS 2 LLCIPP Non-CHPBatteriesMWHBA11112026-102026(U) Under construction, less than or equal to 50 percent completePJM36.6052-79.43582026-09
70542/WHI1Mount Whitney BESSWHI170542TXWallerMount Whitney BESS LLCIPP Non-CHPBatteriesMWHBA119.92027-022027(V) Under construction, more than 50 percent completeERCO30.159658-95.927632026-09
70543/DEN1Denali Energy StorageDEN170543TXAustinDenali Energy Storage LLCIPP Non-CHPBatteriesMWHBA119.92027-022027(V) Under construction, more than 50 percent completeERCO29.632317-96.075652026-09
69864/COBA1Colorado Clean Energy Center (BESS)COBA169864TXColoradoOn Energy StorageIPP Non-CHPBatteriesMWHBA10.110.12026-122026(TS) Construction complete, but not yet in commercial operationERCO29.649-96.515192026-09
69865/CLBA1Columbus Clean Energy Center (BESS)CLBA169865TXColoradoOn Energy StorageIPP Non-CHPBatteriesMWHBA10.110.12026-122026(TS) Construction complete, but not yet in commercial operationERCO29.6789-96.530422026-09
69866/MGBA1Matagorda Clean Energy Center (BESS)MGBA169866TXMatagordaOn Energy StorageIPP Non-CHPBatteriesMWHBA10.110.12026-122026(TS) Construction complete, but not yet in commercial operationERCO28.99489-96.125362026-09
67283/6569Six Flags Magic Mountain656967283CALos AngelesMagic Mountain Parkway Solar Project 2023, LLCIPP Non-CHPSolar PhotovoltaicSUNPV10102026-092026(V) Under construction, more than 50 percent completeCISO34.428209-118.59932026-09
69226/KNBA1Knapp BESSKNBA169226TXScurryGoldenMax Energy IncIPP Non-CHPBatteriesMWHBA10102026-102026(V) Under construction, more than 50 percent completeERCO32.6913-101.05152026-09
69252/HABA1Harlingen #1 BESS 1HABA169252TXCameronHarlingen ESS Assets LLCIPP Non-CHPBatteriesMWHBA10102026-112026(V) Under construction, more than 50 percent completeERCO26.206111-97.708422026-09
69253/NEBA1North Edinburg BESS 1NEBA169253TXHidalgoEdinburg ESS Assets LLCIPP Non-CHPBatteriesMWHBA10102026-112026(V) Under construction, more than 50 percent completeERCO26.347194-98.188442026-09
69465/CSTSPCity of Detroit Castle SolarCSTSP69465MIWayneDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV10102026-112026(V) Under construction, more than 50 percent completeMISO42.411333-83.018672026-09
69665/ORCHOrchard BESSORCH69665TXFort BendIEP Tejas Verde, LLCIPP Non-CHPBatteriesMWHBA10102026-112026(TS) Construction complete, but not yet in commercial operationERCO29.539579-95.957322026-09
66410/596Grizzly Ridge Solar59666410TXHamiltonGrizzly Ridge Solar LLCIPP Non-CHPBatteriesMWHBA10102026-122026(TS) Construction complete, but not yet in commercial operationERCO31.738177-98.213742026-09
68439/17184NorCal FPV 11718468439CAAlamedaMadison Energy Investments LLCIndustrial Non-CHPSolar PhotovoltaicSUNPV10102026-122026(TS) Construction complete, but not yet in commercial operationCISO37.6778-121.82752026-09
70560/GWF-1Grey WolfGWF-170560TXWinklerET Genco LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT10102027-032027(TS) Construction complete, but not yet in commercial operationERCO31.769814-103.26942026-09
70561/WT2-1WT2WT2-170561TXWinklerET Genco LLCIPP Non-CHPNatural Gas Fired Combustion TurbineNGGT10102027-052027(TS) Construction complete, but not yet in commercial operationERCO31.83611-103.3052026-09
67858/DILL1Dill Holdings LLCDILL167858NCIredellDill Holdings LLCIPP Non-CHPSolar PhotovoltaicSUNPV10102027-062027(U) Under construction, less than or equal to 50 percent completeDUK35.966645-80.718822026-09
70533/NASHNash SolarNASH70533TXBrazoriaEllomay USA IncIPP Non-CHPSolar PhotovoltaicSUNPV10102027-062027(U) Under construction, less than or equal to 50 percent completeERCO29.253813-95.596082026-09
64616/1South Portland ESS, LLC164616MECumberlandSouth Portland ESS, LLCIPP Non-CHPBatteriesMWHBA10102027-122027(T) Regulatory approvals received. Not under constructionISNE43.622939-70.330982026-09
68566/SIPSYSR SipseySIPSY68566ALFayetteSR Sipsey, LLCIPP Non-CHPSolar PhotovoltaicSUNPV10102027-122027(T) Regulatory approvals received. Not under constructionTVA33.694556-87.818052026-09
68988/SHB01Sherco LDESSHB0168988MNSherburneNorthern States Power Co - MinnesotaElectric UtilityBatteriesMWHBA10102028-052028(T) Regulatory approvals received. Not under constructionMISO45.374997-93.897192026-09
64171/1Tygart Hydropower164171WVTaylorAgilitas Energy, Inc.IPP Non-CHPConventional HydroelectricWATHY1032029-012029(L) Regulatory approvals pending. Not under constructionPJM39.279354-80.008912026-09
64171/2Tygart Hydropower264171WVTaylorAgilitas Energy, Inc.IPP Non-CHPConventional HydroelectricWATHY1032029-012029(L) Regulatory approvals pending. Not under constructionPJM39.279354-80.008912026-09
64171/3Tygart Hydropower364171WVTaylorAgilitas Energy, Inc.IPP Non-CHPConventional HydroelectricWATHY1032029-012029(L) Regulatory approvals pending. Not under constructionPJM39.279354-80.008912026-09
69702/PI-1Pike Island Hydroelectric ProjectPI-169702OHJeffersonPike Island Hydropower CorporationIPP Non-CHPConventional HydroelectricWATHY10102029-012029(L) Regulatory approvals pending. Not under constructionPJM40.151-80.705692026-09
69702/PI-2Pike Island Hydroelectric ProjectPI-269702OHJeffersonPike Island Hydropower CorporationIPP Non-CHPConventional HydroelectricWATHY10102029-012029(L) Regulatory approvals pending. Not under constructionPJM40.151-80.705692026-09
69701/NC-1New Cumberland Hydroelectric ProjectNC-169701WVHancockCurrent Hydro Project 19, LLCIPP Non-CHPConventional HydroelectricWATHY10102029-042029(L) Regulatory approvals pending. Not under constructionPJM40.52821-80.625742026-09
69701/NC-2New Cumberland Hydroelectric ProjectNC-269701WVHancockCurrent Hydro Project 19, LLCIPP Non-CHPConventional HydroelectricWATHY10102029-042029(L) Regulatory approvals pending. Not under constructionPJM40.52821-80.625742026-09
70559/BESS2MammothBESS270559WVKanawhaMN8 Energy LLCIPP Non-CHPBatteriesMWHBA10102029-062029(L) Regulatory approvals pending. Not under constructionPJM38.20845-81.308932026-09
67570/3004Cedar Hill ESS300467570TXDallasCedar Hill ESS Assets, LLCIPP Non-CHPBatteriesMWHBA10102030-062030(L) Regulatory approvals pending. Not under constructionERCO32.612139-96.925112026-09
69318/APPLEApple BESSAPPLE69318TXEctorApple Infra, LLCIPP Non-CHPBatteriesMWHBA9.99.92026-102026(TS) Construction complete, but not yet in commercial operationERCO31.675697-102.36382026-09
69338/LEAKYRegis LeakeyLEAKY69338TXRealRegis Leakey LLCIPP Non-CHPBatteriesMWHBA9.99.92026-102026(TS) Construction complete, but not yet in commercial operationERCO29.681012-99.761722026-09
65834/SDBTDSaddleback BESS2SDBTD65834TXReevesHEN Infrastructure, L.L.C.IPP Non-CHPAll OtherOTHIC9.99.92026-112026(TS) Construction complete, but not yet in commercial operationERCO31.332883-103.49842026-09
69340/MEDINRegis MedinaMEDIN69340TXBanderaRegis Medina LLCIPP Non-CHPBatteriesMWHBA9.99.92026-112026(V) Under construction, more than 50 percent completeERCO29.807877-99.254672026-09
69534/TOR_BTorrecillas Energy StorageTOR_B69534TXWebbTorrecillas Energy Storage, LLCIPP Non-CHPBatteriesMWHBA9.99.92026-122026(V) Under construction, more than 50 percent completeERCO27.618936-98.839242026-09
69246/BSOU1BESS TX Camarine - BSHOU001BSOU169246TXHarrisPrologis Logistics Services Incorporated BESSIPP Non-CHPBatteriesMWHBA9.99.92027-012027(U) Under construction, less than or equal to 50 percent completeERCO29.86648-95.430662026-09
70549/DARSTCF BESS NINEDARST70549TXGuadalupeCF BESS Nine, LLCIPP Non-CHPBatteriesMWHBA9.99.92027-012027(L) Regulatory approvals pending. Not under constructionERCO29.586397-97.775252026-09
65811/CYSTDCoyote Springs (TX)CYSTD65811TXReevesHEN Infrastructure, L.L.C.IPP Non-CHPPetroleum LiquidsDFOIC9.99.92027-022027(T) Regulatory approvals received. Not under constructionERCO31.39471-103.63032026-09
69902/HOCKLHockleyHOCKL69902TXHarrisHockley LLCIPP Non-CHPBatteriesMWHBA9.99.92027-022027(V) Under construction, more than 50 percent completeERCO30.021964-95.848262026-09
65897/INPKYIndustrial Parkway StorageINPKY65897CASanta BarbaraRPCA Storage 1, LLCIPP Non-CHPBatteriesMWHBA9.89.82026-112026(TS) Construction complete, but not yet in commercial operationCISO34.907345-120.44652026-09
68255/SHELBSR ShelbySHELB68255TNShelbySR Shelby, LLCIPP Non-CHPSolar PhotovoltaicSUNPV9.89.82027-122027(T) Regulatory approvals received. Not under constructionTVA35.353292-89.814982026-09
59596/PV1Rhubarb One SCPV159596SCMarionSolRiver Capital LLCIPP Non-CHPSolar PhotovoltaicSUNPV9.69.62027-062027(L) Regulatory approvals pending. Not under constructionCPLE34.151111-79.412026-09
59027/GEN 1Mahoney Lake HydroelectricGEN 159027AKKetchikan GatewayKetchikan Electric CompanyElectric UtilityConventional HydroelectricWATHY9.69.62027-122027(P) Planned for installation, but regulatory approvals not initiated55.419444-131.53782026-09
69903/EBERNEast BernardEBERN69903TXWhartonEast Bernard LLCIPP Non-CHPBatteriesMWHBA9.59.52026-112026(V) Under construction, more than 50 percent completeERCO29.52854-96.070522026-09
69904/PLEDGPledgerPLEDG69904TXWhartonPledger LLCIPP Non-CHPBatteriesMWHBA9.59.52026-112026(V) Under construction, more than 50 percent completeERCO29.187719-95.912232026-09
69357/PV1Asheville SolarPV169357NCBuncombeDuke Energy Progress - (NC)Electric UtilitySolar PhotovoltaicSUNPV9.59.52026-122026(V) Under construction, more than 50 percent completeCPLW35.470591-82.542232026-09
69819/TRNTNTrenton Solar - (OH)TRNTN69819OHButlerENGIE Distributed Renewables Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV9.59.52027-052027(U) Under construction, less than or equal to 50 percent completePJM39.455321-84.467882026-09
68284/PE-1Puuloa EnergyPE-168284HIHonoluluPuuloa Energy LLCIPP Non-CHPOther Waste BiomassOBLIC9.49.42029-042029(P) Planned for installation, but regulatory approvals not initiatedHECO21.347833-157.95062026-09
68284/PE-10Puuloa EnergyPE-1068284HIHonoluluPuuloa Energy LLCIPP Non-CHPOther Waste BiomassOBLIC9.49.42029-042029(P) Planned for installation, but regulatory approvals not initiatedHECO21.347833-157.95062026-09
68284/PE-11Puuloa EnergyPE-1168284HIHonoluluPuuloa Energy LLCIPP Non-CHPOther Waste BiomassOBLIC9.49.42029-042029(P) Planned for installation, but regulatory approvals not initiatedHECO21.347833-157.95062026-09
68284/PE-2Puuloa EnergyPE-268284HIHonoluluPuuloa Energy LLCIPP Non-CHPOther Waste BiomassOBLIC9.49.42029-042029(P) Planned for installation, but regulatory approvals not initiatedHECO21.347833-157.95062026-09
68284/PE-3Puuloa EnergyPE-368284HIHonoluluPuuloa Energy LLCIPP Non-CHPOther Waste BiomassOBLIC9.49.42029-042029(P) Planned for installation, but regulatory approvals not initiatedHECO21.347833-157.95062026-09
68284/PE-4Puuloa EnergyPE-468284HIHonoluluPuuloa Energy LLCIPP Non-CHPOther Waste BiomassOBLIC9.49.42029-042029(P) Planned for installation, but regulatory approvals not initiatedHECO21.347833-157.95062026-09
68284/PE-5Puuloa EnergyPE-568284HIHonoluluPuuloa Energy LLCIPP Non-CHPOther Waste BiomassOBLIC9.49.42029-042029(P) Planned for installation, but regulatory approvals not initiatedHECO21.347833-157.95062026-09
68284/PE-6Puuloa EnergyPE-668284HIHonoluluPuuloa Energy LLCIPP Non-CHPOther Waste BiomassOBLIC9.49.42029-042029(P) Planned for installation, but regulatory approvals not initiatedHECO21.347833-157.95062026-09
68284/PE-7Puuloa EnergyPE-768284HIHonoluluPuuloa Energy LLCIPP Non-CHPOther Waste BiomassOBLIC9.49.42029-042029(P) Planned for installation, but regulatory approvals not initiatedHECO21.347833-157.95062026-09
68284/PE-8Puuloa EnergyPE-868284HIHonoluluPuuloa Energy LLCIPP Non-CHPOther Waste BiomassOBLIC9.49.42029-042029(P) Planned for installation, but regulatory approvals not initiatedHECO21.347833-157.95062026-09
68284/PE-9Puuloa EnergyPE-968284HIHonoluluPuuloa Energy LLCIPP Non-CHPOther Waste BiomassOBLIC9.49.42029-042029(P) Planned for installation, but regulatory approvals not initiatedHECO21.347833-157.95062026-09
50969/GEN10MU Combined Heat and Power PlantGEN1050969MOBooneCurators of the University of MissouriCommercial CHPNatural Gas Steam TurbineNGST982026-112026(V) Under construction, more than 50 percent completeMISO38.9461-92.33282026-09
66618/FL5Fish Lake GeothermalFL566618NVEsmeraldaFish Lake Geothermal LLCIPP Non-CHPGeothermalGEOST96.82027-122027(P) Planned for installation, but regulatory approvals not initiatedNEVP37.860925-118.03412026-09
57472/STGTBE-Montgomery LLCSTG57472NYOrangeTBE Montgomery LLCIPP Non-CHPOther Waste BiomassOBGCA97.42039-122039(U) Under construction, less than or equal to 50 percent completeNYIS41.4885-74.22622026-09
69695/CCM-1Colonel Charles D. Maynard ProjectCCM-169695ARJeffersonMaynard Hydroelectric LLCIPP Non-CHPConventional HydroelectricWATHY8.68.62031-112031(L) Regulatory approvals pending. Not under constructionMISO34.411873-92.103192026-09
69695/CCM-2Colonel Charles D. Maynard ProjectCCM-269695ARJeffersonMaynard Hydroelectric LLCIPP Non-CHPConventional HydroelectricWATHY8.68.62031-112031(L) Regulatory approvals pending. Not under constructionMISO34.411873-92.103192026-09
69695/CCM-3Colonel Charles D. Maynard ProjectCCM-369695ARJeffersonMaynard Hydroelectric LLCIPP Non-CHPConventional HydroelectricWATHY8.68.62031-112031(L) Regulatory approvals pending. Not under constructionMISO34.411873-92.103192026-09
70305/23Tanglewood Solar, LLC2370305NCPasquotankHeadwater Energy, LLCIPP Non-CHPSolar PhotovoltaicSUNPV8.48.42026-102026(U) Under construction, less than or equal to 50 percent completeCPLE36.25-76.32026-09
66901/WRSWylie Ridge SolarWRS66901WVHancockMonongahela Power CoElectric UtilitySolar PhotovoltaicSUNPV8.48.42027-122027(L) Regulatory approvals pending. Not under constructionPJM40.452683-80.572552026-09
68558/LOTTSR LottLOTT68558ALMobileSR Lott, LLCIPP Non-CHPSolar PhotovoltaicSUNPV8.38.32027-122027(T) Regulatory approvals received. Not under constructionSOCO30.940181-88.299262026-09
62391/NA1Overton Hydroelectric ProjectNA162391LARapidesRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY8.15.52028-062028(P) Planned for installation, but regulatory approvals not initiatedMISO31.185978-92.293092026-09
62391/NA2Overton Hydroelectric ProjectNA262391LARapidesRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY8.15.52028-062028(P) Planned for installation, but regulatory approvals not initiatedMISO31.185978-92.293092026-09
62391/NA3Overton Hydroelectric ProjectNA362391LARapidesRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY8.15.52028-072028(P) Planned for installation, but regulatory approvals not initiatedMISO31.185978-92.293092026-09
62391/NA4Overton Hydroelectric ProjectNA462391LARapidesRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY8.15.52028-072028(P) Planned for installation, but regulatory approvals not initiatedMISO31.185978-92.293092026-09
62391/NA5Overton Hydroelectric ProjectNA562391LARapidesRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY8.15.52028-082028(P) Planned for installation, but regulatory approvals not initiatedMISO31.185978-92.293092026-09
62391/NA6Overton Hydroelectric ProjectNA662391LARapidesRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY8.15.52028-082028(P) Planned for installation, but regulatory approvals not initiatedMISO31.185978-92.293092026-09
70466/NSPNine Springs SolarNSP70466WIDaneMadison Gas & Electric CoElectric UtilitySolar PhotovoltaicSUNPV882027-062027(U) Under construction, less than or equal to 50 percent completeMISO43.029352-89.363072026-09
54918/TM02Ergon Refining VicksburgTM0254918MSWarrenErgon Refining IncIndustrial CHPNatural Gas Fired Combustion TurbineNGGT7.97.92027-092027(U) Under construction, less than or equal to 50 percent completeMISO32.388271-90.908342026-09
54918/TM03Ergon Refining VicksburgTM0354918MSWarrenErgon Refining IncIndustrial CHPNatural Gas Fired Combustion TurbineNGGT7.97.92027-092027(U) Under construction, less than or equal to 50 percent completeMISO32.388271-90.908342026-09
69992/BA1Sherwood Forest BESSBA169992LAOrleansEntergy New Orleans, LLCElectric UtilityBatteriesMWHBA7.77.72027-072027(P) Planned for installation, but regulatory approvals not initiatedMISO30.01266-89.944032026-09
54224/CTG1Franklin Heating StationCTG154224MNOlmstedFranklin Heating StationCommercial CHPNatural Gas Fired Combined CycleNGCT7.57.32027-052027(V) Under construction, more than 50 percent completeMISO44.020576-92.46562026-09
62425/NA1Sardis Lake Hydroelectric ProjectNA162425MSPanolaRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY7.55.52028-102028(P) Planned for installation, but regulatory approvals not initiatedTVA34.399125-89.772462026-09
62425/NA2Sardis Lake Hydroelectric ProjectNA262425MSPanolaRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY7.55.52028-112028(P) Planned for installation, but regulatory approvals not initiatedTVA34.399125-89.772462026-09
55369/BESS1Hamakua Energy PlantBESS155369HIHawaiiHamakua Energy LPIPP Non-CHPBatteriesMWHBA7.57.52030-112030(P) Planned for installation, but regulatory approvals not initiated20.0939-155.47112026-09
70333/KBPV1KeenesburgKBPV170333COWeldENGIE Distributed Renewables Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV7.27.22026-112026(U) Under construction, less than or equal to 50 percent completePSCO40.187364-104.50612026-09
66002/MVSBAAES Mountain View SolarMVSBA66002HIHonoluluAES Distributed EnergyIPP Non-CHPBatteriesMWHBA772026-112026(V) Under construction, more than 50 percent completeHECO21.45799-158.17672026-09
66002/MVSPVAES Mountain View SolarMVSPV66002HIHonoluluAES Distributed EnergyIPP Non-CHPSolar PhotovoltaicSUNPV772026-112026(V) Under construction, more than 50 percent completeHECO21.45799-158.17672026-09
70465/NFRECNew Florence Renewable Energy CenterNFREC70465MOMontgomeryUnion Electric Co - (MO)Commercial Non-CHPSolar PhotovoltaicSUNPV772026-112026(P) Planned for installation, but regulatory approvals not initiatedMISO38.8908-91.41862026-09
70119/GEN1Raceway Solar - (CO)GEN170119COMorganRaceway Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV772027-042027(L) Regulatory approvals pending. Not under constructionSWPP40.262222-103.82922026-09
69466/GRESPCity of Detroit GreenfieldGRESP69466MIWayneDTE Electric CompanyElectric UtilitySolar PhotovoltaicSUNPV772027-092027(T) Regulatory approvals received. Not under constructionMISO42.420589-83.099092026-09
62400/NA1Montgomery L&D Hydroelectric ProjectNA162400PABeaverRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY6.85.52028-102028(P) Planned for installation, but regulatory approvals not initiatedPJM40.652478-80.386872026-09
62400/NA2Montgomery L&D Hydroelectric ProjectNA262400PABeaverRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY6.85.52028-112028(P) Planned for installation, but regulatory approvals not initiatedPJM40.652478-80.386872026-09
62400/NA3Montgomery L&D Hydroelectric ProjectNA362400PABeaverRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY6.85.52028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM40.652478-80.386872026-09
62433/NA1Emsworth L&D Hydroelectric ProjectNA162433PAAlleghenyRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY6.852030-102030(P) Planned for installation, but regulatory approvals not initiatedPJM40.50305-80.089442026-09
62433/NA2Emsworth L&D Hydroelectric ProjectNA262433PAAlleghenyRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY6.852030-112030(P) Planned for installation, but regulatory approvals not initiatedPJM40.50305-80.089442026-09
62433/NA3Emsworth L&D Hydroelectric ProjectNA362433PAAlleghenyRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY6.852030-122030(P) Planned for installation, but regulatory approvals not initiatedPJM40.50305-80.089442026-09
62434/NA3Emsworth BC Hydroelectric ProjectNA362434PAAlleghenyRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY6.852030-122030(P) Planned for installation, but regulatory approvals not initiatedPJM40.50083-80.103062026-09
60588/JHI01Sweetheart Lake Hydroelectric FacilityJHI0160588AKJuneauJuneau Hydropower, IncIPP Non-CHPConventional HydroelectricWATHY6.66.62028-012028(L) Regulatory approvals pending. Not under construction57.9449-133.68672026-09
60588/JHI02Sweetheart Lake Hydroelectric FacilityJHI0260588AKJuneauJuneau Hydropower, IncIPP Non-CHPConventional HydroelectricWATHY6.66.62028-012028(L) Regulatory approvals pending. Not under construction57.9449-133.68672026-09
60588/JHI03Sweetheart Lake Hydroelectric FacilityJHI0360588AKJuneauJuneau Hydropower, IncIPP Non-CHPConventional HydroelectricWATHY6.66.62028-012028(L) Regulatory approvals pending. Not under construction57.9449-133.68672026-09
68285/PS-1Puuloa SolarPS-168285HIHonoluluPuuloa Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV6.46.42027-112027(P) Planned for installation, but regulatory approvals not initiatedHECO21.351522-157.92692026-09
66618/FL4Fish Lake GeothermalFL466618NVEsmeraldaFish Lake Geothermal LLCIPP Non-CHPGeothermalGEOST6.24.32027-122027(P) Planned for installation, but regulatory approvals not initiatedNEVP37.860925-118.03412026-09
63972/TR1Two Rivers Wind FacilityTR163972WYCarbonTwo Rivers Wind LLCIPP Non-CHPOnshore Wind TurbineWNDWT6.16.12028-102028(L) Regulatory approvals pending. Not under constructionPACE41.97508-106.18052026-09
69516/HAMMHamms LandfillHAMM69516NJSussexNJR Clean Energy Ventures CorporationIPP Non-CHPSolar PhotovoltaicSUNPV662026-102026(TS) Construction complete, but not yet in commercial operationPJM41.1015-74.67062026-09
70467/PHSPine Hill SolarPHS70467WIDaneMadison Gas & Electric CoElectric UtilitySolar PhotovoltaicSUNPV662026-112026(U) Under construction, less than or equal to 50 percent completeMISO43.06999-89.64522026-09
70468/20265Big Rapids Solar WI, LLC2026570468WIMarathonOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV662026-122026(L) Regulatory approvals pending. Not under constructionMISO44.815532-90.074552026-09
70469/20261Campbellsport Solar WI, LLC2026170469WIFond Du LacOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV662026-122026(L) Regulatory approvals pending. Not under constructionMISO43.583212-88.278862026-09
70470/20262Honey Creek Solar WI, LLC2026270470WIWalworthWisconsin Electric Power CoElectric UtilitySolar PhotovoltaicSUNPV662026-122026(L) Regulatory approvals pending. Not under constructionMISO42.790988-88.500942026-09
70471/20263Germantown - Rockfield Rd Solar WI, LLC2026370471WIWashingtonOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV662026-122026(L) Regulatory approvals pending. Not under constructionMISO43.257821-88.13162026-09
70472/20268Lime Kiln Solar, LLC2026870472WIWashingtonOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV662026-122026(L) Regulatory approvals pending. Not under constructionMISO43.277345-88.06842026-09
70473/20267Little Rose Solar WI, LLC2026770473WIMarathonOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV662026-122026(L) Regulatory approvals pending. Not under constructionMISO44.800623-90.13032026-09
70476/20260Root River Solar WI, LLC2026070476WIRacineOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV662026-122026(L) Regulatory approvals pending. Not under constructionMISO42.818594-87.938952026-09
70478/20259Tichigan Solar WI, LLC2025970478WIRacineOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV662026-122026(L) Regulatory approvals pending. Not under constructionMISO42.732266-88.164112026-09
68285/PS-2Puuloa SolarPS-268285HIHonoluluPuuloa Solar LLCIPP Non-CHPBatteriesMWHBA662027-112027(P) Planned for installation, but regulatory approvals not initiatedHECO21.351522-157.92692026-09
69867/SHEIISR Shelby II, LLCSHEII69867TNShelbySR Shelby II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV662028-022028(T) Regulatory approvals received. Not under constructionTVA35.353646-89.81092026-09
62388/NA1Grays Landing L&D Hydroelectric ProjectNA162388PAGreeneRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY64.52028-062028(P) Planned for installation, but regulatory approvals not initiatedPJM39.823738-79.923022026-09
62388/NA2Grays Landing L&D Hydroelectric ProjectNA262388PAGreeneRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY64.52028-072028(P) Planned for installation, but regulatory approvals not initiatedPJM39.823738-79.923022026-09
62404/NA1Monongahela L&D4 Hydroelectric ProjectNA162404PAWashingtonRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY64.52028-102028(P) Planned for installation, but regulatory approvals not initiatedPJM40.145943-79.900952026-09
62385/NA1Maxwell L&D Hydroelectric ProjectNA162385PAFayetteRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY64.52028-112028(P) Planned for installation, but regulatory approvals not initiatedPJM40.002401-79.958832026-09
62404/NA2Monongahela L&D4 Hydroelectric ProjectNA262404PAWashingtonRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY64.52028-112028(P) Planned for installation, but regulatory approvals not initiatedPJM40.145943-79.900952026-09
62385/NA2Maxwell L&D Hydroelectric ProjectNA262385PAFayetteRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY64.52028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM40.002401-79.958832026-09
62434/NA1Emsworth BC Hydroelectric ProjectNA162434PAAlleghenyRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY632030-112030(P) Planned for installation, but regulatory approvals not initiatedPJM40.50083-80.103062026-09
62434/NA2Emsworth BC Hydroelectric ProjectNA262434PAAlleghenyRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY642030-122030(P) Planned for installation, but regulatory approvals not initiatedPJM40.50083-80.103062026-09
67265/CTG-1CHP PlantCTG-167265DCDistrict of ColumbiaHoward UniversityIPP CHPNatural Gas Fired Combustion TurbineNGGT5.75.32026-112026(V) Under construction, more than 50 percent completePJM38.92033-77.0212026-09
68543/3850BTown of Sharon Portfolio -Mt St Landfill3850B68543MANorfolkMountain Street Solar Project 2019, LLCIPP Non-CHPBatteriesMWHBA5.75.72027-012027(V) Under construction, more than 50 percent completeISNE42.102685-71.159062026-09
59091/GEN1Braddock Lock and DamGEN159091PAAlleghenyLock+ Hydro Friends Fund XLII, LLCIPP Non-CHPConventional HydroelectricWATHY5.35.32027-032027(L) Regulatory approvals pending. Not under constructionPJM40.388889-79.858892026-09
63677/STURBSturbridge Road SolarSTURB63677MAWorcesterMadison Energy Investments LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-102026(TS) Construction complete, but not yet in commercial operationISNE42.174611-72.017862026-09
68975/17340Washington Street Solar 1 LLC1734068975ILMcleanWashington Street Solar 1 LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-102026(U) Under construction, less than or equal to 50 percent completeMISO40.477287-89.049862026-09
69551/90915Holyoke MA BESS 19091569551MAHampdenHolyoke MA BESS 1 LLCIPP Non-CHPBatteriesMWHBA552026-102026(U) Under construction, less than or equal to 50 percent completeISNE42.16774-72.648982026-09
69844/HORSEHorseshoe Solar Project, LLCHORSE69844ILMontgomeryDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-102026(V) Under construction, more than 50 percent completeMISO39.14706-89.44262026-09
69931/BJORNBjornBJORN69931WIBarronOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV552026-102026(V) Under construction, more than 50 percent completeMISO45.395931-91.8812026-09
70176/KIESEKieserKIESE70176ILMcLeanAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV552026-102026(V) Under construction, more than 50 percent completeMISO40.4396-89.00782026-09
70386/BESS1Chicopee BESSBESS170386MAHampdenUriel Renovables S.AIPP Non-CHPBatteriesMWHBA552026-102026(U) Under construction, less than or equal to 50 percent completeISNE42.173653-72.61192026-09
70387/BESS1Framingham BESSBESS170387MAMiddlesexUriel Renovables S.AIPP Non-CHPBatteriesMWHBA552026-102026(U) Under construction, less than or equal to 50 percent completeISNE42.313107-71.389532026-09
70563/HIBISHibiscus Solar, LLCHIBIS70563ILMacoupinDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-102026(U) Under construction, less than or equal to 50 percent completeMISO39.06927-90.144142026-09
67279/6572Borrego - Highland Ave657267279MABristolHighland Ave Solar 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(U) Under construction, less than or equal to 50 percent completeISNE41.661525-71.059982026-09
67279/6572BBorrego - Highland Ave6572B67279MABristolHighland Ave Solar 1, LLCIPP Non-CHPBatteriesMWHBA552026-112026(U) Under construction, less than or equal to 50 percent completeISNE41.661525-71.059982026-09
67637/GILLDGillardGILLD67637ILGrundy38DN Asset Management LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(U) Under construction, less than or equal to 50 percent completePJM41.19401-88.294542026-09
67643/SOLITSolitudeSOLIT67643ILLaSalle38DN Asset Management LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(U) Under construction, less than or equal to 50 percent completePJM41.130185-89.044072026-09
69178/11237Cherry Solar 11123769178ILBureauGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(TS) Construction complete, but not yet in commercial operationMISO41.450314-89.224832026-09
69180/11254Cold Springs1125469180NYOnondagaGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(TS) Construction complete, but not yet in commercial operationNYIS43.137912-76.277792026-09
69182/11225KA 3401122569182ILKankakeeGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(V) Under construction, more than 50 percent completePJM41.245-87.7532026-09
69310/23220SL Pembroke 22322069310NYGeneseeSL Pembroke 2, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(V) Under construction, more than 50 percent completeNYIS43.028056-78.456942026-09
69384/MALL2Mallory South PV IIMALL269384NYOswegoMallory South PV II LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(V) Under construction, more than 50 percent completeNYIS43.2669-76.1372026-09
69603/90917Ipswich MA BESS 19091769603MAEssexIpswich MA BESS 1 LLCIPP Non-CHPBatteriesMWHBA552026-112026(U) Under construction, less than or equal to 50 percent completeISNE42.716353-70.842022026-09
69756/23212SL Dunkirk2321269756NYChautauquaSL Dunkirk, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(V) Under construction, more than 50 percent completeNYIS42.463685-79.343162026-09
70294/EASTNL IL 2700 EastEAST70294ILLivingstonStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(TS) Construction complete, but not yet in commercial operationPJM41.050261-88.428272026-09
70295/LAKENL IL LakeLAKE70295ILLakeStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(TS) Construction complete, but not yet in commercial operationPJM42.464881-87.889742026-09
70440/BRACENL IL BracevilleBRACE70440ILGrundyStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(TS) Construction complete, but not yet in commercial operationPJM41.230511-88.250372026-09
70464/BAT1Blackman Battery Energy Storage SystemBAT170464MOGreeneCity Utilities of Springfield - (MO)Electric UtilityBatteriesMWHBA552026-112026(T) Regulatory approvals received. Not under constructionSWPP37.163516-93.223252026-09
70562/BUNGABungalow Solar, LLCBUNGA70562ILTazewellDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(U) Under construction, less than or equal to 50 percent completeMISO40.630326-89.449352026-09
70565/TREN1Trenton CSG 1 LLCTREN170565ILClintonDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(U) Under construction, less than or equal to 50 percent completeMISO38.588043-89.686742026-09
70580/OLSTGNL IL Old StageOLSTG70580ILGrundyStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV552026-112026(TS) Construction complete, but not yet in commercial operationPJM41.311417-88.586782026-09
67609/21599NY ELBA 7195 OAK ORCHARD RD - Genesee 12159967609NYGeneseeNY CDG Genesee 1 LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(U) Under construction, less than or equal to 50 percent completeNYIS43.064414-78.184562026-09
69159/DIELSV CSG Diel 1DIEL69159ILRichlandSV CSG Diel 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(TS) Construction complete, but not yet in commercial operationMISO38.70762-88.222382026-09
69205/11249Lodi I1124969205NYSchuylerGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(V) Under construction, more than 50 percent completeNYIS42.588337-76.844252026-09
69206/11250Lodi II1125069206NYSchuylerGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(V) Under construction, more than 50 percent completeNYIS42.586527-76.844132026-09
69218/11247Vienna1124769218NYOneidaGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(U) Under construction, less than or equal to 50 percent completeNYIS43.23835-75.690392026-09
69383/MALL1Mallory South PV IMALL169383NYOswegoMallory South PV I LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(V) Under construction, more than 50 percent completeNYIS43.2669-76.1372026-09
69814/SUNSOSV CSG Sun Trust SolarSUNSO69814ILKaneSV CSG Sun Trust Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(V) Under construction, more than 50 percent completePJM42.0969-88.38652026-09
69815/KINGSSV CSG Kingston Solar 1KINGS69815ILDeKalbSV CSG Kingston Solar 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(V) Under construction, more than 50 percent completePJM42.0971-88.73182026-09
69837/FALCHFalconhead Solar, LLCFALCH69837ILWillDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(U) Under construction, less than or equal to 50 percent completePJM41.43149-87.638212026-09
69882/USMIDUSS Middle SolarUSMID69882ILGrundyUSS Middle Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(U) Under construction, less than or equal to 50 percent completePJM41.413923-88.444512026-09
69883/USJORUSS Jornada SolarUSJOR69883NMDona AnaUSS Jornada Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(U) Under construction, less than or equal to 50 percent completePNM32.431485-106.68322026-09
69997/FASTAFast Ave Solar LLCFASTA69997ILTazewellDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(U) Under construction, less than or equal to 50 percent completeMISO40.534803-89.289592026-09
70001/HARPCHarper Creek Solar, LLCHARPC70001ILJeffersonDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(U) Under construction, less than or equal to 50 percent completeMISO38.301552-88.914512026-09
70382/GEN3Mazaska GardenGEN370382MNRiceBullrock-NxtGenREAIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(U) Under construction, less than or equal to 50 percent completeMISO44.48723-93.134162026-09
70474/20266Lyndon Solar WI, LLC2026670474WISheboyganOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(L) Regulatory approvals pending. Not under constructionMISO43.662209-87.958732026-09
70475/20264Maple Creek Solar WI, LLC2026470475WIOutagamieOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(L) Regulatory approvals pending. Not under constructionMISO44.436056-88.735812026-09
70493/FMCSFour Mile CreekFMCS70493ILJeffersonFour Mile Creek Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(V) Under construction, more than 50 percent completeMISO38.326636-88.754272026-09
70499/NPNorth PanaNP70499ILChristianNorth Pana Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(V) Under construction, more than 50 percent completeMISO39.410586-89.08352026-09
70500/PAWPawpaw (IL)PAW70500ILWhitePawpaw Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(V) Under construction, more than 50 percent completeMISO37.941607-88.340412026-09
70501/SCS1South Cherry Solar 1SCS170501ILBureauSouth Cherry Solar 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(V) Under construction, more than 50 percent completeMISO41.41675-89.212332026-09
70517/1400ENL IL 1400 East1400E70517ILLivingstonStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(TS) Construction complete, but not yet in commercial operationPJM41.0858-88.66182026-09
70548/WRDENCenergy IL - WordenWRDEN70548ILMadisonStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV552026-122026(TS) Construction complete, but not yet in commercial operationMISO38.93278-89.828962026-09
66497/BHBA1Bensonhurst Energy Storage 1 LLCBHBA166497NYKingsConvergent Energy and Power LPIPP Non-CHPBatteriesMWHBA552027-012027(U) Under construction, less than or equal to 50 percent completeISNE40.636787-73.934352026-09
68543/3850GTown of Sharon Portfolio -Mt St Landfill3850G68543MANorfolkMountain Street Solar Project 2019, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-012027(V) Under construction, more than 50 percent completeISNE42.102685-71.159062026-09
69035/PI36Pivot Solar 36PI3669035COWeldPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV552027-012027(V) Under construction, more than 50 percent completeWACM40.346119-104.73142026-09
69262/HILL1Hillsboro Solar ProjectHILL169262TXHillEllomay USA IncIPP Non-CHPSolar PhotovoltaicSUNPV552027-012027(V) Under construction, more than 50 percent completeERCO32.029636-97.145552026-09
69262/HILL2Hillsboro Solar ProjectHILL269262TXHillEllomay USA IncIPP Non-CHPSolar PhotovoltaicSUNPV552027-012027(V) Under construction, more than 50 percent completeERCO32.029636-97.145552026-09
69372/KNOXSKnox II PVKNOXS69372NYAlbanyKnox II PV LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-012027(V) Under construction, more than 50 percent completeNYIS42.67591-74.075632026-09
70009/WILL1Willis Solar 1, LLC - (IL)WILL170009ILMacoupinDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-012027(U) Under construction, less than or equal to 50 percent completeMISO39.118354-89.841992026-09
70102/PS33Pivot Solar 33 LLCPS3370102COWeldPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV552027-012027(V) Under construction, more than 50 percent completePSCO40.32508-104.7312026-09
70177/ALLENAllen CSGALLEN70177ILPeoriaAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV552027-012027(V) Under construction, more than 50 percent completeMISO40.9166-89.52732026-09
70376/IL52Pivot Energy IL 52IL5270376ILMcHenryPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV552027-012027(V) Under construction, more than 50 percent completePJM42.329332-88.411442026-09
70586/RAVENRaven Sol Solar CSGRAVEN70586NMHidalgoRaven Sol SolarIPP Non-CHPSolar PhotovoltaicSUNPV552027-012027(U) Under construction, less than or equal to 50 percent completePNM32.3704-108.69052026-09
70587/GONZOGonzo Sol Solar CSGGONZO70587NMUnionGonzo Sol SolarIPP Non-CHPSolar PhotovoltaicSUNPV552027-012027(U) Under construction, less than or equal to 50 percent completePNM36.444384-103.1912026-09
67639/LLEAFLeatherleafLLEAF67639NYGeneseeDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-022027(U) Under construction, less than or equal to 50 percent completeNYIS43.048657-78.034912026-09
68855/TRP01Tracy Renewable Power PlantTRP0168855CASan JoaquinTracy Renewable Energy, LLCIPP Non-CHPOther Waste BiomassABST532027-022027(U) Under construction, less than or equal to 50 percent completeCISO37.77158-121.42512026-09
69181/11150Hillview1115069181NYWarrenGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV552027-022027(V) Under construction, more than 50 percent completeNYIS43.29864-73.560232026-09
70100/IL070Pivot Energy IL 70 LLCIL07070100ILBoonePivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV552027-022027(V) Under construction, more than 50 percent completePJM42.227709-88.86792026-09
68215/BRAESBraley Hill North SolarBRAES68215MAPlymouthAgilitas Energy, Inc.IPP Non-CHPBatteriesMWHBA552027-032027(V) Under construction, more than 50 percent completeISNE41.776-70.9042026-09
68215/BRAPVBraley Hill North SolarBRAPV68215MAPlymouthAgilitas Energy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV552027-032027(V) Under construction, more than 50 percent completeISNE41.776-70.9042026-09
68218/RANESRandall Lane SolarRANES68218MAPlymouthAgilitas Energy, Inc.IPP Non-CHPBatteriesMWHBA552027-032027(V) Under construction, more than 50 percent completeISNE41.663-70.8442026-09
68218/RANPVRandall Lane SolarRANPV68218MAPlymouthAgilitas Energy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV552027-032027(V) Under construction, more than 50 percent completeISNE41.663-70.8442026-09
70002/MACEDMacedon CSG LLCMACED70002NYWayneDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-032027(U) Under construction, less than or equal to 50 percent completeNYIS43.083573-77.267682026-09
70025/CINC1Cincinnati CSG 1 LLCCINC170025ILTazewellDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-032027(U) Under construction, less than or equal to 50 percent completeMISO40.526203-89.638862026-09
70026/CINC2Cincinnati CSG 2 LLCCINC270026ILTazewellDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-032027(U) Under construction, less than or equal to 50 percent completeMISO40.526203-89.638862026-09
70030/FABIUFabius CSG LLCFABIU70030NYOnondagaDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-032027(U) Under construction, less than or equal to 50 percent completeNYIS42.830007-76.062172026-09
70378/GEN5Crane Creek GardenGEN570378MNWasecaBullrock-NxtGenREAIPP Non-CHPSolar PhotovoltaicSUNPV552027-032027(U) Under construction, less than or equal to 50 percent completeMISO44.09501-93.654672026-09
70554/PV1EESolar29PV170554MNStearnsEESolar29 LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-032027(V) Under construction, more than 50 percent completeMISO45.684973-94.217762026-09
67257/BVEB1Bear Valley Battery PlantBVEB167257CASan BernardinoBear Valley Electric ServiceElectric UtilityBatteriesMWHBA552027-042027(P) Planned for installation, but regulatory approvals not initiatedCISO34.25-116.862026-09
68520/MNDA4Madena 4MNDA468520CAPlacerZGlobal IncIPP Non-CHPBatteriesMWHBA552027-042027(L) Regulatory approvals pending. Not under constructionCISO38.977582-121.37652026-09
68934/EAST1SV CSG East St LouisEAST168934ILSt ClairSV CSG East St Louis LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-042027(U) Under construction, less than or equal to 50 percent completeMISO38.6056-90.07052026-09
68863/PV1Bloomfield SolarPV168863NYSaratogaBloomfield Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-052027(U) Under construction, less than or equal to 50 percent completeNYIS42.989691-73.881212026-09
70007/RICHRRichmond Road Solar LLCRICHR70007VAJames CityDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-062027(T) Regulatory approvals received. Not under constructionPJM37.39976-76.820532026-09
70210/PV1Cypert - Fallsburg IPV170210NYSullivanNY Fallsburg II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-062027(U) Under construction, less than or equal to 50 percent completeNYIS41.783296-74.600562026-09
67645/TWNDAVarnsenTWNDA67645ILWinnebagoCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV552027-072027(L) Regulatory approvals pending. Not under constructionMISO42.315822-89.313152026-09
70401/CLEMClems Way SolarCLEM70401MABristolCleanCapital HoldingsIPP Non-CHPSolar PhotovoltaicSUNPV552027-072027(T) Regulatory approvals received. Not under constructionISNE41.732-70.8942026-09
70437/GROTNGroton Flanders Road LandfillGROTN70437CTNew LondonNJR Clean Energy Ventures CorporationIPP Non-CHPSolar PhotovoltaicSUNPV552027-072027(U) Under construction, less than or equal to 50 percent completeISNE41.35-72.052026-09
69825/MADCRMadden Creek SolarMADCR69825ILPiattMadden Creek Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-082027(T) Regulatory approvals received. Not under constructionMISO40.201889-88.466112026-09
70402/LOGNLogging Swamp NorthLOGN70402MAPlymouthCleanCapital HoldingsIPP Non-CHPSolar PhotovoltaicSUNPV552027-082027(T) Regulatory approvals received. Not under constructionISNE41.775-70.8812026-09
70404/LOGSLogging Swamp SouthLOGS70404MAPlymouthCleanCapital HoldingsIPP Non-CHPSolar PhotovoltaicSUNPV552027-082027(T) Regulatory approvals received. Not under constructionISNE41.774-70.882026-09
69894/13PV1E 1300 Street Solar LLC13PV169894ILHenryHQCA Energy Solutions, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-092027(L) Regulatory approvals pending. Not under constructionMISO41.310529-90.184782026-09
70134/243Westhampton - NY 0243 (Giaquinto 1)24370134NYSuffolkCVE US NY Westhampton 243 LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-092027(U) Under construction, less than or equal to 50 percent completeNYIS40.83636-72.690442026-09
69859/MURP1Murphysboro 1MURP169859ILJacksonNavisun LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-102027(T) Regulatory approvals received. Not under constructionPJM37.794585-89.351412026-09
70027/CORT2Cortland CSG 2 LLCCORT270027NYCortlandDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-112027(U) Under construction, less than or equal to 50 percent completeNYIS42.54409-75.992762026-09
70130/141Suffolk - VA 0141 (Johnson South)14170130VASuffolk CityCVE US VA Suffolk 141 LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-112027(U) Under construction, less than or equal to 50 percent completeTVA36.70257-76.792112026-09
70132/426Waynesboro - VA 0426 (Patterson B)42670132VAAugustaCVE US VA Patterson 426 LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-112027(U) Under construction, less than or equal to 50 percent completePJM38.14701-78.874572026-09
58151/STG03Central Utility Plant - Texas A&MSTG0358151TXBrazosTexas A&M, Utilities & Energy ServicesCommercial CHPNatural Gas Fired Combined CycleNGCA552027-122027(P) Planned for installation, but regulatory approvals not initiatedERCO30.617778-96.343332026-09
64615/1Sanford ESS, LLC164615MEYorkSanford ESS, LLCIPP Non-CHPBatteriesMWHBA552027-122027(T) Regulatory approvals received. Not under constructionISNE43.407648-70.712092026-09
67647/KINGLKingletKINGL67647VAStaffordCypress Creek RenewablesIPP Non-CHPSolar PhotovoltaicSUNPV552027-122027(L) Regulatory approvals pending. Not under constructionPJM38.350511-77.476192026-09
68859/PV1EndicottPV168859NYBroomeEndicott NY Solar Farm, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-122027(P) Planned for installation, but regulatory approvals not initiatedNYIS42.139575-76.096642026-09
68861/PV1Tully 4PV168861NYOnondagaCP Tully Four LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-122027(P) Planned for installation, but regulatory approvals not initiatedNYIS42.810918-76.120142026-09
68862/PV1Emerson NYPV168862NYColumbiaEmerson Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-122027(P) Planned for installation, but regulatory approvals not initiatedNYIS42.275414-73.735122026-09
69158/REEDRSV CSG Reeder SolarREEDR69158ILKnoxSV CSG Reeder Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-122027(U) Under construction, less than or equal to 50 percent completeMISO40.92886-90.493472026-09
69817/SANNESV CSG St Anne 1SANNE69817ILKankakeeSV CSG St Anne 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-122027(T) Regulatory approvals received. Not under constructionPJM41.041-87.69992026-09
69948/MANTBSV CSG MantenoMANTB69948ILKankakeeSV CSG Manteno, LLCIPP Non-CHPBatteriesMWHBA552027-122027(T) Regulatory approvals received. Not under constructionPJM41.221257-87.881862026-09
69948/MANTOSV CSG MantenoMANTO69948ILKankakeeSV CSG Manteno, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-122027(T) Regulatory approvals received. Not under constructionPJM41.221257-87.881862026-09
69949/BLOMBSV CSG BloomingtonBLOMB69949ILMcLeanSV CSG Bloomington, LLCIPP Non-CHPBatteriesMWHBA552027-122027(T) Regulatory approvals received. Not under constructionMISO40.465889-89.032082026-09
69949/BLOOMSV CSG BloomingtonBLOOM69949ILMcLeanSV CSG Bloomington, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552027-122027(T) Regulatory approvals received. Not under constructionMISO40.465889-89.032082026-09
69816/WILSNSV CSG Wilson School SolarWILSN69816ILKaneSV CSG Wilson School Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552028-012028(T) Regulatory approvals received. Not under constructionPJM42.053991-88.352692026-09
69821/SROXSV CSG South RoxanaSROX69821ILMadisonSV CSG South Roxana, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552028-012028(L) Regulatory approvals pending. Not under constructionMISO38.811582-90.05152026-09
64067/AUBPVAuburn PV - BD Solar Auburn LLCAUBPV64067MEAndroscogginBD Solar Auburn LLCIPP Non-CHPSolar PhotovoltaicSUNPV552028-032028(L) Regulatory approvals pending. Not under constructionISNE44.05-70.32026-09
64071/LJNPVLewiston Jn PV - BD Solar Lewiston Jn LLLJNPV64071MEAndroscogginBD Solar Lewiston Junction LLCIPP Non-CHPSolar PhotovoltaicSUNPV552028-032028(L) Regulatory approvals pending. Not under constructionISNE44.05-70.32026-09
62430/NA1Grenada Lake Hydroelectric ProjectNA162430MSGrenadaRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY542028-042028(P) Planned for installation, but regulatory approvals not initiatedTVA33.808842-89.772462026-09
62430/NA2Grenada Lake Hydroelectric ProjectNA262430MSGrenadaRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY542028-052028(P) Planned for installation, but regulatory approvals not initiatedTVA33.808842-89.772462026-09
68864/PV1Bridgewater 2PV168864NYSaratogaBridgewater Solar 2, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552030-122030(P) Planned for installation, but regulatory approvals not initiatedNYIS42.831613-73.674792026-09
68865/PV1Bridgewater 1PV168865NYSaratogaBridgewater Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV552030-122030(P) Planned for installation, but regulatory approvals not initiatedNYIS42.831613-73.674792026-09
68277/1Brookings Solar168277SDBrookingsWestern Minnesota Mun Pwr AgnyElectric UtilitySolar PhotovoltaicSUNPV4.94.92026-102026(TS) Construction complete, but not yet in commercial operationSWPP44.340596-96.729452026-09
68392/IL2PVIL2 - W109IL2PV68392ILWillMadison Energy Investments LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.94.92026-102026(TS) Construction complete, but not yet in commercial operationPJM41.470454-88.023662026-09
70010/167Pescara 116770010NYOrleansPescara 1 Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.94.92026-102026(V) Under construction, more than 50 percent completeNYIS43.304517-78.21962026-09
70011/168Pescara 216870011NYOrleansPescara 2 Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.94.92026-102026(V) Under construction, more than 50 percent completeNYIS43.30713-78.221212026-09
70242/215Riverhead - CVE21570242NYSuffolkCVE US NY Riverhead 215 LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.94.92026-102026(V) Under construction, more than 50 percent completeNYIS40.94233-72.718242026-09
68208/LRZBRCity of Little Rock Solar ArrayLRZBR68208ARPulaskiCity of Little Rock - (AR)Electric UtilitySolar PhotovoltaicSUNPV4.94.92026-112026(U) Under construction, less than or equal to 50 percent completeMISO34.69761-92.214372026-09
70491/11558Hacadam Hill Solar1155870491NYHerkimerHacadam Hill Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.94.92026-112026(V) Under construction, more than 50 percent completeNYIS43.015718-75.193342026-09
70327/ND012Heron Clean Energy, LLCND01270327NYKingsNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.94.92026-122026(U) Under construction, less than or equal to 50 percent completeNYIS40.618159-73.932422026-09
70442/11224KN2161122470442ILKaneGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV4.94.92026-122026(V) Under construction, more than 50 percent completeMISO41.852991-88.439752026-09
70490/11886Grassy Grove Solar East1188670490NYSt LawrenceGrassy Grove Solar East, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.94.92026-122026(V) Under construction, more than 50 percent completeNYIS44.612392-75.152692026-09
70328/ND013Jamaica Community Energy, LLCND01370328NYKingsNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.94.92027-022027(U) Under construction, less than or equal to 50 percent completeNYIS40.637975-73.928172026-09
68870/PV1Watson 2PV168870NYBroomeNY Union II, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.94.92027-062027(U) Under construction, less than or equal to 50 percent completeNYIS42.124945-75.991772026-09
64541/1Potic Solar164541NYGreeneFPS Potic Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.94.92027-072027(L) Regulatory approvals pending. Not under constructionNYIS42.29559-73.90122026-09
70312/ND022Lobelia Clean Energy LLCND02270312NYBronxNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.94.92027-072027(U) Under construction, less than or equal to 50 percent completeNYIS40.853531-73.895312026-09
70313/ND024Lobelia 4452 Clean Energy LLCND02470313NYBronxNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.94.92027-072027(U) Under construction, less than or equal to 50 percent completeNYIS40.853722-73.895252026-09
70322/ND025Wintergreen Clean Energy, LLCND02570322NYBronxNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.94.92027-072027(U) Under construction, less than or equal to 50 percent completeNYIS40.812557-73.892026-09
70323/ND027Wintergreen B Clean Energy LLCND02770323NYBronxNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.94.92027-072027(U) Under construction, less than or equal to 50 percent completeNYIS40.812516-73.890112026-09
70324/ND023Wintergreen C Clean Energy LLCND02370324NYBronxNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.94.92027-072027(U) Under construction, less than or equal to 50 percent completeNYIS40.812516-73.890112026-09
70325/ND026Wintergreen D Clean Energy LLCND02670325NYBronxNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.94.92027-072027(U) Under construction, less than or equal to 50 percent completeNYIS40.812516-73.890112026-09
70308/ND030Blue Aster Clean Energy LLCND03070308NYKingsNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.94.92027-082027(U) Under construction, less than or equal to 50 percent completeNYIS40.674137-73.901022026-09
70309/ND031Blue Aster B Clean Energy LLCND03170309NYKingsNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.94.92027-082027(U) Under construction, less than or equal to 50 percent completeNYIS40.674137-73.901022026-09
70310/ND028Blue Aster C Clean Energy LLCND02870310NYKingsNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.94.92027-082027(U) Under construction, less than or equal to 50 percent completeNYIS40.674137-73.901022026-09
67749/TWISSPistachio Road 1726-WDTWISS67749CAKernRussell Pacific LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.84.82026-102026(V) Under construction, more than 50 percent completeCISO35.70789-119.89172026-09
68230/DESARSR Des ArcDESAR68230ARPrairieSR Des Arc, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.84.82026-102026(V) Under construction, more than 50 percent completeMISO34.977439-91.525162026-09
67134/MARSHSR Marshall, LLCMARSH67134MSMarshallSR Marshall, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.84.82026-122026(TS) Construction complete, but not yet in commercial operationTVA34.959526-89.588562026-09
68256/SBASTSR South BastropSBAST68256LAMorehouseSR South Bastrop, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.84.82026-122026(U) Under construction, less than or equal to 50 percent completeMISO32.747456-91.910912026-09
68257/WINNSR WinnsboroWINN68257LAFranklinSR Winnsboro, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.84.82026-122026(U) Under construction, less than or equal to 50 percent completeMISO32.159745-91.675862026-09
68869/PV1Watson 1PV168869NYBroomeNY Union I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.84.82027-042027(U) Under construction, less than or equal to 50 percent completeNYIS42.124945-75.991772026-09
70116/GEN1La Junta SolarGEN170116COOteroClay Creek Energy, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.84.82027-042027(L) Regulatory approvals pending. Not under constructionWACM38.038-103.52372026-09
70117/GEN1Lamar SolarGEN170117COProwersClay Creek Energy, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.84.82027-042027(L) Regulatory approvals pending. Not under constructionWACM38.043192-102.59222026-09
68557/FORRCSR Forrest CityFORRC68557ARSt FrancisSR Forrest City, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.84.82027-122027(T) Regulatory approvals received. Not under constructionMISO34.984256-90.786022026-09
68569/ULMSR UlmULM68569ARPrairieSR Ulm, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.84.82027-122027(T) Regulatory approvals received. Not under constructionMISO34.577902-91.451842026-09
68570/WHELNSR West HelenaWHELN68570ARPhillipsSR West Helena, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.84.82027-122027(T) Regulatory approvals received. Not under constructionMISO34.552639-90.684212026-09
69704/RC-1R.C. Byrd L&D Hydroelectric ProjectRC-169704WVMasonOhio Power and Light LLCIPP Non-CHPConventional HydroelectricWATHY4.84.82029-022029(L) Regulatory approvals pending. Not under constructionPJM38.68-82.1792026-09
69704/RC-2R.C. Byrd L&D Hydroelectric ProjectRC-269704WVMasonOhio Power and Light LLCIPP Non-CHPConventional HydroelectricWATHY4.84.82029-022029(L) Regulatory approvals pending. Not under constructionPJM38.68-82.1792026-09
69704/RC-3R.C. Byrd L&D Hydroelectric ProjectRC-369704WVMasonOhio Power and Light LLCIPP Non-CHPConventional HydroelectricWATHY4.84.82029-022029(L) Regulatory approvals pending. Not under constructionPJM38.68-82.1792026-09
69704/RC-4R.C. Byrd L&D Hydroelectric ProjectRC-469704WVMasonOhio Power and Light LLCIPP Non-CHPConventional HydroelectricWATHY4.84.82029-022029(L) Regulatory approvals pending. Not under constructionPJM38.68-82.1792026-09
69704/RC-5R.C. Byrd L&D Hydroelectric ProjectRC-569704WVMasonOhio Power and Light LLCIPP Non-CHPConventional HydroelectricWATHY4.84.82029-022029(L) Regulatory approvals pending. Not under constructionPJM38.68-82.1792026-09
69704/RC-6R.C. Byrd L&D Hydroelectric ProjectRC-669704WVMasonOhio Power and Light LLCIPP Non-CHPConventional HydroelectricWATHY4.84.82029-022029(L) Regulatory approvals pending. Not under constructionPJM38.68-82.1792026-09
66618/FL3Fish Lake GeothermalFL366618NVEsmeraldaFish Lake Geothermal LLCIPP Non-CHPGeothermalGEOST4.73.42027-122027(P) Planned for installation, but regulatory approvals not initiatedNEVP37.860925-118.03412026-09
70048/AIREXCity of Milwaukee- Airport ExpansionAIREX70048WIMilwaukeeWEC: City of Milwaukee - Airport ExpansionIPP Non-CHPSolar PhotovoltaicSUNPV4.64.62026-112026(V) Under construction, more than 50 percent completeMISO42.930271-87.888012026-09
70585/TRIGOTrigo Sol Solar CSGTRIGO70585NMValenciaTrigo Sol SolarIPP Non-CHPSolar PhotovoltaicSUNPV4.64.62027-012027(U) Under construction, less than or equal to 50 percent completePNM34.659066-106.73522026-09
69195/LONTBLongtown Energy StorageLONTB69195SCFairfieldDuke Energy Carolinas, LLCElectric UtilityBatteriesMWHBA4.54.52026-102026(V) Under construction, more than 50 percent completeDUK34.416433-80.868142026-09
69828/MEXICMexico PV, LLCMEXIC69828NYOswegoDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.54.52026-102026(V) Under construction, more than 50 percent completeNYIS43.429675-76.165472026-09
69932/CSTLOCastle Rock Lake SolarCSTLO69932WIJuneauOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV4.54.52026-102026(V) Under construction, more than 50 percent completeMISO43.972048-90.067612026-09
70488/BOBWIL - Renewable Properties - Bobcat - WesBOBW70488ILLakeRPIL Solar 14, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.54.52026-102026(V) Under construction, more than 50 percent completePJM42.463396-87.929592026-09
69174/11238Arlington 11123869174ILBureauGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV4.54.52026-112026(V) Under construction, more than 50 percent completeMISO41.454037-89.295092026-09
69175/11239Arlington 21123969175ILBureauGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV4.54.52026-112026(V) Under construction, more than 50 percent completeMISO41.454503-89.294752026-09
69207/11215Osman Trust1121569207ILMcHenryGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV4.54.52026-112026(V) Under construction, more than 50 percent completePJM42.267124-88.452452026-09
70357/PS58Pivot Solar 58 LLCPS5870357COWeldPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV4.54.52026-112026(V) Under construction, more than 50 percent completePSCO40.474398-104.6232026-09
70498/LS3Ladd Solar 3LS370498ILBureauLadd Solar 3, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.54.52026-122026(V) Under construction, more than 50 percent completeMISO41.40225-89.221472026-09
68972/11253Gilman Solar LLC1125368972ILIroquoisGilman Solar LLC PVIPP Non-CHPSolar PhotovoltaicSUNPV4.54.52027-092027(U) Under construction, less than or equal to 50 percent completeMISO40.764392-87.999162026-09
68243/BEARSR Bear CreekBEAR68243ALMarionSR Bear Creek, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.54.52027-122027(T) Regulatory approvals received. Not under constructionSOCO34.275559-87.705642026-09
62401/NA1Allegheny L&D2 Hydroelectric ProjectNA162401PAAlleghenyRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY4.52.52030-112030(P) Planned for installation, but regulatory approvals not initiatedPJM40.89444-79.913612026-09
62401/NA2Allegheny L&D2 Hydroelectric ProjectNA262401PAAlleghenyRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY4.52.52030-122030(P) Planned for installation, but regulatory approvals not initiatedPJM40.89444-79.913612026-09
70311/ND020Eastern BlueBird Clean Energy LLCND02070311NYBronxNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.44.42027-092027(U) Under construction, less than or equal to 50 percent completeNYIS40.884948-73.829012026-09
70315/ND021Northern Cardinal Clean Energy, LLCND02170315NYBronxNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA4.44.42027-092027(U) Under construction, less than or equal to 50 percent completeNYIS40.884948-73.829012026-09
56615/G200Rancho PenasquitosG20056615CASan DiegoSan Diego County Water AuthIPP Non-CHPConventional HydroelectricWATHY4.34.12026-102026(U) Under construction, less than or equal to 50 percent completeCISO32.93695-117.11372026-09
69276/23219SL Ashville 22321969276NYChautauquaSL Ashville 2, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.34.32026-112026(V) Under construction, more than 50 percent completeNYIS42.071667-79.411672026-09
69473/23211SL Brockport2321169473NYMonroeSL Brockport, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.34.32026-112026(V) Under construction, more than 50 percent completeNYIS43.201111-77.898062026-09
69889/USGOLUSS Gold SolarUSGOL69889NMLunaUSS Gold Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.34.32026-122026(U) Under construction, less than or equal to 50 percent completePNM32.26144-107.77782026-09
68567/SUNSTSR SunsetSUNST68567LASt LandrySR Sunset, LLCIPP Non-CHPSolar PhotovoltaicSUNPV4.34.32027-122027(T) Regulatory approvals received. Not under constructionMISO30.421588-92.075072026-09
70516/PV1Fry Ontario Solar ProjectPV170516ORMalheurFry Foods, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV4.24.22027-032027(TS) Construction complete, but not yet in commercial operationIPCO44.0926-117.03442026-09
52021/GEN3ITT Cogen FacilityGEN352021ILCookITT Energy Tech Partners, LLCCommercial CHPNatural Gas Internal Combustion EngineNGIC4.14.12027-032027(V) Under construction, more than 50 percent completePJM41.83442-87.628472026-09
52021/GEN4ITT Cogen FacilityGEN452021ILCookITT Energy Tech Partners, LLCCommercial CHPNatural Gas Internal Combustion EngineNGIC4.14.12027-032027(V) Under construction, more than 50 percent completePJM41.83442-87.628472026-09
68195/DEAVEDelaware Ave SolarDEAVE68195DEKentDelaware Ave Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV442026-102026(V) Under construction, more than 50 percent completePJM38.930578-75.570752026-09
70201/PS50Pivot Solar 50 LLCPS5070201COWeldPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV442026-102026(V) Under construction, more than 50 percent completePSCO40.3657-104.63362026-09
70242/216Riverhead - CVE21670242NYSuffolkCVE US NY Riverhead 215 LLCIPP Non-CHPBatteriesMWHBA442026-102026(V) Under construction, more than 50 percent completeNYIS40.94233-72.718242026-09
70380/GEN4Kraemer GardenGEN470380MNStearnsBullrock-NxtGenREAIPP Non-CHPSolar PhotovoltaicSUNPV442026-102026(U) Under construction, less than or equal to 50 percent completeMISO45.53123-94.249322026-09
69204/11241Little Creek1124169204ILMcDonoughGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV442026-112026(V) Under construction, more than 50 percent completeMISO40.564286-90.880352026-09
69309/23215SL Pembroke2321569309NYGeneseeSL Pembroke, LLCIPP Non-CHPSolar PhotovoltaicSUNPV442026-112026(V) Under construction, more than 50 percent completeNYIS43.028056-78.456942026-09
70510/MCD4McDonough Solar 4 LLCMCD470510ILMcDonoughPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV442026-112026(V) Under construction, more than 50 percent completeMISO40.447671-90.71272026-09
70550/9014Meadow Creek VA BESS 1901470550VACraigMeadow Creek VA BESS 1 LLCIPP Non-CHPBatteriesMWHBA442026-112026(V) Under construction, more than 50 percent completePJM37.4897-80.11892026-09
70551/90915Piney River VA BESS 19091570551VANelsonPiney River VA BESS 1 LLCIPP Non-CHPBatteriesMWHBA442026-112026(V) Under construction, more than 50 percent completePJM37.7187-79.00542026-09
70552/90913Colleen VA BESS 19091370552VANelsonColleen VA BESS 1 LLCIPP Non-CHPBatteriesMWHBA442026-112026(V) Under construction, more than 50 percent completePJM37.7103-78.94632026-09
70553/90912Salem VA BESS 19091270553VASalem CitySalem VA BESS 1 LLCIPP Non-CHPBatteriesMWHBA442026-112026(V) Under construction, more than 50 percent completePJM37.2892-80.032026-09
68196/RIFPVRifle Range Road SolarRIFPV68196DESussexRifle Range Road Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV442026-122026(U) Under construction, less than or equal to 50 percent completePJM38.725699-75.571442026-09
69620/WTS2Waterton Solar IIWTS269620CODouglasPublic Service Co of ColoradoElectric UtilitySolar PhotovoltaicSUNPV442026-122026(U) Under construction, less than or equal to 50 percent completePSCO39.5-105.072026-09
70504/PV1EESolar33PV170504MNSteeleEESolar33 LLCIPP Non-CHPSolar PhotovoltaicSUNPV442026-122026(V) Under construction, more than 50 percent completeMISO44.122066-93.273612026-09
70374/CSC52Chaberton Solar CrestoneCSC5270374DEKentPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV442027-012027(V) Under construction, more than 50 percent completePJM38.946876-75.576772026-09
70104/PS53Pivot Solar 53 LLCPS5370104COAdamsPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV442027-022027(V) Under construction, more than 50 percent completePSCO39.748549-104.66732026-09
68219/SNIESSnipatuit Road SolarSNIES68219MAPlymouthAgilitas Energy, Inc.IPP Non-CHPBatteriesMWHBA442027-032027(V) Under construction, more than 50 percent completeISNE41.768-70.8822026-09
68219/SNIPVSnipatuit Road SolarSNIPV68219MAPlymouthAgilitas Energy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV442027-032027(V) Under construction, more than 50 percent completeISNE41.768-70.8822026-09
69293/WTS1Waterton Solar IWTS169293CODouglasPublic Service Co of ColoradoElectric UtilitySolar PhotovoltaicSUNPV442027-032027(U) Under construction, less than or equal to 50 percent completePSCO39.5-105.072026-09
65710/PTNMPutnam Meadow Solar StationPTNM65710CTWindhamPutnam Meadow Solar Station, LLCIPP Non-CHPSolar PhotovoltaicSUNPV442027-042027(L) Regulatory approvals pending. Not under constructionISNE41.902261-71.911542026-09
68211/GRERGrears Corner SolarGRER68211DENew CastleGrears Corner Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV442027-052027(L) Regulatory approvals pending. Not under constructionPJM39.380083-75.706112026-09
70461/PLNFDPlainfield Solar OnePLNFD70461CTWindhamNJR Clean Energy Ventures CorporationIPP Non-CHPSolar PhotovoltaicSUNPV442027-052027(U) Under construction, less than or equal to 50 percent completeISNE41.65-71.952026-09
66513/18229MA Acushnet 540R Main St1822966513MABristolTJA 540R Main St. Acushnet, LLCIPP Non-CHPSolar PhotovoltaicSUNPV442027-062027(L) Regulatory approvals pending. Not under constructionISNE41.702987-70.88882026-09
65146/VCP16CT Airport Authority Solar OneVCP1665146CTHartfordCAA CT Solar One, LLCIPP Non-CHPSolar PhotovoltaicSUNPV442027-122027(P) Planned for installation, but regulatory approvals not initiatedISNE41.933776-72.67142026-09
69593/1MCCo BESS Generating Facility169593OHCuyahogaThe Medical Center CompanyIPP Non-CHPBatteriesMWHBA3.93.92026-102026(V) Under construction, more than 50 percent completePJM41.3026-81.36042026-09
69593/2MCCo BESS Generating Facility269593OHCuyahogaThe Medical Center CompanyIPP Non-CHPBatteriesMWHBA3.93.92026-102026(V) Under construction, more than 50 percent completePJM41.3026-81.36042026-09
69593/3MCCo BESS Generating Facility369593OHCuyahogaThe Medical Center CompanyIPP Non-CHPBatteriesMWHBA3.93.92026-102026(V) Under construction, more than 50 percent completePJM41.3026-81.36042026-09
69593/4MCCo BESS Generating Facility469593OHCuyahogaThe Medical Center CompanyIPP Non-CHPBatteriesMWHBA3.93.92026-102026(V) Under construction, more than 50 percent completePJM41.3026-81.36042026-09
68936/NAP1SV CSG NaplateNAP168936ILLaSalleSV CSG Naplate, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.93.92026-112026(TS) Construction complete, but not yet in commercial operationMISO41.332158-88.884822026-09
68519/MDNA3Madena 3MDNA368519CAYubaZGlobal IncIPP Non-CHPBatteriesMWHBA3.93.92026-122026(TS) Construction complete, but not yet in commercial operationCISO39.026009-121.54412026-09
69137/ALP2Althea Avenue SolarALP269137CAFresnoRPCA Solar 8, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.93.92026-122026(TS) Construction complete, but not yet in commercial operationCISO36.893121-120.65692026-09
69871/BAT1Tanglewood BESSBAT169871NCPasquotankNorth Carolina El Member CorpElectric UtilityBatteriesMWHBA3.93.92026-122026(V) Under construction, more than 50 percent completePJM36.272111-76.301272026-09
69872/BAT1Windsor BESSBAT169872NCBertieNorth Carolina El Member CorpElectric UtilityBatteriesMWHBA3.93.92026-122026(V) Under construction, more than 50 percent completePJM36.025838-76.981792026-09
70320/ND018Water Willow A Clean Energy LLCND01870320NYQueensNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA3.93.92027-042027(U) Under construction, less than or equal to 50 percent completeNYIS40.708897-73.779392026-09
70321/ND019Water Willow B Clean Energy LLCND01970321NYQueensNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA3.93.92027-042027(U) Under construction, less than or equal to 50 percent completeNYIS40.708897-73.779392026-09
69275/23210SL Ashville2321069275NYChautauquaSL Ashville, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.83.82026-112026(V) Under construction, more than 50 percent completeNYIS42.071667-79.411672026-09
69935/GILMNGilmanGILMN69935WIChippewaOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV3.83.82026-112026(V) Under construction, more than 50 percent completeMISO45.119204-90.874052026-09
70019/23221SL Portland Community 2, LLC2322170019NYChautauquaSL Portland Community 2, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.83.82027-022027(U) Under construction, less than or equal to 50 percent completeNYIS42.37773-79.459722026-09
7907/4Pine Flat47907CAFresnoKings River Conservation DistElectric UtilityConventional HydroelectricWATHY3.83.82028-032028(T) Regulatory approvals received. Not under constructionCISO36.8326-119.3272026-09
70326/ND014Coral Honeysuckle Clean Energy LLCND01470326NYQueensNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA3.73.72027-032027(V) Under construction, more than 50 percent completeNYIS40.679023-73.820322026-09
70329/ND015Linden Clean Energy, LLCND01570329NYQueensNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA3.73.72027-032027(V) Under construction, more than 50 percent completeNYIS40.679074-73.820412026-09
69811/ANGELSV CSG Angelly 1ANGEL69811ILSalineSV CSG Angelly 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.63.62026-112026(TS) Construction complete, but not yet in commercial operationMISO37.7164-88.53032026-09
70497/GF1Greenfield Solar 1 (IL)GF170497ILGreeneGreenfield Solar 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.63.62026-122026(V) Under construction, more than 50 percent completeMISO39.360626-90.253972026-09
70202/PS56Pivot Solar 56 LLCPS5670202COWeldPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV3.63.62027-012027(V) Under construction, more than 50 percent completePSCO40.350547-104.72262026-09
69472/18198NYSolar061819869472NYErieNYSolar06, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.53.52026-102026(V) Under construction, more than 50 percent completeNYIS43.021667-78.988062026-09
70103/PS43Pivot Solar 43 LLCPS4370103COAdamsPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV3.53.52026-102026(V) Under construction, more than 50 percent completePSCO39.748549-104.66732026-09
70018/23216SL Portland Community, LLC2321670018NYChautauquaSL Portland Community, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.53.52027-022027(U) Under construction, less than or equal to 50 percent completeNYIS42.383832-79.47182026-09
69810/MAHOMSV CSG MahometMAHOM69810ILChampaignSV CSG Mahomet, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.53.52028-012028(L) Regulatory approvals pending. Not under constructionMISO40.193189-88.379842026-09
2185/HAU9HauserHAU92185MTLewis and ClarkNorthWestern Energy (MT Hydro)Electric UtilityConventional HydroelectricWATHY3.53.52028-062028(P) Planned for installation, but regulatory approvals not initiatedNWMT46.765941-111.88732026-09
65060/VCP02Hope Solar OneVCP0265060RIProvidenceHope Solar One, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.53.52028-072028(P) Planned for installation, but regulatory approvals not initiatedISNE41.729285-71.637592026-09
2185/HAU12HauserHAU122185MTLewis and ClarkNorthWestern Energy (MT Hydro)Electric UtilityConventional HydroelectricWATHY3.53.52029-122029(P) Planned for installation, but regulatory approvals not initiatedNWMT46.765941-111.88732026-09
70228/LOCKWAC IL - Lockport WestLOCKW70228ILWillStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV3.43.42026-102026(TS) Construction complete, but not yet in commercial operationPJM41.5944-88.06242026-09
54224/EG11Franklin Heating StationEG1154224MNOlmstedFranklin Heating StationCommercial CHPPetroleum LiquidsDFOIC3.43.42027-052027(V) Under construction, more than 50 percent completeMISO44.020576-92.46562026-09
54224/EG12Franklin Heating StationEG1254224MNOlmstedFranklin Heating StationCommercial CHPPetroleum LiquidsDFOIC3.43.42027-052027(V) Under construction, more than 50 percent completeMISO44.020576-92.46562026-09
54224/EG13Franklin Heating StationEG1354224MNOlmstedFranklin Heating StationCommercial CHPPetroleum LiquidsDFOIC3.43.42027-052027(V) Under construction, more than 50 percent completeMISO44.020576-92.46562026-09
54224/EG14Franklin Heating StationEG1454224MNOlmstedFranklin Heating StationCommercial CHPPetroleum LiquidsDFOIC3.43.42027-052027(V) Under construction, more than 50 percent completeMISO44.020576-92.46562026-09
54224/EG15Franklin Heating StationEG1554224MNOlmstedFranklin Heating StationCommercial CHPPetroleum LiquidsDFOIC3.43.42027-052027(V) Under construction, more than 50 percent completeMISO44.020576-92.46562026-09
68884/PV1Glen MaryPV168884NYTiogaNY Tioga IV, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.43.42027-122027(P) Planned for installation, but regulatory approvals not initiatedNYIS42.128604-76.278952026-09
69271/STAG1Staghorn GasSTAG169271TXWardRPC Merchant, LLCIPP Non-CHPNatural Gas Internal Combustion EngineNGIC3.33.32026-112026(TS) Construction complete, but not yet in commercial operationERCO31.457838-103.08472026-09
69271/STAG2Staghorn GasSTAG269271TXWardRPC Merchant, LLCIPP Non-CHPNatural Gas Internal Combustion EngineNGIC3.33.32026-112026(TS) Construction complete, but not yet in commercial operationERCO31.457838-103.08472026-09
69271/STAG3Staghorn GasSTAG369271TXWardRPC Merchant, LLCIPP Non-CHPNatural Gas Internal Combustion EngineNGIC3.33.32026-112026(TS) Construction complete, but not yet in commercial operationERCO31.457838-103.08472026-09
69854/GLWAYTJA-NY-1806 Perth Rd Galway, LLCGLWAY69854NYSaratogaDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.33.32026-112026(TS) Construction complete, but not yet in commercial operationNYIS43.017403-74.051312026-09
70457/DEVIZDeVillezDEVIZ70457ILSalineAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV3.33.32026-112026(V) Under construction, more than 50 percent completeMISO37.7685-88.51552026-09
69881/USHERUSS Hermanas SolarUSHER69881NMLunaUSS Hermanas Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.33.32026-122026(U) Under construction, less than or equal to 50 percent completePNM32.210444-107.81142026-09
70439/PV1SR 415 - NY Avoca IPV170439NYSteubenNY Avoca I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.33.32027-062027(U) Under construction, less than or equal to 50 percent completeNYIS42.401191-77.417872026-09
70317/ND029Roseate Tern Clean Energy LLCND02970317NYBronxNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA3.33.32027-102027(U) Under construction, less than or equal to 50 percent completeNYIS40.715572-73.886732026-09
66618/FL1Fish Lake GeothermalFL166618NVEsmeraldaFish Lake Geothermal LLCIPP Non-CHPGeothermalGEOST3.32.12027-122027(P) Planned for installation, but regulatory approvals not initiatedNEVP37.860925-118.03412026-09
66618/FL2Fish Lake GeothermalFL266618NVEsmeraldaFish Lake Geothermal LLCIPP Non-CHPGeothermalGEOST3.32.92027-122027(P) Planned for installation, but regulatory approvals not initiatedNEVP37.860925-118.03412026-09
69861/NORR2Norris City 2NORR269861ILWhiteNavisun LLCIPP Non-CHPSolar PhotovoltaicSUNPV3.23.22027-102027(T) Regulatory approvals received. Not under constructionPJM38.020585-88.273212026-09
70227/LOCKEAC IL - Lockport EastLOCKE70227ILWillStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV3.13.12026-102026(TS) Construction complete, but not yet in commercial operationPJM41.6044-88.06032026-09
70339/IL55BPivot Energy IL 55 LLCIL55B70339ILMcHenryPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV3.13.12026-102026(V) Under construction, more than 50 percent completePJM42.339848-88.504522026-09
54224/DG9Franklin Heating StationDG954224MNOlmstedFranklin Heating StationCommercial CHPPetroleum LiquidsDFOIC3.13.12028-012028(T) Regulatory approvals received. Not under constructionMISO44.020576-92.46562026-09
68070/ALBERAlberta SolarALBER68070VABrunswickDominion Renewable EnergyElectric UtilitySolar PhotovoltaicSUNPV332026-102026(U) Under construction, less than or equal to 50 percent completePJM36.841728-77.910512026-09
69937/MNDVIMondoviMNDVI69937WIBuffaloOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV332026-102026(V) Under construction, more than 50 percent completeMISO44.569282-91.708562026-09
70486/WHWILIL - Renewable Properties - Bobcat - WhiWHWIL70486ILGrundyRPIL Solar 9, LLCIPP Non-CHPSolar PhotovoltaicSUNPV332026-102026(V) Under construction, more than 50 percent completePJM41.470074-88.425232026-09
66552/MH162EnerSmart Mesa Heights Sub StationMH16266552CASan DiegoEnerSmart StorageIPP Non-CHPBatteriesMWHBA332026-112026(U) Under construction, less than or equal to 50 percent completeCISO32.82412-117.15132026-09
68018/MRCDBMerced BESSMRCDB68018CAMercedZGlobal IncIPP Non-CHPBatteriesMWHBA332026-112026(TS) Construction complete, but not yet in commercial operationCISO36.989396-120.87752026-09
69562/MINNEMinneola SolarMINNE69562CASan BernardinoMinneola SolarIPP Non-CHPSolar PhotovoltaicSUNPV332026-112026(U) Under construction, less than or equal to 50 percent completeCISO34.846914-116.76982026-09
69855/POMFRPomfret PV, LLCPOMFR69855NYChautauquaDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332026-112026(TS) Construction complete, but not yet in commercial operationNYIS42.447083-79.355162026-09
69884/USMEDUSS Meadow Lake SolarUSMED69884NMValenciaUSS Meadow Lake Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV332026-122026(U) Under construction, less than or equal to 50 percent completePNM34.79756-106.65422026-09
69996/HEMLKPenn Hemlock Solar LLCHEMLK69996PASnyderDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332026-122026(U) Under construction, less than or equal to 50 percent completePJM40.693001-77.100992026-09
70004/MONROMonroe Route 35 Solar LLCMONRO70004PAJuniataDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332026-122026(U) Under construction, less than or equal to 50 percent completePJM40.685584-77.137042026-09
70006/PERRRPerry Route 104 Solar LLCPERRR70006PASnyderDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332026-122026(U) Under construction, less than or equal to 50 percent completePJM40.740172-77.010112026-09
70487/TABERNJ - CS Energy - Tabernacle Sands SolarTABER70487NJBurlingtonTabernacle Sand Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV332026-122026(V) Under construction, more than 50 percent completePJM39.810889-74.696722026-09
70494/FMCS2Four Mile Creek Solar TwoFMCS270494ILJeffersonFour Mile Creek Solar Two, LLCIPP Non-CHPSolar PhotovoltaicSUNPV332026-122026(V) Under construction, more than 50 percent completeMISO38.326811-88.755572026-09
2678/ENG13Plant No 1 FreeportENG132678NYNassauVillage of Freeport - (NY)Electric UtilityLandfill GasLFGIC332027-012027(U) Under construction, less than or equal to 50 percent completeNYIS40.6561-73.59222026-09
68140/CH547Melrose Park 2-SLCHI547CH54768140ILCookPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV332027-012027(U) Under construction, less than or equal to 50 percent completePJM41.9809-87.86332026-09
69427/WAXWIWaxwing Solar CSGWAXWI69427COPuebloWaxwing SolarIPP Non-CHPSolar PhotovoltaicSUNPV332027-012027(U) Under construction, less than or equal to 50 percent completePSCO38.2963-104.55252026-09
70477/20269Stone Elephant Solar WI, LLC2026970477WIJeffersonOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV332027-012027(L) Regulatory approvals pending. Not under constructionMISO42.852196-88.564122026-09
69369/BARTEBartell South PV IBARTE69369NYOnondagaBartell South PV I LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-022027(V) Under construction, more than 50 percent completeNYIS43.208874-76.122192026-09
69749/U1Scholl CanyonU169749CALos AngelesCity of Glendale - (CA)Electric UtilityLandfill GasLFGIC32.82027-022027(V) Under construction, more than 50 percent completeLDWP34.15638-118.19272026-09
69749/U2Scholl CanyonU269749CALos AngelesCity of Glendale - (CA)Electric UtilityLandfill GasLFGIC32.82027-022027(V) Under construction, more than 50 percent completeLDWP34.15638-118.19272026-09
69749/U3Scholl CanyonU369749CALos AngelesCity of Glendale - (CA)Electric UtilityLandfill GasLFGIC32.82027-022027(V) Under construction, more than 50 percent completeLDWP34.15638-118.19272026-09
69749/U4Scholl CanyonU469749CALos AngelesCity of Glendale - (CA)Electric UtilityLandfill GasLFGIC32.82027-022027(V) Under construction, more than 50 percent completeLDWP34.15638-118.19272026-09
70008/WPERRWest Perry Planing Mill Road Solar LLCWPERR70008PASnyderDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-022027(U) Under construction, less than or equal to 50 percent completePJM40.689203-77.142232026-09
1263/9Belleville91263KSRepublicCity of Belleville - (KS)Electric UtilityPetroleum LiquidsDFOIC332027-032027(V) Under construction, more than 50 percent completeSWPP39.832769-97.632042026-09
69998/WHTCHFranklin White Church Road Solar LLCWHTCH69998PASnyderDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-032027(U) Under construction, less than or equal to 50 percent completePJM40.780457-77.084022026-09
69999/GREEBGreenwood Bottom Road Solar LLCGREEB69999PAColumbiaDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-032027(U) Under construction, less than or equal to 50 percent completePJM41.117527-76.483082026-09
70000/GREERGreenwood Route 254 Solar LLCGREER70000PAColumbiaDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-032027(U) Under construction, less than or equal to 50 percent completePJM41.130477-76.511522026-09
70003/TAYLRMadison Taylor Road Solar LLCTAYLR70003PAColumbiaDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-032027(U) Under construction, less than or equal to 50 percent completePJM41.112516-76.5382026-09
70564/SALERSalem Route 11 Solar LLCSALER70564PALuzerneDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-032027(T) Regulatory approvals received. Not under constructionPJM41.072294-76.20012026-09
65828/1666Chidsey Hill Road Solar166665828NYSteubenNY Pulteney I, LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-042027(V) Under construction, more than 50 percent completeNYIS42.573062-77.165982026-09
68216/CUSESCushman Road SolarCUSES68216MAPlymouthReWild Renewables, LLCIPP Non-CHPBatteriesMWHBA332027-052027(L) Regulatory approvals pending. Not under constructionISNE41.732-70.8752026-09
68216/CUSPVCushman Road SolarCUSPV68216MAPlymouthReWild Renewables, LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-052027(L) Regulatory approvals pending. Not under constructionISNE41.732-70.8752026-09
69560/MAGNOSunrise Magnolia DEMAGNO69560DEKentStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV332027-052027(V) Under construction, more than 50 percent completePJM39.071366-75.493032026-09
70005/SHOOFPenn Shoofly Solar LLCSHOOF70005PAColumbiaDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-052027(T) Regulatory approvals received. Not under constructionPJM41.115059-76.47382026-09
70105/GDNABGardenia 1GDNAB70105CAKingsZGlobal IncIPP Non-CHPBatteriesMWHBA332027-062027(P) Planned for installation, but regulatory approvals not initiatedCISO35.790785-119.87772026-09
70105/GDNASGardenia 1GDNAS70105CAKingsZGlobal IncIPP Non-CHPSolar PhotovoltaicSUNPV332027-062027(P) Planned for installation, but regulatory approvals not initiatedCISO35.790785-119.87772026-09
56895/7Ameresco Ox Mountain756895CASan MateoAMERESCO Ox Mountain Energy LLCIPP Non-CHPLandfill GasLFGIC32.82027-092027(L) Regulatory approvals pending. Not under constructionCISO37.5-122.42026-09
69994/MONTRMontour Tower Drive Solar LLCMONTR69994PAColumbiaDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-092027(T) Regulatory approvals received. Not under constructionPJM40.981975-76.523152026-09
70170/429Jones - PA 0429 (Rhodes South)42970170PAElkCVE US PA Jones 429 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-102027(U) Under construction, less than or equal to 50 percent completePJM41.56421-78.697332026-09
69160/OTTA1SV CSG Ottawa 1OTTA169160ILLaSalleSV CSG Ottawa 1 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-112027(L) Regulatory approvals pending. Not under constructionMISO41.340799-88.776892026-09
69995/MUNCLMuncy Creek Lime Bluff Road SolarMUNCL69995PALycomingDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-112027(T) Regulatory approvals received. Not under constructionPJM41.22184-76.754672026-09
70075/409Bigler - PA 0409 (Flango 1)40970075PAClearfieldCVE US PA Bigler 409 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-112027(U) Under construction, less than or equal to 50 percent completePJM40.803436-78.422752026-09
70079/151Buckingham - PA 0151 (Crea)15170079PAWayneCVE US PA BUCKINGHAM 151 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-112027(U) Under construction, less than or equal to 50 percent completePJM41.86605-78.422752026-09
70080/396Burrell - PA 0396 (Copeland)39670080PAArmstrongCVE US PA Burrell 396 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-112027(U) Under construction, less than or equal to 50 percent completePJM40.65921-79.438222026-09
70081/379CVE US PA Dayton 37937970081PAArmstrongCVE US PA Dayton 379 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-112027(U) Under construction, less than or equal to 50 percent completePJM40.89056-79.270272026-09
70083/399Jones - PA 0399 (Rhodes)39970083PAElkCVE US PA Jones 399 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-112027(U) Under construction, less than or equal to 50 percent completePJM41.564214-78.697332026-09
70166/385Unity - PA 0385 (Soccerhound)38570166PAClearfieldCVE US PA Latrobe 385 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-112027(U) Under construction, less than or equal to 50 percent completePJM40.25174-79.353542026-09
70171/187Wetmore - PA 0187 (Chittester)18770171PAMcKeanCVE US PA Kane 187 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-112027(U) Under construction, less than or equal to 50 percent completePJM41.66753-78.732952026-09
70172/383Kittanning - PA 0383 (Hoeter)38370172PAArmstrongCVE US PA Kittanning 383 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-112027(U) Under construction, less than or equal to 50 percent completePJM40.82161-79.333932026-09
70077/437Bigler - PA 0437 (Flango 3)43770077PAClearfieldCVE US PA Bigler 437 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-122027(U) Under construction, less than or equal to 50 percent completePJM40.80344-78.422752026-09
70120/185New Alexandria - PA 0185 (Weimer)18570120PAWestmorelandCVE US PA New Alexandria 185 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-122027(U) Under construction, less than or equal to 50 percent completePJM40.40255-79.428052026-09
70169/486Monroe - PA 0486 (Acey)48670169PAClarionCVE US PA Monroe 486 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332027-122027(U) Under construction, less than or equal to 50 percent completePJM41.13178-79.44762026-09
1263/7ABelleville7A1263KSRepublicCity of Belleville - (KS)Electric UtilityPetroleum LiquidsDFOIC332028-012028(P) Planned for installation, but regulatory approvals not initiatedSWPP39.832769-97.632042026-09
70076/436Bigler - PA 0436 (Flango 2)43670076PAClearfieldCVE US PA Bigler 436 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332028-022028(U) Under construction, less than or equal to 50 percent completePJM40.80344-78.422522026-09
70024/BEAVEBeaver Gross Road Solar LLCBEAVE70024PASnyderDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332028-032028(T) Regulatory approvals received. Not under constructionPJM40.747397-77.189222026-09
70028/CONRRDelaware Conrath Road Solar LLCCONRR70028PANorthumberlandDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332028-032028(T) Regulatory approvals received. Not under constructionPJM41.113012-76.850382026-09
69970/MPLRAMaple Ridge AMPLRA69970PAFranklinENGIE Distributed Renewables Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV332028-042028(U) Under construction, less than or equal to 50 percent completePJM39.901992-77.5782026-09
69971/MPLRBMaple Ridge BMPLRB69971PAFranklinENGIE Distributed Renewables Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV332028-042028(U) Under construction, less than or equal to 50 percent completePJM39.901992-77.5782026-09
70032/KEEFELiberty Keefer Mill Road Solar LLCKEEFE70032PAMontourDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV332028-062028(T) Regulatory approvals received. Not under constructionPJM41.030468-76.688272026-09
62386/NA1Opekiska L&D Hydroelectric ProjectNA162386WVMonongaliaRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY322028-082028(P) Planned for installation, but regulatory approvals not initiatedPJM39.564917-80.051142026-09
62386/NA2Opekiska L&D Hydroelectric ProjectNA262386WVMonongaliaRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY322028-092028(P) Planned for installation, but regulatory approvals not initiatedPJM39.564917-80.051142026-09
65313/ESElm Spring Solar 1ES65313VAAugustaAntares Group IncIPP Non-CHPSolar PhotovoltaicSUNPV332028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM38.0945-78.95952026-09
70164/406Kittanning - PA 0406 (Hoeter B)40670164PAArmstrongCVE US PA Kittanning 406 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332028-122028(U) Under construction, less than or equal to 50 percent completePJM40.82161-79.333932026-09
70165/407Kittanning - PA 0407 (Hoeter C)40770165PAArmstrongCVE US PA Kittanning 407 LLCIPP Non-CHPSolar PhotovoltaicSUNPV332028-122028(U) Under construction, less than or equal to 50 percent completePJM40.82161-79.333932026-09
65312/SVShenvalee SolarSV65312VAAugustaAntares Group IncIPP Non-CHPSolar PhotovoltaicSUNPV332029-122029(P) Planned for installation, but regulatory approvals not initiatedPJM38.0249-79.03352026-09
69220/11253West Genesee1125369220NYOnondagaGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV2.92.92026-102026(V) Under construction, more than 50 percent completeNYIS43.165134-76.418762026-09
54808/STG1New York University Central PlantSTG154808NYNew YorkNew York UniversityCommercial Non-CHPNatural Gas Fired Combined CycleNGCA2.91.82027-072027(P) Planned for installation, but regulatory approvals not initiatedNYIS40.7899-73.92332026-09
67770/30200Pittsburg RV Solar3020067770CAContra CostaPittsburg RV & Boat Storage, LLCCommercial Non-CHPSolar PhotovoltaicSUNPV2.82.92026-122026(TS) Construction complete, but not yet in commercial operationCISO38.01155-121.84532026-09
70538/BRHBelchertown Solar PV + Battery ProjectBRH70538MAHampshireAgilitas Energy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV2.82.82026-122026(U) Under construction, less than or equal to 50 percent completeISNE42.3-72.372026-09
70538/BRHBABelchertown Solar PV + Battery ProjectBRHBA70538MAHampshireAgilitas Energy, Inc.IPP Non-CHPBatteriesMWHBA2.82.82026-122026(U) Under construction, less than or equal to 50 percent completeISNE42.3-72.372026-09
70334/IL55BPivot Energy IL 55b LLCIL55B70334ILMcHenryPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV2.82.82027-012027(V) Under construction, more than 50 percent completePJM42.3455-88.505612026-09
69804/MEPV1Menard 1MEPV169804ILMenardENGIE Distributed Renewables Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.82.82027-092027(U) Under construction, less than or equal to 50 percent completeMISO40.089-89.7232026-09
68110/MILANSR MilanMILAN68110TNGibsonSR Milan, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.82.82028-072028(T) Regulatory approvals received. Not under constructionTVA35.945285-88.759892026-09
69196/NEBOBNebo Energy StorageNEBOB69196NCBurkeDuke Energy Carolinas, LLCElectric UtilityBatteriesMWHBA2.72.72026-102026(U) Under construction, less than or equal to 50 percent completeDUK35.791718-81.851042026-09
54808/GR1New York University Central PlantGR154808NYNew YorkNew York UniversityCommercial Non-CHPNatural Gas Internal Combustion EngineNGIC2.62.62026-102026(V) Under construction, more than 50 percent completeNYIS40.7899-73.92332026-09
70012/IN609Redlands DC 9 - sline609IN60970012CASan BernardinoPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV2.62.62026-112026(U) Under construction, less than or equal to 50 percent completeCISO34.083141-117.20352026-09
70375/CLIN5Clinton Solar 5CLIN570375ILClintonPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV2.62.62026-112026(V) Under construction, more than 50 percent completeMISO38.595381-89.186562026-09
70503/PV1EESolar22PV170503MNLe SueurEESolar22 LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.62.62026-112026(V) Under construction, more than 50 percent completeMISO44.248616-93.961642026-09
58903/UNIT1Marseilles Lock and Dam HydroUNIT158903ILLaSalleMarseilles Land and Water CompanyIPP Non-CHPConventional HydroelectricWATHY2.62.62027-122027(U) Under construction, less than or equal to 50 percent completeMISO41.327778-88.701112026-09
58903/UNIT2Marseilles Lock and Dam HydroUNIT258903ILLaSalleMarseilles Land and Water CompanyIPP Non-CHPConventional HydroelectricWATHY2.62.62027-122027(U) Under construction, less than or equal to 50 percent completeMISO41.327778-88.701112026-09
58903/UNIT3Marseilles Lock and Dam HydroUNIT358903ILLaSalleMarseilles Land and Water CompanyIPP Non-CHPConventional HydroelectricWATHY2.62.62027-122027(U) Under construction, less than or equal to 50 percent completeMISO41.327778-88.701112026-09
58903/UNIT4Marseilles Lock and Dam HydroUNIT458903ILLaSalleMarseilles Land and Water CompanyIPP Non-CHPConventional HydroelectricWATHY2.62.62027-122027(U) Under construction, less than or equal to 50 percent completeMISO41.327778-88.701112026-09
70123/224Petersburg - VA 0224 (Murphy)22470123VAChesterfieldCVE US VA Petersburg 224 LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.62.62027-122027(U) Under construction, less than or equal to 50 percent completePJM37.24348-77.436472026-09
70126/467Roulette - PA 046746770126PAPotterCVE US PA Roulette 467 LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.62.62027-122027(U) Under construction, less than or equal to 50 percent completePJM41.777-78.19952026-09
69371/HALIFMiddle Road Solar PartnersHALIF69371PADauphinMiddle Road Solar Partners LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52026-102026(V) Under construction, more than 50 percent completePJM40.516-76.9372026-09
69592/PSKBSNL NY- PulaskiPSKBS69592NYOrangeStandard SolarIPP Non-CHPBatteriesMWHBA2.52.52026-102026(TS) Construction complete, but not yet in commercial operationNYIS41.334309-74.404012026-09
69592/PSKPVNL NY- PulaskiPSKPV69592NYOrangeStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52026-102026(TS) Construction complete, but not yet in commercial operationNYIS41.334309-74.404012026-09
70031/ZEBRAZebrawood Solar, LLCZEBRA70031ILHancockDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52026-102026(U) Under construction, less than or equal to 50 percent completeMISO40.613821-91.284972026-09
55027/1600BPapillion Creek Wastewater1600B55027NESarpyCity of Omaha - (NE)Commercial CHPNatural Gas Internal Combustion EngineNGIC2.52.42026-112026(V) Under construction, more than 50 percent completeSWPP41.0772-95.872026-09
55027/1600CPapillion Creek Wastewater1600C55027NESarpyCity of Omaha - (NE)Commercial CHPNatural Gas Internal Combustion EngineNGIC2.52.42026-112026(V) Under construction, more than 50 percent completeSWPP41.0772-95.872026-09
55027/1600DPapillion Creek Wastewater1600D55027NESarpyCity of Omaha - (NE)Commercial CHPNatural Gas Internal Combustion EngineNGIC2.52.42026-112026(V) Under construction, more than 50 percent completeSWPP41.0772-95.872026-09
69377/NEWFRNew Freedom Solar PartnersNEWFR69377PAYorkNew Freedom Solar Partners LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52026-112026(V) Under construction, more than 50 percent completePJM39.745-76.6962026-09
69934/FALUNFalunFALUN69934WIBurnettOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV2.52.52026-112026(V) Under construction, more than 50 percent completeMISO45.779061-92.53062026-09
69936/KALMRKalmarKALMR69936MNOlmstedOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV2.52.52026-112026(V) Under construction, more than 50 percent completeMISO44.024642-92.5782026-09
69940/TEEPLTeeple CreekTEEPL69940IAAllamakeeOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV2.52.52026-112026(V) Under construction, more than 50 percent completeMISO43.234672-91.504682026-09
52149/GEN21West Point (PA)GEN2152149PAMontgomeryMerck & Co Inc-West PointIndustrial CHPNatural Gas Internal Combustion EngineNGIC2.52.52026-122026(V) Under construction, more than 50 percent completePJM40.217963-75.298822026-09
68935/ROX1SV CSG Roxana 1ROX168935ILMadisonSV CSG Roxana 1 LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52026-122026(V) Under construction, more than 50 percent completeMISO38.836055-90.036852026-09
70489/17405Bakers Falls Solar1740570489NYSaratogaBakers Falls Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52026-122026(V) Under construction, more than 50 percent completeNYIS42.283387-73.608272026-09
70502/SRS2Sunset Road Solar 2SRS270502ILMacoupinSunset Road Solar 2, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52026-122026(V) Under construction, more than 50 percent completeMISO39.158531-89.772622026-09
70205/BURS2Bureau Solar 2 LLCBURS270205ILBureauPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52027-012027(V) Under construction, more than 50 percent completeMISO41.463853-89.467562026-09
70336/NCBP1NCBP ONE, LLCNCBP170336MDPrince GeorgesPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52027-012027(V) Under construction, more than 50 percent completePJM38.8698-76.73942026-09
69176/11218Bonacci 11121869176ILChampaignGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52027-022027(V) Under construction, more than 50 percent completeMISO40.083997-88.162152026-09
69177/11218Bonacci 21121869177ILChampaignGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52027-022027(V) Under construction, more than 50 percent completeMISO40.083997-88.162152026-09
69268/COYA1Coyanosa GasCOYA169268TXPecosRPC Merchant, LLCIPP Non-CHPNatural Gas Internal Combustion EngineNGIC2.52.52027-022027(U) Under construction, less than or equal to 50 percent completeERCO31.275177-103.11262026-09
69268/COYA2Coyanosa GasCOYA269268TXPecosRPC Merchant, LLCIPP Non-CHPNatural Gas Internal Combustion EngineNGIC2.52.52027-022027(U) Under construction, less than or equal to 50 percent completeERCO31.275177-103.11262026-09
69268/COYA3Coyanosa GasCOYA369268TXPecosRPC Merchant, LLCIPP Non-CHPNatural Gas Internal Combustion EngineNGIC2.52.52027-022027(U) Under construction, less than or equal to 50 percent completeERCO31.275177-103.11262026-09
69268/COYA4Coyanosa GasCOYA469268TXPecosRPC Merchant, LLCIPP Non-CHPNatural Gas Internal Combustion EngineNGIC2.52.52027-022027(U) Under construction, less than or equal to 50 percent completeERCO31.275177-103.11262026-09
69373/LITTLLittle Falls PVLITTL69373NYHerkimerLittle Falls PV LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52027-022027(V) Under construction, more than 50 percent completeNYIS42.98791-74.863052026-09
68212/MDLNMaryland Line Road SolarMDLN68212DENew CastleMaryland Line Road Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52027-052027(L) Regulatory approvals pending. Not under constructionPJM39.372-75.7632026-09
935/8Bushnell8935ILMcDonoughCity of Bushnell - (IL)Electric UtilityPetroleum LiquidsDFOIC2.52.52027-062027(U) Under construction, less than or equal to 50 percent completeMISO40.548586-90.513812026-09
68144/CH305Northlake 5-SLCHI305CH30568144ILCookPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52027-062027(V) Under construction, more than 50 percent completePJM41.929004-87.917162026-09
66340/PV1Canyonville Solar LLC (CSG)PV166340ORDouglasSolRiver Capital LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52027-122027(L) Regulatory approvals pending. Not under constructionPACW42.956886-123.26182026-09
70082/404Dayton - PA 0404 (Good East)40470082PAArmstrongCVE US PA Dayton 404 LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.52.52027-122027(U) Under construction, less than or equal to 50 percent completePJM40.89056-79.270272026-09
62402/NA1Arkabutla Lake Hydroelectric ProjectNA162402MSDeSotoRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY2.51.52028-062028(P) Planned for installation, but regulatory approvals not initiatedTVA34.757926-90.125692026-09
62402/NA2Arkabutla Lake Hydroelectric ProjectNA262402MSDeSotoRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY2.51.52028-072028(P) Planned for installation, but regulatory approvals not initiatedTVA34.757926-90.125692026-09
62387/NA1Morgantown L&D Hydroelectric ProjectNA162387WVMonongaliaRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY2.51.52028-082028(P) Planned for installation, but regulatory approvals not initiatedPJM39.619589-79.968112026-09
69668/BCIC1Brigham City GasBCIC169668UTBox ElderBrigham City CorporationElectric UtilityNatural Gas Internal Combustion EngineNGIC2.52.52028-082028(U) Under construction, less than or equal to 50 percent completePACE41.507163-112.00272026-09
69668/BCIC2Brigham City GasBCIC269668UTBox ElderBrigham City CorporationElectric UtilityNatural Gas Internal Combustion EngineNGIC2.52.52028-082028(U) Under construction, less than or equal to 50 percent completePACE41.507163-112.00272026-09
69668/BCIC3Brigham City GasBCIC369668UTBox ElderBrigham City CorporationElectric UtilityNatural Gas Internal Combustion EngineNGIC2.52.52028-082028(U) Under construction, less than or equal to 50 percent completePACE41.507163-112.00272026-09
62387/NA2Morgantown L&D Hydroelectric ProjectNA262387WVMonongaliaRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY2.51.52028-092028(P) Planned for installation, but regulatory approvals not initiatedPJM39.619589-79.968112026-09
62432/NA1Enid Lake Hydroelectric ProjectNA162432MSPanolaRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY2.51.52028-102028(P) Planned for installation, but regulatory approvals not initiatedTVA34.158065-89.905532026-09
62384/NA1Point Marion L&D Hydroelectric ProjectNA162384PAFayetteRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY2.51.52028-112028(P) Planned for installation, but regulatory approvals not initiatedPJM39.726855-79.910132026-09
62432/NA2Enid Lake Hydroelectric ProjectNA262432MSPanolaRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY2.51.52028-112028(P) Planned for installation, but regulatory approvals not initiatedTVA34.158065-89.905532026-09
62384/NA2Point Marion L&D Hydroelectric ProjectNA262384PAFayetteRye DevelopmentIPP Non-CHPConventional HydroelectricWATHY2.51.52028-122028(P) Planned for installation, but regulatory approvals not initiatedPJM39.726855-79.910132026-09
70372/LERMILerdo MiddleLERMI70372CAKernWonderful Renewable Energy, LLC.Industrial Non-CHPSolar PhotovoltaicSUNPV2.42.42026-092026(V) Under construction, more than 50 percent completeCISO35.50622-119.1622026-09
69375/LYSANLysander III PVLYSAN69375NYOnondagaLysander III PV LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.42.42026-112026(V) Under construction, more than 50 percent completeNYIS43.219759-76.388472026-09
70012/BA609Redlands DC 9 - sline609BA60970012CASan BernardinoPrologis Logistics Services IncorporatedIPP Non-CHPBatteriesMWHBA2.42.42026-112026(U) Under construction, less than or equal to 50 percent completeCISO34.083141-117.20352026-09
70458/SAPHISapphire Solar NYSAPHI70458NYJeffersonAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV2.42.42026-112026(U) Under construction, less than or equal to 50 percent completeISNE43.9543-76.07392026-09
69767/NCBP7NCBP SevenNCBP769767MDPrince GeorgesPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV2.42.42027-012027(V) Under construction, more than 50 percent completePJM38.8692-76.73682026-09
70452/OCS62Buckaroo Solar 1OCS6270452ORUmatillaBuckaroo Solar 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.42.42027-052027(V) Under construction, more than 50 percent completePACW45.660992-118.77212026-09
70168/485Monroe - PA 0485 (Lawrence)48570168PAClarionCVE US PA Monroe 485 LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.42.42027-122027(U) Under construction, less than or equal to 50 percent completePJM41.11339-79.41462026-09
61592/WT1Cody Road Wind FarmWT161592NYMadisonGreen Power Energy LLCIPP Non-CHPOnshore Wind TurbineWNDWT2.42.42029-072029(U) Under construction, less than or equal to 50 percent completeNYIS42.967145-75.755922026-09
61592/WT2Cody Road Wind FarmWT261592NYMadisonGreen Power Energy LLCIPP Non-CHPOnshore Wind TurbineWNDWT2.42.42029-072029(U) Under construction, less than or equal to 50 percent completeNYIS42.967145-75.755922026-09
61592/WT3Cody Road Wind FarmWT361592NYMadisonGreen Power Energy LLCIPP Non-CHPOnshore Wind TurbineWNDWT2.42.42029-072029(U) Under construction, less than or equal to 50 percent completeNYIS42.967145-75.755922026-09
69939/SPOONSpoonerSPOON69939WIWashburnOneEnergy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV2.32.32026-102026(V) Under construction, more than 50 percent completeMISO45.84628-91.86342026-09
70370/R4701Ranch 4701R470170370CAKernWonderful Renewable Energy, LLC.Industrial Non-CHPSolar PhotovoltaicSUNPV2.32.32026-102026(V) Under construction, more than 50 percent completeCISO35.742656-119.08092026-09
68571/7481Lowe's - 1440 - Rockford, IL RDC (POI 1)748168571ILWinnebagoSouth Springfield Avenue Solar Project 2022, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.32.32026-112026(V) Under construction, more than 50 percent completeMISO42.239075-89.131872026-09
68572/7824Lowe's - 1440 - Rockford, IL RDC (POI 2)782468572ILWinnebagoSouth Springfield Avenue II Solar Project 2022, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.32.32026-112026(V) Under construction, more than 50 percent completeMISO42.239075-89.131872026-09
70555/ZIONPCenergy IL - Zion Park DistrictZIONP70555ILLakeStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV2.32.32026-112026(TS) Construction complete, but not yet in commercial operationPJM42.4645-87.84762026-09
65070/A04Austin TX GigaFactoryA0465070TXTravisTesla Inc.Industrial Non-CHPSolar PhotovoltaicSUNPV2.32.32026-122026(TS) Construction complete, but not yet in commercial operationERCO30.22021-97.619682026-09
66516/19500TX Dallas 7750 Dynasty Drive1950066516TXDallasCatalyze Dallas 7750 Dynasty Drive Microgrid, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.32.32026-122026(TS) Construction complete, but not yet in commercial operationERCO32.652269-96.755772026-09
66830/P5376Harrah's Atlantic City - POI 1 (MeetingP537666830NJAtlanticDistributed Solar Development, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.32.32026-122026(U) Under construction, less than or equal to 50 percent completePJM39.384389-74.426272026-09
70319/ND016Warbler Clean Energy LLCND01670319NYBronxNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA2.32.32027-022027(U) Under construction, less than or equal to 50 percent completeNYIS40.815404-73.860232026-09
70316/ND017Piping Plover Clean Energy, LLCND01770316NYBronxNineDot Holdings, LLCIPP Non-CHPBatteriesMWHBA2.32.32027-042027(U) Under construction, less than or equal to 50 percent completeNYIS40.815382-73.860152026-09
1267/15Chanute 1151267KSNeoshoCity of Chanute (KS)Electric UtilityPetroleum LiquidsDFOIC2.222026-112026(V) Under construction, more than 50 percent completeSWPP37.683333-95.454722026-09
1267/16Chanute 1161267KSNeoshoCity of Chanute (KS)Electric UtilityPetroleum LiquidsDFOIC2.222026-112026(V) Under construction, more than 50 percent completeSWPP37.683333-95.454722026-09
1267/17Chanute 1171267KSNeoshoCity of Chanute (KS)Electric UtilityPetroleum LiquidsDFOIC2.222026-112026(V) Under construction, more than 50 percent completeSWPP37.683333-95.454722026-09
70101/PPA29Pivot Energy PPA 29 LLCPPA2970101CAPlacerPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV2.22.22027-012027(V) Under construction, more than 50 percent completeCISO38.828466-121.30492026-09
2308/6Tecumseh62308NEJohnsonCity of Tecumseh - (NE)Electric UtilityPetroleum LiquidsDFOIC2.12.12027-082027(U) Under construction, less than or equal to 50 percent completeSWPP40.3664-96.192026-09
2308/7Tecumseh72308NEJohnsonCity of Tecumseh - (NE)Electric UtilityPetroleum LiquidsDFOIC2.12.12027-082027(U) Under construction, less than or equal to 50 percent completeSWPP40.3664-96.192026-09
69818/NCREKSV CSG North Creek 1NCREK69818ILLivingstonSV CSG North Creek 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV2.12.12027-102027(T) Regulatory approvals received. Not under constructionPJM40.916213-88.608212026-09
67283/6569BSix Flags Magic Mountain6569B67283CALos AngelesMagic Mountain Parkway Solar Project 2023, LLCIPP Non-CHPBatteriesMWHBA222026-092026(V) Under construction, more than 50 percent completeCISO34.428209-118.59932026-09
70574/14237Sandoval 21423770574ILClintonNautilus Solar SolutionsIPP Non-CHPSolar PhotovoltaicSUNPV222026-092026(L) Regulatory approvals pending. Not under constructionMISO38.589399-89.146672026-09
1291/17Iola171291KSAllenCity of Iola - (KS)Electric UtilityPetroleum LiquidsDFOIC222026-102026(U) Under construction, less than or equal to 50 percent completeSWPP37.923076-95.425572026-09
1291/18Iola181291KSAllenCity of Iola - (KS)Electric UtilityPetroleum LiquidsDFOIC222026-102026(U) Under construction, less than or equal to 50 percent completeSWPP37.923076-95.425572026-09
1291/19Iola191291KSAllenCity of Iola - (KS)Electric UtilityPetroleum LiquidsDFOIC222026-102026(U) Under construction, less than or equal to 50 percent completeSWPP37.923076-95.425572026-09
1291/20Iola201291KSAllenCity of Iola - (KS)Electric UtilityPetroleum LiquidsDFOIC222026-102026(U) Under construction, less than or equal to 50 percent completeSWPP37.923076-95.425572026-09
63541/BCRV1Solar Carver 1 HybridBCRV163541MAPlymouthSolar Carver 1, LLCIPP Non-CHPBatteriesMWHBA222026-102026(V) Under construction, more than 50 percent completeISNE41.824474-70.752922026-09
63541/SCRV1Solar Carver 1 HybridSCRV163541MAPlymouthSolar Carver 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV222026-102026(V) Under construction, more than 50 percent completeISNE41.824474-70.752922026-09
67857/MCDOWMcDowell Creek Solar LLCMCDOW67857NCMecklenburgMcDowell Creek Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV222026-102026(V) Under construction, more than 50 percent completeDUK35.394168-80.943892026-09
68139/CH102McCook 2-SLCHI102CH10268139ILCookPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV222026-102026(TS) Construction complete, but not yet in commercial operationPJM41.803083-87.819352026-09
70182/PV1StegerPV170182ILCookSteger Road Solar 1 LLCIPP Non-CHPSolar PhotovoltaicSUNPV222026-102026(V) Under construction, more than 50 percent completePJM41.4701-87.57932026-09
70206/PS57Pivot Solar 57 LLCPS5770206COMesaPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV222026-102026(V) Under construction, more than 50 percent completePSCO39.051557-108.45222026-09
70393/S1Stephenson County IL S1S170393ILStephensonSolAmerica Energy / Stephenson County IL S1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV222026-102026(V) Under construction, more than 50 percent completePJM42.304234-89.580152026-09
70448/22258Keithsburg North Solar LLC PV2225870448ILMercerKeithsburg North Solar, LLC PVIPP Non-CHPSolar PhotovoltaicSUNPV222026-102026(U) Under construction, less than or equal to 50 percent completeMISO41.120819-90.940782026-09
66511/18262CA Riverside 2356 Fleetwood Dr.1826266511CARiversideCatalyze Riverside 2356 Fleetwood Drive Microgrid LLCIPP Non-CHPSolar PhotovoltaicSUNPV222026-112026(V) Under construction, more than 50 percent completeCISO34.012142-117.38112026-09
66511/B8262CA Riverside 2356 Fleetwood Dr.B826266511CARiversideCatalyze Riverside 2356 Fleetwood Drive Microgrid LLCIPP Non-CHPBatteriesMWHBA222026-112026(V) Under construction, more than 50 percent completeCISO34.012142-117.38112026-09
66768/694Hogs Bay69466768MEHancockGreenbacker Renewable Energy CorporationIPP Non-CHPSolar PhotovoltaicSUNPV222026-112026(V) Under construction, more than 50 percent completeISNE44.57579-68.199652026-09
68933/CORBSV CSG CorbellCORB68933ILWilliamsonSV CSG Corbell, LLCIPP Non-CHPSolar PhotovoltaicSUNPV222026-112026(TS) Construction complete, but not yet in commercial operationMISO37.758343-89.057482026-09
70373/SDF1A100a Swiss Dale FarmSDF1A70373MDCecilPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV222026-112026(V) Under construction, more than 50 percent completePJM39.661976-76.051112026-09
70537/DOWIIDownsville IIDOWII70537MDWashingtonAES Clean EnergyIPP Non-CHPSolar PhotovoltaicSUNPV222026-112026(V) Under construction, more than 50 percent completePJM39.5922-77.782026-09
65130/PV2City of BowiePV265130MDPrince GeorgesTesla Inc.IPP Non-CHPSolar PhotovoltaicSUNPV222026-122026(V) Under construction, more than 50 percent completePJM38.904641-76.688772026-09
68465/22324Imperator Solar2232468465CAKernImperator Solar, LLCIndustrial Non-CHPSolar PhotovoltaicSUNPV222026-122026(TS) Construction complete, but not yet in commercial operationCISO35.4932-119.16592026-09
69885/USMOUUSS MourningUSMOU69885ILSchuylerUSS Mourning LaneIPP Non-CHPSolar PhotovoltaicSUNPV222026-122026(U) Under construction, less than or equal to 50 percent completePJM40.160741-90.598322026-09
70350/RT40IL - Forefront Ameren- Route 40RT4070350ILPeoriaIL Solar Route 40 Project2, LLCIPP Non-CHPSolar PhotovoltaicSUNPV222026-122026(V) Under construction, more than 50 percent completeMISO40.923873-89.630422026-09
70353/TRU1IL-Forefront Ameren-Truitt 1TRU170353ILPeoriaIL Solar Truitt Project1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV222026-122026(V) Under construction, more than 50 percent completeMISO40.929207-89.641772026-09
70354/TRU2IL-Forefront Ameren-Truitt 2TRU270354ILPeoriaIL Solar Truitt Project2, LLCIPP Non-CHPSolar PhotovoltaicSUNPV222026-122026(V) Under construction, more than 50 percent completeMISO40.929207-89.641772026-09
70508/4786A4786A George Washington, LLC4786A70508MDGarrettPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV222026-122026(V) Under construction, more than 50 percent completePJM39.30012-79.413192026-09
70509/4786B4786B George Washington, LLC4786B70509MDGarrettPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV222026-122026(V) Under construction, more than 50 percent completePJM39.3312-79.413192026-09
70523/BA005Marley Neck 3 - SLBAL005BA00570523MDAnne ArundelPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV222026-122026(U) Under construction, less than or equal to 50 percent completePJM39.194143-76.551782026-09
70196/DEL22DEL022-30423B Thorogoods Rd, LLCDEL2270196DESussexPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV222027-012027(V) Under construction, more than 50 percent completePJM38.569503-75.264682026-09
70198/FLOR2CF IL Solar Marigold Lane, Flora2 LLCFLOR270198ILClayPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV222027-012027(V) Under construction, more than 50 percent completeMISO38.632489-88.438292026-09
63535/GEN02Solar BESS HybridGEN0263535GACobbCobb Electric Membership CorporationElectric UtilityNatural Gas Fired Combustion TurbineNGGT222027-052027(V) Under construction, more than 50 percent completeSOCO33.979348-84.556132026-09
63535/GEN03Solar BESS HybridGEN0363535GACobbCobb Electric Membership CorporationElectric UtilityNatural Gas Fired Combustion TurbineNGGT222027-052027(V) Under construction, more than 50 percent completeSOCO33.979348-84.556132026-09
63535/GEN04Solar BESS HybridGEN0463535GACobbCobb Electric Membership CorporationElectric UtilityNatural Gas Fired Combustion TurbineNGGT222027-052027(V) Under construction, more than 50 percent completeSOCO33.979348-84.556132026-09
70460/WILS1Willington Solar One, LLCWILS170460CTTollandNJR Clean Energy Ventures CorporationIPP Non-CHPSolar PhotovoltaicSUNPV222027-052027(U) Under construction, less than or equal to 50 percent completeISNE41.92-72.272026-09
61037/APPLApple Hill SolarAPPL61037VTBenningtonEcos Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV222027-062027(U) Under construction, less than or equal to 50 percent completeISNE42.9077-73.20412026-09
66513/B8229MA Acushnet 540R Main StB822966513MABristolTJA 540R Main St. Acushnet, LLCIPP Non-CHPBatteriesMWHBA222027-062027(L) Regulatory approvals pending. Not under constructionISNE41.702987-70.88882026-09
69215/11216Sommer1121669215ILMassacGenerate CapitalIPP Non-CHPSolar PhotovoltaicSUNPV222027-082027(U) Under construction, less than or equal to 50 percent completeMISO37.205915-88.81792026-09
67741/IOIT BESSI67741ORKlamathPacifiCorpElectric UtilityBatteriesMWHBA222027-122027(U) Under construction, less than or equal to 50 percent completePACW42.259366-121.78642026-09
68858/PV1CavernPV168858NYClintonCavern Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV222027-122027(P) Planned for installation, but regulatory approvals not initiatedNYIS44.711557-73.541262026-09
68860/PV1Tully 5PV168860NYOnondagaCP Tully Five LLCIPP Non-CHPSolar PhotovoltaicSUNPV222027-122027(P) Planned for installation, but regulatory approvals not initiatedNYIS42.810918-76.120142026-09
70078/438Bigler - PA 0438 (Flango 4)43870078PAClearfieldCVE US PA Bigler 438 LLCIPP Non-CHPSolar PhotovoltaicSUNPV222027-122027(U) Under construction, less than or equal to 50 percent completePJM40.80344-78.422752026-09
68122/CH526Bensenville 2-SLCHI526CH52668122ILDuPagePrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.91.92026-112026(U) Under construction, less than or equal to 50 percent completePJM41.971289-87.954622026-09
70335/PS42Pivot Solar 42 LLCPS4270335COLarimerPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1.91.92026-112026(V) Under construction, more than 50 percent completePSCO40.692398-104.98332026-09
69591/2052520525 Nordhoff PV (North)2052569591CALos AngelesAmiscope Nordhoff, LPIPP Non-CHPSolar PhotovoltaicSUNPV1.91.92026-122026(TS) Construction complete, but not yet in commercial operationLDWP34.235572-118.58112026-09
68119/CH307Aurora 7-SLCHI307CH30768119ILKanePrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.91.92027-042027(U) Under construction, less than or equal to 50 percent completePJM41.79698-88.268092026-09
69222/5381American Canyon RV Boat Storage538169222CANapaNapa Junction RV Storage LLCCommercial Non-CHPSolar PhotovoltaicSUNPV1.91.92027-042027(V) Under construction, more than 50 percent completeCISO38.198033-122.2572026-09
68129/CH603Cicero 3-SLCHI603CH60368129ILCookPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.91.92027-072027(U) Under construction, less than or equal to 50 percent completePJM41.86464-87.757572026-09
69554/BELMOBPL NJ - BelmontBELMO69554NJSomersetStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV1.81.82026-102026(TS) Construction complete, but not yet in commercial operationPJM40.530503-74.544932026-09
69807/WNSRLWindsor LocksWNSRL69807CTHartfordENGIE Distributed Renewables Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.81.82026-112026(U) Under construction, less than or equal to 50 percent completeISNE41.928086-72.686932026-09
70337/PS71Pivot Solar 71 LLCPS7170337COMorganPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1.81.82026-112026(V) Under construction, more than 50 percent completePSCO40.267178-103.65122026-09
68787/23889NorCal FPV 1 (Pond 2)2388968787CAAlamedaNorCal FPV 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.81.82026-122026(V) Under construction, more than 50 percent completeCISO37.6779-121.82762026-09
70115/GEN1Fort Lyon SolarGEN170115COBentClay Creek Energy, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.81.82027-042027(L) Regulatory approvals pending. Not under constructionWACM38.081-103.1332026-09
70118/GEN1Trinidad SolarGEN170118COLas AnimasClay Creek Energy, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.81.82027-042027(L) Regulatory approvals pending. Not under constructionWACM37.185879-104.49242026-09
68138/CH321Internationale Ctr 11-SLCHI321CH32168138ILDuPagePrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.81.82027-062027(U) Under construction, less than or equal to 50 percent completePJM41.70053-88.027442026-09
68044/RODA1Rodatherm Milford 1RODA168044UTBeaverRodatherm Energy CorporationIPP Non-CHPGeothermalGEOBT1.81.22028-012028(U) Under construction, less than or equal to 50 percent completePACE38.572873-112.97862026-09
70428/DRIVSBakersfield DriverDRIVS70428CAKernPacifico Bakersfield Driver LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.71.72026-092026(V) Under construction, more than 50 percent completeCISO35.562181-119.2022026-09
69888/USFLEUSS Fletcher SolarUSFLE69888NMHidalgoUSS Fletcher Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.71.72026-102026(U) Under construction, less than or equal to 50 percent completePNM32.366814-108.69342026-09
68132/CH701Elk Grove 1-SLCHI701CH70168132ILCookPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.71.72026-112026(V) Under construction, more than 50 percent completePJM42.010416-87.9582026-09
68541/7169Palmdale Water District HQ716968541CALos AngelesEast Avenue Q Solar Project 2022, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.71.72026-112026(V) Under construction, more than 50 percent completeCISO34.587916-118.09312026-09
68127/CH424Bensenville Ind Park 4-SLCHI424CH42468127ILCookPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.71.72027-012027(V) Under construction, more than 50 percent completePJM41.983893-87.951722026-09
69766/KHLSKalaeloa Home Lands SolarKHLS69766HIHonoluluPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1.71.72027-012027(V) Under construction, more than 50 percent completeHECO21.310594-158.08632026-09
68118/CH404Addison 11-SLCHI404CH40468118ILDuPagePrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.61.62026-102026(TS) Construction complete, but not yet in commercial operationPJM41.930327-88.048482026-09
68130/CH211Des Plaines 11-SLCHI211CH21168130ILCookPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.61.62026-102026(TS) Construction complete, but not yet in commercial operationPJM42.015-87.9152026-09
69711/6672L3 Harris San Diego667269711CASan DiegoBalboa Avenue I Solar Project 2023, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.61.62026-112026(V) Under construction, more than 50 percent completeCISO32.822588-117.13522026-09
70451/OCS24Tutuilla SolarOCS2470451ORUmatillaTutuilla Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.61.62026-112026(V) Under construction, more than 50 percent completePACW45.63153-119.6852026-09
70507/NN036Prologis - SLNNJ036 - Community SolarNN03670507NJUnionPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.61.62026-112026(U) Under construction, less than or equal to 50 percent completePJM40.66225-74.16442026-09
68141/CH302Northlake 2-SLCHI302CH30268141ILCookPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.61.62027-012027(U) Under construction, less than or equal to 50 percent completePJM41.9118-87.90812026-09
69385/GEN1Hastings Generating FacilityGEN169385MIBarryNAPS - Hastings LLCIPP Non-CHPLandfill GasLFGIC1.61.62027-042027(T) Regulatory approvals received. Not under constructionMISO42.67856-85.296292026-09
10748/FUTR1Marina Landfill GasFUTR110748CAMontereyMonterey Regional Waste MgmtCommercial Non-CHPLandfill GasLFGIC1.61.62027-122027(P) Planned for installation, but regulatory approvals not initiatedCISO36.7131-121.76862026-09
10748/FUTR2Marina Landfill GasFUTR210748CAMontereyMonterey Regional Waste MgmtCommercial Non-CHPLandfill GasLFGIC1.61.62027-122027(P) Planned for installation, but regulatory approvals not initiatedCISO36.7131-121.76862026-09
10748/FUTR3Marina Landfill GasFUTR310748CAMontereyMonterey Regional Waste MgmtCommercial Non-CHPLandfill GasLFGIC1.61.62027-122027(P) Planned for installation, but regulatory approvals not initiatedCISO36.7131-121.76862026-09
10748/FUTR4Marina Landfill GasFUTR410748CAMontereyMonterey Regional Waste MgmtCommercial Non-CHPLandfill GasLFGIC1.61.62027-122027(P) Planned for installation, but regulatory approvals not initiatedCISO36.7131-121.76862026-09
69242/PV1AB Van NuysPV169242CALos AngelesRoscoe Boulevard Operating, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.61.62027-122027(P) Planned for installation, but regulatory approvals not initiatedLDWP34.220959-118.47682026-09
69791/NJUDCBPL NJ - Union Distribution CenterNJUDC69791NJUnionStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV1.512026-102026(TS) Construction complete, but not yet in commercial operationPJM40.6834-74.24222026-09
70445/PV1W 167th StPV170445ILCook555 W 167th St Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.51.52026-102026(TS) Construction complete, but not yet in commercial operationPJM41.59009-87.630442026-09
66475/18263CA Bloomington 2551 S Lilac Avenue Micro1826366475CASan BernardinoCatalyze Bloomington 2551 S Lilac Avenue Microgrid LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.51.52026-112026(V) Under construction, more than 50 percent completeCISO34.05523-117.37782026-09
66475/B8263CA Bloomington 2551 S Lilac Avenue MicroB826366475CASan BernardinoCatalyze Bloomington 2551 S Lilac Avenue Microgrid LLCIPP Non-CHPBatteriesMWHBA1.51.52026-112026(V) Under construction, more than 50 percent completeCISO34.05523-117.37782026-09
69753/1379050 Meister Ave1379069753NJSomersetMeister Avenue Branchburg Solar Project 2024, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.51.52026-112026(V) Under construction, more than 50 percent completePJM40.600337-74.698182026-09
69813/ARGENArgenta SolarARGEN69813ILMaconArgenta Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.51.52026-112026(V) Under construction, more than 50 percent completeMISO39.989915-88.811962026-09
2316/6Wisner62316NECumingCity of Wisner (NE)Electric UtilityPetroleum LiquidsDFOIC1.51.52026-122026(TS) Construction complete, but not yet in commercial operationSWPP41.988069-96.915992026-09
65072/GA3Fremont CA AutoFactoryGA365072CAAlamedaTesla Inc.Industrial Non-CHPSolar PhotovoltaicSUNPV1.51.52026-122026(U) Under construction, less than or equal to 50 percent completeCISO37.49254-121.94462026-09
69805/RFRD7Rockford Plant 7RFRD769805ILWinnebagoENGIE Distributed Renewables Development LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.51.52027-032027(U) Under construction, less than or equal to 50 percent completePJM42.232527-89.024082026-09
70106/JADEBJade Solar 3JADEB70106CAMaderaZGlobal IncIPP Non-CHPBatteriesMWHBA1.51.52027-062027(P) Planned for installation, but regulatory approvals not initiatedCISO37.056528-119.98052026-09
70106/JADESJade Solar 3JADES70106CAMaderaZGlobal IncIPP Non-CHPSolar PhotovoltaicSUNPV1.51.52027-062027(P) Planned for installation, but regulatory approvals not initiatedCISO37.056528-119.98052026-09
69862/GALFGalva SchoolGALF69862ILHenryNavisun LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.51.52027-102027(P) Planned for installation, but regulatory approvals not initiatedPJM41.179241-90.046772026-09
70114/363New Alexandria - PA 0363 (Weimer North)36370114PAWestmorelandCVE US PA New Alexandria 363 LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.51.52027-122027(U) Under construction, less than or equal to 50 percent completePJM40.40255-79.428062026-09
68120/CH513Bensenville 13-SLCHI513CH51368120ILDuPagePrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.41.42026-102026(U) Under construction, less than or equal to 50 percent completePJM41.987884-87.952582026-09
69891/LA100Torrance Dis Ctr 2 - SLLAX100LA10069891CALos AngelesPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.41.42026-102026(TS) Construction complete, but not yet in commercial operationCISO33.84516-118.31642026-09
70099/IL007Pivot Energy IL 7 LLCIL00770099ILLoganPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1.41.42026-102026(V) Under construction, more than 50 percent completeMISO40.268856-89.237462026-09
70456/PV1W Belmont AvePV170456ILCook9100 W Belmont Ave, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.41.42026-102026(V) Under construction, more than 50 percent completePJM41.9378-87.853182026-09
70524/BA006Marley Neck 4 - SLBAL006BA00670524MDAnne ArundelPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.41.42026-112026(U) Under construction, less than or equal to 50 percent completePJM39.193805-76.551712026-09
65072/STAMPFremont CA AutoFactorySTAMP65072CAAlamedaTesla Inc.Industrial Non-CHPSolar PhotovoltaicSUNPV1.41.42026-122026(TS) Construction complete, but not yet in commercial operationCISO37.49254-121.94462026-09
70338/NCB10NCBP TEN, LLCNCB1070338MDPrince GeorgesPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1.41.42027-012027(V) Under construction, more than 50 percent completePJM38.867-76.73862026-09
68143/CH304Northlake 4-SLCHI304CH30468143ILCookPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.41.42027-032027(U) Under construction, less than or equal to 50 percent completePJM41.92302-87.916462026-09
68133/CH151Elk Grove 51-SLCHI151CH15168133ILDuPagePrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.41.42027-072027(U) Under construction, less than or equal to 50 percent completePJM42.00096-87.957822026-09
68502/PV1Vienna Walbec Customer HostedPV168502WIDaneWisconsin Power & Light CoElectric UtilitySolar PhotovoltaicSUNPV1.41.42027-122027(V) Under construction, more than 50 percent completeMISO43.208435-89.410192026-09
70029/EWIN1East Windsor Solar 1 LLCEWIN170029NJMercerDimension Energy LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.41.42028-032028(T) Regulatory approvals received. Not under constructionPJM40.274397-74.501692026-09
63622/OES01OES Biogas PowerOES0163622CASan BernardinoOrganic Energy Solutions, Inc.IPP CHPOther Waste BiomassOBGIC1.31.32026-112026(TS) Construction complete, but not yet in commercial operationCISO34.17325-117.34642026-09
63622/OES02OES Biogas PowerOES0263622CASan BernardinoOrganic Energy Solutions, Inc.IPP CHPOther Waste BiomassOBGIC1.31.32026-112026(TS) Construction complete, but not yet in commercial operationCISO34.17325-117.34642026-09
68793/LA710Bandini - SLLAX710LA71068793CALos AngelesPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.31.32026-112026(TS) Construction complete, but not yet in commercial operationCISO33.983566-118.13482026-09
68121/CH414Bensenville 14-SLCHI414CH41468121ILDuPagePrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.31.32027-042027(V) Under construction, more than 50 percent completePJM41.982829-87.945892026-09
68137/CH910Glendale Heights 10-SLCHI910CH91068137ILDuPagePrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.31.32027-042027(U) Under construction, less than or equal to 50 percent completePJM41.929422-88.070082026-09
68236/LA680South Bay Dis Ctr 6-SLLAX680LA68068236CALos AngelesPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.31.32027-052027(U) Under construction, less than or equal to 50 percent completeCISO33.8439-118.22422026-09
68792/LA680Fordyce - SLLAX680LA68068792CALos AngelesPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.31.32027-062027(U) Under construction, less than or equal to 50 percent completeCISO33.8439-118.22422026-09
69860/MURP2Murphysboro 2MURP269860ILJacksonNavisun LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.31.32027-102027(T) Regulatory approvals received. Not under constructionPJM37.794585-89.351412026-09
69790/EZMLCElizabeth Metropolitan Logistics CenterEZMLC69790NJUnionStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV1.21.22026-102026(TS) Construction complete, but not yet in commercial operationPJM40.68403-74.206232026-09
68789/LA104South Bay Dis Ctr 12 - SLLAX104LA10468789CALos AngelesPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.21.22026-112026(TS) Construction complete, but not yet in commercial operationCISO33.842873-118.22452026-09
68124/CH411Bensenville Ind Park 11CH41168124ILDuPagePrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.21.22026-122026(U) Under construction, less than or equal to 50 percent completePJM41.986194-87.945252026-09
68135/CH802Franklin Park 2-SLCHI802CH80268135ILCookPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.21.22026-122026(V) Under construction, more than 50 percent completePJM41.946509-87.859442026-09
68123/CH410Bensenville Ind Park 10-SLCHI410CH41068123ILDuPagePrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.21.22027-012027(V) Under construction, more than 50 percent completePJM41.984507-87.945872026-09
69211/PV1San Pedro Public Market (SPPM)PV169211CALos AngelesSPPM Operating, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.21.22027-062027(U) Under construction, less than or equal to 50 percent completeLDWP33.731297-118.27952026-09
69697/CW-1CW Bill Young Hydropower ProjectCW-169697PAAlleghenyC.W. Bill Young Hydropower Group, IncIPP Non-CHPConventional HydroelectricWATHY1.21.22031-102031(L) Regulatory approvals pending. Not under constructionPJM40.54028-79.815562026-09
69697/CW-2CW Bill Young Hydropower ProjectCW-269697PAAlleghenyC.W. Bill Young Hydropower Group, IncIPP Non-CHPConventional HydroelectricWATHY1.21.22031-102031(L) Regulatory approvals pending. Not under constructionPJM40.54028-79.815562026-09
69697/CW-3CW Bill Young Hydropower ProjectCW-369697PAAlleghenyC.W. Bill Young Hydropower Group, IncIPP Non-CHPConventional HydroelectricWATHY1.21.22031-102031(L) Regulatory approvals pending. Not under constructionPJM40.54028-79.815562026-09
69697/CW-4CW Bill Young Hydropower ProjectCW-469697PAAlleghenyC.W. Bill Young Hydropower Group, IncIPP Non-CHPConventional HydroelectricWATHY1.21.22031-102031(L) Regulatory approvals pending. Not under constructionPJM40.54028-79.815562026-09
69697/CW-5CW Bill Young Hydropower ProjectCW-569697PAAlleghenyC.W. Bill Young Hydropower Group, IncIPP Non-CHPConventional HydroelectricWATHY1.21.22031-102031(L) Regulatory approvals pending. Not under constructionPJM40.54028-79.815562026-09
69697/CW-6CW Bill Young Hydropower ProjectCW-669697PAAlleghenyC.W. Bill Young Hydropower Group, IncIPP Non-CHPConventional HydroelectricWATHY1.21.22031-102031(L) Regulatory approvals pending. Not under constructionPJM40.54028-79.815562026-09
69697/CW-7CW Bill Young Hydropower ProjectCW-769697PAAlleghenyC.W. Bill Young Hydropower Group, IncIPP Non-CHPConventional HydroelectricWATHY1.21.22031-102031(L) Regulatory approvals pending. Not under constructionPJM40.54028-79.815562026-09
70207/PS60Pivot Solar 60 LLCPS6070207COWeldPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV1.11.12026-102026(V) Under construction, more than 50 percent completePSCO40.474398-104.6232026-09
69533/21938CA National City Terminal Ave2193869533CASan DiegoCatalyze National City Terminal Avenue Microgrid, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.11.12026-112026(V) Under construction, more than 50 percent completeCISO32.654-117.1192026-09
68126/CH402Bensenville Ind Park 2-SLCHI402CH40268126ILDuPagePrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV1.11.12027-012027(U) Under construction, less than or equal to 50 percent completePJM41.983957-87.953832026-09
69895/Gy1a2Gateway#1&2 (Newark CA)Gy1a269895CAAlamedaCoast Energy Holdings, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.11.12027-042027(P) Planned for installation, but regulatory approvals not initiatedCISO37.540903-122.06172026-09
69706/4149CBishop Ranch - BR 3-GG4149C69706CAContra CostaCamino Ramon BR 3-GG Solar Project 2020, LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.11.12027-072027(V) Under construction, more than 50 percent completeCISO37.767242-121.95822026-09
70128/479Roulette - PA 047947970128PAPotterCVE US PA Roulette 479 LLCIPP Non-CHPSolar PhotovoltaicSUNPV1.11.12027-122027(U) Under construction, less than or equal to 50 percent completePJM41.777-78.19952026-09
69698/DAS-1Dashields Hydroelectric ProjectDAS-169698PAAlleghenyDashields Hydropower CorporationsIPP Non-CHPConventional HydroelectricWATHY1.11.12030-082030(L) Regulatory approvals pending. Not under constructionPJM40.549546-80.205442026-09
69698/DAS-2Dashields Hydroelectric ProjectDAS-269698PAAlleghenyDashields Hydropower CorporationsIPP Non-CHPConventional HydroelectricWATHY1.11.12030-082030(L) Regulatory approvals pending. Not under constructionPJM40.549546-80.205442026-09
69698/DAS-3Dashields Hydroelectric ProjectDAS-369698PAAlleghenyDashields Hydropower CorporationsIPP Non-CHPConventional HydroelectricWATHY1.11.12030-082030(L) Regulatory approvals pending. Not under constructionPJM40.549546-80.205442026-09
69698/DAS-4Dashields Hydroelectric ProjectDAS-469698PAAlleghenyDashields Hydropower CorporationsIPP Non-CHPConventional HydroelectricWATHY1.11.12030-082030(L) Regulatory approvals pending. Not under constructionPJM40.549546-80.205442026-09
69698/DAS-5Dashields Hydroelectric ProjectDAS-569698PAAlleghenyDashields Hydropower CorporationsIPP Non-CHPConventional HydroelectricWATHY1.11.12030-082030(L) Regulatory approvals pending. Not under constructionPJM40.549546-80.205442026-09
69698/DAS-6Dashields Hydroelectric ProjectDAS-669698PAAlleghenyDashields Hydropower CorporationsIPP Non-CHPConventional HydroelectricWATHY1.11.12030-082030(L) Regulatory approvals pending. Not under constructionPJM40.549546-80.205442026-09
69698/DAS-7Dashields Hydroelectric ProjectDAS-769698PAAlleghenyDashields Hydropower CorporationsIPP Non-CHPConventional HydroelectricWATHY1.11.12030-082030(L) Regulatory approvals pending. Not under constructionPJM40.549546-80.205442026-09
69698/DAS-8Dashields Hydroelectric ProjectDAS-869698PAAlleghenyDashields Hydropower CorporationsIPP Non-CHPConventional HydroelectricWATHY1.11.12030-082030(L) Regulatory approvals pending. Not under constructionPJM40.549546-80.205442026-09
65045/VCP14Emery Shute Solar OneVCP1465045MEWaldoVCP Realty, LLCIPP Non-CHPSolar PhotovoltaicSUNPV112026-092026(V) Under construction, more than 50 percent completeISNE44.535591-68.864332026-09
69983/GRTKNNovel Gertken Solar LLCGRTKN69983MNStearnsNovel Gertken Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV112026-092026(V) Under construction, more than 50 percent completeMISO45.618191-94.48912026-09
63506/BCRV3Solar Carver 3 HybridBCRV363506MAPlymouthSolar Carver 3, LLCIPP Non-CHPBatteriesMWHBA112026-102026(V) Under construction, more than 50 percent completeISNE41.84206-70.76992026-09
63506/SCRV3Solar Carver 3 HybridSCRV363506MAPlymouthSolar Carver 3, LLCIPP Non-CHPSolar PhotovoltaicSUNPV112026-102026(V) Under construction, more than 50 percent completeISNE41.84206-70.76992026-09
68783/NY009NY CDG 009NY00968783NYSuffolkNY CDG 009 LLCIPP Non-CHPSolar PhotovoltaicSUNPV112026-102026(TS) Construction complete, but not yet in commercial operationNYIS40.808538-72.957732026-09
69305/FITZHEnterprise MN - FitzthumFITZH69305MNStearnsStandard SolarIPP Non-CHPSolar PhotovoltaicSUNPV112026-102026(V) Under construction, more than 50 percent completeMISO45.644581-94.227442026-09
69616/USLYNUSS Lyndon Solar LLCUSLYN69616ILWhitesideUnited States Solar CorporationIPP Non-CHPSolar PhotovoltaicSUNPV112026-102026(V) Under construction, more than 50 percent completePJM41.659472-89.920792026-09
69886/USSWAUSS Swank SolarUSSWA69886ILHenryUSS Swank Solar LLCIPP Non-CHPSolar PhotovoltaicSUNPV112026-102026(V) Under construction, more than 50 percent completePJM41.1615-90.02852026-09
68542/7170GPalmdale Water District 6MG Tank7170G68542CALos AngelesEast Avenue South Solar Project 2022, LLCIPP Non-CHPSolar PhotovoltaicSUNPV112026-112026(V) Under construction, more than 50 percent completeCISO34.558047-118.11872026-09
64098/3Tesla Reno GigaFactory364098NVStoreyTesla Inc.Industrial Non-CHPSolar PhotovoltaicSUNPV112026-122026(TS) Construction complete, but not yet in commercial operationNEVP39.539511-119.43922026-09
64291/B4Lincoln Medical and Mental Health CenterB464291NYBronxLincoln Medical and Mental Health CenterCommercial Non-CHPPetroleum LiquidsDFOIC112026-122026(U) Under construction, less than or equal to 50 percent completeNYIS40.816971-73.924112026-09
70505/1055VS HR Warner NEM, LLC105570505CAOrangeValta EnergyCommercial Non-CHPSolar PhotovoltaicSUNPV112026-122026(V) Under construction, more than 50 percent completeCISO33.7162-117.93452026-09
64865/BLILENovel Blilie Solar LLCBLILE64865MNWilkinNovel Blilie Solar, LLCIPP Non-CHPSolar PhotovoltaicSUNPV112027-022027(U) Under construction, less than or equal to 50 percent completeMISO46.630077-96.758112026-09
69812/BROWNSV CSG Brownstown 1BROWN69812ILFayetteSV CSG Brownstown 1, LLCIPP Non-CHPSolar PhotovoltaicSUNPV112027-022027(V) Under construction, more than 50 percent completeMISO38.971573-89.018492026-09
70381/GEN1Carver GardenGEN170381MNRiceBullrock-NxtGenREAIPP Non-CHPSolar PhotovoltaicSUNPV112027-022027(U) Under construction, less than or equal to 50 percent completeMISO44.29848-93.24082026-09
68217/FEAESFeatherbed Lane South SolarFEAES68217MAPlymouthAgilitas Energy, Inc.IPP Non-CHPBatteriesMWHBA112027-032027(V) Under construction, more than 50 percent completeISNE41.761-70.8962026-09
68217/FEAPVFeatherbed Lane South SolarFEAPV68217MAPlymouthAgilitas Energy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV112027-032027(V) Under construction, more than 50 percent completeISNE41.761-70.8962026-09
70301/BOHREMN CSG 2019-57BOHRE70301MNBlue EarthMN CSG 2019-57 LLCIPP Non-CHPSolar PhotovoltaicSUNPV112027-032027(T) Regulatory approvals received. Not under constructionMISO44.224001-93.97872026-09
70379/GEN2Fuller GardenGEN270379MNSherburneBullrock-NxtGenREAIPP Non-CHPSolar PhotovoltaicSUNPV112027-032027(U) Under construction, less than or equal to 50 percent completeMISO45.45357-94.007072026-09
69034/PMI2Pivot Energy Minnesota Solar 2PMI269034MNKandiyohiPivot EnergyIPP Non-CHPSolar PhotovoltaicSUNPV112027-042027(V) Under construction, more than 50 percent completeMISO44.935059-95.199062026-09
69724/PIKEPike County SolarPIKE69724ILPikeIllinois Rural Electric CoopElectric UtilitySolar PhotovoltaicSUNPV112027-042027(T) Regulatory approvals received. Not under constructionMISO39.6189-90.84612026-09
69786/CV209Stockton 9 - slcva209CV20969786CASan JoaquinPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV112027-042027(U) Under construction, less than or equal to 50 percent completeCISO37.89233-121.26672026-09
69609/EB702San Leandro 10 - sleba702EB70269609CAAlamedaPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV112027-052027(U) Under construction, less than or equal to 50 percent completeCISO37.71422-122.1822026-09
67565/CEC01East Road Storage ProjectCEC0167565CAMendocinoForm Energy Inc.IPP Non-CHPBatteriesMWHBA112027-062027(T) Regulatory approvals received. Not under constructionCISO39.25-123.1962026-09
69785/CV801Stockton 1 - slcva801CV80169785CASan JoaquinPrologis Logistics Services IncorporatedIPP Non-CHPSolar PhotovoltaicSUNPV112027-072027(U) Under construction, less than or equal to 50 percent completeCISO37.93997-121.22652026-09
2038/BA1Cambridge CT HybridBA12038MNIsantiGreat River EnergyElectric UtilityBatteriesMWHBA10.82027-122027(U) Under construction, less than or equal to 50 percent completeMISO45.601-93.20812026-09
70167/408Latrobe - PA 0408 (Soccerhound B)40870167PAClearfieldCVE US PA Latrobe 408 LLCIPP Non-CHPSolar PhotovoltaicSUNPV112027-122027(U) Under construction, less than or equal to 50 percent completePJM40.25174-79.353542026-09
69699/DI-1Dresden Island Hydroelectric ProjectDI-169699ILGrundyNorthern Illinois Hydropower, LLCIPP Non-CHPConventional HydroelectricWATHY112030-122030(L) Regulatory approvals pending. Not under constructionPJM41.401926-88.281722026-09
69699/DI-10Dresden Island Hydroelectric ProjectDI-1069699ILGrundyNorthern Illinois Hydropower, LLCIPP Non-CHPConventional HydroelectricWATHY112030-122030(L) Regulatory approvals pending. Not under constructionPJM41.401926-88.281722026-09
69699/DI-2Dresden Island Hydroelectric ProjectDI-269699ILGrundyNorthern Illinois Hydropower, LLCIPP Non-CHPConventional HydroelectricWATHY112030-122030(L) Regulatory approvals pending. Not under constructionPJM41.401926-88.281722026-09
69699/DI-3Dresden Island Hydroelectric ProjectDI-369699ILGrundyNorthern Illinois Hydropower, LLCIPP Non-CHPConventional HydroelectricWATHY112030-122030(L) Regulatory approvals pending. Not under constructionPJM41.401926-88.281722026-09
69699/DI-4Dresden Island Hydroelectric ProjectDI-469699ILGrundyNorthern Illinois Hydropower, LLCIPP Non-CHPConventional HydroelectricWATHY112030-122030(L) Regulatory approvals pending. Not under constructionPJM41.401926-88.281722026-09
69699/DI-5Dresden Island Hydroelectric ProjectDI-569699ILGrundyNorthern Illinois Hydropower, LLCIPP Non-CHPConventional HydroelectricWATHY112030-122030(L) Regulatory approvals pending. Not under constructionPJM41.401926-88.281722026-09
69699/DI-6Dresden Island Hydroelectric ProjectDI-669699ILGrundyNorthern Illinois Hydropower, LLCIPP Non-CHPConventional HydroelectricWATHY112030-122030(L) Regulatory approvals pending. Not under constructionPJM41.401926-88.281722026-09
69699/DI-7Dresden Island Hydroelectric ProjectDI-769699ILGrundyNorthern Illinois Hydropower, LLCIPP Non-CHPConventional HydroelectricWATHY112030-122030(L) Regulatory approvals pending. Not under constructionPJM41.401926-88.281722026-09
69699/DI-8Dresden Island Hydroelectric ProjectDI-869699ILGrundyNorthern Illinois Hydropower, LLCIPP Non-CHPConventional HydroelectricWATHY112030-122030(L) Regulatory approvals pending. Not under constructionPJM41.401926-88.281722026-09
69699/DI-9Dresden Island Hydroelectric ProjectDI-969699ILGrundyNorthern Illinois Hydropower, LLCIPP Non-CHPConventional HydroelectricWATHY112030-122030(L) Regulatory approvals pending. Not under constructionPJM41.401926-88.281722026-09
68600/7236GLas Virgenes MWD - Composting Plant7236G68600CALos AngelesLas Virgenes Road Solar Project 2022, LLCIPP Non-CHPSolar PhotovoltaicSUNPV0.90.92026-112026(V) Under construction, more than 50 percent completeCISO34.126481-118.69812026-09
69713/9985CSanger USD - Sanger West HS9985C69713CAFresnoSouth Fowler Avenue Solar Project 2023, LLCIPP Non-CHPSolar PhotovoltaicSUNPV0.90.92026-112026(V) Under construction, more than 50 percent completeCISO36.709291-119.68142026-09
64758/MANBManorville IIMANB64758NYSuffolkAgilitas Energy, Inc.IPP Non-CHPBatteriesMWHBA0.80.82027-122027(L) Regulatory approvals pending. Not under constructionNYIS40.834-72.78192026-09
69694/AL4-1Allegheny Lock and Dam 4AL4-169694PAAlleghenyAllegheny Hydro Group Lock and Dam 4, IncIPP Non-CHPConventional HydroelectricWATHY0.80.82031-022031(L) Regulatory approvals pending. Not under constructionPJM40.613718-79.718292026-09
69694/AL4-2Allegheny Lock and Dam 4AL4-269694PAAlleghenyAllegheny Hydro Group Lock and Dam 4, IncIPP Non-CHPConventional HydroelectricWATHY0.80.82031-022031(L) Regulatory approvals pending. Not under constructionPJM40.613718-79.718292026-09
69694/AL4-3Allegheny Lock and Dam 4AL4-369694PAAlleghenyAllegheny Hydro Group Lock and Dam 4, IncIPP Non-CHPConventional HydroelectricWATHY0.80.82031-022031(L) Regulatory approvals pending. Not under constructionPJM40.613718-79.718292026-09
69694/AL4-4Allegheny Lock and Dam 4AL4-469694PAAlleghenyAllegheny Hydro Group Lock and Dam 4, IncIPP Non-CHPConventional HydroelectricWATHY0.80.82031-022031(L) Regulatory approvals pending. Not under constructionPJM40.613718-79.718292026-09
69694/AL4-5Allegheny Lock and Dam 4AL4-569694PAAlleghenyAllegheny Hydro Group Lock and Dam 4, IncIPP Non-CHPConventional HydroelectricWATHY0.80.82031-022031(L) Regulatory approvals pending. Not under constructionPJM40.613718-79.718292026-09
69694/AL4-6Allegheny Lock and Dam 4AL4-669694PAAlleghenyAllegheny Hydro Group Lock and Dam 4, IncIPP Non-CHPConventional HydroelectricWATHY0.80.82031-022031(L) Regulatory approvals pending. Not under constructionPJM40.613718-79.718292026-09
69694/AL4-7Allegheny Lock and Dam 4AL4-769694PAAlleghenyAllegheny Hydro Group Lock and Dam 4, IncIPP Non-CHPConventional HydroelectricWATHY0.80.82031-022031(L) Regulatory approvals pending. Not under constructionPJM40.613718-79.718292026-09
69694/AL4-8Allegheny Lock and Dam 4AL4-869694PAAlleghenyAllegheny Hydro Group Lock and Dam 4, IncIPP Non-CHPConventional HydroelectricWATHY0.80.82031-022031(L) Regulatory approvals pending. Not under constructionPJM40.613718-79.718292026-09
62749/1Heidelberg Hydroelectric Project162749KYLeeLock 14 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.60.62026-102026(TS) Construction complete, but not yet in commercial operationPJM37.552399-83.770012026-09
62749/2Heidelberg Hydroelectric Project262749KYLeeLock 14 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.60.62026-102026(TS) Construction complete, but not yet in commercial operationPJM37.552399-83.770012026-09
62749/5Heidelberg Hydroelectric Project562749KYLeeLock 14 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.60.62026-102026(TS) Construction complete, but not yet in commercial operationPJM37.552399-83.770012026-09
62749/6Heidelberg Hydroelectric Project662749KYLeeLock 14 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.60.62026-102026(TS) Construction complete, but not yet in commercial operationPJM37.552399-83.770012026-09
69706/4149BBishop Ranch - BR 3-GG4149B69706CAContra CostaCamino Ramon BR 3-GG Solar Project 2020, LLCIPP Non-CHPBatteriesMWHBA0.60.62027-072027(V) Under construction, more than 50 percent completeCISO37.767242-121.95822026-09
69708/4150BBishop Ranch - BR 3-HH4150B69708CAContra CostaCamino Ramon BR 3-HH Solar Project 2020, LLCIPP Non-CHPBatteriesMWHBA0.60.62027-072027(V) Under construction, more than 50 percent completeCISO37.766297-121.95822026-09
69708/4150CBishop Ranch - BR 3-HH4150C69708CAContra CostaCamino Ramon BR 3-HH Solar Project 2020, LLCIPP Non-CHPSolar PhotovoltaicSUNPV0.60.62027-072027(V) Under construction, more than 50 percent completeCISO37.766297-121.95822026-09
69710/4148BBishop Ranch - BR 3-FF4148B69710CAContra CostaCamino Ramon BR 3-FF Solar Project 2020, LLCIPP Non-CHPBatteriesMWHBA0.60.62027-072027(V) Under construction, more than 50 percent completeCISO37.768388-121.9592026-09
69710/4148CBishop Ranch - BR 3-FF4148C69710CAContra CostaCamino Ramon BR 3-FF Solar Project 2020, LLCIPP Non-CHPSolar PhotovoltaicSUNPV0.60.62027-072027(V) Under construction, more than 50 percent completeCISO37.768388-121.9592026-09
62390/6KY No. 11 L&D Hydroelectric Project662390KYEstillLock 11 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.60.62027-112027(T) Regulatory approvals received. Not under constructionPJM37.78401-84.103292026-09
62390/NA1KY No. 11 L&D Hydroelectric ProjectNA162390KYEstillLock 11 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.60.62027-112027(T) Regulatory approvals received. Not under constructionPJM37.78401-84.103292026-09
62390/NA2KY No. 11 L&D Hydroelectric ProjectNA262390KYEstillLock 11 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.60.62027-112027(T) Regulatory approvals received. Not under constructionPJM37.78401-84.103292026-09
62390/NA5KY No. 11 L&D Hydroelectric ProjectNA562390KYEstillLock 11 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.60.62027-112027(T) Regulatory approvals received. Not under constructionPJM37.78401-84.103292026-09
64758/MANManorville IIMAN64758NYSuffolkAgilitas Energy, Inc.IPP Non-CHPSolar PhotovoltaicSUNPV0.60.62027-122027(L) Regulatory approvals pending. Not under constructionNYIS40.834-72.78192026-09
62748/1Evelyn Hydroelectric Project162748KYLeeLock 13 Hydro PartnersIPP Non-CHPConventional HydroelectricWATHY0.60.62029-122029(T) Regulatory approvals received. Not under constructionPJM37.601982-83.832972026-09
62748/2Evelyn Hydroelectric Project262748KYLeeLock 13 Hydro PartnersIPP Non-CHPConventional HydroelectricWATHY0.60.62029-122029(T) Regulatory approvals received. Not under constructionPJM37.601982-83.832972026-09
62748/5Evelyn Hydroelectric Project562748KYLeeLock 13 Hydro PartnersIPP Non-CHPConventional HydroelectricWATHY0.60.62029-122029(T) Regulatory approvals received. Not under constructionPJM37.601982-83.832972026-09
62748/6Evelyn Hydroelectric Project662748KYLeeLock 13 Hydro PartnersIPP Non-CHPConventional HydroelectricWATHY0.60.62029-122029(T) Regulatory approvals received. Not under constructionPJM37.601982-83.832972026-09
68600/7236BLas Virgenes MWD - Composting Plant7236B68600CALos AngelesLas Virgenes Road Solar Project 2022, LLCIPP Non-CHPBatteriesMWHBA0.50.52026-112026(V) Under construction, more than 50 percent completeCISO34.126481-118.69812026-09
69713/9985BSanger USD - Sanger West HS9985B69713CAFresnoSouth Fowler Avenue Solar Project 2023, LLCIPP Non-CHPBatteriesMWHBA0.50.52026-112026(V) Under construction, more than 50 percent completeCISO36.709291-119.68142026-09
65072/GVSRSFremont CA AutoFactoryGVSRS65072CAAlamedaTesla Inc.Industrial Non-CHPSolar PhotovoltaicSUNPV0.50.52026-122026(V) Under construction, more than 50 percent completeCISO37.49254-121.94462026-09
68235/C34BBRomeoville 34 - SLCHI234 - BSCHI234C34BB68235ILWillPrologis Logistics Services IncorporatedIPP Non-CHPBatteriesMWHBA0.50.52027-052027(U) Under construction, less than or equal to 50 percent completePJM41.597-88.112026-09
65072/VSRSFremont CA AutoFactoryVSRS65072CAAlamedaTesla Inc.Industrial Non-CHPSolar PhotovoltaicSUNPV0.40.42026-122026(TS) Construction complete, but not yet in commercial operationCISO37.49254-121.94462026-09
70428/DRIVBBakersfield DriverDRIVB70428CAKernPacifico Bakersfield Driver LLCIPP Non-CHPBatteriesMWHBA0.30.32026-092026(V) Under construction, more than 50 percent completeCISO35.562181-119.2022026-09
68542/7170BPalmdale Water District 6MG Tank7170B68542CALos AngelesEast Avenue South Solar Project 2022, LLCIPP Non-CHPBatteriesMWHBA0.30.32026-112026(V) Under construction, more than 50 percent completeCISO34.558047-118.11872026-09
58168/TURB4Energy CenterTURB458168CASan BernardinoUniversity of RedlandsCommercial CHPNatural Gas Fired Combustion TurbineNGGT0.30.32030-122030(P) Planned for installation, but regulatory approvals not initiatedCISO34.063056-117.16392026-09
58168/TURB5Energy CenterTURB558168CASan BernardinoUniversity of RedlandsCommercial CHPNatural Gas Fired Combustion TurbineNGGT0.30.32030-122030(P) Planned for installation, but regulatory approvals not initiatedCISO34.063056-117.16392026-09
58168/TURB6Energy CenterTURB658168CASan BernardinoUniversity of RedlandsCommercial CHPNatural Gas Fired Combustion TurbineNGGT0.30.32030-122030(P) Planned for installation, but regulatory approvals not initiatedCISO34.063056-117.16392026-09
62749/3Heidelberg Hydroelectric Project362749KYLeeLock 14 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.20.22026-102026(TS) Construction complete, but not yet in commercial operationPJM37.552399-83.770012026-09
62749/4Heidelberg Hydroelectric Project462749KYLeeLock 14 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.20.22026-102026(TS) Construction complete, but not yet in commercial operationPJM37.552399-83.770012026-09
69706/4149RBishop Ranch - BR 3-GG4149R69706CAContra CostaCamino Ramon BR 3-GG Solar Project 2020, LLCIPP Non-CHPSolar PhotovoltaicSUNPV0.20.22027-072027(V) Under construction, more than 50 percent completeCISO37.767242-121.95822026-09
69708/4150RBishop Ranch - BR 3-HH4150R69708CAContra CostaCamino Ramon BR 3-HH Solar Project 2020, LLCIPP Non-CHPSolar PhotovoltaicSUNPV0.20.22027-072027(V) Under construction, more than 50 percent completeCISO37.766297-121.95822026-09
69710/4148RBishop Ranch - BR 3-FF4148R69710CAContra CostaCamino Ramon BR 3-FF Solar Project 2020, LLCIPP Non-CHPSolar PhotovoltaicSUNPV0.20.22027-072027(V) Under construction, more than 50 percent completeCISO37.768388-121.9592026-09
62390/NA3KY No. 11 L&D Hydroelectric ProjectNA362390KYEstillLock 11 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.20.22027-112027(T) Regulatory approvals received. Not under constructionPJM37.78401-84.103292026-09
62390/NA4KY No. 11 L&D Hydroelectric ProjectNA462390KYEstillLock 11 Hydro Partners, LLCIPP Non-CHPConventional HydroelectricWATHY0.20.22027-112027(T) Regulatory approvals received. Not under constructionPJM37.78401-84.103292026-09
62748/3Evelyn Hydroelectric Project362748KYLeeLock 13 Hydro PartnersIPP Non-CHPConventional HydroelectricWATHY0.20.22029-122029(T) Regulatory approvals received. Not under constructionPJM37.601982-83.832972026-09
62748/4Evelyn Hydroelectric Project462748KYLeeLock 13 Hydro PartnersIPP Non-CHPConventional HydroelectricWATHY0.20.22029-122029(T) Regulatory approvals received. Not under constructionPJM37.601982-83.832972026-09
70101/PA29BPivot Energy PPA 29 LLCPA29B70101CAPlacerPivot EnergyIPP Non-CHPBatteriesMWHBA0.10.12027-012027(V) Under construction, more than 50 percent completeCISO38.828466-121.30492026-09