Source: https://aidb.si/d/us-planned-power-generators — Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report.
| ID | Plant | Generator | EIA plant ID | State | County | Developer / operator | Sector | Technology | Energy source | Prime mover | Nameplate capacity (MW) | Net summer capacity (MW) | Planned start | Planned year | Status | Balancing authority | Latitude | Longitude | Inventory month |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 64550/CVOWC | Coastal Virginia Offshore Wind (CVOW) Commercial Project | CVOWC | 64550 | VA | Dominion Energy Inc. | Electric Utility | Offshore Wind Turbine | WND | WS | 2640 | 2640 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 36.907956 | -75.34907 | 2026-09 | |
| 58987/II-A | Chokecherry and Sierra Madre Wind | II-A | 58987 | WY | Carbon | Power Company of Wyoming LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 1303.2 | 1303.2 | 2032-12 | 2032 | (U) Under construction, less than or equal to 50 percent complete | CISO | 41.683056 | -107.2 | 2026-09 |
| 68396/PGB45 | Sunstone Solar | PGB45 | 68396 | OR | Morrow | Sunstone Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 1200 | 1200 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | BPAT | 45.605916 | -119.563 | 2026-09 |
| 68396/PGR45 | Sunstone Solar | PGR45 | 68396 | OR | Morrow | Sunstone Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1200 | 1200 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | BPAT | 45.605916 | -119.563 | 2026-09 |
| 68367/PEHA1 | Pepper Hammock Solar and Storage | PEHA1 | 68367 | GA | Wayne | BrightNight Power | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1200 | 1200 | 2029-09 | 2029 | (L) Regulatory approvals pending. Not under construction | SOCO | 31.331 | -81.759 | 2026-09 |
| 65301/SC1 | Steward Creek Solar Phase 1 | SC1 | 65301 | IL | Lee | TerraForm Power Operating, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1200 | 1200 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 41.814343 | -88.98988 | 2026-09 |
| 67551/VISTA | Vista Sands Solar | VISTA | 67551 | WI | Portage | Vista Sands Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1182 | 1182 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 44.446256 | -89.57631 | 2026-09 |
| 69798/PMN1 | Project Matador Nuclear | PMN1 | 69798 | TX | Carson | Fermi Nuclear | IPP Non-CHP | Nuclear | NUC | ST | 1117 | 1117 | 2031-12 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69798/PMN3 | Project Matador Nuclear | PMN3 | 69798 | TX | Carson | Fermi Nuclear | IPP Non-CHP | Nuclear | NUC | ST | 1117 | 1117 | 2031-12 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69798/PMN2 | Project Matador Nuclear | PMN2 | 69798 | TX | Carson | Fermi Nuclear | IPP Non-CHP | Nuclear | NUC | ST | 1117 | 1117 | 2032-12 | 2032 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69798/PMN4 | Project Matador Nuclear | PMN4 | 69798 | TX | Carson | Fermi Nuclear | IPP Non-CHP | Nuclear | NUC | ST | 1117 | 1117 | 2032-12 | 2032 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 68763/DECH1 | Deschutes Solar and BESS | DECH1 | 68763 | OR | Wasco | DECH bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1000 | 1000 | 2029-11 | 2029 | (L) Regulatory approvals pending. Not under construction | BPAT | 45.157 | -121.136 | 2026-09 |
| 68763/DECH2 | Deschutes Solar and BESS | DECH2 | 68763 | OR | Wasco | DECH bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 1000 | 1000 | 2029-11 | 2029 | (L) Regulatory approvals pending. Not under construction | BPAT | 45.157 | -121.136 | 2026-09 |
| 70359/SYRVS | Sycamore Riverside Energy, LLC | SYRVS | 70359 | IN | Sullivan | Invenergy Services LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 964 | 964 | 2029-03 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.213906 | -87.54727 | 2026-09 |
| 67435/SRWND | Sunrise Wind | SRWND | 67435 | NY | Suffolk | Orsted Wind Power North America LLC | IPP Non-CHP | Offshore Wind Turbine | WND | WS | 924 | 924 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.977859 | -71.04454 | 2026-09 |
| 68367/PEHA | Pepper Hammock Solar and Storage | PEHA | 68367 | GA | Wayne | BrightNight Power | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 900 | 900 | 2029-09 | 2029 | (L) Regulatory approvals pending. Not under construction | SOCO | 31.331 | -81.759 | 2026-09 |
| 58987/I-B | Chokecherry and Sierra Madre Wind | I-B | 58987 | WY | Carbon | Power Company of Wyoming LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 849.6 | 849.6 | 2031-12 | 2031 | (U) Under construction, less than or equal to 50 percent complete | CISO | 41.683056 | -107.2 | 2026-09 |
| 58987/I-A | Chokecherry and Sierra Madre Wind | I-A | 58987 | WY | Carbon | Power Company of Wyoming LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 844.2 | 844.2 | 2031-12 | 2031 | (U) Under construction, less than or equal to 50 percent complete | CISO | 41.683056 | -107.2 | 2026-09 |
| 68443/EMP01 | Empire Wind 1 | EMP01 | 68443 | NY | Kings | Empire Offshore Wind LLC | IPP Non-CHP | Offshore Wind Turbine | WND | WS | 810 | 810 | 2027-09 | 2027 | (V) Under construction, more than 50 percent complete | NYIS | 40.32 | -73.42 | 2026-09 |
| 66011/PV1 | Cedar Island Solar LLC | PV1 | 66011 | OR | Sherman | Cedar Island Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 800 | 800 | 2031-12 | 2031 | (L) Regulatory approvals pending. Not under construction | BPAT | 45.233717 | -120.8985 | 2026-09 |
| 68294/VIO1 | Viola Generating Station | VIO1 | 68294 | KS | Sumner | Evergy Kansas Central, Inc | Electric Utility | Natural Gas Fired Combined Cycle | NG | CS | 765 | 693.2 | 2029-01 | 2029 | (T) Regulatory approvals received. Not under construction | SWPP | 37.331481 | -97.67 | 2026-09 |
| 68295/MCN1 | McNew Generating Station | MCN1 | 68295 | KS | Reno | Evergy Kansas Central, Inc | Electric Utility | Natural Gas Fired Combined Cycle | NG | CS | 765 | 690.4 | 2030-01 | 2030 | (T) Regulatory approvals received. Not under construction | SWPP | 38.00595 | -97.92166 | 2026-09 |
| 68053/LEG | Legend Power Station | LEG | 68053 | TX | Jefferson | Entergy Texas Inc. | Electric Utility | Natural Gas Fired Combined Cycle | NG | CC | 754 | 723 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.880219 | -93.99573 | 2026-09 |
| 1364/5 | Mill Creek (KY) | 5 | 1364 | KY | Jefferson | Louisville Gas & Electric Co | Electric Utility | Natural Gas Fired Combined Cycle | NG | CS | 740 | 645 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | LGEE | 38.0525 | -85.9103 | 2026-09 |
| 69566/GEN1 | CPV Basin Ranch Energy Center | GEN1 | 69566 | TX | Ward | CPV Basin Ranch | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CS | 722.5 | 672.4 | 2029-02 | 2029 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.506094 | -103.4875 | 2026-09 |
| 69566/GEN2 | CPV Basin Ranch Energy Center | GEN2 | 69566 | TX | Ward | CPV Basin Ranch | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CS | 722.5 | 672.4 | 2029-02 | 2029 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.506094 | -103.4875 | 2026-09 |
| 68606/5 | Cedar Bayou 5 | 5 | 68606 | TX | Chambers | Cedar Bayou 5 LLC | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CS | 721 | 674 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.751132 | -94.92114 | 2026-09 |
| 65500/REVWD | Revolution Wind | REVWD | 65500 | RI | Washington | Orsted Wind Power North America LLC | IPP Non-CHP | Offshore Wind Turbine | WND | WS | 715 | 715 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ISNE | 41.15217 | -71.07783 | 2026-09 |
| 69857/LBRBS | Libra Solar | LBRBS | 69857 | NV | Lyon | Libra Solar LLC | IPP Non-CHP | Batteries | MWH | BA | 700 | 700 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NEVP | 38.902103 | -118.9614 | 2026-09 |
| 69857/LBRPV | Libra Solar | LBRPV | 69857 | NV | Lyon | Libra Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 700 | 700 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NEVP | 38.902103 | -118.9614 | 2026-09 |
| 68202/ROMW | IP Roman Wind | ROMW | 68202 | TX | Deaf Smith | Intersect USA, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 670.5 | 670.5 | 2028-09 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 34.990891 | -102.6076 | 2026-09 |
| 70541/SPV | Swan Solar | SPV | 70541 | MO | Bates | Swan Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 650 | 650 | 2028-09 | 2028 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 38.322152 | -94.59622 | 2026-09 |
| 68504/SLES1 | Sandow Lakes Energy Station | SLES1 | 68504 | TX | Lee | SL Energy Power Plant I, LLC | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CS | 645 | 590 | 2028-10 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 30.419441 | -97.19124 | 2026-09 |
| 68504/SLES2 | Sandow Lakes Energy Station | SLES2 | 68504 | TX | Lee | SL Energy Power Plant I, LLC | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CS | 645 | 590 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 30.419441 | -97.19124 | 2026-09 |
| 65855/TE1PV | Tehuacana Creek Solar | TE1PV | 65855 | TX | Navarro | Parliament Energy Holdings LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 644.8 | 644.8 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 31.914062 | -96.41347 | 2026-09 |
| 62022/GEN1 | Lincoln Land Energy Center | GEN1 | 62022 | IL | Sangamon | Lincoln Land Energy Center LLC | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CS | 638.4 | 520 | 2030-06 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 39.5788 | -89.57984 | 2026-09 |
| 62022/GEN2 | Lincoln Land Energy Center | GEN2 | 62022 | IL | Sangamon | Lincoln Land Energy Center LLC | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CS | 638.4 | 520 | 2030-06 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 39.5788 | -89.57984 | 2026-09 |
| 63878/HAY | Haymaker Hybrid | HAY | 63878 | MT | Wheatland | Haymaker Energy Project LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 630 | 630 | 2031-10 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | NWMT | 46.357442 | -110.3958 | 2026-09 |
| 69764/HPW | Illinois Generation LLC | HPW | 69764 | IL | Livingston | Pattern Operators LP | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 616.5 | 616.5 | 2028-04 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 41.06713 | -88.2497 | 2026-09 |
| 63802/G001 | Shady Hills Combined Cycle Facility | G001 | 63802 | FL | Pasco | Shady Hills Energy Center, LLC | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CS | 612 | 538.3 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | FPC | 28.366667 | -82.55833 | 2026-09 |
| 68479/SHRT | Short Creek Solar | SHRT | 68479 | TX | Wichita | Wichita Solar I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 606.4 | 605 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 34.017622 | -98.8013 | 2026-09 |
| 68982/SGG01 | Singing Grass Wind | SGG01 | 68982 | CO | Kit Carson | Public Service Co of Colorado | Electric Utility | Onshore Wind Turbine | WND | WT | 603 | 600 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 39.201143 | -102.8576 | 2026-09 |
| 66914/DAN | Danish Fields Solar, LLC | DAN | 66914 | TX | Wharton | Danish Fields Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 600 | 600 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.013637 | -96.22054 | 2026-09 |
| 70135/SWNSN | Swenson Solar | SWNSN | 70135 | TX | Stonewall | Swenson Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 600 | 600 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 32.985403 | -100.0292 | 2026-09 |
| 65842/CFCBS | Clear Fork Creek Solar and BESS SLF | CFCBS | 65842 | TX | Wilson | Clear Fork | IPP Non-CHP | Batteries | MWH | BA | 600 | 600 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.263568 | -97.78055 | 2026-09 |
| 65842/CFCPV | Clear Fork Creek Solar and BESS SLF | CFCPV | 65842 | TX | Wilson | Clear Fork | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 600 | 600 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.263568 | -97.78055 | 2026-09 |
| 69989/PB1 | Arkansas Cypress Solar Station | PB1 | 69989 | AR | Jefferson | Entergy Arkansas LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 600 | 600 | 2029-01 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 34.42 | -92.08 | 2026-09 |
| 68071/BELLF | Bellflower Solar (VA) | BELLF | 68071 | VA | Brunswick | Dominion Renewable Energy | Electric Utility | Solar Photovoltaic | SUN | PV | 600 | 600 | 2030-01 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37 | -78 | 2026-09 |
| 64163/11111 | Hecate Energy Cider Solar LLC | 11111 | 64163 | NY | Genesee | Greenbacker Renewable Energy Corporation | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 557 | 557 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 43.097336 | -78.23041 | 2026-09 |
| 58987/II-B | Chokecherry and Sierra Madre Wind | II-B | 58987 | WY | Carbon | Power Company of Wyoming LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 553.5 | 553.5 | 2033-12 | 2033 | (U) Under construction, less than or equal to 50 percent complete | CISO | 41.683056 | -107.2 | 2026-09 |
| 69684/70125 | Maricopa Solar | 70125 | 69684 | AZ | Maricopa | Maricopa Solar | IPP Non-CHP | Batteries | MWH | BA | 550 | 550 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | AZPS | 33.46303 | -113.1101 | 2026-09 |
| 65310/DAWN1 | Renegade Solar Project (Dawn) | DAWN1 | 65310 | TX | Deaf Smith | Renegade Renewables, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 515 | 515 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 34.913 | -102.2706 | 2026-09 |
| 64234/19936 | Hecate Energy Harley Hand Solar LLC | 19936 | 64234 | TX | Nolan | Hecate Energy Harley Hand Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 514 | 514 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.468537 | -100.2164 | 2026-09 |
| 64847/CRTW1 | Rail Tie Wind | CRTW1 | 64847 | WY | Albany | Repsol Renewables NA | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 504 | 504 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | WACM | 41.055833 | -105.4942 | 2026-09 |
| 65028/ROSES | Roseland Solar Project, LLC | ROSES | 65028 | TX | Falls | Enel Green Power Roseland Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 500 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.461242 | -96.82493 | 2026-09 |
| 64209/26SBA | Bellefield 2 Solar & Energy Storage Farm | 26SBA | 64209 | CA | Kern | 26SB 8me LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 500 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 35.017779 | -118.0687 | 2026-09 |
| 64209/26SBB | Bellefield 2 Solar & Energy Storage Farm | 26SBB | 64209 | CA | Kern | 26SB 8me LLC | IPP Non-CHP | Batteries | MWH | BA | 500 | 500 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 35.017779 | -118.0687 | 2026-09 |
| 69820/GRA1 | Grace Energy Center | GRA1 | 69820 | CA | Riverside | Grace Orchard Interconnection, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 500 | 2027-08 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 33.653564 | -114.696 | 2026-09 |
| 69820/GRA2 | Grace Energy Center | GRA2 | 69820 | CA | Riverside | Grace Orchard Interconnection, LLC | IPP Non-CHP | Batteries | MWH | BA | 500 | 500 | 2027-10 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 33.653564 | -114.696 | 2026-09 |
| 66414/RMSY | Hecate Energy Ramsey Storage | RMSY | 66414 | TX | Wharton | Hecate Energy Ramsey Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 500 | 500 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.02939 | -96.2362 | 2026-09 |
| 68204/MEITW | IP Meitner Wind | MEITW | 68204 | TX | Roberts | Intersect USA, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 500 | 258 | 2028-02 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 35.696972 | -100.8213 | 2026-09 |
| 68203/MEITS | IP Meitner Solar | MEITS | 68203 | TX | Gray | Intersect USA, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 214 | 2028-04 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 35.562222 | -100.6941 | 2026-09 |
| 68201/ROMS | IP Roman Solar | ROMS | 68201 | TX | Deaf Smith | Intersect USA, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 500 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 34.990891 | -102.6076 | 2026-09 |
| 70397/SRSP1 | Steel River Solar Phase 1 | SRSP1 | 70397 | AR | Mississippi | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 500 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 35.578637 | -90.09763 | 2026-09 |
| 68354/LSPV1 | La Salle Solar | LSPV1 | 68354 | TX | LaSalle | La Salle Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 500 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.092519 | -99.05701 | 2026-09 |
| 68034/SNSCB | Sunscape Renewable Energy | SNSCB | 68034 | TX | Nueces | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 500 | 500 | 2028-10 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 27.819197 | -97.79994 | 2026-09 |
| 68034/SNSCP | Sunscape Renewable Energy | SNSCP | 68034 | TX | Nueces | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 500 | 2028-10 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 27.819197 | -97.79994 | 2026-09 |
| 69584/3572 | Rising Star Solar | 3572 | 69584 | TX | Starr | Rising Star Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 500 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 26.382105 | -98.61544 | 2026-09 |
| 68353/LSBS1 | La Salle ESS | LSBS1 | 68353 | TX | LaSalle | La Salle ESS LLC | IPP Non-CHP | Batteries | MWH | BA | 500 | 500 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.094701 | -99.05554 | 2026-09 |
| 70398/SRSP2 | Steel River Solar Phase 2 | SRSP2 | 70398 | AR | Mississippi | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 500 | 2029-07 | 2029 | (U) Under construction, less than or equal to 50 percent complete | MISO | 35.578637 | -90.09763 | 2026-09 |
| 70399/SRSP3 | Steel River Solar Phase 3 | SRSP3 | 70399 | AR | Mississippi | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 500 | 2030-07 | 2030 | (U) Under construction, less than or equal to 50 percent complete | MISO | 35.578637 | -90.09763 | 2026-09 |
| 68635/KU1 | Kemmerer Unit 1 | KU1 | 68635 | WY | Lincoln | US SFR Owner LLC | IPP Non-CHP | Nuclear | NUC | ST | 500 | 342.1 | 2030-12 | 2030 | (L) Regulatory approvals pending. Not under construction | PACE | 41.705993 | -110.5603 | 2026-09 |
| 68342/HOHI1 | Hop Hill Solar Generation and BESS | HOHI1 | 68342 | WA | Benton | HOHI bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 500 | 500 | 2031-09 | 2031 | (L) Regulatory approvals pending. Not under construction | BPAT | 46.324 | -119.822 | 2026-09 |
| 68342/HOHI2 | Hop Hill Solar Generation and BESS | HOHI2 | 68342 | WA | Benton | HOHI bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 500 | 500 | 2031-09 | 2031 | (L) Regulatory approvals pending. Not under construction | BPAT | 46.324 | -119.822 | 2026-09 |
| 63911/MECN | MEC North | MECN | 63911 | MI | Calhoun | MEC North | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CS | 500 | 500 | 2034-06 | 2034 | (T) Regulatory approvals received. Not under construction | MISO | 42.233559 | -84.96234 | 2026-09 |
| 63912/MECS | MEC South | MECS | 63912 | MI | Calhoun | MEC South | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CS | 500 | 500 | 2034-06 | 2034 | (L) Regulatory approvals pending. Not under construction | MISO | 42.237103 | -84.95915 | 2026-09 |
| 70522/SSLR | Hecate Energy Sunfish Solar LLC | SSLR | 70522 | MI | Calhoun | Hecate Energy Sunfish Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 499 | 499 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 42.376961 | -84.87973 | 2026-09 |
| 68317/DUTC1 | Dutchman Solar generation and BESS | DUTC1 | 68317 | WY | Converse | DUTC bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 499 | 499 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | WACM | 42.871644 | -105.8176 | 2026-09 |
| 68317/DUTC2 | Dutchman Solar generation and BESS | DUTC2 | 68317 | WY | Converse | DUTC bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 499 | 499 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | WACM | 42.871644 | -105.8176 | 2026-09 |
| 69071/CT1 | Bison Generation Station | CT1 | 69071 | ND | Williams | Basin Electric Power Coop | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 496 | 409 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | SWPP | 48.327932 | -103.3127 | 2026-09 |
| 69071/CT2 | Bison Generation Station | CT2 | 69071 | ND | Williams | Basin Electric Power Coop | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 496 | 409 | 2030-03 | 2030 | (L) Regulatory approvals pending. Not under construction | SWPP | 48.327932 | -103.3127 | 2026-09 |
| 68296/MC1 | Mullin Creek #1 Generating Station | MC1 | 68296 | MO | Nodaway | Evergy Missouri West | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 489.7 | 425.1 | 2030-01 | 2030 | (T) Regulatory approvals received. Not under construction | SWPP | 38.00595 | -97.92166 | 2026-09 |
| 728/8 | Yates | 8 | 728 | GA | Coweta | Georgia Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 482.8 | 418.4 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | SOCO | 33.4622 | -84.8986 | 2026-09 |
| 728/10 | Yates | 10 | 728 | GA | Coweta | Georgia Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 482.8 | 418.4 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SOCO | 33.4622 | -84.8986 | 2026-09 |
| 728/9 | Yates | 9 | 728 | GA | Coweta | Georgia Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 482.8 | 418.4 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SOCO | 33.4622 | -84.8986 | 2026-09 |
| 69184/WF5CT | Waterford 5 | WF5CT | 69184 | LA | St Charles | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 478 | 420 | 2029-06 | 2029 | (T) Regulatory approvals received. Not under construction | MISO | 29.988583 | -90.48565 | 2026-09 |
| 69185/JPSCT | Jefferson Power Station | JPSCT | 69185 | AR | Jefferson | Entergy Arkansas LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 478 | 420 | 2029-11 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 34.427527 | -92.13996 | 2026-09 |
| 69445/CT1 | Waterford 6 | CT1 | 69445 | LA | St Charles | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 478 | 420 | 2030-06 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 29.988583 | -90.48565 | 2026-09 |
| 69223/GT1 | Vicksburg Advanced Power Station | GT1 | 69223 | MS | Warren | Entergy Mississippi LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 477.7 | 422.8 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 32.28526 | -90.92568 | 2026-09 |
| 70187/CT1 | Traceview Advanced Power Station | CT1 | 70187 | MS | Madison | Entergy Mississippi LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 477.7 | 422.8 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 32.405646 | -90.22114 | 2026-09 |
| 69426/CT1 | Westlake Power Station | CT1 | 69426 | LA | Calcasieu | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 477.7 | 390 | 2030-10 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.281105 | -93.30189 | 2026-09 |
| 67914/1A | Delta Blues Advanced Power Station | 1A | 67914 | MS | Washington | Entergy Mississippi LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 477 | 422.2 | 2028-05 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 33.330476 | -91.13058 | 2026-09 |
| 69060/SNFA | Snowflake A Solar and BESS | SNFA | 69060 | AZ | Navajo | Clenera DevCo LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 475 | 475 | 2027-08 | 2027 | (L) Regulatory approvals pending. Not under construction | AZPS | 34.998055 | -110.1255 | 2026-09 |
| 69060/SNFBA | Snowflake A Solar and BESS | SNFBA | 69060 | AZ | Navajo | Clenera DevCo LLC | IPP Non-CHP | Batteries | MWH | BA | 475 | 475 | 2027-08 | 2027 | (L) Regulatory approvals pending. Not under construction | AZPS | 34.998055 | -110.1255 | 2026-09 |
| 69690/PG2 | Panther Grove 2 | PG2 | 69690 | IL | Livingston | Panther Grove 2 LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 472.5 | 472.5 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.815283 | -88.86191 | 2026-09 |
| 68214/1A | Franklin Farms 1&2 | 1A | 68214 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 469.3 | 435.4 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 32.53246 | -91.62767 | 2026-09 |
| 68214/2A | Franklin Farms 1&2 | 2A | 68214 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 469.3 | 435.4 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 32.53246 | -91.62767 | 2026-09 |
| 69449/1A | Richland Parish Power Station 1&2 | 1A | 69449 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 469.3 | 435.4 | 2030-03 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 32.468339 | -91.68038 | 2026-09 |
| 69449/2A | Richland Parish Power Station 1&2 | 2A | 69449 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 469.3 | 435.4 | 2030-03 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 32.468339 | -91.68038 | 2026-09 |
| 69649/3A | Richland Parish Power Station 3 | 3A | 69649 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 469.3 | 435.4 | 2030-10 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 32.496716 | -91.69867 | 2026-09 |
| 69650/4A | Richland Parish Power Station 4 | 4A | 69650 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 469.3 | 435.4 | 2030-10 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 32.497782 | -91.6997 | 2026-09 |
| 69944/PC1A | Pointe Coupee Power Station | PC1A | 69944 | LA | Pointe Coupee | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 469.3 | 435.4 | 2031-10 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.739 | -91.377 | 2026-09 |
| 69944/PC2A | Pointe Coupee Power Station | PC2A | 69944 | LA | Pointe Coupee | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 469.3 | 435.4 | 2031-11 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.739 | -91.377 | 2026-09 |
| 69944/PC3A | Pointe Coupee Power Station | PC3A | 69944 | LA | Pointe Coupee | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 469.3 | 435.4 | 2031-12 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.739 | -91.377 | 2026-09 |
| 69077/1A | Lone Star Power Station | 1A | 69077 | TX | San Jacinto | Entergy Texas Inc. | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 467.3 | 432 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 30.414158 | -95.01671 | 2026-09 |
| 69750/1A | Ironwood Power Station | 1A | 69750 | AR | Hot Spring | Entergy Arkansas LLC | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 467.3 | 432 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 34.433826 | -92.9042 | 2026-09 |
| 65851/HB2PV | Hollow Branch Creek | HB2PV | 65851 | TX | Madison | Parliament Energy Holdings LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 460 | 460 | 2027-08 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.061726 | -96.05606 | 2026-09 |
| 68546/1 | Smarr Combined Cycle Energy Facility | 1 | 68546 | GA | Monroe | Oglethorpe Power Corporation | Electric Utility | Natural Gas Fired Combined Cycle | NG | CC | 459 | 407 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SOCO | 32.975936 | -83.84369 | 2026-09 |
| 65854/RDYPV | Rowdy Creek Solar and BESS | RDYPV | 65854 | TX | Lamar | Parliament Energy Holdings LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 455 | 455 | 2028-06 | 2028 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 33.75694 | -95.6458 | 2026-09 |
| 3407/CTG1 | Kingston | CTG1 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 454.8 | 372.9 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3399/CTG2 | Cumberland (TN) | CTG2 | 3399 | TN | Stewart | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 454.8 | 372.9 | 2029-01 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 36.3903 | -87.6539 | 2026-09 |
| 3399/CTG1 | Cumberland (TN) | CTG1 | 3399 | TN | Stewart | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 454.8 | 372.9 | 2034-12 | 2034 | (U) Under construction, less than or equal to 50 percent complete | TVA | 36.3903 | -87.6539 | 2026-09 |
| 66621/1A | Orange County Advanced Power Station | 1A | 66621 | TX | Orange | Entergy Texas Inc. | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 453 | 396.6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 30.025251 | -93.87134 | 2026-09 |
| 66621/1B | Orange County Advanced Power Station | 1B | 66621 | TX | Orange | Entergy Texas Inc. | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 453 | 396.6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 30.025251 | -93.87134 | 2026-09 |
| 66871/SOLAR | GulfStar Power, LLC | SOLAR | 66871 | TX | Wharton | GulfStar Power, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 451.6 | 451.6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.191296 | -95.96752 | 2026-09 |
| 68772/CHALK | Chalk Bluff Solar | CHALK | 68772 | AR | St Francis | Chalk Bluff Solar Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 450 | 450 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 35.051606 | -90.43254 | 2026-09 |
| 70175/ZSPV | ZSS Solar | ZSPV | 70175 | TX | Knox | NextEra Energy Resources - ERCOT | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 450 | 450 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 33.479935 | -99.67475 | 2026-09 |
| 67664/SOLEI | Soleil | SOLEI | 67664 | TX | Clay | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 450 | 450 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.799253 | -98.04552 | 2026-09 |
| 68273/1 | Naples Power Plant | 1 | 68273 | TX | Morris | Arkansas Electric Coop Corp | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 450 | 450 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 33.21964 | -94.70564 | 2026-09 |
| 68273/2 | Naples Power Plant | 2 | 68273 | TX | Morris | Arkansas Electric Coop Corp | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 450 | 450 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 33.21964 | -94.70564 | 2026-09 |
| 69691/06 | Greens Bayou 6 | 06 | 69691 | TX | Harris | NRG Greens Bayou 6 LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 447 | 411 | 2028-05 | 2028 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.821222 | -95.21786 | 2026-09 |
| 68607/PLJW1 | Pelicans Jaw Hybrid Solar | PLJW1 | 68607 | CA | Kern | Pelicans Jaw Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 440 | 440 | 2027-04 | 2027 | (TS) Construction complete, but not yet in commercial operation | CISO | 35.765183 | -119.7436 | 2026-09 |
| 69689/CT11 | Vast Sands Power | CT11 | 69689 | TX | Ward | Permian Power I LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 440 | 440 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.584096 | -102.958 | 2026-09 |
| 69689/CT12 | Vast Sands Power | CT12 | 69689 | TX | Ward | Permian Power I LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 440 | 440 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.584096 | -102.958 | 2026-09 |
| 69873/CRW02 | Cheyenne Ridge II | CRW02 | 69873 | CO | Cheyenne | Public Service Co of Colorado | Electric Utility | Onshore Wind Turbine | WND | WT | 438 | 438 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 38.997719 | -102.3593 | 2026-09 |
| 56/LEC3 | Lowman Energy Center | LEC3 | 56 | AL | Washington | PowerSouth Energy Cooperative | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 438 | 409 | 2029-11 | 2029 | (L) Regulatory approvals pending. Not under construction | SOCO | 31.488019 | -87.91075 | 2026-09 |
| 68305/GWT1 | Gigawatt Solar | GWT1 | 68305 | TX | Parker | Gigawatt Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 429 | 429 | 2028-08 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.547389 | -97.59792 | 2026-09 |
| 63818/78787 | Panther Grove Wind, LLC | 78787 | 63818 | IL | Woodford | Panther Grove Wind, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 423 | 423 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 40.7129 | -89.1706 | 2026-09 |
| 68759/IPQ1B | Quantum BESS | IPQ1B | 68759 | TX | Haskell | Intersect USA, LLC | IPP Non-CHP | Batteries | MWH | BA | 422.4 | 323.6 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 33.0121 | -99.5604 | 2026-09 |
| 68761/IPQ2B | Quantum II BESS | IPQ2B | 68761 | TX | Haskell | Intersect USA, LLC | IPP Non-CHP | Batteries | MWH | BA | 422.4 | 323.6 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 33.135 | -99.5719 | 2026-09 |
| 67262/RP1 | Ripley Energy Center | RP1 | 67262 | OK | Payne | Associated Electric Coop, Inc | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 419 | 411.4 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | AECI | 36.116 | -96.902 | 2026-09 |
| 67263/TN1 | Turney Energy Center | TN1 | 67263 | MO | Clinton | Associated Electric Coop, Inc | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 419 | 411.4 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | AECI | 39.615 | -94.351 | 2026-09 |
| 65855/TE1BS | Tehuacana Creek Solar | TE1BS | 65855 | TX | Navarro | Parliament Energy Holdings LLC | IPP Non-CHP | Batteries | MWH | BA | 418 | 418 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 31.914062 | -96.41347 | 2026-09 |
| 69272/SEQII | Enbridge Solar (Sequoia II) | SEQII | 69272 | TX | Callahan | Enbridge Solar (Sequoia II), LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 415 | 415 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 32.341078 | -99.17308 | 2026-09 |
| 68369/STMO | Starfire Mountain Solar | STMO | 68369 | KY | Perry | BrightNight Power | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 410 | 410 | 2029-09 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 37.4119 | -83.1206 | 2026-09 |
| 8059/2G1 | Comanche (OK) | 2G1 | 8059 | OK | Comanche | Public Service Co of Oklahoma | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 408.8 | 368.1 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 34.5431 | -98.3244 | 2026-09 |
| 8059/3G1 | Comanche (OK) | 3G1 | 8059 | OK | Comanche | Public Service Co of Oklahoma | Electric Utility | Natural Gas Fired Combined Cycle | NG | CT | 408.8 | 368.1 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 34.5431 | -98.3244 | 2026-09 |
| 66912/HS1 | Hill Solar 1 | HS1 | 66912 | TX | Hill | Hill Solar 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 405 | 405 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 32.139 | -97.06 | 2026-09 |
| 67984/FFLPA | Firefly Solar PA | FFLPA | 67984 | PA | Lawrence | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 401.6 | 401.6 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 40.930281 | -80.43244 | 2026-09 |
| 67378/MB | Mineral Basin Solar Power | MB | 67378 | PA | Clearfield | Mineral Basin Solar Power, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 401.6 | 401.6 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 41.106469 | -78.29426 | 2026-09 |
| 66621/1C | Orange County Advanced Power Station | 1C | 66621 | TX | Orange | Entergy Texas Inc. | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 400 | 365 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 30.025251 | -93.87134 | 2026-09 |
| 68422/CALII | Callisto II Energy Center | CALII | 68422 | TX | Harris | Callisto II Energy Center LLC | IPP Non-CHP | Batteries | MWH | BA | 400 | 400 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 29.645345 | -95.45025 | 2026-09 |
| 67978/SSPV1 | Sierra Solar Hybrid | SSPV1 | 67978 | NV | Churchill | Sierra Pacific Power Co | Electric Utility | Solar Photovoltaic | SUN | PV | 400 | 400 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | NEVP | 39.8536 | -119.0394 | 2026-09 |
| 68917/BS | Beavertail Solar | BS | 68917 | MO | Henry | Beavertail Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | SPA | 38.311814 | -93.93546 | 2026-09 |
| 69509/1 | Gabriel | 1 | 69509 | CA | Los Angeles | San Gabriel Project LLC | IPP Non-CHP | Batteries | MWH | BA | 400 | 400 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 34.11 | -117.97 | 2026-09 |
| 67059/1 | Iron Belt | 1 | 67059 | TX | Borden | Iron Belt Energy Storage Project, LLC | IPP Non-CHP | Batteries | MWH | BA | 400 | 400 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.5557 | -101.6601 | 2026-09 |
| 69508/1 | Marici | 1 | 69508 | CA | Los Angeles | Marici Project LLC | IPP Non-CHP | Batteries | MWH | BA | 400 | 400 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 34.007751 | -117.9462 | 2026-09 |
| 69553/BCS | Blacks Creek Solar | BCS | 69553 | ID | Ada | Blacks Creek Energy Center, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | IPCO | 43.499 | -116.1918 | 2026-09 |
| 64670/KOV4A | Big Creek Solar LLC | KOV4A | 64670 | AR | Lee | Big Creek Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 34.870404 | -117.9656 | 2026-09 |
| 63782/RH1 | Rough Hat | RH1 | 63782 | NV | Clark | Candela Renewables, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 36.09907 | -115.8337 | 2026-09 |
| 66805/LYCAN | Lycan Solar Project | LYCAN | 66805 | CA | Riverside | EDF Renewables Development, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 33.621326 | -115.0959 | 2026-09 |
| 69056/CBBA | CO Bar Solar and BESS | CBBA | 69056 | AZ | Coconino | Clenera DevCo LLC | IPP Non-CHP | Batteries | MWH | BA | 400 | 400 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 35.636594 | -111.8835 | 2026-09 |
| 69056/CBPV | CO Bar Solar and BESS | CBPV | 69056 | AZ | Coconino | Clenera DevCo LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 35.636594 | -111.8835 | 2026-09 |
| 69239/HSS | High Spring Solar Energy | HSS | 69239 | OK | Muskogee | High Spring Solar Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 250.4 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 35.576674 | -95.65816 | 2026-09 |
| 70219/VALLE | Valley Farms Energy Center | VALLE | 70219 | AZ | Pinal | Valley Farms Energy Center, LLC | IPP Non-CHP | Batteries | MWH | BA | 400 | 400 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 32.94793 | -111.4576 | 2026-09 |
| 68022/CLP20 | Cowboy Solar I | CLP20 | 68022 | WY | Laramie | Cowboy Solar I | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2028-03 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 41.032968 | -104.3816 | 2026-09 |
| 64208/30PNA | Red Antelope Solar & Energy Storage Farm | 30PNA | 64208 | AZ | Coconino | 302PN 8me LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2028-05 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 36.7 | -111.28 | 2026-09 |
| 68287/EAGL1 | Eagle Eye Solar and Storage | EAGL1 | 68287 | AZ | La Paz | EAGL bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2028-05 | 2028 | (L) Regulatory approvals pending. Not under construction | WALC | 33.727 | -112.881 | 2026-09 |
| 68287/EAGL2 | Eagle Eye Solar and Storage | EAGL2 | 68287 | AZ | La Paz | EAGL bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 400 | 400 | 2028-05 | 2028 | (L) Regulatory approvals pending. Not under construction | WALC | 33.727 | -112.881 | 2026-09 |
| 68209/PSGBS | Purple Sage Energy Center | PSGBS | 68209 | NV | Clark | Noble Solar LLC | IPP Non-CHP | Batteries | MWH | BA | 400 | 400 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 36.029139 | -115.8062 | 2026-09 |
| 68209/PSGPV | Purple Sage Energy Center | PSGPV | 68209 | NV | Clark | Noble Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 36.029139 | -115.8062 | 2026-09 |
| 63488/OBSLR | Obsidian Solar Center | OBSLR | 63488 | OR | Lake | Obsidian Solar Center LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | BPAT | 43.312167 | -120.8218 | 2026-09 |
| 68022/CLPBS | Cowboy Solar I | CLPBS | 68022 | WY | Laramie | Cowboy Solar I | IPP Non-CHP | Batteries | MWH | BA | 400 | 400 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 41.032968 | -104.3816 | 2026-09 |
| 70331/MRASL | Mirasol Energy Center, LLC. | MRASL | 70331 | CO | Pueblo | Mirasol Energy Center, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 400 | 400 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | PSCO | 38.11439 | -104.2017 | 2026-09 |
| 68367/PEHA2 | Pepper Hammock Solar and Storage | PEHA2 | 68367 | GA | Wayne | BrightNight Power | IPP Non-CHP | Batteries | MWH | BA | 400 | 400 | 2029-09 | 2029 | (L) Regulatory approvals pending. Not under construction | SOCO | 31.331 | -81.759 | 2026-09 |
| 66805/LYCN2 | Lycan Solar Project | LYCN2 | 66805 | CA | Riverside | EDF Renewables Development, Inc. | IPP Non-CHP | Batteries | MWH | BA | 400 | 400 | 2030-04 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 33.621326 | -115.0959 | 2026-09 |
| 67657/HANSO | Hanson | HANSO | 67657 | TX | Coleman | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 396 | 396 | 2027-07 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.690367 | -99.51389 | 2026-09 |
| 69877/CHPV1 | Charger Solar | CHPV1 | 69877 | TX | Refugio | AP Solar 4 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 394.4 | 394.4 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 28.416661 | -97.03519 | 2026-09 |
| 69057/CBDBA | CO Bar D Solar and BESS | CBDBA | 69057 | AZ | Coconino | Clenera DevCo LLC | IPP Non-CHP | Batteries | MWH | BA | 394 | 394 | 2028-05 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 35.636594 | -111.8835 | 2026-09 |
| 69057/CBDPV | CO Bar D Solar and BESS | CBDPV | 69057 | AZ | Coconino | Clenera DevCo LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 394 | 394 | 2028-05 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 35.636594 | -111.8835 | 2026-09 |
| 69595/GTGEN | Saddleback Generation Station | GTGEN | 69595 | AZ | Maricopa | Copia Power | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 375 | 345 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 33.410034 | -113.1694 | 2026-09 |
| 69595/GTGN2 | Saddleback Generation Station | GTGN2 | 69595 | AZ | Maricopa | Copia Power | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 375 | 345 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 33.410034 | -113.1694 | 2026-09 |
| 60206/HCCT1 | Wolf Summit Energy | HCCT1 | 60206 | WV | Harrison | Wolf Summit Energy LLC | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 371.5 | 319.1 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 39.287039 | -80.32287 | 2026-09 |
| 65853/MIDPV | Banita Creek- Spindlepop Solar | MIDPV | 65853 | TX | Nacogdoches | Parliament Energy Holdings LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 371 | 371 | 2028-06 | 2028 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.5552 | -94.7919 | 2026-09 |
| 63841/ARIDA | Arida Solar (Hybrid) | ARIDA | 63841 | NV | Clark | 326FW 8me LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 370 | 370 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.092036 | -114.6888 | 2026-09 |
| 63841/BESS | Arida Solar (Hybrid) | BESS | 63841 | NV | Clark | 326FW 8me LLC | IPP Non-CHP | Batteries | MWH | BA | 370 | 370 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.092036 | -114.6888 | 2026-09 |
| 69189/C2PV | Cowboy Solar II | C2PV | 69189 | WY | Laramie | Cowboy Solar II | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 365 | 365 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | WACM | 41.032968 | -104.3816 | 2026-09 |
| 68760/IPQ1S | Quantum Solar | IPQ1S | 68760 | TX | Haskell | Intersect USA, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 362.8 | 320.6 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 33.0129 | -99.5604 | 2026-09 |
| 68762/IPQ2S | Quantum II Solar | IPQ2S | 68762 | TX | Haskell | Intersect USA, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 362.8 | 320.6 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 33.1377 | -99.57 | 2026-09 |
| 68745/SS2 | Sunfish Solar 2 | SS2 | 68745 | MI | Calhoun | Consumers Energy Co - (MI) | Electric Utility | Solar Photovoltaic | SUN | PV | 360 | 360 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 42.24653 | -85.00559 | 2026-09 |
| 3122/CT5 | Homer City Generating Station | CT5 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 360 | 360 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CT6 | Homer City Generating Station | CT6 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 360 | 360 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CT2 | Homer City Generating Station | CT2 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 360 | 360 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CT3 | Homer City Generating Station | CT3 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 360 | 360 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CT7 | Homer City Generating Station | CT7 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 360 | 360 | 2029-03 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CT4 | Homer City Generating Station | CT4 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 360 | 360 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CT1 | Homer City Generating Station | CT1 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 360 | 360 | 2029-11 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 70200/64205 | Lucy Solar | 64205 | 70200 | TX | Concho | Concho County Solar 1 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 351.3 | 351.3 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 31.472348 | -99.99328 | 2026-09 |
| 66915/CTW | Cottonwood Bayou Solar | CTW | 66915 | TX | Brazoria | Cottonwood Bayou Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 350 | 350 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.263123 | -95.258 | 2026-09 |
| 67359/4666 | Funston Solar | 4666 | 67359 | TX | Jones | Funston Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 350 | 350 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 32.783669 | -99.72019 | 2026-09 |
| 68065/CHILS | Chillingham Solar | CHILS | 68065 | TX | Bell | Chillingham Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 350 | 350 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.006 | -97.262 | 2026-09 |
| 65854/RDYBS | Rowdy Creek Solar and BESS | RDYBS | 65854 | TX | Lamar | Parliament Energy Holdings LLC | IPP Non-CHP | Batteries | MWH | BA | 350 | 350 | 2027-05 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.75694 | -95.6458 | 2026-09 |
| 69796/HARVS | Harvey Solar | HARVS | 69796 | OH | Licking | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 350 | 350 | 2028-08 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 40.273115 | -82.71962 | 2026-09 |
| 68039/ELISA | Elisabeth Solar | ELISA | 68039 | AZ | Yuma | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 350 | 350 | 2028-09 | 2028 | (L) Regulatory approvals pending. Not under construction | CISO | 32.95453 | -113.4954 | 2026-09 |
| 69989/PB2 | Arkansas Cypress Solar Station | PB2 | 69989 | AR | Jefferson | Entergy Arkansas LLC | Electric Utility | Batteries | MWH | BA | 350 | 350 | 2029-01 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 34.42 | -92.08 | 2026-09 |
| 68546/2 | Smarr Combined Cycle Energy Facility | 2 | 68546 | GA | Monroe | Oglethorpe Power Corporation | Electric Utility | Natural Gas Fired Combined Cycle | NG | CC | 345 | 304 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SOCO | 32.975936 | -83.84369 | 2026-09 |
| 68940/CAPV | Country Acres Clean Power LLC | CAPV | 68940 | CA | Placer | Clenera DevCo LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 344 | 344 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | BANC | 38.751744 | -121.4221 | 2026-09 |
| 68305/GWT2 | Gigawatt Solar | GWT2 | 68305 | TX | Parker | Gigawatt Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 344 | 344 | 2028-08 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.547389 | -97.59792 | 2026-09 |
| 69661/IPD1S | Darden I Solar | IPD1S | 69661 | CA | Fresno | IPX Power USA, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 342.7 | 287.5 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 36.504106 | -120.2167 | 2026-09 |
| 69662/IPD2S | Darden II Solar | IPD2S | 69662 | CA | Fresno | IPX Power USA, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 342.7 | 287.5 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 36.457086 | -120.2248 | 2026-09 |
| 69663/IPD3S | Darden III Solar | IPD3S | 69663 | CA | Fresno | IPX Power USA, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 342.7 | 287.5 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 36.499703 | -120.1912 | 2026-09 |
| 69664/IPD4S | Darden IV Solar | IPD4S | 69664 | CA | Fresno | IPX Power USA, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 342.7 | 287.5 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 36.464339 | -120.1862 | 2026-09 |
| 69184/WF5ST | Waterford 5 | WF5ST | 69184 | LA | St Charles | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 342 | 310 | 2029-06 | 2029 | (T) Regulatory approvals received. Not under construction | MISO | 29.988583 | -90.48565 | 2026-09 |
| 69185/JPS1 | Jefferson Power Station | JPS1 | 69185 | AR | Jefferson | Entergy Arkansas LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 342 | 310 | 2029-11 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 34.427527 | -92.13996 | 2026-09 |
| 69445/ST1 | Waterford 6 | ST1 | 69445 | LA | St Charles | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 342 | 310 | 2030-06 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 29.988583 | -90.48565 | 2026-09 |
| 67914/1C | Delta Blues Advanced Power Station | 1C | 67914 | MS | Washington | Entergy Mississippi LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 341.7 | 291.5 | 2028-05 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 33.330476 | -91.13058 | 2026-09 |
| 69223/ST1 | Vicksburg Advanced Power Station | ST1 | 69223 | MS | Warren | Entergy Mississippi LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 341.7 | 291.9 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 32.28526 | -90.92568 | 2026-09 |
| 70187/ST1 | Traceview Advanced Power Station | ST1 | 70187 | MS | Madison | Entergy Mississippi LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 341.7 | 291.9 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 32.405646 | -90.22114 | 2026-09 |
| 69426/CA1 | Westlake Power Station | CA1 | 69426 | LA | Calcasieu | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 341.7 | 341.7 | 2030-10 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.281105 | -93.30189 | 2026-09 |
| 62954/GEN1 | Alle-Catt Wind Energy LLC | GEN1 | 62954 | NY | Allegany | Invenergy Services LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 340 | 340 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 42.262038 | -78.20154 | 2026-09 |
| 69040/ARY1 | Arroyo Solar | ARY1 | 69040 | CO | Pueblo | Public Service Co of Colorado | Electric Utility | Solar Photovoltaic | SUN | PV | 335 | 335 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 38.161657 | -104.5488 | 2026-09 |
| 64999/CPNS1 | Pecan Prairie North Solar | CPNS1 | 64999 | TX | Leon | Repsol Renewables NA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 324.1 | 324.1 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.13718 | -96.26925 | 2026-09 |
| 64669/KOV4A | Notch Peak Solar LLC | KOV4A | 64669 | UT | Millard | Notch Peak Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 324 | 324 | 2028-09 | 2028 | (T) Regulatory approvals received. Not under construction | LDWP | 39.520131 | -112.6602 | 2026-09 |
| 3407/STG1 | Kingston | STG1 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 323 | 296.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3399/STG2 | Cumberland (TN) | STG2 | 3399 | TN | Stewart | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 323 | 296.6 | 2029-01 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 36.3903 | -87.6539 | 2026-09 |
| 3399/STG1 | Cumberland (TN) | STG1 | 3399 | TN | Stewart | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 323 | 296.6 | 2034-12 | 2034 | (U) Under construction, less than or equal to 50 percent complete | TVA | 36.3903 | -87.6539 | 2026-09 |
| 66910/MYR | Myrtle Solar, LLC | MYR | 66910 | TX | Brazoria | Myrtle Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 313 | 313 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.228486 | -95.42744 | 2026-09 |
| 68214/1B | Franklin Farms 1&2 | 1B | 68214 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 311 | 302.8 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 32.53246 | -91.62767 | 2026-09 |
| 68214/2B | Franklin Farms 1&2 | 2B | 68214 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 311 | 302.8 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 32.53246 | -91.62767 | 2026-09 |
| 69449/1B | Richland Parish Power Station 1&2 | 1B | 69449 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 311 | 302.8 | 2030-03 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 32.468339 | -91.68038 | 2026-09 |
| 69449/2B | Richland Parish Power Station 1&2 | 2B | 69449 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 311 | 302.8 | 2030-03 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 32.468339 | -91.68038 | 2026-09 |
| 69649/3B | Richland Parish Power Station 3 | 3B | 69649 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 311 | 302.8 | 2030-10 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 32.496716 | -91.69867 | 2026-09 |
| 69650/4B | Richland Parish Power Station 4 | 4B | 69650 | LA | Richland | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 311 | 302.8 | 2030-10 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 32.497782 | -91.6997 | 2026-09 |
| 69944/PC1B | Pointe Coupee Power Station | PC1B | 69944 | LA | Pointe Coupee | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 311 | 302.8 | 2031-10 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.739 | -91.377 | 2026-09 |
| 69944/PC2B | Pointe Coupee Power Station | PC2B | 69944 | LA | Pointe Coupee | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 311 | 302.8 | 2031-11 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.739 | -91.377 | 2026-09 |
| 69944/PC3B | Pointe Coupee Power Station | PC3B | 69944 | LA | Pointe Coupee | Entergy Louisiana LLC | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 311 | 302.8 | 2031-12 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.739 | -91.377 | 2026-09 |
| 69930/MS2 | Milford Solar Phase II | MS2 | 69930 | UT | Beaver | Milford Solar Phase II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 310 | 310 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | LDWP | 38.522442 | -113.0148 | 2026-09 |
| 67776/GRS2B | Cuchillas PV and BESS | GRS2B | 67776 | TX | Webb | Gransolar Texas Two LLC | IPP Non-CHP | Batteries | MWH | BA | 306.9 | 306.9 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 27.644178 | -99.18445 | 2026-09 |
| 66391/BESS | Ash Creek BESS | BESS | 66391 | TX | Hill | ACTX BESS Project LLC | IPP Non-CHP | Batteries | MWH | BA | 306 | 306 | 2028-03 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.900218 | -97.01642 | 2026-09 |
| 67776/GRS2P | Cuchillas PV and BESS | GRS2P | 67776 | TX | Webb | Gransolar Texas Two LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 305.6 | 305.6 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 27.644178 | -99.18445 | 2026-09 |
| 66691/BRIGG | Briggs Solar, LLC | BRIGG | 66691 | TX | Haskell | Intersect USA, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 305 | 305 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.144326 | -99.55977 | 2026-09 |
| 69661/IPD1B | Darden I Solar | IPD1B | 69661 | CA | Fresno | IPX Power USA, LLC | IPP Non-CHP | Batteries | MWH | BA | 303.7 | 287.5 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 36.504106 | -120.2167 | 2026-09 |
| 69662/IPD2B | Darden II Solar | IPD2B | 69662 | CA | Fresno | IPX Power USA, LLC | IPP Non-CHP | Batteries | MWH | BA | 303.7 | 287.5 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 36.457086 | -120.2248 | 2026-09 |
| 69663/IPD3B | Darden III Solar | IPD3B | 69663 | CA | Fresno | IPX Power USA, LLC | IPP Non-CHP | Batteries | MWH | BA | 303.7 | 287.5 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 36.499703 | -120.1912 | 2026-09 |
| 69664/IPD4B | Darden IV Solar | IPD4B | 69664 | CA | Fresno | IPX Power USA, LLC | IPP Non-CHP | Batteries | MWH | BA | 303.7 | 287.5 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 36.464339 | -120.1862 | 2026-09 |
| 65853/MIDBS | Banita Creek- Spindlepop Solar | MIDBS | 65853 | TX | Nacogdoches | Parliament Energy Holdings LLC | IPP Non-CHP | Batteries | MWH | BA | 302.9 | 302.9 | 2027-04 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.5552 | -94.7919 | 2026-09 |
| 68739/UVAPV | Uva Creek Solar | UVAPV | 68739 | TX | Borden | Red River Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 301 | 301 | 2028-08 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 32.679762 | -101.5044 | 2026-09 |
| 63798/ATL01 | Atlas | ATL01 | 63798 | AZ | La Paz | 174 Power Global Corp. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2026-09 | 2026 | (V) Under construction, more than 50 percent complete | AZPS | 33.94345 | -113.7917 | 2026-09 |
| 66545/MMTHS | Mammoth South Solar Project | MMTHS | 66545 | IN | Pulaski | Mammoth South LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.095334 | -86.69157 | 2026-09 |
| 69055/ALTS4 | ATLAS SOLAR IV | ALTS4 | 69055 | AZ | La Paz | ATLAS SOLAR IV, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 33.582903 | -113.5769 | 2026-09 |
| 66546/MMTHC | Mammoth Central Solar Project | MMTHC | 66546 | IN | Pulaski | Mammoth Central LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.090899 | -86.71283 | 2026-09 |
| 68514/MC201 | Mammoth Central II Solar Facility | MC201 | 68514 | IN | Pulaski | Mammoth Central II LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.090053 | -86.69398 | 2026-09 |
| 69479/KSHKS | Koshkonong Solar Energy Center LLC | KSHKS | 69479 | WI | Dane | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 42.976875 | -89.07209 | 2026-09 |
| 69299/4519 | Singer Solar | 4519 | 69299 | LA | Beauregard | Singer Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 30.694644 | -93.33381 | 2026-09 |
| 68328/ORCH1 | Pioneer Clean Energy Center | ORCH1 | 68328 | AZ | Yuma | Yuma bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | AZPS | 32.549081 | -114.5974 | 2026-09 |
| 68328/ORCH2 | Pioneer Clean Energy Center | ORCH2 | 68328 | AZ | Yuma | Yuma bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | AZPS | 32.549081 | -114.5974 | 2026-09 |
| 68184/COLES | Coles Wind | COLES | 68184 | IL | Coles | Coles Wind, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 300 | 300 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 39.605953 | -88.18026 | 2026-09 |
| 69480/HGHNN | High Noon Solar Energy LLC | HGHNN | 69480 | WI | Columbia | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 43.35326 | -89.34738 | 2026-09 |
| 70020/1 | Pinopolis BESS | 1 | 70020 | SC | Berkeley | Pinopolis BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | SC | 33.246764 | -79.98517 | 2026-09 |
| 68030/RDHLW | Red Hollow Renewable Energy | RDHLW | 68030 | TX | Archer | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-10 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 33.564936 | -98.612 | 2026-09 |
| 68030/RHLWB | Red Hollow Renewable Energy | RHLWB | 68030 | TX | Archer | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2027-10 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 33.564936 | -98.612 | 2026-09 |
| 69364/REDEG | Red Egret | REDEG | 69364 | TX | Galveston | Red Egret, LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.4229 | -95.0049 | 2026-09 |
| 70097/SWB | Sherco BESS | SWB | 70097 | MN | Sherburne | Northern States Power Co - Minnesota | Electric Utility | Batteries | MWH | BA | 300 | 300 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 45.372125 | -93.89978 | 2026-09 |
| 60070/GEN | Nolin Hills | GEN | 60070 | OR | Umatilla | Nolin Hills Wind, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 300 | 300 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | BPAT | 45.55455 | -119.1143 | 2026-09 |
| 60070/GEN2 | Nolin Hills | GEN2 | 60070 | OR | Umatilla | Nolin Hills Wind, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | BPAT | 45.55455 | -119.1143 | 2026-09 |
| 65850/ELIBS | Elio Energy LLC | ELIBS | 65850 | TX | Brazoria | Elio Energy LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.247678 | -95.68546 | 2026-09 |
| 66309/UVPV2 | Uvalde Solar 2 | UVPV2 | 66309 | TX | Uvalde | RWE Americas, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.225768 | -99.69913 | 2026-09 |
| 66426/1EUS | Utah Solar 1 | 1EUS | 66426 | UT | Millard | ECG Utah Solar1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 39.504761 | -112.5077 | 2026-09 |
| 66908/BZPV | Bonanza Solar and Storage Project | BZPV | 66908 | NV | Clark | EDF Renewables Development, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 36.558 | -115.799 | 2026-09 |
| 68033/SNRSE | Sunrose Renewable Energy | SNRSE | 68033 | TX | Austin | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.674226 | -96.12137 | 2026-09 |
| 68033/SRSEB | Sunrose Renewable Energy | SRSEB | 68033 | TX | Austin | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.674226 | -96.12137 | 2026-09 |
| 69963/YLWWD | Yellow Wood Solar Energy LLC | YLWWD | 69963 | OH | Clinton | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 39.271465 | -83.7904 | 2026-09 |
| 70097/SSB | Sherco BESS | SSB | 70097 | MN | Sherburne | Northern States Power Co - Minnesota | Electric Utility | Batteries | MWH | BA | 300 | 300 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 45.372125 | -93.89978 | 2026-09 |
| 70204/CANPV | Cantaloupe Solar | CANPV | 70204 | TX | Reeves | Cantaloupe Solar - ERCOT | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.05668 | -103.6634 | 2026-09 |
| 70238/RDHS | Roadhouse Energy Center | RDHS | 70238 | CA | San Bernardino | Roadhouse Energy Storage | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 34.0065 | -117.5696 | 2026-09 |
| 70330/BRSPV | Bighorn Ridge Solar | BRSPV | 70330 | TX | Pecos | NextEra Energy Resources - ERCOT | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 30.956251 | -103.028 | 2026-09 |
| 70583/HLS01 | Highland Solar I, LLC - (CO) | HLS01 | 70583 | CO | Pueblo | Highland Solar I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PSCO | 38.41955 | -104.2277 | 2026-09 |
| 68076/ROCKY | Rocky Run Solar | ROCKY | 68076 | VA | Brunswick | Dominion Renewable Energy | Electric Utility | Solar Photovoltaic | SUN | PV | 300 | 300 | 2028-01 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37 | -78 | 2026-09 |
| 68758/IPEA3 | Easley Solar | IPEA3 | 68758 | CA | Riverside | IPX Power USA, LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 33.722655 | -115.326 | 2026-09 |
| 64208/30PNB | Red Antelope Solar & Energy Storage Farm | 30PNB | 64208 | AZ | Coconino | 302PN 8me LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2028-05 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 36.7 | -111.28 | 2026-09 |
| 68813/VITEX | Vitex Storage | VITEX | 68813 | NV | Clark | Cypress Creek Renewables | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | NEVP | 36.382286 | -114.9102 | 2026-09 |
| 63113/BESS | Southern Bighorn Solar Hybrid | BESS | 63113 | NV | Clark | 300MS 8me LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | NEVP | 36.304793 | -114.4728 | 2026-09 |
| 63113/SBS | Southern Bighorn Solar Hybrid | SBS | 63113 | NV | Clark | 300MS 8me LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | NEVP | 36.304793 | -114.4728 | 2026-09 |
| 69763/HPS | Heritage Prairie Solar LLC | HPS | 69763 | IL | Kankakee | Pattern Operators LP | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2028-09 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 41.06713 | -88.2497 | 2026-09 |
| 68283/DESA | Desert Sand BESS | DESA | 68283 | AZ | Maricopa | DESA bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | AZPS | 33.497049 | -113.0514 | 2026-09 |
| 68283/DESA1 | Desert Sand BESS | DESA1 | 68283 | AZ | Maricopa | DESA bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | AZPS | 33.497049 | -113.0514 | 2026-09 |
| 70367/OBAES | O'Bannion Energy Storage | OBAES | 70367 | TX | Jack | O'Bannion Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 33.041 | -98.339 | 2026-09 |
| 68298/THSI1 | THREE SISTERS Solar Generation and BESS | THSI1 | 68298 | AZ | Pinal | THSI bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2029-04 | 2029 | (L) Regulatory approvals pending. Not under construction | AZPS | 32.053732 | -109.823 | 2026-09 |
| 68298/THSI2 | THREE SISTERS Solar Generation and BESS | THSI2 | 68298 | AZ | Pinal | THSI bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2029-04 | 2029 | (L) Regulatory approvals pending. Not under construction | AZPS | 32.053732 | -109.823 | 2026-09 |
| 68371/REBU | Red Butte Solar and Storage | REBU | 68371 | UT | Iron | BrightNight Power | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2029-04 | 2029 | (L) Regulatory approvals pending. Not under construction | PACE | 37.6134 | -113.644 | 2026-09 |
| 68371/REBU2 | Red Butte Solar and Storage | REBU2 | 68371 | UT | Iron | BrightNight Power | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2029-04 | 2029 | (L) Regulatory approvals pending. Not under construction | PACE | 37.6134 | -113.644 | 2026-09 |
| 67649/AMERA | Amerada | AMERA | 67649 | TX | Freestone | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2029-07 | 2029 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.861926 | -96.11463 | 2026-09 |
| 65703/HEHUM | Humidor Storage I | HEHUM | 65703 | CA | Los Angeles | Hecate Grid Humidor Storage 1 LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.29116 | -118.7518 | 2026-09 |
| 68344/LOSN1 | Lower Snake Solar Generation BESS | LOSN1 | 68344 | WA | Garfield | LOSN, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2029-10 | 2029 | (L) Regulatory approvals pending. Not under construction | BPAT | 46.502392 | -117.8263 | 2026-09 |
| 68344/LOSN2 | Lower Snake Solar Generation BESS | LOSN2 | 68344 | WA | Garfield | LOSN, LLC | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2029-10 | 2029 | (L) Regulatory approvals pending. Not under construction | BPAT | 46.502392 | -117.8263 | 2026-09 |
| 67819/CRSB1 | Robinson Solar | CRSB1 | 67819 | NV | White Pine | Repsol Renewables NA | IPP Non-CHP | Batteries | MWH | BA | 300 | 300 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | NEVP | 39.298603 | -115.2192 | 2026-09 |
| 67819/CRSS1 | Robinson Solar | CRSS1 | 67819 | NV | White Pine | Repsol Renewables NA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | NEVP | 39.298603 | -115.2192 | 2026-09 |
| 69640/73509 | Cazadores Solar | 73509 | 69640 | TX | Duval | Cazadores Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 27.392246 | -98.50107 | 2026-09 |
| 61170/33UI8 | Gale 1 Solar | 33UI8 | 61170 | UT | Millard | 33UI 8me LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2030-08 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 39.523 | -112.546 | 2026-09 |
| 69643/60215 | Deep Space Solar | 60215 | 69643 | CO | Kiowa | Deep Space Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PSCO | 38.402141 | -103.286 | 2026-09 |
| 69644/58441 | Pease River Solar | 58441 | 69644 | TX | Foard | Pease River Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 300 | 300 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 33.991957 | -99.69277 | 2026-09 |
| 68186/FIRE | Firelands Wind | FIRE | 68186 | OH | Huron | Firelands Wind, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 297 | 297 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.210325 | -82.77908 | 2026-09 |
| 68339/1 | Abercrombie Solar | 1 | 68339 | ND | Richland | Otter Tail Power Co | Electric Utility | Solar Photovoltaic | SUN | PV | 295.1 | 295.1 | 2028-08 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 46.4277 | -96.8259 | 2026-09 |
| 69150/SYPRT | Sypert Branch Solar | SYPRT | 69150 | TX | Milam | Sypert Branch Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 293.9 | 260 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 30.877895 | -97.1944 | 2026-09 |
| 68758/IPEA1 | Easley Solar | IPEA1 | 68758 | CA | Riverside | IPX Power USA, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 290 | 290 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 33.722655 | -115.326 | 2026-09 |
| 59243/CHAN1 | Changing Winds | CHAN1 | 59243 | TX | Castro | Invenergy Services LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 288 | 288 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 34.511944 | -102.0519 | 2026-09 |
| 69606/7496 | Monarch Creek Wind, LLC | 7496 | 69606 | TX | Throckmorton | Monarch Creek Wind, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 287.6 | 287.6 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 33.183899 | -99.42239 | 2026-09 |
| 68507/EEC | Excelsior Energy Center | EEC | 68507 | NY | Genesee | Excelsior Energy Center, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 280 | 280 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | NYIS | 43.064852 | -78.07681 | 2026-09 |
| 69496/PDRA | Piedra Solar | PDRA | 69496 | TX | Freestone | Piedra Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 280 | 280 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.648989 | -96.34517 | 2026-09 |
| 8059/2S1 | Comanche (OK) | 2S1 | 8059 | OK | Comanche | Public Service Co of Oklahoma | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 277.6 | 267 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 34.5431 | -98.3244 | 2026-09 |
| 8059/3S1 | Comanche (OK) | 3S1 | 8059 | OK | Comanche | Public Service Co of Oklahoma | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 277.6 | 267 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 34.5431 | -98.3244 | 2026-09 |
| 67542/BHWP | Blue Hills Wind Project | BHWP | 67542 | TX | Val Verde | Greenalia Wind Power Blue Hills, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 276 | 276 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | ERCO | 30.233597 | -101.3636 | 2026-09 |
| 69778/HK1SO | Hashknife Energy Center LLC | HK1SO | 69778 | AZ | Navajo | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 275 | 275 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | AZPS | 34.574259 | -110.4946 | 2026-09 |
| 69778/HK1ST | Hashknife Energy Center LLC | HK1ST | 69778 | AZ | Navajo | Invenergy Services LLC | IPP Non-CHP | Batteries | MWH | BA | 275 | 275 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | AZPS | 34.574259 | -110.4946 | 2026-09 |
| 66786/ELVMT | Elevate Middletown | ELVMT | 66786 | CT | Middlesex | Lighthouse Middletown, LLC | IPP Non-CHP | Batteries | MWH | BA | 275 | 275 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ISNE | 41.554321 | -72.57832 | 2026-09 |
| 69588/YCWT | Yellow Cat Wind, LLC | YCWT | 69588 | TX | Navarro | RWE Americas, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 270 | 270 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 32.07 | -96.83 | 2026-09 |
| 64911/CSRS1 | South Ripley Solar | CSRS1 | 64911 | NY | Chautauqua | Repsol Renewables NA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 270 | 270 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | NYIS | 42.198116 | -79.75789 | 2026-09 |
| 3122/CA5 | Homer City Generating Station | CA5 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 268 | 268 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CA6 | Homer City Generating Station | CA6 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 268 | 268 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CA2 | Homer City Generating Station | CA2 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 268 | 268 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CA3 | Homer City Generating Station | CA3 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 268 | 268 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CA7 | Homer City Generating Station | CA7 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 268 | 268 | 2029-03 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CA4 | Homer City Generating Station | CA4 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 268 | 268 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 3122/CA1 | Homer City Generating Station | CA1 | 3122 | PA | Indiana | Homer City Generation, L.P. | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 268 | 268 | 2029-11 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.512825 | -79.19611 | 2026-09 |
| 69403/GOOD2 | Goodnight Wind II | GOOD2 | 69403 | TX | Armstrong | FGE Goodnight II, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 265.5 | 265.5 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 34.937162 | -101.4339 | 2026-09 |
| 69808/CT1 | Princeton Road Station | CT1 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 265.4 | 239.6 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/CT2 | Princeton Road Station | CT2 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 265.4 | 239.6 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 68873/BIGS | Big Sampson Wind | BIGS | 68873 | TX | Crockett | Big Sampson Wind Project, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 265 | 265 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 30.981883 | -101.8505 | 2026-09 |
| 64547/3 | Turtle Creek | 3 | 64547 | NE | Sarpy | Omaha Public Power District | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 264 | 221 | 2028-08 | 2028 | (T) Regulatory approvals received. Not under construction | SWPP | 41.092238 | -96.16831 | 2026-09 |
| 55972/CT-3 | Cass County | CT-3 | 55972 | NE | Cass | Omaha Public Power District | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 264 | 221 | 2029-02 | 2029 | (T) Regulatory approvals received. Not under construction | SWPP | 40.947913 | -95.96403 | 2026-09 |
| 55972/CT-4 | Cass County | CT-4 | 55972 | NE | Cass | Omaha Public Power District | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 264 | 221 | 2029-02 | 2029 | (T) Regulatory approvals received. Not under construction | SWPP | 40.947913 | -95.96403 | 2026-09 |
| 55972/CT-5 | Cass County | CT-5 | 55972 | NE | Cass | Omaha Public Power District | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 264 | 221 | 2029-02 | 2029 | (T) Regulatory approvals received. Not under construction | SWPP | 40.947913 | -95.96403 | 2026-09 |
| 69071/CA1 | Bison Generation Station | CA1 | 69071 | ND | Williams | Basin Electric Power Coop | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 263 | 320 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | SWPP | 48.327932 | -103.3127 | 2026-09 |
| 69071/CA2 | Bison Generation Station | CA2 | 69071 | ND | Williams | Basin Electric Power Coop | Electric Utility | Natural Gas Fired Combined Cycle | NG | CA | 263 | 320 | 2030-03 | 2030 | (L) Regulatory approvals pending. Not under construction | SWPP | 48.327932 | -103.3127 | 2026-09 |
| 7916/7 | Talbot County Energy | 7 | 7916 | GA | Talbot | Oglethorpe Power Corporation | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 262 | 241 | 2029-01 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SOCO | 32.5892 | -84.6917 | 2026-09 |
| 69635/74964 | Peach Wood Solar | 74964 | 69635 | GA | Mitchell | Peach WoodSolar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 261 | 261 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | SOCO | 31.343419 | -84.21269 | 2026-09 |
| 70419/RSBA | Royal Slope | RSBA | 70419 | WA | Grant | Royal Slope Solar LLC | IPP Non-CHP | Batteries | MWH | BA | 260 | 260 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | BPAT | 46.883147 | -119.9207 | 2026-09 |
| 70419/RSPV | Royal Slope | RSPV | 70419 | WA | Grant | Royal Slope Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 260 | 260 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | BPAT | 46.883147 | -119.9207 | 2026-09 |
| 65893/OCIRO | OCI SunRoper | OCIRO | 65893 | TX | Wharton | OCI Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 260 | 260 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.240399 | -96.01154 | 2026-09 |
| 69799/F1G01 | Project Matador Gas Plant (PMG) | F1G01 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 260 | 242.7 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/F1G02 | Project Matador Gas Plant (PMG) | F1G02 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 260 | 242.7 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/F1G03 | Project Matador Gas Plant (PMG) | F1G03 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 260 | 242.7 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/F2G01 | Project Matador Gas Plant (PMG) | F2G01 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 260 | 242.7 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/F2G02 | Project Matador Gas Plant (PMG) | F2G02 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 260 | 242.7 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/F2G03 | Project Matador Gas Plant (PMG) | F2G03 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 260 | 242.7 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 70407/RSS | Roy Solar | RSS | 70407 | OK | Stephens | Roy Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 258 | 258 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SPA | 34.309919 | -96.77935 | 2026-09 |
| 67837/RAYRS | Ray Ranch Solar | RAYRS | 67837 | TX | Goliad | Ray Ranch Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 255.2 | 255.2 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 28.628 | -97.724 | 2026-09 |
| 66411/RMSY | Hecate Grid East Valley Storage | RMSY | 66411 | TX | Cameron | Hecate Grid East Valley Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 255 | 255 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 25.94113 | -97.53276 | 2026-09 |
| 70299/814 | Pioneer Creek Wind, LLC | 814 | 70299 | KS | Ford | NextEra Energy Resources, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 252 | 252 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | SWPP | 37.735053 | -99.80556 | 2026-09 |
| 64835/NA | Silver Queen Wind Farm | NA | 64835 | IA | Crawford | Silver Queen Wind Farm, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 252 | 252 | 2028-10 | 2028 | (L) Regulatory approvals pending. Not under construction | SWPP | 42.002397 | -95.1316 | 2026-09 |
| 69892/OAK | Oak Valley Solar | OAK | 69892 | TX | Ellis | Oak Valley Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 251.3 | 251.3 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.012951 | -96.49974 | 2026-09 |
| 69681/DRAKE | Mallard Energy Storage | DRAKE | 69681 | TX | Collin | Mallard Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 33.064274 | -96.45051 | 2026-09 |
| 69968/RUS | Rumble Solar | RUS | 69968 | OK | Grady | Rumble Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 35.338721 | -97.98901 | 2026-09 |
| 68325/SMS | Show Me State Solar | SMS | 68325 | MO | Callaway | Show Me State Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 38.958702 | -91.94479 | 2026-09 |
| 65880/ZEYA | Zeya | ZEYA | 65880 | TX | Galveston | Engie North America | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.388758 | -94.94793 | 2026-09 |
| 67357/4666 | Tiger Solar | 4666 | 67357 | TX | Jones | Vaca Del Sol, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 32.796921 | -99.88089 | 2026-09 |
| 70137/DL250 | Dry Land Prairie Energy Storage | DL250 | 70137 | CO | Cheyenne | Dry Land Prairie Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 38.99974 | -102.4943 | 2026-09 |
| 70053/SP250 | South Platte Storage | SP250 | 70053 | CO | Morgan | South Platte Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 40.12 | -103.42 | 2026-09 |
| 70300/USADC | Adams Creek Solar Project | USADC | 70300 | TX | Wilbarger | Adams Creek Solar Project, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2027-06 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 34.15382 | -98.96333 | 2026-09 |
| 69887/PRTGS | Portage Solar, LLC | PRTGS | 69887 | WI | Portage | Geronimo Power | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 44.456358 | -89.54401 | 2026-09 |
| 70178/CBLT | Cobalt | CBLT | 70178 | CA | Riverside | RE Cobalt LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2027-08 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 33.571 | -118.1789 | 2026-09 |
| 66706/11101 | Patoka Solar | 11101 | 66706 | IN | Posey | Strata Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2027-09 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 38.14033 | -87.77567 | 2026-09 |
| 66707/11102 | Prairie Oak Solar | 11102 | 66707 | IL | Shelby | Strata Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2027-09 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 39.542799 | -89.03153 | 2026-09 |
| 67552/ELMBA | Elm Flats Solar | ELMBA | 67552 | TX | Navarro | Headwater Energy, LLC | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 32.113579 | -96.30476 | 2026-09 |
| 68583/RRB | Rock N' Roll | RRB | 68583 | TX | Brazoria | Lydian Energy | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2027-10 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.299371 | -95.42218 | 2026-09 |
| 67226/ROCKH | Rock House Solar | ROCKH | 67226 | GA | McDuffie | EDF Renewables Development, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2027-11 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SOCO | 33.4481 | -82.4039 | 2026-09 |
| 63202/701 | TREX US Red Holly | 701 | 63202 | TX | Lynn | TREX US Red Holly LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 32.952 | -101.737 | 2026-09 |
| 69721/BESS1 | Energizar BESS | BESS1 | 69721 | MA | Suffolk | Energizar Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ISNE | 42.39556 | -71.02218 | 2026-09 |
| 70047/SSPV | Selenite Springs Solar | SSPV | 70047 | TX | Pecos | NextEra Energy Resources - ERCOT | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 30.992503 | -103.0571 | 2026-09 |
| 70462/PAWS | Pawnee Solar & BESS | PAWS | 70462 | CO | Morgan | Public Service Co of Colorado | Electric Utility | Solar Photovoltaic | SUN | PV | 250 | 250 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 40.127571 | -103.7249 | 2026-09 |
| 70034/ES | Evlou Solar, LLC | ES | 70034 | TX | El Paso | Evlou Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2028-01 | 2028 | (U) Under construction, less than or equal to 50 percent complete | EPE | 31.507744 | -106.0534 | 2026-09 |
| 70034/ESS | Evlou Solar, LLC | ESS | 70034 | TX | El Paso | Evlou Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2028-01 | 2028 | (U) Under construction, less than or equal to 50 percent complete | EPE | 31.507744 | -106.0534 | 2026-09 |
| 67987/MYSPB | Mystic Springs Renewable Energy (Hybrid) | MYSPB | 67987 | TX | Kaufman | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2028-03 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.821255 | -96.19042 | 2026-09 |
| 67987/MYSPS | Mystic Springs Renewable Energy (Hybrid) | MYSPS | 67987 | TX | Kaufman | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2028-03 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.821255 | -96.19042 | 2026-09 |
| 70258/H2SLR | Hawkeye Solar II, LLC | H2SLR | 70258 | IA | Clinton | Hawkeye Solar II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 41.835204 | -90.69966 | 2026-09 |
| 67982/ATHS1 | Athens Solar I (Hybrid) | ATHS1 | 67982 | CA | Placer | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.754889 | -121.4071 | 2026-09 |
| 67982/ATHSB | Athens Solar I (Hybrid) | ATHSB | 67982 | CA | Placer | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.754889 | -121.4071 | 2026-09 |
| 68883/STBA | Sawtooth Solar | STBA | 68883 | AZ | Pinal | EDF Renewables Development, Inc. | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | AZPS | 32.728 | -111.629 | 2026-09 |
| 68883/STPV | Sawtooth Solar | STPV | 68883 | AZ | Pinal | EDF Renewables Development, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | AZPS | 32.728 | -111.629 | 2026-09 |
| 66684/HL001 | Intermountain Pumped Storage Project | HL001 | 66684 | UT | Millard | Premium Energy Holdings | IPP Non-CHP | Hydroelectric Pumped Storage | WAT | PS | 250 | 250 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 39.414705 | -112.4404 | 2026-09 |
| 66684/HL002 | Intermountain Pumped Storage Project | HL002 | 66684 | UT | Millard | Premium Energy Holdings | IPP Non-CHP | Hydroelectric Pumped Storage | WAT | PS | 250 | 250 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 39.414705 | -112.4404 | 2026-09 |
| 66684/HL003 | Intermountain Pumped Storage Project | HL003 | 66684 | UT | Millard | Premium Energy Holdings | IPP Non-CHP | Hydroelectric Pumped Storage | WAT | PS | 250 | 250 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 39.414705 | -112.4404 | 2026-09 |
| 66684/HL004 | Intermountain Pumped Storage Project | HL004 | 66684 | UT | Millard | Premium Energy Holdings | IPP Non-CHP | Hydroelectric Pumped Storage | WAT | PS | 250 | 250 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 39.414705 | -112.4404 | 2026-09 |
| 66686/HL001 | Haiwee Pumped Storage Project | HL001 | 66686 | CA | Inyo | Premium Energy Holdings | IPP Non-CHP | Hydroelectric Pumped Storage | WAT | PS | 250 | 250 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 36.233105 | -117.9625 | 2026-09 |
| 66686/HL002 | Haiwee Pumped Storage Project | HL002 | 66686 | CA | Inyo | Premium Energy Holdings | IPP Non-CHP | Hydroelectric Pumped Storage | WAT | PS | 250 | 250 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 36.233105 | -117.9625 | 2026-09 |
| 66686/HL003 | Haiwee Pumped Storage Project | HL003 | 66686 | CA | Inyo | Premium Energy Holdings | IPP Non-CHP | Hydroelectric Pumped Storage | WAT | PS | 250 | 250 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 36.233105 | -117.9625 | 2026-09 |
| 66686/HL004 | Haiwee Pumped Storage Project | HL004 | 66686 | CA | Inyo | Premium Energy Holdings | IPP Non-CHP | Hydroelectric Pumped Storage | WAT | PS | 250 | 250 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 36.233105 | -117.9625 | 2026-09 |
| 70397/SRSB1 | Steel River Solar Phase 1 | SRSB1 | 70397 | AR | Mississippi | Cypress Creek Renewables | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 35.578637 | -90.09763 | 2026-09 |
| 70515/PV1 | Burt County Solar (Sandhills Energy) | PV1 | 70515 | NE | Burt | Burt County Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2028-10 | 2028 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 41.712811 | -96.15962 | 2026-09 |
| 64912/CMPS1 | Mill Point Solar | CMPS1 | 64912 | NY | Montgomery | Repsol Renewables NA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.919098 | -74.34116 | 2026-09 |
| 68491/FPS | Freedom Pine Solar | FPS | 68491 | ME | York | Freedom Pine Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2029-01 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ISNE | 43.34779 | -70.8974 | 2026-09 |
| 3797/CERC1 | Chesterfield | CERC1 | 3797 | VA | Chesterfield | Virginia Electric & Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 250 | 233.9 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 37.3822 | -77.3833 | 2026-09 |
| 3797/CERC2 | Chesterfield | CERC2 | 3797 | VA | Chesterfield | Virginia Electric & Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 250 | 233.9 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 37.3822 | -77.3833 | 2026-09 |
| 3797/CERC3 | Chesterfield | CERC3 | 3797 | VA | Chesterfield | Virginia Electric & Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 250 | 233.9 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 37.3822 | -77.3833 | 2026-09 |
| 3797/CERC4 | Chesterfield | CERC4 | 3797 | VA | Chesterfield | Virginia Electric & Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 250 | 233.9 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 37.3822 | -77.3833 | 2026-09 |
| 68351/CLAPV | Clairemont Solar | CLAPV | 68351 | TX | Kent | Clairemont Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 33.371565 | -100.9758 | 2026-09 |
| 68356/LUBA2 | Lazy U ESS 2 | LUBA2 | 68356 | TX | Hardeman | Lazy U ESS 2 LLC | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 34.265496 | -99.87214 | 2026-09 |
| 68357/LUPV1 | Lazy U Solar 1 | LUPV1 | 68357 | TX | Hardeman | Lazy U Solar 1 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 34.265496 | -99.87214 | 2026-09 |
| 68358/LUPV2 | Lazy U Solar 2 | LUPV2 | 68358 | TX | Hardeman | Lazy U Solar 2 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 34.265496 | -99.87214 | 2026-09 |
| 70398/SRSB2 | Steel River Solar Phase 2 | SRSB2 | 70398 | AR | Mississippi | Cypress Creek Renewables | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2029-07 | 2029 | (U) Under construction, less than or equal to 50 percent complete | MISO | 35.578637 | -90.09763 | 2026-09 |
| 68355/LUBA1 | Lazy U ESS 1 | LUBA1 | 68355 | TX | Hardeman | Lazy U ESS 1 LLC | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2030-07 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 34.265496 | -99.87214 | 2026-09 |
| 70399/SRSB3 | Steel River Solar Phase 3 | SRSB3 | 70399 | AR | Mississippi | Cypress Creek Renewables | IPP Non-CHP | Batteries | MWH | BA | 250 | 250 | 2030-07 | 2030 | (U) Under construction, less than or equal to 50 percent complete | MISO | 35.578637 | -90.09763 | 2026-09 |
| 67950/MFS1 | Moonlight Flats Solar Power 1 | MFS1 | 67950 | PA | Clearfield | Moonlight Flats Solar Power, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 250 | 250 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 41.092288 | -78.17989 | 2026-09 |
| 69595/STGEN | Saddleback Generation Station | STGEN | 69595 | AZ | Maricopa | Copia Power | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 250 | 230 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 33.410034 | -113.1694 | 2026-09 |
| 69595/STGN2 | Saddleback Generation Station | STGN2 | 69595 | AZ | Maricopa | Copia Power | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 250 | 230 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 33.410034 | -113.1694 | 2026-09 |
| 63850/CHERY | Cherry | CHERY | 63850 | CA | Kings | Westlands Cherry, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 249.7 | 249.7 | 2027-07 | 2027 | (T) Regulatory approvals received. Not under construction | CISO | 36.122457 | -119.9232 | 2026-09 |
| 67862/SOLAR | Kingstree East 230 Solar Project | SOLAR | 67862 | SC | Georgetown | Kingstree East 230 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 249 | 249 | 2029-12 | 2029 | (T) Regulatory approvals received. Not under construction | SC | 33.563633 | -79.46326 | 2026-09 |
| 68370/SALM | Salmonfly Solar and Storage | SALM | 68370 | OR | Jefferson | BrightNight Power | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 247 | 247 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | PGE | 44.6157 | -121.3436 | 2026-09 |
| 68370/SALM2 | Salmonfly Solar and Storage | SALM2 | 68370 | OR | Jefferson | BrightNight Power | IPP Non-CHP | Batteries | MWH | BA | 247 | 247 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | PGE | 44.6157 | -121.3436 | 2026-09 |
| 66701/BB1 | Buffalo Branch Wind and Solar LLC | BB1 | 66701 | MO | Dade | Buffalo Branch Wind and Solar LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 247 | 247 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | AECI | 37.38332 | -93.92999 | 2026-09 |
| 63851/GRAPE | Grape | GRAPE | 63851 | CA | Kings | Westlands Grape, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 246.4 | 246.4 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 36.145687 | -119.9051 | 2026-09 |
| 68302/LAKET | Lake Trout Solar | LAKET | 68302 | IN | Blackford | Lake Trout Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 245 | 245 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.524925 | -85.30333 | 2026-09 |
| 69506/GAIPV | Gail Mountain Solar | GAIPV | 69506 | TX | Borden | Red River Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 244.4 | 244.4 | 2028-08 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 32.714612 | -101.5274 | 2026-09 |
| 66896/LP2PV | Lupinus Solar 2, LLC | LP2PV | 66896 | TX | Franklin | Sunraycer Assets I LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 244 | 244 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 30.303385 | -95.25692 | 2026-09 |
| 70453/CT4 | Red Oak Ridge Energy Center LLC | CT4 | 70453 | WI | Kenosha | Invenergy Services LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 242 | 242 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 42.631839 | -87.96625 | 2026-09 |
| 70453/CT5 | Red Oak Ridge Energy Center LLC | CT5 | 70453 | WI | Kenosha | Invenergy Services LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 242 | 242 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 42.631839 | -87.96625 | 2026-09 |
| 70453/RDOR1 | Red Oak Ridge Energy Center LLC | RDOR1 | 70453 | WI | Kenosha | Invenergy Services LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 242 | 242 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 42.631839 | -87.96625 | 2026-09 |
| 70453/RDOR2 | Red Oak Ridge Energy Center LLC | RDOR2 | 70453 | WI | Kenosha | Invenergy Services LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 242 | 242 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 42.631839 | -87.96625 | 2026-09 |
| 70453/RDOR3 | Red Oak Ridge Energy Center LLC | RDOR3 | 70453 | WI | Kenosha | Invenergy Services LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 242 | 242 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 42.631839 | -87.96625 | 2026-09 |
| 66168/GEN01 | Cattlemen Solar Park | GEN01 | 66168 | TX | Milam | Cattlemen Solar Park LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 240 | 240 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.045676 | -96.85863 | 2026-09 |
| 68785/DHS1 | Dolet Hills Solar | DHS1 | 68785 | LA | DeSoto | Dolet Hills Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 240 | 240 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 31.95595 | -93.62641 | 2026-09 |
| 68264/12345 | Rich Road Solar Energy Center | 12345 | 68264 | NY | St Lawrence | Rich Road Solar Energy Center | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 240 | 240 | 2028-05 | 2028 | (L) Regulatory approvals pending. Not under construction | NYIS | 44.567518 | -75.19654 | 2026-09 |
| 6112/7 | Fort St Vrain | 7 | 6112 | CO | Weld | Public Service Co of Colorado | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 239 | 177.9 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 40.2461 | -104.8742 | 2026-09 |
| 6112/8 | Fort St Vrain | 8 | 6112 | CO | Weld | Public Service Co of Colorado | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 239 | 177.9 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 40.2461 | -104.8742 | 2026-09 |
| 68607/PJBS1 | Pelicans Jaw Hybrid Solar | PJBS1 | 68607 | CA | Kern | Pelicans Jaw Solar LLC | IPP Non-CHP | Batteries | MWH | BA | 238.5 | 238.5 | 2027-04 | 2027 | (TS) Construction complete, but not yet in commercial operation | CISO | 35.765183 | -119.7436 | 2026-09 |
| 4041/11 | South Oak Creek | 11 | 4041 | WI | Milwaukee | Wisconsin Electric Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 236.3 | 227.6 | 2028-02 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 42.8457 | -87.8294 | 2026-09 |
| 4041/12 | South Oak Creek | 12 | 4041 | WI | Milwaukee | Wisconsin Electric Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 236.3 | 227.6 | 2028-02 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 42.8457 | -87.8294 | 2026-09 |
| 4041/13 | South Oak Creek | 13 | 4041 | WI | Milwaukee | Wisconsin Electric Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 236.3 | 227.6 | 2028-02 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 42.8457 | -87.8294 | 2026-09 |
| 4041/14 | South Oak Creek | 14 | 4041 | WI | Milwaukee | Wisconsin Electric Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 236.3 | 227.6 | 2028-02 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 42.8457 | -87.8294 | 2026-09 |
| 4041/15 | South Oak Creek | 15 | 4041 | WI | Milwaukee | Wisconsin Electric Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 236.3 | 227.6 | 2028-02 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 42.8457 | -87.8294 | 2026-09 |
| 66421/GRS13 | Despain Solar | GRS13 | 66421 | TX | Kinney | Gransolar Texas Thirteen, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 236.2 | 236 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.282259 | -100.2098 | 2026-09 |
| 69295/DFBSS | Duffy BESS | DFBSS | 69295 | TX | Matagorda | Duffy Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 235.9 | 235.9 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 28.854592 | -96.08606 | 2026-09 |
| 6085/20 | R M Schahfer | 20 | 6085 | IN | Jasper | Northern Indiana Pub Serv Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 233.8 | 234.4 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 41.2164 | -87.0261 | 2026-09 |
| 69004/ADELI | Adelite Storage Project LLC | ADELI | 69004 | TX | Milam | Acciona Energy USA Global, LLC | IPP Non-CHP | Batteries | MWH | BA | 230 | 230 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 30.622383 | -97.2105 | 2026-09 |
| 68579/AC2S | AC Ranch II | AC2S | 68579 | NM | Lea | Lydian Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 230 | 230 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | SWPP | 32.732263 | -103.2748 | 2026-09 |
| 68079/STAS1 | Stagecoach LRE | STAS1 | 68079 | CO | Pueblo | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 230 | 230 | 2029-12 | 2029 | (T) Regulatory approvals received. Not under construction | PSCO | 38.17739 | -104.5012 | 2026-09 |
| 62437/WT | Dodge County Wind | WT | 62437 | MN | Dodge | Dodge County Wind, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 228 | 228 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 44.005633 | -92.95039 | 2026-09 |
| 67783/GRS12 | Ventures BESS | GRS12 | 67783 | TX | Matagorda | Gransolar Texas Twelve LLC | IPP Non-CHP | Batteries | MWH | BA | 226.8 | 226.8 | 2028-09 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 28.974482 | -95.99381 | 2026-09 |
| 69658/NS2 | New Salem Wind II | NS2 | 69658 | ND | Morton | New Salem Wind II | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 226 | 95.3 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 46.797929 | -101.4344 | 2026-09 |
| 67356/6794 | Throckmorton Wind | 6794 | 67356 | TX | Haskell | Throckmorton Wind, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 225.6 | 225.6 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 33.213466 | -99.47612 | 2026-09 |
| 67767/BECBA | Bramble Energy Center | BECBA | 67767 | TX | Zavala | Mission Clean Energy Devco LLC | IPP Non-CHP | Batteries | MWH | BA | 225.1 | 225.1 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.955627 | -99.72318 | 2026-09 |
| 70193/REC01 | Romero Energy Center | REC01 | 70193 | AZ | Maricopa | Romero Energy Center, LLC | IPP Non-CHP | Batteries | MWH | BA | 225 | 225 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | AZPS | 33.509114 | -113.008 | 2026-09 |
| 68417/1 | Hallsville | 1 | 68417 | TX | Harrison | Southwestern Electric Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 225 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 32.4607 | -94.4852 | 2026-09 |
| 68417/2 | Hallsville | 2 | 68417 | TX | Harrison | Southwestern Electric Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 225 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 32.4607 | -94.4852 | 2026-09 |
| 69198/ATL10 | ATLAS Solar X, LLC | ATL10 | 69198 | AZ | La Paz | ATLAS Solar Manager, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 225 | 225 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 33.546706 | -113.5562 | 2026-09 |
| 70194/REC02 | Romero Energy Center II, LLC | REC02 | 70194 | AZ | Maricopa | Romero Energy Center II, LLC | IPP Non-CHP | Batteries | MWH | BA | 225 | 225 | 2028-06 | 2028 | (U) Under construction, less than or equal to 50 percent complete | AZPS | 33.509114 | -113.008 | 2026-09 |
| 64634/90FI8 | Kingsley Solar Farm | 90FI8 | 64634 | CA | Imperial | 90FI 8me, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 225 | 225 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 32.742036 | -115.7354 | 2026-09 |
| 69450/GEN01 | Emerald Bluffs Solar Park | GEN01 | 69450 | WI | Juneau | Emerald Bluffs Solar Park LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 225 | 225 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 43.764276 | -90.01398 | 2026-09 |
| 2951/11 | Horseshoe Lake | 11 | 2951 | OK | Oklahoma | Oklahoma Gas & Electric Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 224 | 224 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | SWPP | 35.50866 | -97.17969 | 2026-09 |
| 2951/12 | Horseshoe Lake | 12 | 2951 | OK | Oklahoma | Oklahoma Gas & Electric Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 224 | 224 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | SWPP | 35.50866 | -97.17969 | 2026-09 |
| 2951/13 | Horseshoe Lake | 13 | 2951 | OK | Oklahoma | Oklahoma Gas & Electric Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 224 | 224 | 2029-02 | 2029 | (T) Regulatory approvals received. Not under construction | SWPP | 35.50866 | -97.17969 | 2026-09 |
| 2951/14 | Horseshoe Lake | 14 | 2951 | OK | Oklahoma | Oklahoma Gas & Electric Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 224 | 224 | 2029-02 | 2029 | (T) Regulatory approvals received. Not under construction | SWPP | 35.50866 | -97.17969 | 2026-09 |
| 66138/INMA1 | Mayapple Solar 1 | INMA1 | 66138 | IN | Pulaski | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 224 | 224 | 2029-03 | 2029 | (T) Regulatory approvals received. Not under construction | PJM | 41.055223 | -86.71323 | 2026-09 |
| 63193/UNIT1 | Alira | UNIT1 | 63193 | TX | Andrews | Luminant Generation Company LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 222.8 | 222.8 | 2030-01 | 2030 | (L) Regulatory approvals pending. Not under construction | ERCO | 32.347392 | -102.9677 | 2026-09 |
| 61331/BA2 | NISA Electric Generation Project | BA2 | 61331 | NY | Kings | NYC Energy LLC | IPP Non-CHP | Batteries | MWH | BA | 220.1 | 220.1 | 2028-10 | 2028 | (T) Regulatory approvals received. Not under construction | NYIS | 40.7065 | -73.9702 | 2026-09 |
| 63028/GEN1 | Tip Top Solar Energy Center LLC | GEN1 | 63028 | NM | Lea | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 220 | 220 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 32.133136 | -103.3235 | 2026-09 |
| 67759/TCHEC | Trenton Channel Energy Center | TCHEC | 67759 | MI | Wayne | DTE Electric Company | Electric Utility | Batteries | MWH | BA | 220 | 220 | 2027-01 | 2027 | (TS) Construction complete, but not yet in commercial operation | MISO | 42.124423 | -83.18571 | 2026-09 |
| 69520/AMDRB | Amador BESS | AMDRB | 69520 | TX | Van Zandt | BT Amador Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 220 | 220 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 32.479347 | -96.0321 | 2026-09 |
| 69590/HC1 | Hollis Creek Solar | HC1 | 69590 | LA | Sabine | Hollis Creek PV I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 220 | 200 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 31.661627 | -93.47361 | 2026-09 |
| 68744/LSEC | Liberty Solar Energy Center | LSEC | 68744 | MI | Kalamazoo | Consumers Energy Co - (MI) | Electric Utility | Solar Photovoltaic | SUN | PV | 220 | 220 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 42.3631 | -85.474 | 2026-09 |
| 68668/RIC90 | Coke BESS | RIC90 | 68668 | TX | Coke | RIC Development, LLC | IPP Non-CHP | Batteries | MWH | BA | 220 | 220 | 2028-04 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.862499 | -100.7638 | 2026-09 |
| 69108/COT01 | Eastern Cottontail Solar | COT01 | 69108 | OH | Fairfield | EDF Renewables Development, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 220 | 254.5 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 39.844172 | -82.49453 | 2026-09 |
| 69149/ANSN2 | Anson 2 Solar | ANSN2 | 69149 | TX | Jones | Anson Solar Center 2, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 218.5 | 200 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 32.805609 | -99.91901 | 2026-09 |
| 67996/SEPAS | Leuven Solar LLC | SEPAS | 67996 | TX | Nolan | Belgian Renewable Energy Group (BREG) | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 217 | 217 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.49301 | -100.2463 | 2026-09 |
| 67576/1 | Castle Bluff Energy Center | 1 | 67576 | MO | St Louis | Union Electric Co - (MO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 216 | 175 | 2027-10 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 38.4017 | -90.3358 | 2026-09 |
| 67576/2 | Castle Bluff Energy Center | 2 | 67576 | MO | St Louis | Union Electric Co - (MO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 216 | 175 | 2027-10 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 38.4017 | -90.3358 | 2026-09 |
| 67576/3 | Castle Bluff Energy Center | 3 | 67576 | MO | St Louis | Union Electric Co - (MO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 216 | 175 | 2027-10 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 38.4017 | -90.3358 | 2026-09 |
| 66559/TXJC1 | Jones City 1 Solar | TXJC1 | 66559 | TX | Jones | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 215 | 215 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 32.781168 | -100.0065 | 2026-09 |
| 69654/ZEUB | Zeus BESS | ZEUB | 69654 | CA | San Joaquin | Zeus BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 213.6 | 200 | 2031-09 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 37.711754 | -121.4884 | 2026-09 |
| 64672/BLUJS | Blue Jay Solar I, LLC | BLUJS | 64672 | TX | Grimes | Blue Jay Solar I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 210 | 210 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 30.705329 | -96.06983 | 2026-09 |
| 68323/ALT8A | Atlas VIII | ALT8A | 68323 | AZ | La Paz | Atlas VIII LLC | IPP Non-CHP | Batteries | MWH | BA | 210 | 210 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 33.582903 | -113.5769 | 2026-09 |
| 69956/S10BS | Sanborn Hybrid 3 | S10BS | 69956 | CA | Kern | Terra-Gen Operating Co-Hybrid | IPP Non-CHP | Batteries | MWH | BA | 210 | 210 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 34.996 | -118.114 | 2026-09 |
| 69956/S10PV | Sanborn Hybrid 3 | S10PV | 69956 | CA | Kern | Terra-Gen Operating Co-Hybrid | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 210 | 210 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 34.996 | -118.114 | 2026-09 |
| 69537/1 | Lyon County Generating Station | 1 | 69537 | MN | Lyon | Northern States Power Co - Minnesota | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 210 | 193.3 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 44.226167 | -95.75362 | 2026-09 |
| 69537/2 | Lyon County Generating Station | 2 | 69537 | MN | Lyon | Northern States Power Co - Minnesota | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 210 | 193.3 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 44.226167 | -95.75362 | 2026-09 |
| 68040/SYCAM | Sycamore Cross Solar | SYCAM | 68040 | VA | Isle of Wight | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 208.2 | 208.2 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.017425 | -76.74399 | 2026-09 |
| 8224/CT3 | North Valmy | CT3 | 8224 | NV | Humboldt | Sierra Pacific Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 208 | 208 | 2028-05 | 2028 | (U) Under construction, less than or equal to 50 percent complete | NEVP | 40.881317 | -117.1516 | 2026-09 |
| 8224/CT4 | North Valmy | CT4 | 8224 | NV | Humboldt | Sierra Pacific Power Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 208 | 208 | 2028-05 | 2028 | (U) Under construction, less than or equal to 50 percent complete | NEVP | 40.881317 | -117.1516 | 2026-09 |
| 60206/HCCA1 | Wolf Summit Energy | HCCA1 | 60206 | WV | Harrison | Wolf Summit Energy LLC | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 207.4 | 205.4 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 39.287039 | -80.32287 | 2026-09 |
| 70237/MULE1 | Mule Shoe Energy Storage | MULE1 | 70237 | TX | Yoakum | Mule Shoe Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 207 | 207 | 2028-08 | 2028 | (T) Regulatory approvals received. Not under construction | SWPP | 33.125909 | -102.76 | 2026-09 |
| 69589/BEEK1 | Beekman Solar | BEEK1 | 69589 | LA | Morehouse | Beekman PV I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 206.8 | 185 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 32.989386 | -91.94288 | 2026-09 |
| 70514/GEN1 | Hoyte Solar | GEN1 | 70514 | TX | Milam | Milano Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 206.8 | 206.8 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 30.722496 | -96.77352 | 2026-09 |
| 69468/PSVSP | Poseyville Solar Park | PSVSP | 69468 | MI | Midland | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 206.4 | 117 | 2028-04 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 43.5178 | -84.2254 | 2026-09 |
| 69507/NHKRY | New Hickory Solar | NHKRY | 69507 | TX | Jackson | New Hickory Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 206 | 206 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.069747 | -96.8782 | 2026-09 |
| 69058/CBCBA | CO Bar C Solar and BESS | CBCBA | 69058 | AZ | Coconino | Clenera DevCo LLC | IPP Non-CHP | Batteries | MWH | BA | 206 | 206 | 2027-08 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 35.636594 | -111.8835 | 2026-09 |
| 69058/CBCPV | CO Bar C Solar and BESS | CBCPV | 69058 | AZ | Coconino | Clenera DevCo LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 206 | 206 | 2027-08 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | AZPS | 35.636594 | -111.8835 | 2026-09 |
| 66651/C2-92 | Arco Wind and Solar Project | C2-92 | 66651 | ID | Bonneville | PacifiCorp | Electric Utility | Onshore Wind Turbine | WND | WT | 206 | 206 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | PACE | 43.557 | -112.4415 | 2026-09 |
| 68511/CHC1 | Henry Solar | CHC1 | 68511 | OH | Henry | Repsol Renewables NA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 206 | 206 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 41.474421 | -84.11271 | 2026-09 |
| 67543/DOGSP | Donegal Solar Project | DOGSP | 67543 | TX | Dickens | HE-Cottonwood Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 204.2 | 204.2 | 2028-10 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 33.796247 | -100.8728 | 2026-09 |
| 67341/NOSPV | SGT Hoskins Solar Project Hybrid | NOSPV | 67341 | TX | Lamar | SGT Hoskins Solar Project, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 204.1 | 204.1 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 33.63124 | -95.33785 | 2026-09 |
| 68853/LMWOD | Limewood Bell Renewables Solar | LMWOD | 68853 | TX | Bell | Modal Power LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 204 | 204 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.129365 | -97.26139 | 2026-09 |
| 67353/4666 | Erath County Solar | 4666 | 67353 | TX | Erath | Erath County Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 204 | 204 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.089488 | -98.17853 | 2026-09 |
| 67917/CHMPN | Champaign BESS, LLC | CHMPN | 67917 | TX | Glasscock | Samsung C&T Renewables, LLC | IPP Non-CHP | Batteries | MWH | BA | 202.7 | 202.7 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.871567 | -101.7384 | 2026-09 |
| 65049/CPCW1 | Pike Creek Wind | CPCW1 | 65049 | IL | Logan | Repsol Renewables NA | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 202.5 | 202.5 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 40.059 | -89.537 | 2026-09 |
| 69659/RBW | Red Butte Wind | RBW | 69659 | ND | Morton | Red Butte Wind | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 202 | 84 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 47.063928 | -101.4753 | 2026-09 |
| 68275/1 | Erin | 1 | 68275 | TX | Wharton | Erin Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 202 | 202 | 2029-10 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.163 | -96.013 | 2026-09 |
| 69879/N3884 | Ninnescah Flats Solar | N3884 | 69879 | KS | Pratt | Nextera Energy Resources | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 201.6 | 201.6 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | SWPP | 37.628817 | -98.59311 | 2026-09 |
| 67918/DIOS | Dios BESS, LLC | DIOS | 67918 | TX | Jackson | Samsung C&T Renewables, LLC | IPP Non-CHP | Batteries | MWH | BA | 201.6 | 201.6 | 2027-08 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.012998 | -96.5051 | 2026-09 |
| 65948/PNW01 | Plum Nellie Wind Farm LLC | PNW01 | 65948 | KS | Cloud | Plum Nellie Wind Farm LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 201.6 | 201.6 | 2027-10 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 39.376786 | -97.55649 | 2026-09 |
| 65462/AXTON | Axton Solar | AXTON | 65462 | VA | Henry | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 201.1 | 201.1 | 2028-09 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 36.671684 | -79.68606 | 2026-09 |
| 62892/SONRI | EDPR CA Solar Park VI LLC (CA) Hybrid | SONRI | 62892 | CA | Fresno | EDPR CA Solar Park VI LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 201 | 200 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 36.62543 | -120.3789 | 2026-09 |
| 67575/NZRTH | TX Nazareth Solar | NZRTH | 67575 | TX | Swisher | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 201 | 201 | 2027-08 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 34.49 | -101.97 | 2026-09 |
| 68902/ECHPV | Echols Grove Solar | ECHPV | 68902 | TX | Lamar | Echols Grove LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 201 | 201 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.616471 | -95.45837 | 2026-09 |
| 67535/ASHU1 | Bell Creek BESS LLC | ASHU1 | 67535 | TX | Brazoria | Nexus Renewables U.S. Inc. | IPP Non-CHP | Batteries | MWH | BA | 200.9 | 200.9 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.137519 | -95.66797 | 2026-09 |
| 68168/KAHBA | Kahla Storage | KAHBA | 68168 | TX | Leon | Belltown Power Texas 2, LLC | IPP Non-CHP | Batteries | MWH | BA | 200.9 | 200.9 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.325705 | -96.26071 | 2026-09 |
| 69120/RESBS | Resaca Oasis Storage | RESBS | 69120 | TX | Cameron | Red River Clean Energy | IPP Non-CHP | Batteries | MWH | BA | 200.7 | 200.7 | 2028-09 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 25.978783 | -97.37263 | 2026-09 |
| 67558/RIC96 | Blackcat BESS | RIC96 | 67558 | TX | Matagorda | RIC Development, LLC | IPP Non-CHP | Batteries | MWH | BA | 200.6 | 200.6 | 2028-04 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.974879 | -95.99499 | 2026-09 |
| 70021/STACB | Staccato BESS | STACB | 70021 | TX | Fayette | Sunraycer Assets I LLC | IPP Non-CHP | Batteries | MWH | BA | 200.5 | 200.5 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 30.053062 | -96.92122 | 2026-09 |
| 68179/TEMPW | Templeton Wind | TEMPW | 68179 | IN | Benton | Templeton Wind Energy Center, LLC | Electric Utility | Onshore Wind Turbine | WND | WT | 200.2 | 200.2 | 2027-06 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 40.519676 | -87.15039 | 2026-09 |
| 67976/GEN01 | Cattlemen Solar II | GEN01 | 67976 | TX | Milam | Cattlemen Solar Park II LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.083559 | -96.85732 | 2026-09 |
| 68481/HS2 | Hill Solar II | HS2 | 68481 | TX | Hill | Hill Solar II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 32.115203 | -97.06783 | 2026-09 |
| 68914/12343 | Padua 3 | 12343 | 68914 | TX | Bexar | Padua 3 | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.325064 | -98.32562 | 2026-09 |
| 70344/RSPV | Rush Springs Solar | RSPV | 70344 | OK | Stephens | Rush Springs Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 34.469189 | -97.89441 | 2026-09 |
| 68425/TWPII | Tidwell Prairie II | TWPII | 68425 | TX | Robertson | Tidwell Prairie IIA LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 31.103064 | -96.66494 | 2026-09 |
| 69155/AHBA1 | Apache Hill Energy Center | AHBA1 | 69155 | TX | Hood | Apache Hill Energy Center | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 32.380005 | -97.72782 | 2026-09 |
| 65870/CASTR | Castor | CASTR | 65870 | TX | Brazoria | Engie North America | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.150279 | -95.65118 | 2026-09 |
| 66968/BFW00 | Blackford Wind | BFW00 | 66968 | IN | Blackford | Leeward Asset Management, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 200 | 200 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 40.402078 | -85.30058 | 2026-09 |
| 68089/TS03 | Twelvemile Solar 3 | TS03 | 68089 | OK | Mayes | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 36.331569 | -95.22931 | 2026-09 |
| 68341/GREE | Greenwater BESS | GREE | 68341 | WA | Pierce | GREE bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PSEI | 47.236485 | -122.2271 | 2026-09 |
| 68515/GREER | Greer Solar Plant | GREER | 68515 | MS | Washington | Greer Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 33.115544 | -90.83077 | 2026-09 |
| 69477/PLSNT | Pleasant Prairie Solar Energy LLC | PLSNT | 69477 | OH | Franklin | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 39.944801 | -83.20397 | 2026-09 |
| 69549/DLE1 | Dry Lake East Energy Center | DLE1 | 69549 | NV | Clark | Dry Lake East Energy Center | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | NEVP | 36.401094 | -114.8652 | 2026-09 |
| 70408/WCB | Willow Creek Energy Storage | WCB | 70408 | OK | Pawnee | Willow Creek Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | SPA | 36.389624 | -97.02781 | 2026-09 |
| 70513/3988 | Delta Bobcat Solar | 3988 | 70513 | MO | Cape Girardeau | Delta Bobcat Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 37.222603 | -89.7176 | 2026-09 |
| 64290/ATHB2 | SE Athos II, LLC | ATHB2 | 64290 | CA | Riverside | SE Athos II, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 33.751283 | -115.355 | 2026-09 |
| 69392/BBIA | Barton Branch IA | BBIA | 69392 | TX | Robertson | Barton Branch IA LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.103064 | -96.66494 | 2026-09 |
| 64744/TC001 | Turkey Creek Solar Project | TC001 | 64744 | CO | Pueblo | 174 Power Global Corp. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | WACM | 38.382137 | -104.9141 | 2026-09 |
| 66893/TXJS2 | Jones City 2 Solar | TXJS2 | 66893 | TX | Jones | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 32.794928 | -99.99293 | 2026-09 |
| 67249/RRES | Rock Rose Energy Storage | RRES | 67249 | TX | Fort Bend | Rock Rose Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.395241 | -95.73535 | 2026-09 |
| 69779/HK2SO | Hashknife Energy Center II LLC | HK2SO | 69779 | AZ | Navajo | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | AZPS | 34.574259 | -110.4946 | 2026-09 |
| 69779/HK2ST | Hashknife Energy Center II LLC | HK2ST | 69779 | AZ | Navajo | Invenergy Services LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | AZPS | 34.574259 | -110.4946 | 2026-09 |
| 68568/TULLA | SR Tullahoma | TULLA | 68568 | TN | Moore | SR Tullahoma, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | TVA | 35.360002 | -86.27532 | 2026-09 |
| 69723/BESS1 | Taft BESS | BESS1 | 69723 | MA | Worcester | FE Taft LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | ISNE | 42.03383 | -71.60374 | 2026-09 |
| 66852/HILL3 | Hillsboro Solar 3 | HILL3 | 66852 | AL | Lawrence | Urban Grid Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-05 | 2027 | (L) Regulatory approvals pending. Not under construction | TVA | 34.669883 | -87.2332 | 2026-09 |
| 65964/URSA | Ursa Solar, LLC | URSA | 65964 | WI | Columbia | Samsung C&T Renewables, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 43.504285 | -89.11314 | 2026-09 |
| 69169/FWS | Freshwater Solar, LLC | FWS | 69169 | MI | Montcalm | Freshwater Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 43.338197 | -85.04013 | 2026-09 |
| 70400/BEE1A | Bee Branch IA | BEE1A | 70400 | TX | Robertson | Bee Branch IA, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.104838 | -96.66477 | 2026-09 |
| 63784/PLMNO | Palomino Solar | PLMNO | 63784 | OH | Highland | Palomino Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 39.2158 | -83.7771 | 2026-09 |
| 66685/WH001 | Whale Rock Pumped Storage Hydro Project | WH001 | 66685 | CA | San Luis Obispo | Premium Energy Holdings | IPP Non-CHP | Hydroelectric Pumped Storage | WAT | PS | 200 | 200 | 2027-07 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.454196 | -120.8671 | 2026-09 |
| 66685/WH002 | Whale Rock Pumped Storage Hydro Project | WH002 | 66685 | CA | San Luis Obispo | Premium Energy Holdings | IPP Non-CHP | Hydroelectric Pumped Storage | WAT | PS | 200 | 200 | 2027-07 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.454196 | -120.8671 | 2026-09 |
| 66685/WH003 | Whale Rock Pumped Storage Hydro Project | WH003 | 66685 | CA | San Luis Obispo | Premium Energy Holdings | IPP Non-CHP | Hydroelectric Pumped Storage | WAT | PS | 200 | 200 | 2027-07 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.454196 | -120.8671 | 2026-09 |
| 68348/ACESS | Alamo City ESS | ACESS | 68348 | TX | Bexar | Alamo City ESS LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-07 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.345305 | -98.31948 | 2026-09 |
| 68911/27288 | Flint | 27288 | 68911 | OH | Franklin | Flint | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.09639 | -82.73361 | 2026-09 |
| 68906/PFBA2 | Pine Forest Solar I | PFBA2 | 68906 | TX | Hopkins | Pine Forest Solar I, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-08 | 2027 | (U) Under construction, less than or equal to 50 percent complete | DOPD | 33.100779 | -95.39229 | 2026-09 |
| 67768/CECBA | Cumbia Energy Center | CECBA | 67768 | TX | Nueces | Mission Clean Energy Devco LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-09 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 27.739083 | -97.44955 | 2026-09 |
| 66401/OHLPV | OCI Hillsboro | OHLPV | 66401 | TX | Hill | HEC Renewable Energy America LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-10 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.941 | -97.021 | 2026-09 |
| 65821/HNYSR | Honey Creek Solar | HNYSR | 65821 | IN | White | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.7971 | -86.8572 | 2026-09 |
| 66401/OHLBS | OCI Hillsboro | OHLBS | 66401 | TX | Hill | HEC Renewable Energy America LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.941 | -97.021 | 2026-09 |
| 66904/LBTN | Lumberton PV I, LLC | LBTN | 66904 | TX | Hardin | Lumberton PV I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.298323 | -94.27631 | 2026-09 |
| 67354/5698 | Waco Solar II | 5698 | 67354 | TX | Limestone | Waco Solar II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.71062 | -96.7914 | 2026-09 |
| 67652/BHALU | Bhalu | BHALU | 67652 | TX | Howard | Cypress Creek Renewables | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 32.31219 | -101.3378 | 2026-09 |
| 68031/SCPSB | Scopus Solar | SCPSB | 68031 | MO | Bollinger | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 37.392178 | -89.89929 | 2026-09 |
| 68031/SCPSR | Scopus Solar | SCPSR | 68031 | MO | Bollinger | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 37.392178 | -89.89929 | 2026-09 |
| 68036/VCHSB | Vichy Solar | VCHSB | 68036 | MO | Maries | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 38.167934 | -91.82552 | 2026-09 |
| 68036/VCHSR | Vichy Solar | VCHSR | 68036 | MO | Maries | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 38.167934 | -91.82552 | 2026-09 |
| 68299/TUAL | Tualatin Battery Energy Storage System | TUAL | 68299 | OR | Washington | TUAL bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PGE | 45 | -122 | 2026-09 |
| 68315/ARFL1 | Anthelope Hills Solar Generation BESS | ARFL1 | 68315 | MT | Beaverhead | ARFL bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | NWMT | 45.05029 | -113.0588 | 2026-09 |
| 68315/ARFL2 | Anthelope Hills Solar Generation BESS | ARFL2 | 68315 | MT | Beaverhead | ARFL bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | NWMT | 45.05029 | -113.0588 | 2026-09 |
| 69189/C2BS | Cowboy Solar II | C2BS | 69189 | WY | Laramie | Cowboy Solar II | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 41.032968 | -104.3816 | 2026-09 |
| 69199/ATL11 | ATLAS Solar XI, LLC | ATL11 | 69199 | AZ | La Paz | ATLAS Solar Manager, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 33.553361 | -113.5803 | 2026-09 |
| 69982/3569 | Diamondback Solar | 3569 | 69982 | TX | Starr | Diamondback Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 26.426684 | -98.70102 | 2026-09 |
| 70297/BWTS | Blackwater Solar Center - NM | BWTS | 70297 | NM | Roosevelt | Blackwater Solar Center, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | SWPP | 34.292324 | -103.1657 | 2026-09 |
| 70341/TW200 | Thunder Wolf II, LLC | TW200 | 70341 | CO | Pueblo | Thunder Wolf II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | WACM | 38.94808 | -104.2357 | 2026-09 |
| 70462/PAWB | Pawnee Solar & BESS | PAWB | 70462 | CO | Morgan | Public Service Co of Colorado | Electric Utility | Batteries | MWH | BA | 200 | 200 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 40.127571 | -103.7249 | 2026-09 |
| 66858/SPRV2 | Spring Valley Solar 2 | SPRV2 | 66858 | AL | Colbert | Urban Grid Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-02 | 2028 | (L) Regulatory approvals pending. Not under construction | TVA | 34.674983 | -87.66373 | 2026-09 |
| 67945/JCSIB | Juniper Creek Storage | JCSIB | 67945 | CA | Sacramento | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 38.554073 | -121.2066 | 2026-09 |
| 67985/HRNT2 | Hornet Solar II (TX) (Hybrid) | HRNT2 | 67985 | TX | Swisher | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 34.483406 | -101.9699 | 2026-09 |
| 67985/HRT2B | Hornet Solar II (TX) (Hybrid) | HRT2B | 67985 | TX | Swisher | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 34.483406 | -101.9699 | 2026-09 |
| 70257/H1SLR | Hawkeye Solar, LLC | H1SLR | 70257 | IA | Clinton | Hawkeye Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 41.835204 | -90.69966 | 2026-09 |
| 68490/BLS | Broadleaf Solar | BLS | 68490 | CT | Hartford | Broadleaf Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-04 | 2028 | (L) Regulatory approvals pending. Not under construction | ISNE | 41.9241 | -72.7824 | 2026-09 |
| 67250/ALIBS | Alina Energy LLC | ALIBS | 67250 | TX | Wilson | Alina Energy LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.161128 | -98.08988 | 2026-09 |
| 67250/ALIPV | Alina Energy LLC | ALIPV | 67250 | TX | Wilson | Alina Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.161128 | -98.08988 | 2026-09 |
| 68604/DALPV | Dahlia Energy | DALPV | 68604 | TX | La Salle | Dahlia Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.369598 | -98.96762 | 2026-09 |
| 65847/ELDBS | Eldora Energy LLC | ELDBS | 65847 | TX | Matagorda | Eldora Energy LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.865989 | -96.12169 | 2026-09 |
| 65847/ELDPV | Eldora Energy LLC | ELDPV | 65847 | TX | Matagorda | Eldora Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.865989 | -96.12169 | 2026-09 |
| 68347/ABPV1 | Abeja Solar Farm | ABPV1 | 68347 | TX | Bee | Abeja Solar Farm LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.288244 | -97.84019 | 2026-09 |
| 68362/SABS1 | Sun Angel ESS | SABS1 | 68362 | TX | Angelina | Sun Angel ESS LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.345947 | -94.66785 | 2026-09 |
| 69470/SVCSP | Silver Creek Solar Park | SVCSP | 69470 | MI | Huron | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 43.837206 | -83.05481 | 2026-09 |
| 69952/CH1 | Cypress Harvest Solar Station | CH1 | 69952 | LA | Iberville | Entergy Louisiana LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-08 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.237835 | -91.26486 | 2026-09 |
| 69776/DKVSP | Deckerville Solar Park | DKVSP | 69776 | MI | Sanilac | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-11 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 44.5521 | -82.7649 | 2026-09 |
| 61687/PLMCK | Plum Creek | PLMCK | 61687 | MN | Cottonwood | Geronimo Power | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 200 | 200 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 44.14504 | -95.38272 | 2026-09 |
| 64632/99MT8 | Sienna Solar Farm | 99MT8 | 64632 | CA | San Bernardino | 99MT 8me, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.493659 | -116.915 | 2026-09 |
| 64632/99MTB | Sienna Solar Farm | 99MTB | 64632 | CA | San Bernardino | 99MT 8me, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.493659 | -116.915 | 2026-09 |
| 68282/CENT | Centralia Battery Energy Storage System | CENT | 68282 | WA | Thurston | CENT bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | PSEI | 46.779823 | -122.8848 | 2026-09 |
| 68485/22SVA | Rexford 2 Solar Farm | 22SVA | 68485 | CA | Tulare | 22SV 8ME LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.893525 | -119.0805 | 2026-09 |
| 68485/22SVB | Rexford 2 Solar Farm | 22SVB | 68485 | CA | Tulare | 22SV 8ME LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.893525 | -119.0805 | 2026-09 |
| 69657/NS1 | New Salem Wind I | NS1 | 69657 | ND | Morton | New Salem Wind I | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 200 | 83.1 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 46.730181 | -101.3054 | 2026-09 |
| 69990/BW1 | Bogalusa West Solar Station | BW1 | 69990 | LA | Washington | Entergy Louisiana LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 200 | 200 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.84 | -89.86 | 2026-09 |
| 68090/WILLO | Willow Beach Wind | WILLO | 68090 | TX | Brazoria | AES Clean Energy | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 200 | 200 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.249522 | -95.13416 | 2026-09 |
| 67655/ELKRN | Elk Run | ELKRN | 67655 | CO | Las Animas | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | PSCO | 37.454588 | -104.4887 | 2026-09 |
| 68292/GGSO | Gage Solar | GGSO | 68292 | KY | McCracken | GGSO, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | LGEE | 37.0967 | -88.7791 | 2026-09 |
| 70138/CRAW1 | Crawfish Creek Energy Storage | CRAW1 | 70138 | AL | Jackson | Crawfish Creek Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2029-06 | 2029 | (T) Regulatory approvals received. Not under construction | TVA | 34.83057 | -85.66845 | 2026-09 |
| 68349/AVBS1 | Avant Prairie ESS | AVBS1 | 68349 | TX | Freestone | Avant Prairie ESS LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.625891 | -96.12222 | 2026-09 |
| 68350/BESS1 | Bravo ESS | BESS1 | 68350 | TX | Zapata | Bravo ESS LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 27.285037 | -99.41187 | 2026-09 |
| 68360/PRESS | Prost ESS | PRESS | 68360 | TX | Austin | Prost ESS LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.957853 | -96.53331 | 2026-09 |
| 68363/SSESS | SunShiner ESS | SSESS | 68363 | TX | Zavala | SunShiner ESS LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.937123 | -99.83407 | 2026-09 |
| 68364/TBESS | Tex-Bar ESS | TBESS | 68364 | TX | Madison | Tex-Bar ESS LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 30.930573 | -96.03037 | 2026-09 |
| 69952/CH2 | Cypress Harvest Solar Station | CH2 | 69952 | LA | Iberville | Entergy Louisiana LLC | Electric Utility | Batteries | MWH | BA | 200 | 200 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.237835 | -91.26486 | 2026-09 |
| 68368/MYSO | Mayfield Solar and Storage | MYSO | 68368 | KY | McCracken | BrightNight Power | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2029-10 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 36.8864 | -88.659 | 2026-09 |
| 64904/1 | Elliot Solar LLC | 1 | 64904 | IN | Gibson | Elliot Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2029-12 | 2029 | (U) Under construction, less than or equal to 50 percent complete | MISO | 38.316297 | -87.42793 | 2026-09 |
| 65808/SVEC | Sacramento Valley Energy Center, LLC | SVEC | 65808 | CA | Sacramento | Sacramento Valley Energy Center, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2029-12 | 2029 | (U) Under construction, less than or equal to 50 percent complete | BANC | 38.57147 | -121.1845 | 2026-09 |
| 68084/MLB | Morrow Lake BESS | MLB | 68084 | TX | Frio | Leeward Asset Management, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.936239 | -99.08318 | 2026-09 |
| 68288/MAHI | Flag Run Solar | MAHI | 68288 | IN | Clark | MAHI bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 38.556 | -85.201 | 2026-09 |
| 68290/DYSP | Dyers Spring Solar | DYSP | 68290 | KY | Breckinridge | DYSP, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | LGEE | 37.688411 | -86.26927 | 2026-09 |
| 68332/DEGA1 | Dega Solar and Storage | DEGA1 | 68332 | AL | Talladega | DEGA bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | SOCO | 33.537201 | -86.0855 | 2026-09 |
| 68332/DEGA2 | Dega Solar and Storage | DEGA2 | 68332 | AL | Talladega | DEGA bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | SOCO | 33.537201 | -86.0855 | 2026-09 |
| 68843/TLCP | Tupper Lake Wind | TLCP | 68843 | MI | Ionia | Tupper Lake | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 200 | 198 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 42.829 | -85.138 | 2026-09 |
| 69633/99757 | Lion Solar | 99757 | 69633 | AR | Jefferson | Lion Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 34.324581 | -91.9253 | 2026-09 |
| 70186/SOLBS | Solstice Solar LLC | SOLBS | 70186 | OK | Le Flore | Clenera DevCo LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 35.291043 | -94.77891 | 2026-09 |
| 70186/SOLPV | Solstice Solar LLC | SOLPV | 70186 | OK | Le Flore | Clenera DevCo LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 200 | 200 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 35.291043 | -94.77891 | 2026-09 |
| 58652/1 | La Paz Solar Tower | 1 | 58652 | AZ | La Paz | Enviromission, Inc | IPP Non-CHP | Solar Thermal without Energy Storage | SUN | OT | 200 | 200 | 2030-06 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | WALC | 33.917222 | -114.2675 | 2026-09 |
| 69637/28152 | Oakley BESS | 28152 | 69637 | TX | Denton | Oakley BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 33.41854 | -97.18809 | 2026-09 |
| 69641/49453 | Metro BESS | 49453 | 69641 | TX | Caldwell | Metro BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 30.003245 | -97.67794 | 2026-09 |
| 70136/MORL1 | Morel Energy Storage | MORL1 | 70136 | CO | Moffat | Morel Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2030-12 | 2030 | (T) Regulatory approvals received. Not under construction | SWPP | 40.469217 | -107.6032 | 2026-09 |
| 68342/HOHI | Hop Hill Solar Generation and BESS | HOHI | 68342 | WA | Benton | HOHI bn, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 200 | 200 | 2031-09 | 2031 | (L) Regulatory approvals pending. Not under construction | BPAT | 46.324 | -119.822 | 2026-09 |
| 68361/RUESS | Rush ESS | RUESS | 68361 | TX | Bexar | Rush ESS LLC | IPP Non-CHP | Batteries | MWH | BA | 200 | 200 | 2031-12 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.307639 | -98.29673 | 2026-09 |
| 58835/ELK4 | Elk Station | ELK4 | 58835 | TX | Hale | Golden Spread Electric Cooperative, Inc | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 199.8 | 201 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 33.865 | -101.8433 | 2026-09 |
| 68767/BRGSP | Greenalia Solar Power Blackwelder Ranch | BRGSP | 68767 | TX | Pecos | Greenalia Solar Power Blackwelder Ranch, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 199.7 | 199.7 | 2030-06 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 30.81256 | -102.1865 | 2026-09 |
| 69946/SBA | Spindle BESS | SBA | 69946 | CO | Weld | Spindle Battery LLC | IPP Non-CHP | Batteries | MWH | BA | 199 | 199 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | PSCO | 40.092401 | -104.9012 | 2026-09 |
| 68510/CFC1 | Ritter Solar | CFC1 | 68510 | OH | Fulton | Repsol Renewables NA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 199 | 199 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 41.694902 | -84.31682 | 2026-09 |
| 69278/1 | Fortress 1 | 1 | 69278 | CO | Morgan | Fortress Solar 1 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 199 | 199 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | PSCO | 40.26 | -103.57 | 2026-09 |
| 68153/BA1 | Fremont Solar | BA1 | 68153 | UT | Iron | Fremont Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 198 | 198 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PACE | 37.9789 | -112.7761 | 2026-09 |
| 69780/OCPV1 | Oystercatcher Solar | OCPV1 | 69780 | TX | Ellis | Cardinal Investment Company, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 197 | 197 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 32.192556 | -96.91867 | 2026-09 |
| 70259/CHCS2 | Cunningham Solar II | CHCS2 | 70259 | NM | Lea | Southwestern Public Service Co | Electric Utility | Solar Photovoltaic | SUN | PV | 196 | 196 | 2027-04 | 2027 | (T) Regulatory approvals received. Not under construction | SWPP | 32.786412 | -103.3507 | 2026-09 |
| 66908/BZES | Bonanza Solar and Storage Project | BZES | 66908 | NV | Clark | EDF Renewables Development, Inc. | IPP Non-CHP | Batteries | MWH | BA | 195 | 195 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 36.558 | -115.799 | 2026-09 |
| 67798/GRS7 | Steelhead Energy Storage | GRS7 | 67798 | TX | Fannin | GRS BESS Texas Seven, LLC | IPP Non-CHP | Batteries | MWH | BA | 193.7 | 190.1 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.633102 | -96.15789 | 2026-09 |
| 67233/SOL1 | Lawrence County Solar | SOL1 | 67233 | AL | Lawrence | Tennessee Valley Authority | Electric Utility | Solar Photovoltaic | SUN | PV | 193 | 193 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 34.63928 | -87.25098 | 2026-09 |
| 66673/66666 | Accalia Point Solar, LLC | 66666 | 66673 | TX | Cameron | Accalia Point Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 190.5 | 190.5 | 2028-05 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 26.098075 | -97.83752 | 2026-09 |
| 68461/KEYBB | Key Energy Storage | KEYBB | 68461 | CA | Fresno | Key Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 190 | 190 | 2027-04 | 2027 | (T) Regulatory approvals received. Not under construction | CISO | 36.13681 | -120.1312 | 2026-09 |
| 68029/PSP | Penton Solar Plant | PSP | 68029 | MS | DeSoto | Entergy Mississippi LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 190 | 190 | 2028-03 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 34.861567 | -90.263 | 2026-09 |
| 67777/GRS4B | Harryoung PV and BESS | GRS4B | 67777 | TX | Cameron | Gransolar Texas Four LLC | IPP Non-CHP | Batteries | MWH | BA | 190 | 190 | 2028-05 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 26.276027 | -97.63249 | 2026-09 |
| 67777/GRS4P | Harryoung PV and BESS | GRS4P | 67777 | TX | Cameron | Gransolar Texas Four LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 190 | 190 | 2028-05 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 26.276027 | -97.63249 | 2026-09 |
| 59047/GEN 1 | Gallegos Wind Farm, Phase 1 | GEN 1 | 59047 | NM | Union | Gallegos Wind Farm LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 190 | 190 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PNM | 36.580281 | -103.849 | 2026-09 |
| 64658/AFS | AEUG Fleming Solar, LLC | AFS | 64658 | KY | Fleming | Acciona Energy USA Global, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 188.5 | 188.5 | 2028-05 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PJM | 38.429925 | -83.77156 | 2026-09 |
| 68411/NORPV | Noor Solar | NORPV | 68411 | TX | Chambers | Industrial Kilo Project, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 188.2 | 185 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.909115 | -94.96756 | 2026-09 |
| 67555/RIC98 | Zephyr Storage | RIC98 | 67555 | TX | Brown | RIC Development, LLC | IPP Non-CHP | Batteries | MWH | BA | 185.6 | 185.6 | 2028-03 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.707049 | -98.85746 | 2026-09 |
| 67556/RIC97 | Serrano BESS | RIC97 | 67556 | TX | Maverick | RIC Development, LLC | IPP Non-CHP | Batteries | MWH | BA | 185.6 | 185.6 | 2028-04 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.837905 | -100.5487 | 2026-09 |
| 66893/TXJC2 | Jones City 2 Solar | TXJC2 | 66893 | TX | Jones | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 185 | 185 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 32.794928 | -99.99293 | 2026-09 |
| 65935/14 | Vermillion Rise Solar | 14 | 65935 | IN | Vermillion | Vermillion Rise Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 185 | 185 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 39.83182 | -87.42895 | 2026-09 |
| 69467/PETSP | Peatville Solar Park | PETSP | 69467 | MI | Sanilac | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 185 | 185 | 2028-07 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 43.64 | -82.8 | 2026-09 |
| 68319/NIM | Nimbus Wind Farm | NIM | 68319 | AR | Carroll | Nimbus Wind Farm LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 183 | 183 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 36.27118 | -93.40682 | 2026-09 |
| 69579/HMWT | Honey Mesquite Wind, LLC | HMWT | 69579 | TX | Sterling | RWE Americas, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 180.5 | 180.5 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 32.030383 | -101.1672 | 2026-09 |
| 67559/RIC95 | Dunlay Solar | RIC95 | 67559 | TX | Medina | RIC Development, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 180.4 | 150.5 | 2030-05 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.314674 | -99.09725 | 2026-09 |
| 69151/ARY_B | Arroyo Storage | ARY_B | 69151 | TX | Cameron | BT Cantwell Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 180 | 180 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 26.264311 | -97.61156 | 2026-09 |
| 69245/NTFL | Nightfall Solar | NTFL | 69245 | TX | Uvalde | Sol Systems | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 180 | 180 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.259299 | -99.72513 | 2026-09 |
| 66891/245BS | Indigo Solar & Storage | 245BS | 66891 | TX | Fisher | Innovative Solar 245 LLC | IPP Non-CHP | Batteries | MWH | BA | 180 | 180 | 2027-05 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.628061 | -100.236 | 2026-09 |
| 67173/HLW00 | Hoosier Line Solar | HLW00 | 67173 | IN | White | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 180 | 180 | 2027-10 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.851153 | -86.94475 | 2026-09 |
| 70183/FSPV | Flatland Solar | FSPV | 70183 | TX | Scurry | Flatland Solar Energy, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 180 | 180 | 2027-11 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 32.618367 | -100.9789 | 2026-09 |
| 62846/WWE1 | Water Valley Wind Energy | WWE1 | 62846 | TX | Tom Green | Tri Global Energy, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 180 | 180 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.611223 | -100.8133 | 2026-09 |
| 63096/GEN1 | Horseshoe Solar Energy | GEN1 | 63096 | NY | Livingston | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 180 | 180 | 2028-11 | 2028 | (L) Regulatory approvals pending. Not under construction | NYIS | 42.570762 | -77.45296 | 2026-09 |
| 68814/ASHU2 | Brazos River BESS LLC | ASHU2 | 68814 | TX | Brazoria | Nexus Renewables U.S. Inc. | IPP Non-CHP | Batteries | MWH | BA | 180 | 180 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.150409 | -95.62124 | 2026-09 |
| 66238/1SPS | Sculpin Solar | 1SPS | 66238 | IN | DeKalb | RWE Americas, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 180 | 180 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 41.364556 | -84.84381 | 2026-09 |
| 69761/DBBES | Dawn Break Solar | DBBES | 69761 | WI | Waushara | Dawn Break Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 180 | 180 | 2029-09 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 44.140833 | -89.46472 | 2026-09 |
| 69761/DBSOL | Dawn Break Solar | DBSOL | 69761 | WI | Waushara | Dawn Break Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 180 | 180 | 2029-09 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 44.140833 | -89.46472 | 2026-09 |
| 65975/TXSD2 | Starr Solar Ranch | TXSD2 | 65975 | TX | Starr | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Batteries | MWH | BA | 180 | 180 | 2031-12 | 2031 | (L) Regulatory approvals pending. Not under construction | ERCO | 26.523359 | -99.01711 | 2026-09 |
| 68413/OT | Old Town Wind | OT | 68413 | IL | Marshall | Old Town Wind LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 178 | 178 | 2029-10 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 40.988976 | -89.17326 | 2026-09 |
| 68176/WILBA | Willis Storage | WILBA | 68176 | TX | Rains | Belltown Power Texas 2, LLC | IPP Non-CHP | Batteries | MWH | BA | 176.1 | 176.1 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 32.870406 | -95.74785 | 2026-09 |
| 68165/BROBA | Brotherton Storage | BROBA | 68165 | TX | Anderson | Belltown Power Texas 2, LLC | IPP Non-CHP | Batteries | MWH | BA | 176.1 | 176.1 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.687913 | -95.73988 | 2026-09 |
| 68171/MCMBA | Mcmurtre Storage | MCMBA | 68171 | TX | Hunt | Belltown Power Texas 2, LLC | IPP Non-CHP | Batteries | MWH | BA | 176.1 | 176.1 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.179664 | -95.80922 | 2026-09 |
| 68178/YOOBA | Yooperlite Storage | YOOBA | 68178 | TX | Wise | Belltown Power Texas 2, LLC | IPP Non-CHP | Batteries | MWH | BA | 175.7 | 175.7 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.033186 | -97.88031 | 2026-09 |
| 64349/6666 | Armadillo Solar Center | 6666 | 64349 | TX | Navarro | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 175 | 175 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 32.00014 | -96.2027 | 2026-09 |
| 65425/KWOOD | Kingwood Solar | KWOOD | 65425 | OH | Greene | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 175 | 175 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.782 | -83.83 | 2026-09 |
| 69984/6059 | Hackberry Creek Solar | 6059 | 69984 | TX | Mitchell | Hackberry Creek Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 175 | 175 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 32.393074 | -100.8702 | 2026-09 |
| 68459/5961 | Bob Creek Wind, LLC | 5961 | 68459 | TX | Sterling | Bob Creek Wind, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 175 | 175 | 2028-04 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.868813 | -101.2275 | 2026-09 |
| 69462/AUGSP | Au Gres Solar Park | AUGSP | 69462 | MI | Arenac | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 175 | 175 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 44.118 | -83.794 | 2026-09 |
| 68323/ALT8B | Atlas VIII | ALT8B | 68323 | AZ | La Paz | Atlas VIII LLC | IPP Non-CHP | Batteries | MWH | BA | 172.4 | 172.4 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 33.582903 | -113.5769 | 2026-09 |
| 68940/CABS | Country Acres Clean Power LLC | CABS | 68940 | CA | Placer | Clenera DevCo LLC | IPP Non-CHP | Batteries | MWH | BA | 172 | 172 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | BANC | 38.751744 | -121.4221 | 2026-09 |
| 67956/CONPV | Concho Pearl Solar and Storage | CONPV | 67956 | TX | Concho | Red River Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 171.9 | 171.9 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 31.465492 | -99.93435 | 2026-09 |
| 69110/CONEF | Coneflower Storage Project LLC | CONEF | 69110 | TX | Chambers | Acciona Energy USA Global, LLC | IPP Non-CHP | Batteries | MWH | BA | 170.9 | 170.9 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.8547 | -94.9254 | 2026-09 |
| 66390/GDYPV | MRG Goody Solar Project Hybrid | GDYPV | 66390 | TX | Lamar | Nexus Renewable Power, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 170.8 | 170.8 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 33.639193 | -95.62905 | 2026-09 |
| 66397/TOKIO | Tokio Solar | TOKIO | 66397 | TX | McLennan | Gransolar Texas Eight, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 170.4 | 168 | 2028-05 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.427419 | -97.31086 | 2026-09 |
| 69967/FTS | Foxtail Flats Solar, LLC | FTS | 69967 | NM | San Juan | Foxtail Flats Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 170 | 170 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PNM | 36.8685 | -108.277 | 2026-09 |
| 67222/1 | Yellow Viking Solar | 1 | 67222 | TX | Somervell | Lydian Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 170 | 170 | 2027-10 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 32.31664 | -97.62889 | 2026-09 |
| 68082/BBP | Bluebonnet Prairie Wind | BBP | 68082 | TX | Navarro | Leeward Asset Management, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 170 | 170 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 32.143863 | -96.30097 | 2026-09 |
| 68366/AGAT | AGATE BESS | AGAT | 68366 | WA | Kitsap | BrightNight Power | IPP Non-CHP | Batteries | MWH | BA | 170 | 170 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | PSEI | 47.76879 | -122.6078 | 2026-09 |
| 69991/SN1 | Segno Solar Station | SN1 | 69991 | TX | Polk | Entergy Louisiana LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 170 | 170 | 2029-03 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.577 | -94.686 | 2026-09 |
| 68769/M3GSP | Greenalia Solar Power Misae III | M3GSP | 68769 | TX | Childress | Greenlia Solar Power Misae III, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 169.6 | 169.6 | 2027-09 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 34.343755 | -100.0668 | 2026-09 |
| 68397/I168M | Ironwood Solar | I168M | 68397 | AZ | Yuma | Arizona Public Service Co | Electric Utility | Solar Photovoltaic | SUN | PV | 168 | 168 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | AZPS | 32.915556 | -113.5778 | 2026-09 |
| 69722/BESS1 | Salt Cod BESS | BESS1 | 69722 | MA | Bristol | Somerset Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 168 | 168 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | ISNE | 41.73722 | -71.1489 | 2026-09 |
| 66976/WAPPA | Carol Wind, LLC | WAPPA | 66976 | TX | Potter | Carol Wind, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 167.8 | 167.8 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 35.259819 | -102.0643 | 2026-09 |
| 69148/BESS1 | Allen 2 BESS | BESS1 | 69148 | NC | Gaston | Duke Energy Carolinas, LLC | Electric Utility | Batteries | MWH | BA | 167 | 167 | 2027-07 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | DUK | 35.192096 | -81.01013 | 2026-09 |
| 66312/CHSL | Courthouse Solar | CHSL | 66312 | VA | Charlotte | Dominion Energy Inc. | Electric Utility | Solar Photovoltaic | SUN | PV | 167 | 167 | 2030-10 | 2030 | (U) Under construction, less than or equal to 50 percent complete | PJM | 37.04 | -78.58 | 2026-09 |
| 70441/PALO2 | Palo Duro Energy Storage II | PALO2 | 70441 | TX | Ochiltree | Palo Duro Energy Center, LLC | IPP Non-CHP | Batteries | MWH | BA | 165.7 | 165.7 | 2029-05 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 36.410697 | -101.0149 | 2026-09 |
| 66895/LP1PV | Lupinus Solar 1, LLC | LP1PV | 66895 | TX | Franklin | Sunraycer Assets I LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 165 | 165 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 30.303385 | -95.25692 | 2026-09 |
| 67936/GS1 | Goshen Solar | GS1 | 67936 | WY | Goshen | Goshen Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 163 | 163 | 2030-12 | 2030 | (T) Regulatory approvals received. Not under construction | WACM | 41.853445 | -104.5032 | 2026-09 |
| 67956/CONBS | Concho Pearl Solar and Storage | CONBS | 67956 | TX | Concho | Red River Clean Energy | IPP Non-CHP | Batteries | MWH | BA | 162.4 | 162.4 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 31.465492 | -99.93435 | 2026-09 |
| 63342/BKII | McCrae Wind Energy II | BKII | 63342 | TX | Glasscock | McCrae Wind Energy II, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 162.1 | 162.1 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.754037 | -101.6752 | 2026-09 |
| 68993/ENX40 | MPG Solar | ENX40 | 68993 | PA | Centre | MPG Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 162 | 162 | 2028-07 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 41.060649 | -78.04193 | 2026-09 |
| 68907/1 | Vidal Energy Center | 1 | 68907 | CA | San Bernardino | CDH Vidal LLC | IPP Non-CHP | Batteries | MWH | BA | 160 | 160 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.084796 | -114.4707 | 2026-09 |
| 68907/2 | Vidal Energy Center | 2 | 68907 | CA | San Bernardino | CDH Vidal LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 160 | 160 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.084796 | -114.4707 | 2026-09 |
| 68559/MAGNA | SR Magnolia | MAGNA | 68559 | MS | Monroe | SR Magnolia, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 160 | 160 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | TVA | 33.856467 | -88.67488 | 2026-09 |
| 69582/CSTP | Chester Solar Technology Park, LLC | CSTP | 69582 | VA | Chesterfield | Chester Solar Technology Park, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 160 | 160 | 2027-10 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 37.317 | -77.466 | 2026-09 |
| 70256/DCES | Dry Creek Energy Storage, LLC | DCES | 70256 | CA | Sacramento | Dry Creek Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 160 | 160 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | BANC | 38.347139 | -121.1209 | 2026-09 |
| 68584/YBS | Yellow Barn Solar | YBS | 68584 | NY | Tompkins | Lydian Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 160 | 160 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.56495 | -76.43907 | 2026-09 |
| 67653/CARRI | Carriger | CARRI | 67653 | WA | Klickitat | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 160 | 160 | 2028-11 | 2028 | (L) Regulatory approvals pending. Not under construction | BPAT | 45.8777 | -120.8865 | 2026-09 |
| 69638/11767 | Landshark Energy Generation Facility | 11767 | 69638 | MS | Calhoun | Landshark Energy Generation Facility LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 160 | 160 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 33.898797 | -89.14577 | 2026-09 |
| 67774/GRS3 | Pecan BESS | GRS3 | 67774 | TX | Leon | Gransolar Texas Three, LLC | IPP Non-CHP | Batteries | MWH | BA | 157.1 | 157.1 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.078667 | -96.22328 | 2026-09 |
| 68667/RIC89 | Chimney Rock BESS | RIC89 | 68667 | TX | Taylor | RIC Development, LLC | IPP Non-CHP | Batteries | MWH | BA | 156 | 156 | 2028-04 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.387494 | -99.84846 | 2026-09 |
| 70584/SOSBA | SOSA Energy Center | SOSBA | 70584 | TX | Madison | SOSA Energy Center, LLC | IPP Non-CHP | Batteries | MWH | BA | 155.8 | 150 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 30.927401 | -96.0738 | 2026-09 |
| 65900/SPRIN | Springwater Solar, LLC | SPRIN | 65900 | OH | Madison | Springwater Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 155 | 155 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 39.82972 | -83.2498 | 2026-09 |
| 70022/DCYSO | Decoy Solar Energy LLC | DCYSO | 70022 | AR | Arkansas | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 155 | 155 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 34.463496 | -91.52053 | 2026-09 |
| 67078/GRS3 | Quarter Ranch Solar | GRS3 | 67078 | TX | Webb | Gransolar Texas Three, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 154.1 | 154 | 2028-10 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 27.301064 | -99.43041 | 2026-09 |
| 69945/WTRTN | Watertown Solar | WTRTN | 69945 | MI | Sanilac | Watertown Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 154 | 154 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 43.399794 | -82.81425 | 2026-09 |
| 67581/CIRSA | Cairos Solar and Storage | CIRSA | 67581 | TX | Kinney | Samsung C&T Renewables, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 153.3 | 153.3 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.269974 | -100.1975 | 2026-09 |
| 66651/37565 | Arco Wind and Solar Project | 37565 | 66651 | ID | Bonneville | PacifiCorp | Electric Utility | Onshore Wind Turbine | WND | WT | 153 | 153 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | PACE | 43.557 | -112.4415 | 2026-09 |
| 59971/ESTR1 | Easter | ESTR1 | 59971 | TX | Castro | Enbridge Wind (Easter), LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 152 | 152 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 34.668882 | -102.3517 | 2026-09 |
| 63584/NY2 | NY2 Battery | NY2 | 63584 | NY | Orange | Key Capture Energy | IPP Non-CHP | Batteries | MWH | BA | 151.5 | 151.5 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | NYIS | 41.52667 | -74.14226 | 2026-09 |
| 66905/SOLAR | Ables Springs Solar & Storage | SOLAR | 66905 | TX | Kaufman | Ables Springs Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 151 | 151 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 32.819566 | -96.18484 | 2026-09 |
| 68478/DRK | Darkwood Solar | DRK | 68478 | TX | Comanche | Mustang Creek Solar I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150.7 | 150.7 | 2027-10 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.928528 | -98.4241 | 2026-09 |
| 68866/SAN | Santa Teresa Solar | SAN | 68866 | NM | Dona Ana | Santa Teresa Solar | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | EPE | 31.805525 | -106.6989 | 2026-09 |
| 69540/RCS01 | Rock Creek Solar | RCS01 | 69540 | IA | Clinton | Rock Creek Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 41.771603 | -90.35751 | 2026-09 |
| 66960/BLKSL | Blackford Solar | BLKSL | 66960 | IN | Blackford | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 40.41608 | -85.25979 | 2026-09 |
| 67964/A400M | Agave | A400M | 67964 | AZ | Maricopa | Arizona Public Service Co | Electric Utility | Batteries | MWH | BA | 150 | 150 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | AZPS | 33.32389 | -112.8397 | 2026-09 |
| 69874/BHSF | Bee Hollow Solar, LLC | BHSF | 69874 | IL | St Clair | Geronimo Power | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 38.323 | -89.75 | 2026-09 |
| 64215/45MGA | Aratina Solar Center 2 | 45MGA | 64215 | CA | Kern | 45MG 8me LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 35.062965 | -118.0878 | 2026-09 |
| 67347/OF1 | Osagrove Flats Wind | OF1 | 67347 | IL | LaSalle | Avangrid Power LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 150 | 150 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 40.941383 | -88.97152 | 2026-09 |
| 67755/LTRSP | Little Trout Solar | LTRSP | 67755 | MI | Presque Isle | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 150 | 150 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 45.334045 | -83.75117 | 2026-09 |
| 69277/GR001 | Gunnar Reliability Project | GR001 | 69277 | TX | Hidalgo | Gunnar Reliability Project LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 26.315571 | -98.14851 | 2026-09 |
| 69605/TENN | Tennyson Solar | TENN | 69605 | TX | Coke | BNB Tennyson Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.726229 | -100.2771 | 2026-09 |
| 68932/OSBA | Overnight Solar | OSBA | 68932 | CA | San Bernardino | Overnight Solar LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 35.016197 | -117.357 | 2026-09 |
| 68932/OSPV | Overnight Solar | OSPV | 68932 | CA | San Bernardino | Overnight Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 35.016197 | -117.357 | 2026-09 |
| 67995/PWS | Piney Woods Solar | PWS | 67995 | TX | Walker | Piney Woods Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 30.718683 | -95.66965 | 2026-09 |
| 68321/ALT4 | Atlas BESS IV LLC | ALT4 | 68321 | AZ | La Paz | ATLAS BESS IV, LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 33.582903 | -113.5769 | 2026-09 |
| 66891/IS245 | Indigo Solar & Storage | IS245 | 66891 | TX | Fisher | Innovative Solar 245 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-05 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.628061 | -100.236 | 2026-09 |
| 69929/WC001 | Weirs Creek | WC001 | 69929 | KY | Hopkins | Weirs Creek Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 37.423648 | -87.69048 | 2026-09 |
| 70377/BES | Boxcar Energy Storage | BES | 70377 | TX | Collin | Boxcar Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 33.018516 | -96.52003 | 2026-09 |
| 66671/CONEZ | Conez Solar, LLC | CONEZ | 66671 | GA | Emanuel | Samsung C&T Renewables, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SOCO | 32.458353 | -82.39457 | 2026-09 |
| 67231/HS | Hinds Solar, LLC | HS | 67231 | MS | Hinds | Hinds Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 32.416186 | -90.38886 | 2026-09 |
| 66672/AG239 | Stark Solar, LLC | AG239 | 66672 | OH | Stark | Samsung C&T Renewables, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-08 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.852661 | -81.15701 | 2026-09 |
| 68901/PVCLA | Cedar Range Solar | PVCLA | 68901 | TX | Hopkins | Cedar Range LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.057483 | -95.82701 | 2026-09 |
| 69660/HS | El Patrimonio | HS | 69660 | TX | Bexar | Heritage Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.240499 | -98.51006 | 2026-09 |
| 69974/CRZN1 | Corazon Energy Storage | CRZN1 | 69974 | NM | Bernalillo | Corazon Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PNM | 35.003482 | -106.742 | 2026-09 |
| 60272/WT1 | Cone Renewable Energy Project, LLC | WT1 | 60272 | TX | Crosby | Cone Renewable Energy Project, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 150 | 150 | 2027-11 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.8093 | -101.3424 | 2026-09 |
| 70195/MAMM1 | Mammoth Plains Energy Storage | MAMM1 | 70195 | OK | Dewey | Mammoth Plains Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2027-11 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SPA | 35.981842 | -98.70672 | 2026-09 |
| 70199/PALO1 | Palo Duro Energy Storage | PALO1 | 70199 | TX | Ochiltree | Palo Duro Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2027-11 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 36.4106 | -101.0102 | 2026-09 |
| 66558/LAMO1 | Mowata Solar | LAMO1 | 66558 | LA | Acadia | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 30.3918 | -92.4044 | 2026-09 |
| 67358/4670 | Lake Whitney Solar | 4670 | 67358 | TX | Bosque | Lake Whitney Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.837644 | -97.39844 | 2026-09 |
| 67874/ENX32 | Parks Valley Energy LLC | ENX32 | 67874 | WV | Hampshire | Parks Valley Energy LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.288816 | -78.47481 | 2026-09 |
| 69972/SP150 | South Platte Solar | SP150 | 69972 | CO | Morgan | South Platte Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 40.194947 | -103.7088 | 2026-09 |
| 70218/SEL1B | Selma Energy Center | SEL1B | 70218 | AZ | Pinal | Selma Energy Center, LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | DOPD | 32.849821 | -111.5251 | 2026-09 |
| 70544/GBESS | Greer Energy Storage | GBESS | 70544 | MS | Washington | Greer Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 33.113983 | -90.83066 | 2026-09 |
| 69278/2 | Fortress 1 | 2 | 69278 | CO | Morgan | Fortress Solar 1 LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | PSCO | 40.26 | -103.57 | 2026-09 |
| 65665/HEPU1 | Hecate Energy Pulaski 1 | HEPU1 | 65665 | VA | Pulaski | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2028-04 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 37.139595 | -80.68741 | 2026-09 |
| 67986/MSPRB | Meadow Springs Renewable Energy (Hybrid) | MSPRB | 67986 | IL | White | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 38.029 | -88.284 | 2026-09 |
| 67986/MSPRE | Meadow Springs Renewable Energy (Hybrid) | MSPRE | 67986 | IL | White | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 38.029 | -88.284 | 2026-09 |
| 68480/LS1 | Laurens Solar | LS1 | 68480 | GA | Laurens | Laurens Solar I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | SOCO | 32.577504 | -83.11216 | 2026-09 |
| 66132/TXTR1 | Trinity River Solar 1 | TXTR1 | 66132 | TX | Liberty | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 30.010255 | -94.48631 | 2026-09 |
| 68061/GEMPV | Gemstone Solar LLC | GEMPV | 68061 | MI | Cass | Clenera DevCo LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2028-10 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 41.896754 | -86.0488 | 2026-09 |
| 69577/SPROR | Superior Solar Project, LLC | SPROR | 69577 | MI | Marquette | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 100 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 46.455 | -87.466 | 2026-09 |
| 70055/AA1 | Allen Acres Solar | AA1 | 70055 | IL | LaSalle | Avangrid Power LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2029-05 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 41.11792 | -88.64038 | 2026-09 |
| 68333/CROS | Crossroads Solar - GA | CROS | 68333 | GA | Liberty | Crossroads bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2029-07 | 2029 | (L) Regulatory approvals pending. Not under construction | SOCO | 31.71 | -81.66 | 2026-09 |
| 68105/JASP | SR Jasper | JASP | 68105 | MS | Jasper | SR Jasper, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2029-12 | 2029 | (T) Regulatory approvals received. Not under construction | SOCO | 32.048427 | -88.94419 | 2026-09 |
| 67894/51LVA | Bellefield 3 Solar and Battery Storage | 51LVA | 67894 | CA | Kern | 51LV 8me, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2030-05 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.029153 | -117.9926 | 2026-09 |
| 67894/51LVB | Bellefield 3 Solar and Battery Storage | 51LVB | 67894 | CA | Kern | 51LV 8me, LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2030-05 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.029153 | -117.9926 | 2026-09 |
| 61170/33UI9 | Gale 1 Solar | 33UI9 | 61170 | UT | Millard | 33UI 8me LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2030-08 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 39.523 | -112.546 | 2026-09 |
| 67352/CPVCL | CPV County Line Solar, LLC | CPVCL | 67352 | VA | Charlotte | CPV County Line Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 150 | 150 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.190161 | -78.68228 | 2026-09 |
| 70236/SLRN1 | Sierra Luna Energy Storage | SLRN1 | 70236 | AZ | Maricopa | Sierra Luna Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 150 | 150 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | SRP | 33.408834 | -112.3042 | 2026-09 |
| 70340/CAR15 | Carousel Energy Storage, LLC | CAR15 | 70340 | CO | Kit Carson | Carousel Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 149.6 | 149.6 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | SWPP | 39.213298 | -102.1036 | 2026-09 |
| 68194/RIVER | Riverstone Solar | RIVER | 68194 | VA | Buckingham | Riverstone Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 149.5 | 149.5 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 37.72839 | -78.45188 | 2026-09 |
| 68738/CANPV | Cannibal Draw Solar and Storage | CANPV | 68738 | TX | Glasscock | Red River Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 149.5 | 149.5 | 2028-04 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 32.023861 | -101.284 | 2026-09 |
| 68900/BSS | Badger State Solar LLC | BSS | 68900 | WI | Jefferson | Badger State Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 149 | 149 | 2027-10 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 43.012287 | -88.86356 | 2026-09 |
| 67773/GRS20 | Cosper Solar | GRS20 | 67773 | TX | Bell | Gransolar Texas Twenty LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 148.2 | 148 | 2027-11 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 30.994225 | -97.79588 | 2026-09 |
| 68078/CHIPV | Chisme Solar and Storage | CHIPV | 68078 | TX | Brown | Red River Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 147 | 147 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.568929 | -98.82195 | 2026-09 |
| 68078/CHIBS | Chisme Solar and Storage | CHIBS | 68078 | TX | Brown | Red River Clean Energy | IPP Non-CHP | Batteries | MWH | BA | 146 | 146 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.568929 | -98.82195 | 2026-09 |
| 67567/WEGSP | Wensowitch Solar Park | WEGSP | 67567 | TX | Navarro | Greenalia Solar Power Wensowitch, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 145.6 | 145.6 | 2028-11 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 32.300261 | -96.37123 | 2026-09 |
| 69464/CDFSP | Cedar Field Solar Park | CDFSP | 69464 | MI | Gladwin | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 145 | 145 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 43.95 | -84.55 | 2026-09 |
| 65344/66148 | Noria Hondo Solar (Hybrid) | 66148 | 65344 | TX | Kleberg | Nexus Renewable Power, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 145 | 145 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 27.553355 | -97.67528 | 2026-09 |
| 68876/6339 | Okolona Solar | 6339 | 68876 | MS | Henderson | Okolona Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 145 | 145 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 37.693 | -87.549 | 2026-09 |
| 68876/6340 | Okolona Solar | 6340 | 68876 | MS | Henderson | Okolona Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 145 | 145 | 2028-08 | 2028 | (T) Regulatory approvals received. Not under construction | MISO | 37.693 | -87.549 | 2026-09 |
| 68665/RIC87 | Summerhill BESS | RIC87 | 68665 | TX | Taylor | RIC Development, LLC | IPP Non-CHP | Batteries | MWH | BA | 143 | 143 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.51289 | -99.79563 | 2026-09 |
| 67784/GRS11 | Vial BESS | GRS11 | 67784 | TX | Hill | Gransolar Texas Eleven LLC | IPP Non-CHP | Batteries | MWH | BA | 141.4 | 141.4 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.953772 | -97.06248 | 2026-09 |
| 69993/VT1 | Votaw Solar Station | VT1 | 69993 | TX | Hardin | Entergy Louisiana LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 141 | 141 | 2029-05 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.4355 | -94.673 | 2026-09 |
| 67999/SCAEC | Spring Creek Agri-Energy Center | SCAEC | 67999 | MI | Calhoun | Consumers Energy Co - (MI) | Electric Utility | Solar Photovoltaic | SUN | PV | 140 | 140 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 42.2024 | -85.23803 | 2026-09 |
| 69878/5869 | Emmons-Logan Energy Storage | 5869 | 69878 | ND | Emmons | Emmons-Logan Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 140 | 140 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 46.372883 | -99.9784 | 2026-09 |
| 70455/BES | City Breeze Energy Storage | BES | 70455 | TX | Matagorda | City Breeze Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 140 | 140 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 29.011 | -95.97 | 2026-09 |
| 66703/11103 | Austin Creek Solar | 11103 | 66703 | IL | Adams | Strata Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 140 | 140 | 2027-09 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 39.790103 | -91.31508 | 2026-09 |
| 64857/C0513 | Canyonland Solar | C0513 | 64857 | CO | Montezuma | Canyonland Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 140 | 140 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 37.431 | -108.724 | 2026-09 |
| 69482/BBS1 | Bluebird Solar | BBS1 | 69482 | WA | Klickitat | Avangrid Power LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 140 | 140 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | BPAT | 45.896375 | -120.3031 | 2026-09 |
| 67661/OXHIL | Oxbow Hill | OXHIL | 67661 | NY | Niagara | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 140 | 140 | 2029-05 | 2029 | (L) Regulatory approvals pending. Not under construction | NYIS | 42.9711 | -75.73553 | 2026-09 |
| 68766/PFGWP | Pioneer Field Wind Power | PFGWP | 68766 | TX | Tom Green | Greenalia Wind Power Pioneer Field, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 136.2 | 163.2 | 2030-11 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.19494 | -100.2118 | 2026-09 |
| 70098/BEB | Blue Lake BESS | BEB | 70098 | MN | Scott | Northern States Power Co - Minnesota | Electric Utility | Batteries | MWH | BA | 135.5 | 135.5 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 44.786793 | -93.4269 | 2026-09 |
| 66409/GWNT | Hecate Grid Gwent Storage 1 | GWNT | 66409 | CA | Ventura | Hecate Grid Gwent Storage 1, LLC | IPP Non-CHP | Batteries | MWH | BA | 135 | 135 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.28093 | -118.903 | 2026-09 |
| 68666/RIC88 | Stonewall BESS | RIC88 | 68666 | TX | Stonewall | RIC Development, LLC | IPP Non-CHP | Batteries | MWH | BA | 135 | 135 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 33.2466 | -100.3982 | 2026-09 |
| 64981/CPSS1 | Pecan Prairie South Solar | CPSS1 | 64981 | TX | Leon | Repsol Renewables NA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 132.9 | 132.9 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.05001 | -96.221 | 2026-09 |
| 69101/MLB03 | Millers Branch Solar | MLB03 | 69101 | TX | Haskell | Southern Power Co | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 132 | 132 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 33.22132 | -99.58652 | 2026-09 |
| 68252/QUVAL | SR Quincy Valley | QUVAL | 68252 | WA | Grant | SR Quincy Valley, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 130 | 130 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | GCPD | 47.27998 | -119.7046 | 2026-09 |
| 70450/PV1 | Wheatridge Optimization II | PV1 | 70450 | OR | Morrow | Wheatridge Optimization II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 130 | 130 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | BPAT | 45.559975 | -119.6292 | 2026-09 |
| 65141/BS301 | Boulder Solar III LLC | BS301 | 65141 | NV | Clark | 174 Power Global Corp. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 128 | 128 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NEVP | 35.838769 | -114.9642 | 2026-09 |
| 65141/BS3ES | Boulder Solar III LLC | BS3ES | 65141 | NV | Clark | 174 Power Global Corp. | IPP Non-CHP | Batteries | MWH | BA | 128 | 128 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NEVP | 35.838769 | -114.9642 | 2026-09 |
| 69965/RS | Roccasecca BESS LLC | RS | 69965 | NV | Clark | Roccasecca BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 126.5 | 126.5 | 2027-02 | 2027 | (TS) Construction complete, but not yet in commercial operation | CISO | 35.83 | -115.0128 | 2026-09 |
| 68173/SANPV | Sandford Solar and Storage | SANPV | 68173 | TX | Wise | Belltown Power Texas 2, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 126.2 | 126.2 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.30726 | -97.52777 | 2026-09 |
| 68191/HRTG | Heritage Wind | HRTG | 68191 | NY | Orleans | Heritage Wind, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 126 | 126 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 43.170976 | -78.17454 | 2026-09 |
| 62263/GEN1 | Saddle Mountain East Wind Farm | GEN1 | 62263 | WA | Adams | EDP Renewables North America LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 126 | 126 | 2029-10 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | AVA | 46.789 | -119.346 | 2026-09 |
| 68166/DOLBA | Dolomite Storage | DOLBA | 68166 | TX | Ellis | Belltown Power Texas 2, LLC | IPP Non-CHP | Batteries | MWH | BA | 125.7 | 125.7 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 32.456144 | -96.73774 | 2026-09 |
| 68410/BRAZ | Brazoria Solar I | BRAZ | 68410 | TX | Brazoria | Brazoria Solar i, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 125 | 125 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.138777 | -95.37108 | 2026-09 |
| 68410/BRAZ2 | Brazoria Solar I | BRAZ2 | 68410 | TX | Brazoria | Brazoria Solar i, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 125 | 125 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.138777 | -95.37108 | 2026-09 |
| 1355/BESS | E W Brown | BESS | 1355 | KY | Mercer | Kentucky Utilities Co | Electric Utility | Batteries | MWH | BA | 125 | 125 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | LGEE | 37.78831 | -84.71257 | 2026-09 |
| 67552/ELMFL | Elm Flats Solar | ELMFL | 67552 | TX | Navarro | Headwater Energy, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 125 | 125 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 32.113579 | -96.30476 | 2026-09 |
| 66663/EMPIR | Empire Solar (NY) | EMPIR | 66663 | NY | Chautauqua | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 125 | 125 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.2596 | -79.6142 | 2026-09 |
| 67937/FLOSO | Flora Solar | FLOSO | 67937 | IL | Clay | Flora Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 125 | 125 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 38.648852 | -88.51444 | 2026-09 |
| 68316/BIGL1 | Biglow Solar Generation and BESS | BIGL1 | 68316 | OR | Sherman | BIGL bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 125 | 125 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PGE | 45.606 | -120.625 | 2026-09 |
| 68316/BIGL2 | Biglow Solar Generation and BESS | BIGL2 | 68316 | OR | Sherman | BIGL bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 125 | 125 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PGE | 45.606 | -120.625 | 2026-09 |
| 70218/SEL1S | Selma Energy Center | SEL1S | 70218 | AZ | Pinal | Selma Energy Center, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 125 | 125 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | DOPD | 32.849821 | -111.5251 | 2026-09 |
| 68673/OESLW | Sand Luis West | OESLW | 68673 | CA | Fresno | Origis Energy USA, Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 125 | 125 | 2028-11 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 36.1676 | -120.054 | 2026-09 |
| 65590/OCTNS | Octans | OCTNS | 65590 | TX | Pecos | Engie North America | IPP Non-CHP | Batteries | MWH | BA | 125 | 125 | 2028-12 | 2028 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.000575 | -102.6799 | 2026-09 |
| 68671/RIC91 | Houston County BESS | RIC91 | 68671 | TX | Houston | RIC Development, LLC | IPP Non-CHP | Batteries | MWH | BA | 125 | 125 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.239009 | -95.57699 | 2026-09 |
| 70492/WRES1 | Willow Rock Energy Storage Center | WRES1 | 70492 | CA | Kern | GEM A-CAES LLC | IPP Non-CHP | MWH | CE | 125 | 125 | 2030-07 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.912528 | -118.1576 | 2026-09 | |
| 70492/WRES2 | Willow Rock Energy Storage Center | WRES2 | 70492 | CA | Kern | GEM A-CAES LLC | IPP Non-CHP | MWH | CE | 125 | 125 | 2030-07 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.912528 | -118.1576 | 2026-09 | |
| 70492/WRES3 | Willow Rock Energy Storage Center | WRES3 | 70492 | CA | Kern | GEM A-CAES LLC | IPP Non-CHP | MWH | CE | 125 | 125 | 2030-07 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.912528 | -118.1576 | 2026-09 | |
| 70492/WRES4 | Willow Rock Energy Storage Center | WRES4 | 70492 | CA | Kern | GEM A-CAES LLC | IPP Non-CHP | MWH | CE | 125 | 125 | 2030-07 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.912528 | -118.1576 | 2026-09 | |
| 68925/MIDB | Midway BESS | MIDB | 68925 | CA | Fresno | Midway BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 124.6 | 119.9 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 36.652653 | -120.5783 | 2026-09 |
| 68765/HUGSP | Hutcherson Solar | HUGSP | 68765 | TX | Wilbarger | Greenalia Solar Power Hutcherson, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 123.3 | 123.3 | 2030-01 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 34.02533 | -99.26568 | 2026-09 |
| 68155/RIOLA | Rio Lago Solar | RIOLA | 68155 | TX | Bandera | Modal Power LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 123 | 123 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.756134 | -99.09524 | 2026-09 |
| 66896/LP2BA | Lupinus Solar 2, LLC | LP2BA | 66896 | TX | Franklin | Sunraycer Assets I LLC | IPP Non-CHP | Batteries | MWH | BA | 122.9 | 122.9 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 30.303385 | -95.25692 | 2026-09 |
| 69167/BCKBN | Backbone Creek BESS | BCKBN | 69167 | TX | Burnet | Backbone BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 121 | 121 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 30.550207 | -98.25687 | 2026-09 |
| 66778/HS1 | Hart Solar Project | HS1 | 66778 | MI | Oceana | Hart Solar Partners, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 120 | 120 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 43.692866 | -86.32097 | 2026-09 |
| 68968/ENX37 | Border Basin Solar | ENX37 | 68968 | OH | Hancock | Border Basin, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 120 | 120 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.107431 | -83.5722 | 2026-09 |
| 67870/ENX34 | Clermont Solar | ENX34 | 67870 | PA | McKean | Clermont Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 120 | 120 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.656025 | -78.56731 | 2026-09 |
| 68898/ECS1 | Eagle Creek Solar Park LLC | ECS1 | 68898 | MI | Saginaw | Eagle Creek Solar Park LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 120 | 120 | 2027-03 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 43.308523 | -84.21895 | 2026-09 |
| 68359/OCPSF | Pepper Solar Farm | OCPSF | 68359 | TX | McLennan | Pepper Solar Farm, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 120 | 120 | 2027-08 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.678359 | -97.04595 | 2026-09 |
| 68293/FRON | Frontier Solar | FRON | 68293 | KY | Washington | FRON bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 120 | 120 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | LGEE | 37.605063 | -85.24822 | 2026-09 |
| 68877/WLDC1 | Wildcat Ranch Energy Storage | WLDC1 | 68877 | TX | Cochran | Wildcat Ranch Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 120 | 107.5 | 2027-11 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PNM | 33.524176 | -102.8773 | 2026-09 |
| 65051/TSEC | Tracy Solar Energy Center | TSEC | 65051 | NY | Jefferson | EDF Renewables Development, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 119 | 119 | 2027-11 | 2027 | (L) Regulatory approvals pending. Not under construction | NYIS | 44.175939 | -75.98513 | 2026-09 |
| 67884/ENX27 | Two Oaks Solar and Storage LLC | ENX27 | 67884 | VA | Louisa | Two Oaks Solar and Storage | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 118 | 118 | 2029-11 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 38.013053 | -77.93117 | 2026-09 |
| 70547/PV-1 | Rippon Energy Facility | PV-1 | 70547 | WV | Jefferson | Torch Operating Company, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 117.1 | 117.1 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 39.198017 | -77.86053 | 2026-09 |
| 68080/GRS8B | Marcos PV and BESS | GRS8B | 68080 | TX | Victoria | GRS BESS Texas Eight LLC | IPP Non-CHP | Batteries | MWH | BA | 115.9 | 115 | 2029-08 | 2029 | (L) Regulatory approvals pending. Not under construction | ERCO | 28.904979 | -97.71017 | 2026-09 |
| 68080/GRS8P | Marcos PV and BESS | GRS8P | 68080 | TX | Victoria | GRS BESS Texas Eight LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 115.9 | 115 | 2029-08 | 2029 | (L) Regulatory approvals pending. Not under construction | ERCO | 28.904979 | -97.71017 | 2026-09 |
| 66675/ALOAK | Alfred Oaks Solar, LLC | ALOAK | 66675 | NY | Allegany | Alfred Oaks Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 115.2 | 115.2 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.21 | -77.82 | 2026-09 |
| 68086/SBS | South Branch Solar | SBS | 68086 | OH | Hancock | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 115 | 115 | 2027-06 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 41.128477 | -83.51517 | 2026-09 |
| 68553/BACN2 | SR Bacon II | BACN2 | 68553 | GA | Bacon | SR Bacon II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 115 | 115 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | SOCO | 31.511392 | -82.33683 | 2026-09 |
| 64543/1 | Cedar Creek Solar | 1 | 64543 | DE | New Castle | FPS Cedar Creek Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 114 | 114 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 39.37259 | -75.56455 | 2026-09 |
| 67779/GRS5 | Hayrick BESS | GRS5 | 67779 | TX | Coke | Gransolar Texas Five LLC | IPP Non-CHP | Batteries | MWH | BA | 113.9 | 113.9 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 32.022914 | -100.2926 | 2026-09 |
| 64215/45MGB | Aratina Solar Center 2 | 45MGB | 64215 | CA | Kern | 45MG 8me LLC | IPP Non-CHP | Batteries | MWH | BA | 113 | 113 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 35.062965 | -118.0878 | 2026-09 |
| 65977/BF1PV | Boulder Flats Solar | BF1PV | 65977 | NV | Clark | Boulder Flats Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 113 | 113 | 2028-12 | 2028 | (V) Under construction, more than 50 percent complete | NEVP | 35.878865 | -114.9833 | 2026-09 |
| 65458/ANOD1 | Anode (Springville) BESS | ANOD1 | 65458 | CA | Tulare | Southern California Edison Co | Electric Utility | Batteries | MWH | BA | 112.5 | 112.5 | 2027-03 | 2027 | (TS) Construction complete, but not yet in commercial operation | CISO | 36.107903 | -118.9409 | 2026-09 |
| 65458/ANOD2 | Anode (Springville) BESS | ANOD2 | 65458 | CA | Tulare | Southern California Edison Co | Electric Utility | Batteries | MWH | BA | 112.5 | 112.5 | 2027-03 | 2027 | (TS) Construction complete, but not yet in commercial operation | CISO | 36.107903 | -118.9409 | 2026-09 |
| 68768/BRGWP | Blackwelder Ranch Wind | BRGWP | 68768 | TX | Pecos | Greenalia Wind Power Blackwelder Ranch, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 110.4 | 110.4 | 2030-06 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 30.81256 | -102.1865 | 2026-09 |
| 66341/EGSS | Eagle Springs Hybrid | EGSS | 66341 | TX | Delta | Sunraycer Assets I LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 110.1 | 110.1 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 33.433264 | -95.57444 | 2026-09 |
| 70463/WSTBA | Westminster Reliability Project, LLC | WSTBA | 70463 | CA | Orange | RWE Americas, LLC | IPP Non-CHP | Batteries | MWH | BA | 110 | 110 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 33.773169 | -118.0116 | 2026-09 |
| 63850/BESS2 | Cherry | BESS2 | 63850 | CA | Kings | Westlands Cherry, LLC | IPP Non-CHP | Batteries | MWH | BA | 110 | 110 | 2027-07 | 2027 | (T) Regulatory approvals received. Not under construction | CISO | 36.122457 | -119.9232 | 2026-09 |
| 68099/COPE | SR Copeland | COPE | 68099 | TN | Cumberland | SR Copeland, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 110 | 110 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | TVA | 36.035453 | -85.10991 | 2026-09 |
| 70420/PV1 | Wheatridge Optimization I | PV1 | 70420 | OR | Morrow | Wheatridge Optimization I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 110 | 110 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | BPAT | 45.560054 | -119.6224 | 2026-09 |
| 69481/FXTRT | Foxtrot Solar Energy LLC | FXTRT | 69481 | MO | Jasper | Evergy Missouri West | Electric Utility | Solar Photovoltaic | SUN | PV | 108.9 | 108.9 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | SWPP | 37.352 | -94.606 | 2026-09 |
| 65338/UNIS1 | Union Ridge Solar | UNIS1 | 65338 | OH | Montgomery | RWE Americas, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 108 | 108 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 39.984126 | -82.6413 | 2026-09 |
| 70360/FNDRD | Foundry Ridge Energy Center LLC | FNDRD | 70360 | WI | Walworth | Invenergy Services LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 108 | 108 | 2028-08 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 42.583072 | -88.72461 | 2026-09 |
| 70360/FNRD2 | Foundry Ridge Energy Center LLC | FNRD2 | 70360 | WI | Walworth | Invenergy Services LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 108 | 108 | 2028-08 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 42.583072 | -88.72461 | 2026-09 |
| 70360/FNRD3 | Foundry Ridge Energy Center LLC | FNRD3 | 70360 | WI | Walworth | Invenergy Services LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 108 | 108 | 2028-08 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 42.583072 | -88.72461 | 2026-09 |
| 68563/NORWD | SR Norwood | NORWD | 68563 | GA | Warren | SR Norwood, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 107 | 107 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | TVA | 33.435993 | -82.76361 | 2026-09 |
| 67564/REGSP | Reis Solar Park | REGSP | 67564 | TX | Atascosa | Greenalia Solar Power Reis, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 105.5 | 105.5 | 2029-05 | 2029 | (T) Regulatory approvals received. Not under construction | ERCO | 28.652762 | -98.45369 | 2026-09 |
| 69799/F1S01 | Project Matador Gas Plant (PMG) | F1S01 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 104.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/F1S02 | Project Matador Gas Plant (PMG) | F1S02 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 104.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/F1S03 | Project Matador Gas Plant (PMG) | F1S03 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 104.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/F2S01 | Project Matador Gas Plant (PMG) | F2S01 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 104.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/F2S02 | Project Matador Gas Plant (PMG) | F2S02 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 104.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/F2S03 | Project Matador Gas Plant (PMG) | F2S03 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 104.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/FBS01 | Project Matador Gas Plant (PMG) | FBS01 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 101.8 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES001 | Project Matador Gas Plant (PMG) | ES001 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES002 | Project Matador Gas Plant (PMG) | ES002 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES003 | Project Matador Gas Plant (PMG) | ES003 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES004 | Project Matador Gas Plant (PMG) | ES004 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES005 | Project Matador Gas Plant (PMG) | ES005 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES006 | Project Matador Gas Plant (PMG) | ES006 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES007 | Project Matador Gas Plant (PMG) | ES007 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES008 | Project Matador Gas Plant (PMG) | ES008 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES009 | Project Matador Gas Plant (PMG) | ES009 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES010 | Project Matador Gas Plant (PMG) | ES010 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES011 | Project Matador Gas Plant (PMG) | ES011 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES012 | Project Matador Gas Plant (PMG) | ES012 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES013 | Project Matador Gas Plant (PMG) | ES013 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES014 | Project Matador Gas Plant (PMG) | ES014 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES015 | Project Matador Gas Plant (PMG) | ES015 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/ES016 | Project Matador Gas Plant (PMG) | ES016 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS001 | Project Matador Gas Plant (PMG) | MS001 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS002 | Project Matador Gas Plant (PMG) | MS002 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS003 | Project Matador Gas Plant (PMG) | MS003 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS004 | Project Matador Gas Plant (PMG) | MS004 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS005 | Project Matador Gas Plant (PMG) | MS005 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS006 | Project Matador Gas Plant (PMG) | MS006 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS007 | Project Matador Gas Plant (PMG) | MS007 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS008 | Project Matador Gas Plant (PMG) | MS008 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS009 | Project Matador Gas Plant (PMG) | MS009 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS010 | Project Matador Gas Plant (PMG) | MS010 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS011 | Project Matador Gas Plant (PMG) | MS011 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS012 | Project Matador Gas Plant (PMG) | MS012 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS013 | Project Matador Gas Plant (PMG) | MS013 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS014 | Project Matador Gas Plant (PMG) | MS014 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS015 | Project Matador Gas Plant (PMG) | MS015 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MS016 | Project Matador Gas Plant (PMG) | MS016 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 105 | 105 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 67346/Q1335 | Hoffman Falls Wind 2 | Q1335 | 67346 | NY | Madison | Liberty Renewables Incorporated | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 103.5 | 102.5 | 2029-03 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.964628 | -75.75371 | 2026-09 |
| 68428/GTSBY | Gatsby Energy Storage Project | GTSBY | 68428 | TX | Pecos | Gatsby Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 103.4 | 103.4 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 30.664176 | -101.7801 | 2026-09 |
| 62894/WT | High Bridge Wind Project | WT | 62894 | NY | Chenango | High Bridge Wind, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 103.2 | 103.2 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.437923 | -75.48056 | 2026-09 |
| 68334/EVCRK | Evans Creek Energy Storage Project | EVCRK | 68334 | TX | Val Verde | Evans Creek Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 103 | 103 | 2026-09 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 29.746007 | -101.1406 | 2026-09 |
| 69956/S9 | Sanborn Hybrid 3 | S9 | 69956 | CA | Kern | Terra-Gen Operating Co-Hybrid | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 103 | 103 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 34.996 | -118.114 | 2026-09 |
| 65326/SS1 | Sunset Solar | SS1 | 65326 | OR | Wasco | Avangrid Power LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 103 | 103 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | BPAT | 45.165062 | -120.8804 | 2026-09 |
| 64290/ATH1S | SE Athos II, LLC | ATH1S | 64290 | CA | Riverside | SE Athos II, LLC | IPP Non-CHP | Batteries | MWH | BA | 102.3 | 102.3 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 33.751283 | -115.355 | 2026-09 |
| 66396/NDUAH | Naduah Solar | NDUAH | 66396 | TX | Limestone | Gransolar Texas Fifteen, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 102.3 | 77.6 | 2027-10 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.521467 | -96.67385 | 2026-09 |
| 70531/PV100 | Newman Buffer | PV100 | 70531 | TX | El Paso | El Paso Electric Co | Electric Utility | Solar Photovoltaic | SUN | PV | 102.2 | 100 | 2027-02 | 2027 | (L) Regulatory approvals pending. Not under construction | EPE | 31.98 | -106.44 | 2026-09 |
| 67341/NOSES | SGT Hoskins Solar Project Hybrid | NOSES | 67341 | TX | Lamar | SGT Hoskins Solar Project, LLC | IPP Non-CHP | Batteries | MWH | BA | 102.1 | 102.1 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 33.63124 | -95.33785 | 2026-09 |
| 69969/PAS | Panhandle Solar | PAS | 69969 | OK | Texas | Panhandle Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 102 | 102 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 36.609029 | -101.4743 | 2026-09 |
| 67919/DOLCE | Dolce BESS, LLC | DOLCE | 67919 | TX | Mitchell | Samsung C&T Renewables, LLC | IPP Non-CHP | Batteries | MWH | BA | 101.4 | 101.4 | 2028-04 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.484063 | -100.9018 | 2026-09 |
| 70443/MAMM2 | Mammoth Plains Energy Storage II | MAMM2 | 70443 | OK | Dewey | Mammoth Plains Energy Center, LLC | IPP Non-CHP | Batteries | MWH | BA | 101.2 | 101.2 | 2029-05 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 35.97972 | -98.70606 | 2026-09 |
| 66894/ALBPV | Albatross Solar, LLC | ALBPV | 66894 | TX | McLennan | Sunraycer Assets I LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 101 | 101 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.484342 | -97.42239 | 2026-09 |
| 66958/NOPR1 | Northern Prairie 1 | NOPR1 | 66958 | WI | St Croix | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 101 | 101 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | MISO | 45.131813 | -92.31686 | 2026-09 |
| 68172/MYEPV | Myers Solar and Storage | MYEPV | 68172 | TX | Goliad | Belltown Power Texas 2, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100.9 | 100.9 | 2028-08 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 28.420043 | -97.70934 | 2026-09 |
| 68173/SANBT | Sandford Solar and Storage | SANBT | 68173 | TX | Wise | Belltown Power Texas 2, LLC | IPP Non-CHP | Batteries | MWH | BA | 100.9 | 100.9 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.30726 | -97.52777 | 2026-09 |
| 68014/BRDFS | Bradford Solar PA | BRDFS | 68014 | PA | Bradford | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100.5 | 100.5 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 41.721657 | -76.53663 | 2026-09 |
| 68851/HSPV1 | Hermes Solar PV | HSPV1 | 68851 | TX | Bell | Bell 1 Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100.4 | 100 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 30.989842 | -97.14982 | 2026-09 |
| 68852/HSBE1 | Hermes Storage BESS | HSBE1 | 68852 | TX | Bell | Bell 1 Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 100.4 | 100 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 30.981595 | -97.1429 | 2026-09 |
| 68149/RAVEB | Raven Storage | RAVEB | 68149 | TX | Wharton | Raven Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 29.575617 | -96.08872 | 2026-09 |
| 69156/GEN01 | Duff Solar Park | GEN01 | 69156 | IN | Dubois | Duff Solar Park LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 38.31341 | -87.02063 | 2026-09 |
| 69054/ALT2 | ATLAS II | ALT2 | 69054 | AZ | La Paz | ATLAS Solar II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 33.582903 | -113.5769 | 2026-09 |
| 63386/3RIVS | Three Rivers Solar Power, LLC | 3RIVS | 63386 | ME | Hancock | Three Rivers Solar Power, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ISNE | 44.711644 | -68.11 | 2026-09 |
| 65043/DUSO | Dulles Solar and Storage | DUSO | 65043 | VA | Loudoun | Dominion Energy Inc. | Electric Utility | Solar Photovoltaic | SUN | PV | 100 | 100 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 38.95 | -77.5 | 2026-09 |
| 68452/KITTB | Kitt Solar | KITTB | 68452 | AZ | Pinal | 301AK 8me LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | AZPS | 32.73353 | -111.5691 | 2026-09 |
| 68452/KITTS | Kitt Solar | KITTS | 68452 | AZ | Pinal | 301AK 8me LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | AZPS | 32.73353 | -111.5691 | 2026-09 |
| 69027/SSBA | Stoneridge Solar, LLC | SSBA | 69027 | TX | Milam | RWE Americas, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 30.569447 | -97.11043 | 2026-09 |
| 69497/SLB | Star Light Energy Center | SLB | 69497 | NM | Valencia | Star Light Energy Center | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PNM | 34.739572 | -106.7928 | 2026-09 |
| 69497/SLS | Star Light Energy Center | SLS | 69497 | NM | Valencia | Star Light Energy Center | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PNM | 34.739572 | -106.7928 | 2026-09 |
| 69517/BV3BA | Buena Vista Energy Center III | BV3BA | 69517 | NM | Otero | Buena Vista Energy Center III, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | EPE | 32.06659 | -106.2853 | 2026-09 |
| 69517/BV3SO | Buena Vista Energy Center III | BV3SO | 69517 | NM | Otero | Buena Vista Energy Center III, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | EPE | 32.06659 | -106.2853 | 2026-09 |
| 69586/GPS | Great Plains Solar, LLC | GPS | 69586 | IL | Perry | Great Plains Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 38.177944 | -89.55289 | 2026-09 |
| 69594/SPS | Switchgrass Plains Solar, LLC | SPS | 69594 | IL | Fayette | Switchgrass Plains Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 39.172414 | -89.05787 | 2026-09 |
| 69809/5756 | Northern Divide Energy Storage | 5756 | 69809 | ND | Burke | Northern Divide Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 48.769875 | -102.7678 | 2026-09 |
| 70188/WES01 | Weld Energy Storage | WES01 | 70188 | CO | Weld | Weld Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 40.613467 | -104.8467 | 2026-09 |
| 64290/ATH1N | SE Athos II, LLC | ATH1N | 64290 | CA | Riverside | SE Athos II, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 33.751283 | -115.355 | 2026-09 |
| 68426/VOYGR | Voyager Energy Storage | VOYGR | 68426 | MI | Washtenaw | Voyager Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 42.153167 | -83.8333 | 2026-09 |
| 69393/PHIEC | Pamela Heights I Energy Center | PHIEC | 69393 | TX | Harris | Pamela Heights I Energy Center LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.645345 | -95.45021 | 2026-09 |
| 66441/INCV1 | Crossvine Solar | INCV1 | 66441 | IN | Dubois | Crossvine Solar 1 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 38.264271 | -87.00189 | 2026-09 |
| 66658/NOTT | Nottingham Solar | NOTT | 66658 | OH | Harrison | Nottingham Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.189455 | -81.04111 | 2026-09 |
| 69356/PWLNB | Powerline Energy Storage | PWLNB | 69356 | FL | Citrus | Duke Energy Florida, LLC | Electric Utility | Batteries | MWH | BA | 100 | 100 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPC | 28.96684 | -82.61751 | 2026-09 |
| 70403/GRBS1 | Grand Basin Energy Storage | GRBS1 | 70403 | MI | Jackson | Grand Basin Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 42.420211 | -84.48752 | 2026-09 |
| 69059/COBA | Crimson Orchard Solar and BESS | COBA | 69059 | ID | Elmore | Clenera DevCo LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2027-04 | 2027 | (L) Regulatory approvals pending. Not under construction | IPCO | 43.181239 | -115.7465 | 2026-09 |
| 69059/COPV | Crimson Orchard Solar and BESS | COPV | 69059 | ID | Elmore | Clenera DevCo LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-04 | 2027 | (L) Regulatory approvals pending. Not under construction | IPCO | 43.181239 | -115.7465 | 2026-09 |
| 70033/WT001 | White Tank Energy Storage | WT001 | 70033 | AZ | Maricopa | White Tank Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | AZPS | 33.498 | -112.3176 | 2026-09 |
| 68897/PVSI | New Frontiers Solar | PVSI | 68897 | KY | Breckinridge | Clover Creek Solar Project LLC d/b/a New Frontiers Solar Park | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-06 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 37.79502 | -86.5068 | 2026-09 |
| 68909/ISSBA | Imperial Sun Solar | ISSBA | 68909 | CA | Imperial | Imperial Sun Solar LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2027-07 | 2027 | (L) Regulatory approvals pending. Not under construction | IID | 32.6851 | -115.2977 | 2026-09 |
| 68909/ISSPV | Imperial Sun Solar | ISSPV | 68909 | CA | Imperial | Imperial Sun Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-07 | 2027 | (L) Regulatory approvals pending. Not under construction | IID | 32.6851 | -115.2977 | 2026-09 |
| 69966/FMM | Four Mile Mesa Solar, LLC | FMM | 69966 | NM | San Juan | Four Mile Mesa Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PNM | 36.8685 | -108.277 | 2026-09 |
| 69966/FMMS | Four Mile Mesa Solar, LLC | FMMS | 69966 | NM | San Juan | Four Mile Mesa Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PNM | 36.8685 | -108.277 | 2026-09 |
| 68473/BROOK | Brookside Solar | BROOK | 68473 | NY | Franklin | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | NYIS | 44.932 | -74.1302 | 2026-09 |
| 69687/L7SF | Lucky 7 Solar Farm LLC | L7SF | 69687 | TX | Hopkins | Lucky 7 Solar Farm LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 33.082 | -95.721 | 2026-09 |
| 67667/3COAS | Third Coast BESS, LLC | 3COAS | 67667 | TX | Jackson | Cypress Creek Renewables | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 28.852327 | -96.55642 | 2026-09 |
| 64216/201LC | Rockmont Solar and Storage Project | 201LC | 64216 | NM | San Juan | 201LC 8me LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PNM | 36.776579 | -108.3751 | 2026-09 |
| 65471/RGS23 | Rose Gold Solar | RGS23 | 65471 | IN | Jay | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.404357 | -85.19716 | 2026-09 |
| 66113/NEBE1 | Big Elk Solar | NEBE1 | 66113 | NE | Washington | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | SWPP | 41.475678 | -96.29309 | 2026-09 |
| 66216/BESS | Yaupon Solar Project (Hybrid) | BESS | 66216 | TX | Milam | Yaupon Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.0444 | -96.8514 | 2026-09 |
| 68554/BACN3 | SR Bacon III | BACN3 | 68554 | GA | Bacon | SR Bacon III, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | SOCO | 31.511392 | -82.33683 | 2026-09 |
| 68555/CORDV | SR Cordova | CORDV | 68555 | SC | Orangeburg | SR Cordova, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | SCEG | 33.45963 | -80.88897 | 2026-09 |
| 68903/MUSPV | Solex Ridge Solar | MUSPV | 68903 | TX | Henderson | Solex Ridge, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 32.169946 | -95.5803 | 2026-09 |
| 68939/COGPV | Coggon Solar LLC | COGPV | 68939 | IA | Linn | Clenera DevCo LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 42.290594 | -91.57266 | 2026-09 |
| 69170/FW2 | Freshwater Solar II, LLC | FW2 | 69170 | MI | Montcalm | Freshwater Solar II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 43.310581 | -85.05159 | 2026-09 |
| 70583/HES01 | Highland Solar I, LLC - (CO) | HES01 | 70583 | CO | Pueblo | Highland Solar I, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PSCO | 38.41955 | -104.2277 | 2026-09 |
| 67090/FMS | Flint Mine Solar | FMS | 67090 | NY | Greene | Flint Mine Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | NYIS | 42.313611 | -73.84556 | 2026-09 |
| 70050/DRENN | Drennan Energy Storage | DRENN | 70050 | CO | El Paso | Drennan Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | SWPP | 38.772896 | -104.6671 | 2026-09 |
| 66922/59957 | Timber Cove Solar | 59957 | 66922 | TX | Freestone | Freestone Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-05 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.870589 | -96.15247 | 2026-09 |
| 69973/OSON1 | Oso Negro | OSON1 | 69973 | NM | Bernalillo | Oso Negro, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2028-05 | 2028 | (T) Regulatory approvals received. Not under construction | PNM | 35.111657 | -106.7205 | 2026-09 |
| 68032/SKLRE | Skylight Renewable Energy | SKLRE | 68032 | CA | Sutter | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WALC | 38.947494 | -121.4792 | 2026-09 |
| 68032/SKREB | Skylight Renewable Energy | SKREB | 68032 | CA | Sutter | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WALC | 38.947494 | -121.4792 | 2026-09 |
| 68205/GRNWD | Greenwood Solar I | GRNWD | 68205 | VA | Culpeper | Greenwood Solar I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-06 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 38.427261 | -77.90787 | 2026-09 |
| 68604/DALBS | Dahlia Energy | DALBS | 68604 | TX | La Salle | Dahlia Energy LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 28.369598 | -98.96762 | 2026-09 |
| 69762/425LM | Southern Bighorn Solar 2 | 425LM | 69762 | NV | Clark | 425LM 8ME LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | NEVP | 36.56117 | -114.7413 | 2026-09 |
| 69762/BESS2 | Southern Bighorn Solar 2 | BESS2 | 69762 | NV | Clark | 425LM 8ME LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | NEVP | 36.56117 | -114.7413 | 2026-09 |
| 64659/AMS | AEUG Madison Solar, LLC | AMS | 64659 | KY | Madison | Acciona Energy USA Global, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-09 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PJM | 37.822029 | -84.30052 | 2026-09 |
| 64848/BEF1 | Bedington Energy Facility, LLC | BEF1 | 64848 | WV | Berkeley | Bedington Energy Facility, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-10 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 39.531839 | -77.88709 | 2026-09 |
| 69021/RH1PV | Rustic Hills Solar I | RH1PV | 69021 | IN | Warrick | Clenera DevCo LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-10 | 2028 | (T) Regulatory approvals received. Not under construction | MISO | 37.96707 | -87.30739 | 2026-09 |
| 69022/RH2PV | Rustic Hills Solar II LLC | RH2PV | 69022 | IN | Warrick | Clenera DevCo LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-10 | 2028 | (T) Regulatory approvals received. Not under construction | MISO | 37.974259 | -87.32197 | 2026-09 |
| 66114/INRD1 | Merrillville Solar | INRD1 | 66114 | IN | Lake | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 41.462794 | -87.27285 | 2026-09 |
| 68352/GIPV1 | Girasol Solar Farm | GIPV1 | 68352 | MS | Sunflower | Girasol Solar Farm LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 33.676092 | -90.64287 | 2026-09 |
| 69608/SNSPI | Sinnissippi Solar Energy LLC | SNSPI | 69608 | WI | Jefferson | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 43.12592 | -88.67098 | 2026-09 |
| 69775/STBSP | Strasburg Solar Park | STBSP | 69775 | MI | Monroe | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 100 | 100 | 2028-12 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 41.971933 | -83.45975 | 2026-09 |
| 67896/229HD | Holstein 2 Battery Storage | 229HD | 67896 | TX | Nolan | 229HD 8me, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2029-05 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.081901 | -100.159 | 2026-09 |
| 67325/NYRIV | Riverside Solar LLC | NYRIV | 67325 | NY | St Lawrence | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 44.06585 | -76.1222 | 2026-09 |
| 67324/NYSOM | Somerset Solar LLC | NYSOM | 67324 | NY | Niagara | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 125 | 2029-10 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 43.352072 | -78.61036 | 2026-09 |
| 68343/GRVA1 | Grand Valley Solar Generation and BESS | GRVA1 | 68343 | CO | Mesa | GRVA bn, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2029-10 | 2029 | (L) Regulatory approvals pending. Not under construction | PSCO | 39.1987 | -108.782 | 2026-09 |
| 68343/GRVA2 | Grand Valley Solar Generation and BESS | GRVA2 | 68343 | CO | Mesa | GRVA bn, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2029-10 | 2029 | (L) Regulatory approvals pending. Not under construction | PSCO | 39.1987 | -108.782 | 2026-09 |
| 65808/BSVEC | Sacramento Valley Energy Center, LLC | BSVEC | 65808 | CA | Sacramento | Sacramento Valley Energy Center, LLC | IPP Non-CHP | Batteries | MWH | BA | 100 | 100 | 2029-12 | 2029 | (U) Under construction, less than or equal to 50 percent complete | BANC | 38.57147 | -121.1845 | 2026-09 |
| 69636/69363 | Main Horn Solar | 69363 | 69636 | TX | Navarro | Main Horn Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.984498 | -96.36558 | 2026-09 |
| 69642/96513 | Arkana Solar | 96513 | 69642 | AR | Columbia | Arkana Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 33.04521 | -93.44841 | 2026-09 |
| 69639/16777 | Triune Solar | 16777 | 69639 | TX | Trinity | Triune Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 100 | 100 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.996927 | -95.12384 | 2026-09 |
| 64531/KOV4A | Noosa Energy Storage LLC | KOV4A | 64531 | CA | San Joaquin | Engie North America | IPP Non-CHP | Batteries | MWH | BA | 99 | 99 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 37.756292 | -121.1481 | 2026-09 |
| 4050/BESS1 | Edgewater | BESS1 | 4050 | WI | Sheboygan | Wisconsin Power & Light Co | Electric Utility | Batteries | MWH | BA | 99 | 99 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 43.715142 | -87.70586 | 2026-09 |
| 69981/GRNTS | Grant Solar, LLC | GRNTS | 69981 | SD | McCook | Geronimo Power | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 99 | 99 | 2027-10 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 43.550003 | -97.26738 | 2026-09 |
| 68153/PV1 | Fremont Solar | PV1 | 68153 | UT | Iron | Fremont Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 99 | 99 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PACE | 37.9789 | -112.7761 | 2026-09 |
| 68228/Q1448 | Agricola Wind | Q1448 | 68228 | NY | Cayuga | Liberty Renewables Incorporated | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 99 | 97 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.755287 | -76.53902 | 2026-09 |
| 68738/CANBS | Cannibal Draw Solar and Storage | CANBS | 68738 | TX | Glasscock | Red River Clean Energy | IPP Non-CHP | Batteries | MWH | BA | 98.6 | 98.6 | 2028-04 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 32.023861 | -101.284 | 2026-09 |
| 69742/PV3 | Cooperative Solar Three-Marion | PV3 | 69742 | KY | Marion | East Kentucky Power Coop, Inc | Electric Utility | Solar Photovoltaic | SUN | PV | 96 | 96 | 2027-08 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 37.605113 | -85.24824 | 2026-09 |
| 65293/OEMS4 | Covington (MS) | OEMS4 | 65293 | MS | Covington | Origis Energy USA, Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 96 | 96 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | MISO | 31.4395 | -89.4846 | 2026-09 |
| 67568/WIGSP | Wittig Solar Park | WIGSP | 67568 | TX | Wharton | Greenalia Solar Power Wittig, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 96 | 96 | 2029-12 | 2029 | (T) Regulatory approvals received. Not under construction | ERCO | 29.245055 | -95.87477 | 2026-09 |
| 69629/BIGM1 | Big Muddy Solar | BIGM1 | 69629 | IL | Jackson | Big Muddy Solar Project, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 95 | 95 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 37.86 | -89.3 | 2026-09 |
| 68073/BLUER | Blue Ridge Solar | BLUER | 68073 | VA | Pittsylvania | Dominion Renewable Energy | Electric Utility | Solar Photovoltaic | SUN | PV | 95 | 95 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 36.790101 | -79.42875 | 2026-09 |
| 68085/RMS1 | Red Maple LRE | RMS1 | 68085 | IL | DeKalb | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 95 | 95 | 2028-09 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 41.886064 | -88.72725 | 2026-09 |
| 66484/GCA | Glen Canyon Solar A, LLC | GCA | 66484 | UT | Kane | AES Distributed Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 95 | 95 | 2028-12 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PACE | 37.091539 | -111.7255 | 2026-09 |
| 68271/SWLS1 | Sweetleaf Solar LLC | SWLS1 | 68271 | NC | Halifax | CleanChoice Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 93 | 93 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 36.220711 | -77.68863 | 2026-09 |
| 67650/BEARR | Bear Ridge | BEARR | 67650 | NY | Niagara | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 93 | 93 | 2028-05 | 2028 | (L) Regulatory approvals pending. Not under construction | NYIS | 43.14244 | -78.79106 | 2026-09 |
| 69648/RSBA | Rosamond South II | RSBA | 69648 | CA | Kern | Golden Fields Solar VI, LLC | IPP Non-CHP | Batteries | MWH | BA | 92 | 92 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 34.852326 | -118.4312 | 2026-09 |
| 67544/LEGSP | Leitrim Solar Park | LEGSP | 67544 | TX | Hill | Greenalia Solar Power Leitrim, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 91.2 | 91.2 | 2030-10 | 2030 | (T) Regulatory approvals received. Not under construction | ERCO | 31.79623 | -97.20278 | 2026-09 |
| 64253/S1 | Mohawk Solar | S1 | 64253 | NY | Montgomery | Avangrid Power LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 90.5 | 90.5 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | NYIS | 42.887133 | -74.63781 | 2026-09 |
| 68253/ROCH1 | SR Rochelle I | ROCH1 | 68253 | GA | Wilcox | SR Rochelle I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 90 | 90 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | SOCO | 31.923234 | -83.45427 | 2026-09 |
| 69524/WLS | Windy Lane Energy Center | WLS | 69524 | NM | De Baca | Windy Lane Energy Center, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 90 | 90 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PNM | 34.587619 | -104.0312 | 2026-09 |
| 64428/JVR1A | JVR Energy Park LLC | JVR1A | 64428 | CA | San Diego | JVR Energy Park LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 90 | 90 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 32.625903 | -116.1749 | 2026-09 |
| 65052/HSEC | Homer Solar Energy Center | HSEC | 65052 | NY | Cortland | EDF Renewables Development, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 90 | 90 | 2027-11 | 2027 | (L) Regulatory approvals pending. Not under construction | NYIS | 42.658652 | -76.09993 | 2026-09 |
| 67561/RIC93 | Callan Solar | RIC93 | 67561 | TX | McCulloch | RIC Development, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 90 | 90 | 2028-04 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 30.990928 | -99.60118 | 2026-09 |
| 68585/YRS | York Run Solar | YRS | 68585 | NY | Chautauqua | Lydian Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 90 | 90 | 2028-09 | 2028 | (L) Regulatory approvals pending. Not under construction | NYIS | 42.011319 | -79.2243 | 2026-09 |
| 64849/WILDC | Wildcat Solar Power Plant LLC | WILDC | 64849 | NM | McKinley | Solariant Capital, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 90 | 90 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PNM | 35.580453 | -108.9023 | 2026-09 |
| 70405/BA-1 | Winchester Solar I, LLC | BA-1 | 70405 | AZ | Cochise | Torch Operating Company, LLC | IPP Non-CHP | Batteries | MWH | BA | 87.8 | 87.8 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | TEPC | 32.186372 | -109.9531 | 2026-09 |
| 70405/PV-1 | Winchester Solar I, LLC | PV-1 | 70405 | AZ | Cochise | Torch Operating Company, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 87.8 | 87.8 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | TEPC | 32.186372 | -109.9531 | 2026-09 |
| 70406/BA-2 | Winchester Solar II, LLC | BA-2 | 70406 | AZ | Cochise | Torch Operating Company, LLC | IPP Non-CHP | Batteries | MWH | BA | 87.8 | 87.8 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | WALC | 32.207126 | -109.9435 | 2026-09 |
| 70406/PV-2 | Winchester Solar II, LLC | PV-2 | 70406 | AZ | Cochise | Torch Operating Company, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 87.8 | 87.8 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | WALC | 32.207126 | -109.9435 | 2026-09 |
| 70559/GEN1 | Mammoth | GEN1 | 70559 | WV | Kanawha | MN8 Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 86 | 86 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 38.20845 | -81.30893 | 2026-09 |
| 69795/KEABE | Keamuku | KEABE | 69795 | HI | Hawaii | AES Clean Energy | IPP Non-CHP | Batteries | MWH | BA | 86 | 86 | 2030-05 | 2030 | (L) Regulatory approvals pending. Not under construction | HECO | 19.8799 | -155.7373 | 2026-09 |
| 69795/KEAMU | Keamuku | KEAMU | 69795 | HI | Hawaii | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 86 | 86 | 2030-05 | 2030 | (L) Regulatory approvals pending. Not under construction | HECO | 19.8799 | -155.7373 | 2026-09 |
| 68226/BACON | SR Bacon | BACON | 68226 | GA | Bacon | SR Bacon, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 85 | 85 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | SOCO | 31.511392 | -82.33683 | 2026-09 |
| 70089/MURCH | Murch Solar, LLC | MURCH | 70089 | MI | Van Buren | Murch Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 85 | 85 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 42.401 | -86.03 | 2026-09 |
| 69925/SWBA1 | Stellar Wright BESS | SWBA1 | 69925 | CA | Merced | Stellar Renewable Power | IPP Non-CHP | Batteries | MWH | BA | 84.8 | 80 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 37.007998 | -120.9637 | 2026-09 |
| 67782/GS22B | RedSun PV and BESS | GS22B | 67782 | TX | Burnet | Gransolar Texas Twenty Two LLC | IPP Non-CHP | Batteries | MWH | BA | 84 | 84 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 30.784886 | -98.20217 | 2026-09 |
| 67782/GS22P | RedSun PV and BESS | GS22P | 67782 | TX | Burnet | Gransolar Texas Twenty Two LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 84 | 84 | 2028-07 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 30.784886 | -98.20217 | 2026-09 |
| 69147/G1 | New Caledonia | G1 | 69147 | MS | Lowndes | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 84 | 81 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 33.649272 | -88.3146 | 2026-09 |
| 69147/G2 | New Caledonia | G2 | 69147 | MS | Lowndes | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 84 | 81 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 33.649272 | -88.3146 | 2026-09 |
| 69147/G3 | New Caledonia | G3 | 69147 | MS | Lowndes | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 84 | 81 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 33.649272 | -88.3146 | 2026-09 |
| 69147/G4 | New Caledonia | G4 | 69147 | MS | Lowndes | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 84 | 81 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 33.649272 | -88.3146 | 2026-09 |
| 69147/G5 | New Caledonia | G5 | 69147 | MS | Lowndes | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 84 | 81 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 33.649272 | -88.3146 | 2026-09 |
| 69147/G6 | New Caledonia | G6 | 69147 | MS | Lowndes | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 84 | 81 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 33.649272 | -88.3146 | 2026-09 |
| 66895/LP1BA | Lupinus Solar 1, LLC | LP1BA | 66895 | TX | Franklin | Sunraycer Assets I LLC | IPP Non-CHP | Batteries | MWH | BA | 83 | 83 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 30.303385 | -95.25692 | 2026-09 |
| 67566/ROGSP | Roscommon Solar Park | ROGSP | 67566 | TX | Lamar | Greenalia Solar Power Roscommon, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 82.8 | 82.8 | 2029-10 | 2029 | (T) Regulatory approvals received. Not under construction | ERCO | 33.631719 | -95.69587 | 2026-09 |
| 68002/FOLEY | Foley Solar, LLC | FOLEY | 68002 | AL | Baldwin | Nofar USA Energy Investments and Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | SOCO | 30.377488 | -87.72751 | 2026-09 |
| 69197/HALIF | Halifax County Solar | HALIF | 69197 | NC | Halifax | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 36.2537 | -77.6884 | 2026-09 |
| 70235/68372 | Mulqueeney Wind Energy | 68372 | 70235 | CA | Alameda | Mulqueeney Wind Energy LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 80 | 80 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 37.69742 | -121.5891 | 2026-09 |
| 67998/KSEC | Karn Solar Energy Center | KSEC | 67998 | MI | Bay | Consumers Energy Co - (MI) | Electric Utility | Solar Photovoltaic | SUN | PV | 80 | 80 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 43.644996 | -83.84007 | 2026-09 |
| 70084/AC | Alligator Creek Solar | AC | 70084 | GA | Wheeler | Alligator Creek Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | SOCO | 32.104 | -82.844 | 2026-09 |
| 70364/GEN1 | Walker Solar | GEN1 | 70364 | PA | Juniata | MN8 Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.585531 | -77.34537 | 2026-09 |
| 70302/22 | Gum Swamp Solar, LLC | 22 | 70302 | NC | Scotland | Headwater Energy, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CPLE | 34.867 | -79.599 | 2026-09 |
| 70035/NSES | North Star Energy Storage, LLC | NSES | 70035 | MN | Chisago | North Star Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 80 | 80 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 45.480911 | -92.90814 | 2026-09 |
| 69967/FTB | Foxtail Flats Solar, LLC | FTB | 69967 | NM | San Juan | Foxtail Flats Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 80 | 80 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PNM | 36.8685 | -108.277 | 2026-09 |
| 69463/BCRSP | Beecher Solar Park | BCRSP | 69463 | MI | Lenawee | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 41.923 | -83.917 | 2026-09 |
| 67663/SGROV | Scotch Grove Solar | SGROV | 67663 | NC | Scotland | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | CPLE | 34.84957 | -79.44656 | 2026-09 |
| 67665/SDAVI | South Davidson | SDAVI | 67665 | NC | Davidson | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-10 | 2027 | (L) Regulatory approvals pending. Not under construction | DUK | 35.618203 | -80.10797 | 2026-09 |
| 68057/BAMA1 | Alabama Creek Solar | BAMA1 | 68057 | AL | Dallas | Alabama Creek Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | SOCO | 32.315548 | -87.22312 | 2026-09 |
| 70271/OKFL1 | Fiddle Leaf Solar, LLC | OKFL1 | 70271 | OK | Delaware | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 76 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | SWPP | 36.256047 | -94.58653 | 2026-09 |
| 70304/24 | Sleepy Creek Solar, LLC | 24 | 70304 | NC | Bladen | Headwater Energy, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CPLE | 34.592 | -78.326 | 2026-09 |
| 66363/GEN1 | Black Walnut Solar, LLC | GEN1 | 66363 | NC | Jones | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-11 | 2027 | (L) Regulatory approvals pending. Not under construction | DUK | 35.050032 | -77.15218 | 2026-09 |
| 66383/GEN1 | Hyco Solar LLC | GEN1 | 66383 | NC | Person | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-11 | 2027 | (L) Regulatory approvals pending. Not under construction | DUK | 36.484574 | -79.13311 | 2026-09 |
| 67989/PGR28 | Drawhorn Solar | PGR28 | 67989 | GA | Hancock | Drawhorn Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-11 | 2027 | (L) Regulatory approvals pending. Not under construction | SOCO | 33.214449 | -83.04206 | 2026-09 |
| 68028/DSP | Delta Solar Plant | DSP | 68028 | LA | Bolivar | Entergy Mississippi LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-11 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 33.794007 | -90.71392 | 2026-09 |
| 63653/SNDHC | Sand Hill C | SNDHC | 63653 | CA | Alameda | Viracocha Wind LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 80 | 80 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 37.769695 | -121.5961 | 2026-09 |
| 67990/BM1 | Bright Mountain Solar | BM1 | 67990 | KY | Perry | Avangrid Power LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.29003 | -83.28286 | 2026-09 |
| 68104/HPHUL | SR Hope Hull | HPHUL | 68104 | AL | Montgomery | SR Hope Hull, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | SOCO | 32.2555 | -86.3194 | 2026-09 |
| 66385/GEN1 | Panther Branch Solar, LLC | GEN1 | 66385 | NC | Duplin | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2028-08 | 2028 | (L) Regulatory approvals pending. Not under construction | DUK | 35.145344 | -78.15963 | 2026-09 |
| 68043/ROBES | Robeson Solar I | ROBES | 68043 | NC | Robeson | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CPLE | 34.614574 | -78.93468 | 2026-09 |
| 68871/TIMIL | Timber Mill Solar | TIMIL | 68871 | NC | Jones | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CPLE | 34.96634 | -77.21299 | 2026-09 |
| 65325/98936 | High Top Solar | 98936 | 65325 | WA | Yakima | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2029-01 | 2029 | (T) Regulatory approvals received. Not under construction | PACW | 46.522974 | -119.9586 | 2026-09 |
| 58175/JWPI | Jawbone Wind Project | JWPI | 58175 | MT | Wheatland | Triple Oak Power LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 80 | 80 | 2029-12 | 2029 | (U) Under construction, less than or equal to 50 percent complete | NWMT | 46.508056 | -109.7278 | 2026-09 |
| 68812/STVML | Stevens Mill Solar | STVML | 68812 | NC | Wayne | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 80 | 80 | 2030-06 | 2030 | (L) Regulatory approvals pending. Not under construction | CPLE | 35.35546 | -78.1192 | 2026-09 |
| 61331/BA1 | NISA Electric Generation Project | BA1 | 61331 | NY | Kings | NYC Energy LLC | IPP Non-CHP | Batteries | MWH | BA | 79.9 | 79.9 | 2028-10 | 2028 | (T) Regulatory approvals received. Not under construction | NYIS | 40.7065 | -73.9702 | 2026-09 |
| 68249/METTR | SR Horus | METTR | 68249 | KY | Simpson | SR Horus, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 79.7 | 79.7 | 2027-09 | 2027 | (V) Under construction, more than 50 percent complete | TVA | 36.661 | -86.534 | 2026-09 |
| 68969/ENX39 | Strinestown Solar | ENX39 | 68969 | PA | York | Strinestown Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 79.6 | 79.6 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 40.090105 | -76.73955 | 2026-09 |
| 66862/NY29 | KCE NY 29, LLC | NY29 | 66862 | NY | Suffolk | Key Capture Energy | IPP Non-CHP | Batteries | MWH | BA | 79 | 79 | 2030-03 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 40.81278 | -73.21729 | 2026-09 |
| 67563/RAGSP | Ratcliff Solar Park | RAGSP | 67563 | TX | Freestone | Greenalia Solar Power Ratcliff, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 78.8 | 78.8 | 2029-08 | 2029 | (T) Regulatory approvals received. Not under construction | ERCO | 30.217058 | -95.81602 | 2026-09 |
| 67581/CIRSB | Cairos Solar and Storage | CIRSB | 67581 | TX | Kinney | Samsung C&T Renewables, LLC | IPP Non-CHP | Batteries | MWH | BA | 77.3 | 77.3 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 29.269974 | -100.1975 | 2026-09 |
| 66315/CCSO | Clover Creek Solar | CCSO | 66315 | VA | Halifax | Dominion Energy Inc. | Electric Utility | Solar Photovoltaic | SUN | PV | 77.2 | 77.2 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 36.816641 | -78.69262 | 2026-09 |
| 69351/HNYBS | Honeycomb Solar and Storage | HNYBS | 69351 | TX | Bee | Honeycomb Solar Holdco, LLC | IPP Non-CHP | Batteries | MWH | BA | 76.5 | 76.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 28.184344 | -97.77169 | 2026-09 |
| 66398/EYTCH | Eytcheson Solar | EYTCH | 66398 | TX | Navarro | Gransolar Texas Fourteen, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 76.4 | 76.2 | 2028-01 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.872617 | -96.7 | 2026-09 |
| 69823/CABOK | Cabokenze Energy Storage | CABOK | 69823 | GA | Burke | Cabokenze Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 76 | 76 | 2027-11 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SOCO | 33.037636 | -82.11924 | 2026-09 |
| 70220/RSP1 | Robinson Solar Plant | RSP1 | 70220 | SC | Chesterfield | Duke Energy Carolinas, LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 76 | 76 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | CPLE | 34.4168 | -80.1918 | 2026-09 |
| 68172/MYEBT | Myers Solar and Storage | MYEBT | 68172 | TX | Goliad | Belltown Power Texas 2, LLC | IPP Non-CHP | Batteries | MWH | BA | 75.7 | 75.7 | 2028-08 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 28.420043 | -97.70934 | 2026-09 |
| 68461/KEYBA | Key Energy Storage | KEYBA | 68461 | CA | Fresno | Key Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 75 | 75 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 36.13681 | -120.1312 | 2026-09 |
| 68578/AC1S | AC Ranch I | AC1S | 68578 | NM | Lea | Lydian Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 75 | 75 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 32.732263 | -103.2748 | 2026-09 |
| 67676/GEN01 | Zeta Solar & Storage | GEN01 | 67676 | CA | Merced | Zeta Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 75 | 75 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 36.911894 | -120.8101 | 2026-09 |
| 67676/GEN02 | Zeta Solar & Storage | GEN02 | 67676 | CA | Merced | Zeta Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 75 | 75 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 36.911894 | -120.8101 | 2026-09 |
| 70023/EDGCM | Edgecombe Solar LLC | EDGCM | 70023 | NC | Edgecombe | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 75 | 75 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 35.949381 | -77.65926 | 2026-09 |
| 68337/LOTUS | Lotus Solar | LOTUS | 68337 | SC | Darlington | Modal Power LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 75 | 75 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | CPLE | 34.447832 | -80.10356 | 2026-09 |
| 68995/ENX38 | Dover Solar (PA) | ENX38 | 68995 | PA | York | Dover Solar, LLC (PA) | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 75 | 75 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 40.01169 | -76.8234 | 2026-09 |
| 65344/66149 | Noria Hondo Solar (Hybrid) | 66149 | 65344 | TX | Kleberg | Nexus Renewable Power, LLC | IPP Non-CHP | Batteries | MWH | BA | 75 | 75 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 27.553355 | -97.67528 | 2026-09 |
| 66851/FAIR1 | Fairview Solar (AR) | FAIR1 | 66851 | AR | Ashley | Urban Grid Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 75 | 75 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 33.342883 | -91.89495 | 2026-09 |
| 70545/WBESS | Wildwood Energy Storage | WBESS | 70545 | MS | Tallahatchie | Wildwood Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 75 | 75 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 33.93316 | -90.33908 | 2026-09 |
| 70454/BESS1 | Big Bend III Battery Storage | BESS1 | 70454 | FL | Hillsborough | Tampa Electric Co | Electric Utility | Batteries | MWH | BA | 75 | 75 | 2028-06 | 2028 | (T) Regulatory approvals received. Not under construction | TEC | 27.795 | -82.403 | 2026-09 |
| 70365/BODES | Bodkin BESS | BODES | 70365 | TX | Brazoria | Bodkin BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 75 | 75 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | ERCO | 29.292 | -95.301 | 2026-09 |
| 70366/BHBES | Boot Hill Energy Storage | BHBES | 70366 | KS | Ford | Boot Hill Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 75 | 75 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | SWPP | 37.704 | -99.977 | 2026-09 |
| 61511/BCNE | Burt County Wind | BCNE | 61511 | NE | Burt | RWE Americas, LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 75 | 75 | 2029-09 | 2029 | (L) Regulatory approvals pending. Not under construction | SWPP | 41.886 | -96.345 | 2026-09 |
| 68331/CVSO | Caverns Solar | CVSO | 68331 | FL | Jackson | CVSO, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 75 | 75 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | FPL | 30.871983 | -85.29425 | 2026-09 |
| 67666/SUNDN | Sundance (CO) | SUNDN | 67666 | CO | Elbert | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 39.414779 | -104.4481 | 2026-09 |
| 67723/SOLAR | Kingstree West 115 | SOLAR | 67723 | SC | Williamsburg | Kingstree West 115 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | CPLE | 33.693976 | -79.95404 | 2026-09 |
| 62181/23 | B & K Solar | 23 | 62181 | SC | Darlington | B & K Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CPLE | 34.423425 | -80.06213 | 2026-09 |
| 70223/TPSP1 | Turnpike Solar Plant | TPSP1 | 70223 | FL | Osceola | Duke Energy Florida, LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | FPC | 28.063296 | -81.22305 | 2026-09 |
| 62184/27 | Big Fork Solar | 27 | 62184 | SC | Barnwell | Big Fork Solar | IPP Non-CHP | Batteries | MWH | BA | 74.9 | 74.9 | 2027-04 | 2027 | (T) Regulatory approvals received. Not under construction | SCEG | 33.135275 | -81.23911 | 2026-09 |
| 62234/48 | Juniper Solar | 48 | 62234 | SC | Chesterfield | Juniper Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2027-04 | 2027 | (T) Regulatory approvals received. Not under construction | CPLE | 34.638189 | -79.86121 | 2026-09 |
| 70222/LCSP1 | Lonesome Camp Solar Plant | LCSP1 | 70222 | FL | Osceola | Duke Energy Florida, LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | FPC | 28.079121 | -81.24029 | 2026-09 |
| 64345/1112 | Highland Solar North | 1112 | 64345 | FL | Highlands | Placid Solar II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2027-05 | 2027 | (L) Regulatory approvals pending. Not under construction | FPC | 27.2821 | -81.4256 | 2026-09 |
| 62221/33 | Culpepper Solar | 33 | 62221 | SC | Darlington | Culpepper Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | CPLE | 34.465864 | -79.96044 | 2026-09 |
| 62295/67 | Rollins Solar | 67 | 62295 | SC | Darlington | Rollins Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | CPLE | 34.353572 | -80.01618 | 2026-09 |
| 62296/68 | Ross Solar | 68 | 62296 | SC | Darlington | Ross Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | CPLE | 34.444756 | -79.85173 | 2026-09 |
| 62184/26 | Big Fork Solar | 26 | 62184 | SC | Barnwell | Big Fork Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2028-11 | 2028 | (T) Regulatory approvals received. Not under construction | SCEG | 33.135275 | -81.23911 | 2026-09 |
| 62188/30 | Colleton Solar | 30 | 62188 | SC | Colleton | Colleton Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2028-11 | 2028 | (T) Regulatory approvals received. Not under construction | SCEG | 33.123794 | -80.84248 | 2026-09 |
| 68075/PINES | Pineside Solar | PINES | 68075 | VA | Buckingham | Dominion Renewable Energy | Electric Utility | Solar Photovoltaic | SUN | PV | 74.9 | 74.9 | 2030-01 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.5 | -78.5 | 2026-09 |
| 69351/HNYPV | Honeycomb Solar and Storage | HNYPV | 69351 | TX | Bee | Honeycomb Solar Holdco, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.8 | 74.8 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 28.184344 | -97.77169 | 2026-09 |
| 69474/SWTSU | Sweet Sue Solar | SWTSU | 69474 | VA | King William | Dominion Renewable Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.8 | 74.8 | 2028-03 | 2028 | (V) Under construction, more than 50 percent complete | PJM | 37.762 | -77.191 | 2026-09 |
| 69461/1 | Keene Branch Solar | 1 | 69461 | FL | Hillsborough | Tampa Electric Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | TEC | 27.658706 | -82.2657 | 2026-09 |
| 69626/SMF | FRP Miller Solar | SMF | 69626 | FL | Duval | FRP Miller Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | JEA | 30.320634 | -81.91274 | 2026-09 |
| 68828/1 | Tangelo | 1 | 68828 | FL | Okeechobee | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 27.507993 | -80.73651 | 2026-09 |
| 68834/1 | Hendry | 1 | 68834 | FL | Hendry | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 26.410345 | -81.03189 | 2026-09 |
| 68824/1 | Middle Lake | 1 | 68824 | FL | Madison | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 30.380511 | -83.34074 | 2026-09 |
| 68829/1 | Ambersweet | 1 | 68829 | FL | Indian River | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 27.567468 | -80.62782 | 2026-09 |
| 68832/1 | County Line | 1 | 68832 | FL | DeSoto | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 27.110556 | -81.80083 | 2026-09 |
| 68830/1 | Catfish | 1 | 68830 | FL | Okeechobee | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 27.277731 | -80.78854 | 2026-09 |
| 68831/1 | Cocoplum | 1 | 68831 | FL | Hendry | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 26.762027 | -81.1907 | 2026-09 |
| 68833/1 | Hardwood Hammock | 1 | 68833 | FL | Walton | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 27.282662 | -81.77522 | 2026-09 |
| 68836/1 | Maple Trail | 1 | 68836 | FL | Baker | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 30.314392 | -82.18501 | 2026-09 |
| 68825/1 | Pinecone | 1 | 68825 | FL | Calhoun | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 30.439415 | -85.25499 | 2026-09 |
| 68826/1 | Saddle | 1 | 68826 | FL | Calhoun | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 30.439415 | -85.25499 | 2026-09 |
| 68827/1 | Spanish Moss | 1 | 68827 | FL | St Lucie | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 27.509782 | -80.56447 | 2026-09 |
| 68835/1 | Joshua Creek | 1 | 68835 | FL | DeSoto | Florida Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPL | 27.282662 | -81.77522 | 2026-09 |
| 65708/WMSS | Warren Meadow Solar Station | WMSS | 65708 | ME | Knox | Warren Meadow Solar Station, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74.5 | 74.5 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | ISNE | 44.16061 | -69.22341 | 2026-09 |
| 62229/43 | Holliday Solar I | 43 | 62229 | SC | Horry | Holliday Solar I | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74 | 74 | 2028-11 | 2028 | (T) Regulatory approvals received. Not under construction | SC | 34.054128 | -79.20663 | 2026-09 |
| 62309/73 | Shining Sun Solar | 73 | 62309 | SC | Orangeburg | Shining Sun Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 74 | 74.4 | 2028-11 | 2028 | (T) Regulatory approvals received. Not under construction | SC | 33.5425 | -80.57219 | 2026-09 |
| 64634/90FIB | Kingsley Solar Farm | 90FIB | 64634 | CA | Imperial | 90FI 8me, LLC | IPP Non-CHP | Batteries | MWH | BA | 74 | 74 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 32.742036 | -115.7354 | 2026-09 |
| 64167/GEN | Hornet Solar | GEN | 64167 | NC | Gaston | Hornet Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 73 | 73 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | DUK | 35.387 | -81.029 | 2026-09 |
| 67195/GEN | Maple Leaf Solar | GEN | 67195 | NC | Johnston | Capital Power Corporation | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 73 | 73 | 2027-04 | 2027 | (T) Regulatory approvals received. Not under construction | DUK | 35.595 | -78.317 | 2026-09 |
| 6085/19A | R M Schahfer | 19A | 6085 | IN | Jasper | Northern Indiana Pub Serv Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 71.5 | 49.6 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 41.2164 | -87.0261 | 2026-09 |
| 6085/19B | R M Schahfer | 19B | 6085 | IN | Jasper | Northern Indiana Pub Serv Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 71.5 | 49.6 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 41.2164 | -87.0261 | 2026-09 |
| 6085/19C | R M Schahfer | 19C | 6085 | IN | Jasper | Northern Indiana Pub Serv Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 71.5 | 49.6 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 41.2164 | -87.0261 | 2026-09 |
| 62262/GEN1 | Rolling Upland Wind Farm LLC | GEN1 | 62262 | NY | Madison | Rolling Upland Wind Farm LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 71.4 | 71.4 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.524607 | -75.27744 | 2026-09 |
| 70221/HPSP1 | Hudson Place Solar Plant | HPSP1 | 70221 | SC | Newberry | Duke Energy Carolinas, LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 70.7 | 70.7 | 2028-01 | 2028 | (L) Regulatory approvals pending. Not under construction | DUK | 34.2391 | -81.6922 | 2026-09 |
| 66691/BRUGG | Briggs Solar, LLC | BRUGG | 66691 | TX | Haskell | Intersect USA, LLC | IPP Non-CHP | Batteries | MWH | BA | 70.5 | 70.5 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 33.144326 | -99.55977 | 2026-09 |
| 68000/BLUMN | Blue Moon | BLUMN | 68000 | KY | Harrison | Blue Moon Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 70 | 70 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 38.37118 | -84.2578 | 2026-09 |
| 66787/ELVPS | Elevate Pier S | ELVPS | 66787 | CA | Los Angeles | Lighthouse Pier S, LLC | IPP Non-CHP | Batteries | MWH | BA | 70 | 70 | 2026-12 | 2026 | (L) Regulatory approvals pending. Not under construction | CISO | 33.764993 | -118.2237 | 2026-09 |
| 69947/GEN05 | EDPR Scarlet III | GEN05 | 69947 | CA | Fresno | EDPR Scarlet III LLC | IPP Non-CHP | Batteries | MWH | BA | 70 | 70 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 36.608742 | -120.3511 | 2026-09 |
| 64428/JVR1B | JVR Energy Park LLC | JVR1B | 64428 | CA | San Diego | JVR Energy Park LLC | IPP Non-CHP | Batteries | MWH | BA | 70 | 70 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 32.625903 | -116.1749 | 2026-09 |
| 50736/FSS17 | Pure Hedge LLC | FSS17 | 50736 | CT | Windham | Pure Hedge LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 70 | 70 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 41.712448 | -71.82225 | 2026-09 |
| 70109/JASMI | Jasmine | JASMI | 70109 | CA | Kern | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 70 | 70 | 2027-12 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 35.1006 | -119.1187 | 2026-09 |
| 67560/RIC94 | Edens Solar | RIC94 | 67560 | TX | Hill | RIC Development, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 70 | 70 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 32.063132 | -97.11104 | 2026-09 |
| 66124/SSPV | Switchgrass Solar, LLC | SSPV | 66124 | VA | Suffolk City | RWE Americas, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 70 | 70 | 2028-10 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 36.676484 | -76.58588 | 2026-09 |
| 70559/BESS1 | Mammoth | BESS1 | 70559 | WV | Kanawha | MN8 Energy LLC | IPP Non-CHP | Batteries | MWH | BA | 70 | 70 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 38.20845 | -81.30893 | 2026-09 |
| 201/4 | Thomas Fitzhugh | 4 | 201 | AR | Franklin | Arkansas Electric Coop Corp | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 69.3 | 46.5 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | SWPP | 35.462382 | -93.80493 | 2026-09 |
| 69524/WLB | Windy Lane Energy Center | WLB | 69524 | NM | De Baca | Windy Lane Energy Center, LLC | IPP Non-CHP | Batteries | MWH | BA | 68 | 68 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PNM | 34.587619 | -104.0312 | 2026-09 |
| 68416/CTS1 | Crooked Trail Solar | CTS1 | 68416 | ME | Penobscot | VCP Realty, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 68 | 68 | 2029-10 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | ISNE | 45.144194 | -68.58603 | 2026-09 |
| 67379/1 | Whitetail Wind Farm | 1 | 67379 | WI | Grant | Invenergy Services LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 67.2 | 67.2 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 42.951448 | -90.4407 | 2026-09 |
| 68175/SYMPV | Symank Solar | SYMPV | 68175 | TX | Bosque | Belltown Power Texas 2, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 66.6 | 66.6 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.626039 | -97.64211 | 2026-09 |
| 68926/BLUEJ | Blue Jay Road Solar, LLC | BLUEJ | 68926 | MO | Ralls | Birch Creek Development | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 66 | 66 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 39.380782 | -91.53206 | 2026-09 |
| 68556/DURHM | SR Durhamville | DURHM | 68556 | TN | Haywood | SR Durhamville, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 66 | 66 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | TVA | 35.626611 | -89.46162 | 2026-09 |
| 3407/G1 | Kingston | G1 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G10 | Kingston | G10 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G11 | Kingston | G11 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G12 | Kingston | G12 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G13 | Kingston | G13 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G14 | Kingston | G14 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G15 | Kingston | G15 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G16 | Kingston | G16 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G2 | Kingston | G2 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G3 | Kingston | G3 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G4 | Kingston | G4 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G5 | Kingston | G5 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G6 | Kingston | G6 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G7 | Kingston | G7 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G8 | Kingston | G8 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 3407/G9 | Kingston | G9 | 3407 | TN | Roane | Tennessee Valley Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 65.8 | 45 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 35.8992 | -84.5194 | 2026-09 |
| 69631/SFS01 | Sunflower Sky Energy Center | SFS01 | 69631 | KS | Wilson | Evergy Missouri West | Electric Utility | Solar Photovoltaic | SUN | PV | 65 | 65 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | SWPP | 37.502223 | -95.64868 | 2026-09 |
| 70420/BA1 | Wheatridge Optimization I | BA1 | 70420 | OR | Morrow | Wheatridge Optimization I, LLC | IPP Non-CHP | Batteries | MWH | BA | 65 | 65 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | BPAT | 45.560054 | -119.6224 | 2026-09 |
| 62280/58 | Melsam Solar | 58 | 62280 | SC | Dillon | Melsam Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 65 | 65 | 2028-11 | 2028 | (T) Regulatory approvals received. Not under construction | CPLE | 34.344878 | -79.37456 | 2026-09 |
| 68672/OECHA | Chalan | OECHA | 68672 | CA | Kern | Origis Energy USA, Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 64.9 | 64.9 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 35.7803 | -119.911 | 2026-09 |
| 70109/JASBE | Jasmine | JASBE | 70109 | CA | Kern | AES Clean Energy | IPP Non-CHP | Batteries | MWH | BA | 64.4 | 64.4 | 2027-12 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 35.1006 | -119.1187 | 2026-09 |
| 68074/CERUL | Cerulean Solar | CERUL | 68074 | VA | Richmond | Dominion Renewable Energy | Electric Utility | Solar Photovoltaic | SUN | PV | 62 | 62 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 37.867194 | -76.58987 | 2026-09 |
| 69773/GT1 | Mohave Energy Park | GT1 | 69773 | AZ | Mohave | Arizona Electric Pwr Coop Inc | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 43 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | WALC | 34.932499 | -114.548 | 2026-09 |
| 69773/GT2 | Mohave Energy Park | GT2 | 69773 | AZ | Mohave | Arizona Electric Pwr Coop Inc | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 43 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | WALC | 34.932499 | -114.548 | 2026-09 |
| 69773/GT3 | Mohave Energy Park | GT3 | 69773 | AZ | Mohave | Arizona Electric Pwr Coop Inc | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 43 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | WALC | 34.932499 | -114.548 | 2026-09 |
| 69773/GT4 | Mohave Energy Park | GT4 | 69773 | AZ | Mohave | Arizona Electric Pwr Coop Inc | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 43 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | WALC | 34.932499 | -114.548 | 2026-09 |
| 66478/GEN1 | NTEC Gas Plant | GEN1 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN10 | NTEC Gas Plant | GEN10 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN11 | NTEC Gas Plant | GEN11 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN12 | NTEC Gas Plant | GEN12 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN13 | NTEC Gas Plant | GEN13 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN14 | NTEC Gas Plant | GEN14 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN15 | NTEC Gas Plant | GEN15 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN16 | NTEC Gas Plant | GEN16 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN17 | NTEC Gas Plant | GEN17 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN18 | NTEC Gas Plant | GEN18 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN2 | NTEC Gas Plant | GEN2 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN3 | NTEC Gas Plant | GEN3 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN4 | NTEC Gas Plant | GEN4 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN5 | NTEC Gas Plant | GEN5 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN6 | NTEC Gas Plant | GEN6 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN7 | NTEC Gas Plant | GEN7 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN8 | NTEC Gas Plant | GEN8 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 66478/GEN9 | NTEC Gas Plant | GEN9 | 66478 | NM | San Juan | Navajo Transitional Energy Company | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 60.5 | 37.6 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PNM | 36.682944 | -108.4502 | 2026-09 |
| 67871/ENX29 | Gladys Solar LLC | ENX29 | 67871 | VA | Campbell | Gladys Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 60.4 | 60.4 | 2027-10 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.143719 | -79.14207 | 2026-09 |
| 67781/GRS7 | Lampe Solar | GRS7 | 67781 | TX | Washington | Gransolar Texas Seven LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 60.2 | 60.2 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 30.310524 | -96.47887 | 2026-09 |
| 67562/RIC92 | Stonewall Solar | RIC92 | 67562 | TX | Stonewall | RIC Development, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 60.2 | 60.2 | 2028-04 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 33.174177 | -100.2308 | 2026-09 |
| 66313/MOCO | Moon Corner Solar | MOCO | 66313 | VA | Richmond | Dominion Energy Inc. | Electric Utility | Solar Photovoltaic | SUN | PV | 60 | 60 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 37.89 | -76.54 | 2026-09 |
| 68495/BDOG1 | Bird Dog Energy Storage | BDOG1 | 68495 | TX | San Patricio | VESI 37 LLC | IPP Non-CHP | Batteries | MWH | BA | 60 | 60 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 28.158672 | -97.86231 | 2026-09 |
| 62310/74 | Shorthorn Solar | 74 | 62310 | SC | Lee | Shorthorn Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 60 | 60 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | CPLE | 34.246975 | -80.15782 | 2026-09 |
| 68810/MORA | Mora Solar | MORA | 68810 | PA | Carbon | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 60 | 60 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 41.062982 | -75.63435 | 2026-09 |
| 70450/BA1 | Wheatridge Optimization II | BA1 | 70450 | OR | Morrow | Wheatridge Optimization II, LLC | IPP Non-CHP | Batteries | MWH | BA | 60 | 60 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | BPAT | 45.559975 | -119.6292 | 2026-09 |
| 63567/WSMTR | Westminister NC | WSMTR | 63567 | NC | Rutherford | Ecoplexus, Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 60 | 60 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | DUK | 35.452 | -81.919 | 2026-09 |
| 64767/TC001 | Pigeon Run Solar Project | TC001 | 64767 | VA | Campbell | Pigeon Run Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 60 | 60 | 2029-07 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.158473 | -79.05564 | 2026-09 |
| 64768/TC001 | Zenith Solar | TC001 | 64768 | VA | Pittsylvania | Zenith Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 60 | 60 | 2030-07 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 36.817763 | -79.23328 | 2026-09 |
| 68924/IROB | Iron BESS | IROB | 68924 | CA | Fresno | Panoche BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 59.5 | 57 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 36.652653 | -120.5783 | 2026-09 |
| 69541/VACB | Vaca BESS | VACB | 69541 | CA | Solano | Vaca Dixon BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 59.5 | 57 | 2027-07 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 38.398379 | -121.924 | 2026-09 |
| 65823/PARB | Parowan Solar | PARB | 65823 | UT | Iron | Leeward Asset Management, LLC | IPP Non-CHP | Batteries | MWH | BA | 58 | 58 | 2028-02 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PACE | 37.875795 | -112.8885 | 2026-09 |
| 65823/PARS0 | Parowan Solar | PARS0 | 65823 | UT | Iron | Leeward Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 58 | 58 | 2028-02 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PACE | 37.875795 | -112.8885 | 2026-09 |
| 708/5 | Hammond | 5 | 708 | GA | Floyd | Georgia Power Co | Electric Utility | Batteries | MWH | BA | 57.5 | 57.5 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | SOCO | 34.2528 | -85.3456 | 2026-09 |
| 6249/5 | Winyah | 5 | 6249 | SC | Georgetown | South Carolina Public Service Authority | Electric Utility | Petroleum Liquids | DFO | GT | 57 | 44 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SC | 33.33184 | -79.35724 | 2026-09 |
| 6249/6 | Winyah | 6 | 6249 | SC | Georgetown | South Carolina Public Service Authority | Electric Utility | Petroleum Liquids | DFO | GT | 57 | 44 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SC | 33.33184 | -79.35724 | 2026-09 |
| 69799/EG001 | Project Matador Gas Plant (PMG) | EG001 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG002 | Project Matador Gas Plant (PMG) | EG002 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG003 | Project Matador Gas Plant (PMG) | EG003 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG004 | Project Matador Gas Plant (PMG) | EG004 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG005 | Project Matador Gas Plant (PMG) | EG005 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG006 | Project Matador Gas Plant (PMG) | EG006 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG007 | Project Matador Gas Plant (PMG) | EG007 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG008 | Project Matador Gas Plant (PMG) | EG008 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG009 | Project Matador Gas Plant (PMG) | EG009 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG010 | Project Matador Gas Plant (PMG) | EG010 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG011 | Project Matador Gas Plant (PMG) | EG011 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG012 | Project Matador Gas Plant (PMG) | EG012 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG013 | Project Matador Gas Plant (PMG) | EG013 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG014 | Project Matador Gas Plant (PMG) | EG014 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG015 | Project Matador Gas Plant (PMG) | EG015 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG016 | Project Matador Gas Plant (PMG) | EG016 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG017 | Project Matador Gas Plant (PMG) | EG017 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG018 | Project Matador Gas Plant (PMG) | EG018 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG019 | Project Matador Gas Plant (PMG) | EG019 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG020 | Project Matador Gas Plant (PMG) | EG020 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG021 | Project Matador Gas Plant (PMG) | EG021 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG022 | Project Matador Gas Plant (PMG) | EG022 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG023 | Project Matador Gas Plant (PMG) | EG023 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG024 | Project Matador Gas Plant (PMG) | EG024 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG025 | Project Matador Gas Plant (PMG) | EG025 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG026 | Project Matador Gas Plant (PMG) | EG026 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG027 | Project Matador Gas Plant (PMG) | EG027 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG028 | Project Matador Gas Plant (PMG) | EG028 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG029 | Project Matador Gas Plant (PMG) | EG029 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG030 | Project Matador Gas Plant (PMG) | EG030 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG031 | Project Matador Gas Plant (PMG) | EG031 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG032 | Project Matador Gas Plant (PMG) | EG032 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG033 | Project Matador Gas Plant (PMG) | EG033 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG034 | Project Matador Gas Plant (PMG) | EG034 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG035 | Project Matador Gas Plant (PMG) | EG035 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG036 | Project Matador Gas Plant (PMG) | EG036 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG037 | Project Matador Gas Plant (PMG) | EG037 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG038 | Project Matador Gas Plant (PMG) | EG038 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG039 | Project Matador Gas Plant (PMG) | EG039 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG040 | Project Matador Gas Plant (PMG) | EG040 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG041 | Project Matador Gas Plant (PMG) | EG041 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG042 | Project Matador Gas Plant (PMG) | EG042 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG043 | Project Matador Gas Plant (PMG) | EG043 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG044 | Project Matador Gas Plant (PMG) | EG044 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG045 | Project Matador Gas Plant (PMG) | EG045 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG046 | Project Matador Gas Plant (PMG) | EG046 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG047 | Project Matador Gas Plant (PMG) | EG047 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/EG048 | Project Matador Gas Plant (PMG) | EG048 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG001 | Project Matador Gas Plant (PMG) | MG001 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG002 | Project Matador Gas Plant (PMG) | MG002 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG003 | Project Matador Gas Plant (PMG) | MG003 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG004 | Project Matador Gas Plant (PMG) | MG004 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG005 | Project Matador Gas Plant (PMG) | MG005 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG006 | Project Matador Gas Plant (PMG) | MG006 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG007 | Project Matador Gas Plant (PMG) | MG007 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG008 | Project Matador Gas Plant (PMG) | MG008 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG009 | Project Matador Gas Plant (PMG) | MG009 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG010 | Project Matador Gas Plant (PMG) | MG010 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG011 | Project Matador Gas Plant (PMG) | MG011 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG012 | Project Matador Gas Plant (PMG) | MG012 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG013 | Project Matador Gas Plant (PMG) | MG013 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG014 | Project Matador Gas Plant (PMG) | MG014 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG015 | Project Matador Gas Plant (PMG) | MG015 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG016 | Project Matador Gas Plant (PMG) | MG016 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG017 | Project Matador Gas Plant (PMG) | MG017 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG018 | Project Matador Gas Plant (PMG) | MG018 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG019 | Project Matador Gas Plant (PMG) | MG019 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG020 | Project Matador Gas Plant (PMG) | MG020 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG021 | Project Matador Gas Plant (PMG) | MG021 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG022 | Project Matador Gas Plant (PMG) | MG022 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG023 | Project Matador Gas Plant (PMG) | MG023 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG024 | Project Matador Gas Plant (PMG) | MG024 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG025 | Project Matador Gas Plant (PMG) | MG025 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG026 | Project Matador Gas Plant (PMG) | MG026 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG027 | Project Matador Gas Plant (PMG) | MG027 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG028 | Project Matador Gas Plant (PMG) | MG028 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG029 | Project Matador Gas Plant (PMG) | MG029 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG030 | Project Matador Gas Plant (PMG) | MG030 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG031 | Project Matador Gas Plant (PMG) | MG031 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG032 | Project Matador Gas Plant (PMG) | MG032 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG033 | Project Matador Gas Plant (PMG) | MG033 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG034 | Project Matador Gas Plant (PMG) | MG034 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG035 | Project Matador Gas Plant (PMG) | MG035 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG036 | Project Matador Gas Plant (PMG) | MG036 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG037 | Project Matador Gas Plant (PMG) | MG037 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG038 | Project Matador Gas Plant (PMG) | MG038 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG039 | Project Matador Gas Plant (PMG) | MG039 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG040 | Project Matador Gas Plant (PMG) | MG040 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG041 | Project Matador Gas Plant (PMG) | MG041 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG042 | Project Matador Gas Plant (PMG) | MG042 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG043 | Project Matador Gas Plant (PMG) | MG043 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG044 | Project Matador Gas Plant (PMG) | MG044 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG045 | Project Matador Gas Plant (PMG) | MG045 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG046 | Project Matador Gas Plant (PMG) | MG046 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG047 | Project Matador Gas Plant (PMG) | MG047 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/MG048 | Project Matador Gas Plant (PMG) | MG048 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 57 | 57 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 67785/GRS19 | Whistle Solar | GRS19 | 67785 | TX | Navarro | Gransolar Texas Nineteen LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 56.3 | 56.3 | 2028-05 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.985 | -96.43658 | 2026-09 |
| 69119/NHBA1 | New Hill 1 Battery | NHBA1 | 69119 | NC | Wake | Duke Energy Progress - (NC) | Electric Utility | Batteries | MWH | BA | 56 | 56 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CPLE | 35.659692 | -78.94412 | 2026-09 |
| 67157/PV1 | Powell Solar | PV1 | 67157 | OR | Crook | Invenergy Services LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 55.9 | 55.9 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | PACW | 44.258414 | -120.8895 | 2026-09 |
| 66341/EGSB | Eagle Springs Hybrid | EGSB | 66341 | TX | Delta | Sunraycer Assets I LLC | IPP Non-CHP | Batteries | MWH | BA | 55.1 | 55.1 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 33.433264 | -95.57444 | 2026-09 |
| 69956/S8 | Sanborn Hybrid 3 | S8 | 69956 | CA | Kern | Terra-Gen Operating Co-Hybrid | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 55 | 55 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.996 | -118.114 | 2026-09 |
| 68561/MIDDN | SR Middleton | MIDDN | 68561 | TN | Hardeman | SR Middleton, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 55 | 55 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | TVA | 35.176939 | -88.87867 | 2026-09 |
| 66382/GEN1 | Healing Springs Solar, LLC | GEN1 | 66382 | NC | Davidson | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 55 | 55 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | DUK | 35.623627 | -80.15972 | 2026-09 |
| 68486/44STA | Sienna 2 Solar and Storage Project | 44STA | 68486 | CA | San Bernardino | 44ST 8ME LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 55 | 55 | 2029-03 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.506711 | -116.8901 | 2026-09 |
| 68486/44STB | Sienna 2 Solar and Storage Project | 44STB | 68486 | CA | San Bernardino | 44ST 8ME LLC | IPP Non-CHP | Batteries | MWH | BA | 55 | 55 | 2029-03 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.506711 | -116.8901 | 2026-09 |
| 68923/ENTB | Enterprise BESS | ENTB | 68923 | CA | San Diego | Enterprise BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 54.1 | 52 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | CISO | 33.12181 | -117.1174 | 2026-09 |
| 69523/1 | Mattaniah Solar | 1 | 69523 | FL | Polk | Tampa Electric Co | Electric Utility | Solar Photovoltaic | SUN | PV | 52 | 52 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | TEC | 27.893214 | -82.04614 | 2026-09 |
| 7887/5 | Terry Bundy Generating Station | 5 | 7887 | NE | Lancaster | Lincoln Electric System | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 52 | 46.9 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | SWPP | 40.909653 | -96.61309 | 2026-09 |
| 7887/6 | Terry Bundy Generating Station | 6 | 7887 | NE | Lancaster | Lincoln Electric System | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 52 | 46.9 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | SWPP | 40.909653 | -96.61309 | 2026-09 |
| 68380/ISCPV | Isaac Solar | ISCPV | 68380 | TX | Matagorda | Industrial Bravo Project, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 51.4 | 50 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 28.797223 | -95.93717 | 2026-09 |
| 69793/HEPV1 | Henderson County Solar | HEPV1 | 69793 | KY | Henderson | Stellar Renewable Power | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 51.1 | 50 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 37.799412 | -87.62325 | 2026-09 |
| 66390/GDYES | MRG Goody Solar Project Hybrid | GDYES | 66390 | TX | Lamar | Nexus Renewable Power, LLC | IPP Non-CHP | Batteries | MWH | BA | 50.4 | 50.4 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 33.639193 | -95.62905 | 2026-09 |
| 66894/ALBBA | Albatross Solar, LLC | ALBBA | 66894 | TX | McLennan | Sunraycer Assets I LLC | IPP Non-CHP | Batteries | MWH | BA | 50.4 | 50.4 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 31.484342 | -97.42239 | 2026-09 |
| 67778/GR16B | Findley PV and BESS | GR16B | 67778 | TX | Limestone | Gransolar Texas Sixteen, LLC | IPP Non-CHP | Batteries | MWH | BA | 50.3 | 50.3 | 2028-01 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.643389 | -96.77961 | 2026-09 |
| 67778/GR16P | Findley PV and BESS | GR16P | 67778 | TX | Limestone | Gransolar Texas Sixteen, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50.3 | 50.3 | 2028-01 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.643389 | -96.77961 | 2026-09 |
| 68970/HOFEL | Ho-Fel Solar | HOFEL | 68970 | VA | Isle of Wight | Ho-Fel Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50.2 | 50.2 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 36.673032 | -76.88201 | 2026-09 |
| 70485/GT01 | White Cloud Generating | GT01 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 70485/GT02 | White Cloud Generating | GT02 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 70485/GT03 | White Cloud Generating | GT03 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 70485/GT04 | White Cloud Generating | GT04 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 70485/GT05 | White Cloud Generating | GT05 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 70485/GT06 | White Cloud Generating | GT06 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 70485/GT07 | White Cloud Generating | GT07 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 70485/GT08 | White Cloud Generating | GT08 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 70485/GT09 | White Cloud Generating | GT09 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 70485/GT10 | White Cloud Generating | GT10 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 70485/GT11 | White Cloud Generating | GT11 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 70485/GT12 | White Cloud Generating | GT12 | 70485 | MO | Nodaway | White Cloud Generating, LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 50.2 | 47.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.228497 | -94.85165 | 2026-09 |
| 67666/SUNBA | Sundance (CO) | SUNBA | 67666 | CO | Elbert | Cypress Creek Renewables | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 39.414779 | -104.4481 | 2026-09 |
| 68850/GRTSP | Gratiot Solar Park | GRTSP | 68850 | MI | Gratiot | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 50 | 50 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 43.436999 | -84.49845 | 2026-09 |
| 68929/RUBY | Ruby Solar, LLC | RUBY | 68929 | IL | Clinton | Birch Creek Development | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 38.595759 | -89.16983 | 2026-09 |
| 68938/OHJE1 | Juliet Energy Project, LLC | OHJE1 | 68938 | OH | Wood | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.343803 | -83.81598 | 2026-09 |
| 67215/ENX25 | Sun Ridge Solar | ENX25 | 67215 | VA | Rockingham | Sun Ridge Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 38.314898 | -78.74463 | 2026-09 |
| 65043/DUST | Dulles Solar and Storage | DUST | 65043 | VA | Loudoun | Dominion Energy Inc. | Electric Utility | Batteries | MWH | BA | 50 | 50 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 38.95 | -77.5 | 2026-09 |
| 68247/GRGTN | SR Georgetown | GRGTN | 68247 | SC | Georgetown | SR Georgetown. LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | DUK | 33.333354 | -79.51325 | 2026-09 |
| 68340/1 | Solway Solar | 1 | 68340 | MN | Beltrami | Otter Tail Power Co | Electric Utility | Solar Photovoltaic | SUN | PV | 50 | 50 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 47.546501 | -95.13 | 2026-09 |
| 68953/KB1 | Kifer BESS 1 | KB1 | 68953 | CA | Santa Clara | Kifer Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 37.376214 | -121.952 | 2026-09 |
| 69548/SFE | FRP Forest Trail Solar | SFE | 69548 | FL | Duval | FRP Forest Trail Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | JEA | 30.440764 | -81.83423 | 2026-09 |
| 69626/BMF | FRP Miller Solar | BMF | 69626 | FL | Duval | FRP Miller Solar LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | JEA | 30.320634 | -81.91274 | 2026-09 |
| 70107/MSP | Mills Solar Project | MSP | 70107 | IA | Mills | MidAmerican Energy Co | Electric Utility | Solar Photovoltaic | SUN | PV | 50 | 50 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 41.033333 | -95.45192 | 2026-09 |
| 70345/SFES | Steele Flats Energy Storage | SFES | 70345 | NE | Jefferson | Steele Flats Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 40.051306 | -96.95178 | 2026-09 |
| 68930/ENX36 | MC Solar | ENX36 | 68930 | PA | Mercer | MC Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.412805 | -80.43245 | 2026-09 |
| 69770/BRS | Ryan Storage | BRS | 69770 | TX | Coryell | Ryan Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.53576 | -97.79874 | 2026-09 |
| 69964/BALBE | Baldy Mesa Storage | BALBE | 69964 | CA | San Bernardino | AES Clean Energy | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 34.6029 | -117.449 | 2026-09 |
| 63846/RACE | Raceway Solar | RACE | 63846 | DE | Kent | Freepoint Commodities LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 38.909956 | -75.58819 | 2026-09 |
| 69194/MCBA | Maiden Creek Battery | MCBA | 69194 | NC | Catawba | Duke Energy Carolinas, LLC | Electric Utility | Batteries | MWH | BA | 50 | 50 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | DUK | 35.613673 | -81.18707 | 2026-09 |
| 68564/PURYR | SR Puryear | PURYR | 68564 | TN | Henry | SR Puryear, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2027-08 | 2027 | (V) Under construction, more than 50 percent complete | TVA | 36.449856 | -88.30107 | 2026-09 |
| 67988/PGR28 | Sandersville Solar | PGR28 | 67988 | GA | Washington | Sandersville Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2027-10 | 2027 | (L) Regulatory approvals pending. Not under construction | SOCO | 32.987105 | -82.75254 | 2026-09 |
| 67884/ENX28 | Two Oaks Solar and Storage LLC | ENX28 | 67884 | VA | Louisa | Two Oaks Solar and Storage | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2027-11 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 38.013053 | -77.93117 | 2026-09 |
| 70197/LORE1 | Lorenzo Energy Storage | LORE1 | 70197 | TX | Crosby | Lorenzo Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2027-11 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 33.749367 | -101.4829 | 2026-09 |
| 56998/BA7 | Pueblo Airport Generating Station | BA7 | 56998 | CO | Pueblo | Black Hills Service Company LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PSCO | 38.320833 | -104.5264 | 2026-09 |
| 63202/701-S | TREX US Red Holly | 701-S | 63202 | TX | Lynn | TREX US Red Holly LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 32.952 | -101.737 | 2026-09 |
| 65407/BEAR1 | Beartooth Energy Storage LLC | BEAR1 | 65407 | MT | Yellowstone | Beartooth Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | NWMT | 45.7843 | -108.7178 | 2026-09 |
| 68562/MTPLT | SR Mount Pleasant | MTPLT | 68562 | MS | Marshall | SR Mount Pleasant, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | TVA | 34.951675 | -89.58282 | 2026-09 |
| 68565/ROCH2 | SR Rochelle II | ROCH2 | 68565 | GA | Wilcox | SR Rochelle II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | TVA | 32.030665 | -83.506 | 2026-09 |
| 69799/FBG01 | Project Matador Gas Plant (PMG) | FBG01 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 50 | 49.4 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/FBG02 | Project Matador Gas Plant (PMG) | FBG02 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 50 | 49.4 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/FBG03 | Project Matador Gas Plant (PMG) | FBG03 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 50 | 49.4 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/FBG04 | Project Matador Gas Plant (PMG) | FBG04 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 50 | 49.4 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/FBG05 | Project Matador Gas Plant (PMG) | FBG05 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 50 | 49.4 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/FBG06 | Project Matador Gas Plant (PMG) | FBG06 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CT | 50 | 49.4 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 35.283762 | -101.569 | 2026-09 |
| 67983/AURRB | Aurora Renewable Energy (Hybrid) | AURRB | 67983 | CA | Stanislaus | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2028-04 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | BANC | 37.628805 | -121.0714 | 2026-09 |
| 67983/AURRE | Aurora Renewable Energy (Hybrid) | AURRE | 67983 | CA | Stanislaus | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2028-04 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | BANC | 37.628805 | -121.0714 | 2026-09 |
| 62190/32 | Crossroads Solar | 32 | 62190 | SC | Barnwell | Crossroads Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2028-11 | 2028 | (T) Regulatory approvals received. Not under construction | SCEG | 33.368886 | -81.36497 | 2026-09 |
| 62217/40 | GEB Solar | 40 | 62217 | SC | Darlington | GEB Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2028-11 | 2028 | (T) Regulatory approvals received. Not under construction | CPLE | 34.412367 | -80.04192 | 2026-09 |
| 62299/66 | Quest Solar | 66 | 62299 | SC | Allendale | Quest Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2028-11 | 2028 | (T) Regulatory approvals received. Not under construction | SCEG | 32.976531 | -81.22681 | 2026-09 |
| 64849/ATMWS | Wildcat Solar Power Plant LLC | ATMWS | 64849 | NM | McKinley | Solariant Capital, LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PNM | 35.580453 | -108.9023 | 2026-09 |
| 65286/ENX18 | Caden Energix Piney River LLC | ENX18 | 65286 | VA | Amherst | Caden Energix Piney River LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 37.696818 | -79.02306 | 2026-09 |
| 68019/RICBA | Richwood Solar and Storage | RICBA | 68019 | OH | Union | Samsung C&T Renewables, LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.353175 | -83.33117 | 2026-09 |
| 68213/1 | Panton | 1 | 68213 | VT | Addison | Viridis Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 50 | 50 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | ISNE | 44.1328 | -73.31151 | 2026-09 |
| 69099/HEWA1 | Orion - Helion | HEWA1 | 69099 | WA | Chelan | Helion Energy, Inc. | IPP Non-CHP | All Other | H2 | OT | 50 | 50 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | CHPD | 47.3368 | -120.1043 | 2026-09 |
| 60670/1 | CE&P Imperial Valley 1 | 1 | 60670 | CA | Imperial | California Ethanol Power, LLC | Industrial CHP | All Other | OTH | CC | 50 | 50 | 2029-06 | 2029 | (T) Regulatory approvals received. Not under construction | IID | 32.912778 | -115.5183 | 2026-09 |
| 65445/RBESS | Ridgely Energy Farm | RBESS | 65445 | TN | Lake | Leeward Asset Management, LLC | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 36.306319 | -89.46202 | 2026-09 |
| 67838/NY30 | KCE NY 30, LLC | NY30 | 67838 | NY | Suffolk | Key Capture Energy | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 40.69477 | -73.35182 | 2026-09 |
| 67839/NY31 | KCE NY 31, LLC | NY31 | 67839 | NY | Suffolk | Key Capture Energy | IPP Non-CHP | Batteries | MWH | BA | 50 | 50 | 2031-05 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 40.9581 | -72.86654 | 2026-09 |
| 69278/3 | Fortress 1 | 3 | 69278 | CO | Morgan | Fortress Solar 1 LLC | IPP Non-CHP | Batteries | MWH | BA | 49.9 | 49.9 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | PSCO | 40.26 | -103.57 | 2026-09 |
| 56964/BESS1 | Bayonne Energy Center | BESS1 | 56964 | NJ | Hudson | Bayonne Energy Center LLC | IPP Non-CHP | Batteries | MWH | BA | 49.8 | 49.8 | 2027-08 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.652834 | -74.09155 | 2026-09 |
| 56948/COE19 | Coolidge Generation Station | COE19 | 56948 | AZ | Pinal | Salt River Project | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49.5 | 42 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 32.917399 | -111.5033 | 2026-09 |
| 56948/COE20 | Coolidge Generation Station | COE20 | 56948 | AZ | Pinal | Salt River Project | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49.5 | 42 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 32.917399 | -111.5033 | 2026-09 |
| 56948/COE21 | Coolidge Generation Station | COE21 | 56948 | AZ | Pinal | Salt River Project | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49.5 | 42 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 32.917399 | -111.5033 | 2026-09 |
| 56948/COE22 | Coolidge Generation Station | COE22 | 56948 | AZ | Pinal | Salt River Project | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49.5 | 42 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 32.917399 | -111.5033 | 2026-09 |
| 56948/COE23 | Coolidge Generation Station | COE23 | 56948 | AZ | Pinal | Salt River Project | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49.5 | 42 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 32.917399 | -111.5033 | 2026-09 |
| 56948/COE24 | Coolidge Generation Station | COE24 | 56948 | AZ | Pinal | Salt River Project | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49.5 | 42 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 32.917399 | -111.5033 | 2026-09 |
| 55455/CT10 | Red Hawk | CT10 | 55455 | AZ | Maricopa | Arizona Public Service Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49 | 45 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 33.334562 | -112.8406 | 2026-09 |
| 55455/CT3 | Red Hawk | CT3 | 55455 | AZ | Maricopa | Arizona Public Service Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49 | 45 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 33.334562 | -112.8406 | 2026-09 |
| 55455/CT4 | Red Hawk | CT4 | 55455 | AZ | Maricopa | Arizona Public Service Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49 | 45 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 33.334562 | -112.8406 | 2026-09 |
| 55455/CT5 | Red Hawk | CT5 | 55455 | AZ | Maricopa | Arizona Public Service Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49 | 45 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 33.334562 | -112.8406 | 2026-09 |
| 55455/CT6 | Red Hawk | CT6 | 55455 | AZ | Maricopa | Arizona Public Service Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49 | 45 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 33.334562 | -112.8406 | 2026-09 |
| 55455/CT7 | Red Hawk | CT7 | 55455 | AZ | Maricopa | Arizona Public Service Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49 | 45 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 33.334562 | -112.8406 | 2026-09 |
| 55455/CT8 | Red Hawk | CT8 | 55455 | AZ | Maricopa | Arizona Public Service Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49 | 45 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 33.334562 | -112.8406 | 2026-09 |
| 55455/CT9 | Red Hawk | CT9 | 55455 | AZ | Maricopa | Arizona Public Service Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 49 | 45 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SRP | 33.334562 | -112.8406 | 2026-09 |
| 7903/MGS3 | McCartney | MGS3 | 7903 | MO | Greene | City Utilities of Springfield - (MO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48.9 | 47.4 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 37.248431 | -93.17084 | 2026-09 |
| 7903/MGS4 | McCartney | MGS4 | 7903 | MO | Greene | City Utilities of Springfield - (MO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48.9 | 47.4 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 37.248431 | -93.17084 | 2026-09 |
| 7903/MGS5 | McCartney | MGS5 | 7903 | MO | Greene | City Utilities of Springfield - (MO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48.9 | 47.4 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 37.248431 | -93.17084 | 2026-09 |
| 69648/BSBA2 | Rosamond South II | BSBA2 | 69648 | CA | Kern | Golden Fields Solar VI, LLC | IPP Non-CHP | Batteries | MWH | BA | 48 | 48 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 34.852326 | -118.4312 | 2026-09 |
| 68705/H01 | Horizon | H01 | 68705 | CO | El Paso | City of Colorado Springs - (CO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48 | 37 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 38.775 | -104.6668 | 2026-09 |
| 68705/H02 | Horizon | H02 | 68705 | CO | El Paso | City of Colorado Springs - (CO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48 | 37 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 38.775 | -104.6668 | 2026-09 |
| 68705/H03 | Horizon | H03 | 68705 | CO | El Paso | City of Colorado Springs - (CO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48 | 37 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 38.775 | -104.6668 | 2026-09 |
| 68705/H04 | Horizon | H04 | 68705 | CO | El Paso | City of Colorado Springs - (CO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48 | 37 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 38.775 | -104.6668 | 2026-09 |
| 68705/H05 | Horizon | H05 | 68705 | CO | El Paso | City of Colorado Springs - (CO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48 | 37 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 38.775 | -104.6668 | 2026-09 |
| 68705/H06 | Horizon | H06 | 68705 | CO | El Paso | City of Colorado Springs - (CO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48 | 37 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 38.775 | -104.6668 | 2026-09 |
| 68705/H07 | Horizon | H07 | 68705 | CO | El Paso | City of Colorado Springs - (CO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48 | 37 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 38.775 | -104.6668 | 2026-09 |
| 68705/H08 | Horizon | H08 | 68705 | CO | El Paso | City of Colorado Springs - (CO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48 | 37 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 38.775 | -104.6668 | 2026-09 |
| 68705/H09 | Horizon | H09 | 68705 | CO | El Paso | City of Colorado Springs - (CO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48 | 37 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 38.775 | -104.6668 | 2026-09 |
| 68705/H10 | Horizon | H10 | 68705 | CO | El Paso | City of Colorado Springs - (CO) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 48 | 37 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 38.775 | -104.6668 | 2026-09 |
| 64073/GBS | Great Bear Solar, LLC | GBS | 64073 | OH | Van Wert | Avangrid Power LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 46 | 46 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.9397 | -84.5828 | 2026-09 |
| 69772/BRSP1 | Bush River Solar Plant | BRSP1 | 69772 | SC | Laurens | Duke Energy Carolinas, LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 45 | 45 | 2028-01 | 2028 | (L) Regulatory approvals pending. Not under construction | CPLW | 34.3861 | -81.7944 | 2026-09 |
| 66879/CT1 | KCE CT 1, LLC | CT1 | 66879 | CT | Windham | Key Capture Energy | IPP Non-CHP | Batteries | MWH | BA | 45 | 45 | 2031-04 | 2031 | (P) Planned for installation, but regulatory approvals not initiated | ISNE | 41.882568 | -71.89481 | 2026-09 |
| 6761/G | Rawhide | G | 6761 | CO | Larimer | Platte River Power Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 44.6 | 44.6 | 2028-03 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PSCO | 40.860905 | -105.0212 | 2026-09 |
| 6761/H | Rawhide | H | 6761 | CO | Larimer | Platte River Power Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 44.6 | 44.6 | 2028-03 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PSCO | 40.860905 | -105.0212 | 2026-09 |
| 6761/LM3 | Rawhide | LM3 | 6761 | CO | Larimer | Platte River Power Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 44.6 | 44.6 | 2028-03 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PSCO | 40.860905 | -105.0212 | 2026-09 |
| 6761/LM4 | Rawhide | LM4 | 6761 | CO | Larimer | Platte River Power Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 44.6 | 44.6 | 2028-03 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PSCO | 40.860905 | -105.0212 | 2026-09 |
| 6761/LM5 | Rawhide | LM5 | 6761 | CO | Larimer | Platte River Power Authority | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 44.6 | 44.6 | 2028-03 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PSCO | 40.860905 | -105.0212 | 2026-09 |
| 67772/GRS9 | Braswell Solar | GRS9 | 67772 | TX | McLennan | Gransolar Texas Nine LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 44.2 | 42.6 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | ERCO | 31.34904 | -97.21786 | 2026-09 |
| 70343/WAGT1 | GPI WACO Power | WAGT1 | 70343 | TX | McLennan | Graphic Packaging International - WACO | Industrial Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 43.4 | 43.4 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.47682 | -97.18766 | 2026-09 |
| 6211/GEN4 | Dynegy Oakland Power Plant | GEN4 | 6211 | CA | Alameda | Dynegy Oakland, LLC | IPP Non-CHP | Batteries | MWH | BA | 43.3 | 43.3 | 2028-05 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 37.79675 | -122.2819 | 2026-09 |
| 68068/CP1G2 | Cape Generating Station | CP1G2 | 68068 | UT | Beaver | Cape HoldCo LLC | IPP Non-CHP | Geothermal | GEO | BT | 43 | 30 | 2027-01 | 2027 | (TS) Construction complete, but not yet in commercial operation | LDWP | 38.506706 | -112.9175 | 2026-09 |
| 68068/CP1G3 | Cape Generating Station | CP1G3 | 68068 | UT | Beaver | Cape HoldCo LLC | IPP Non-CHP | Geothermal | GEO | BT | 43 | 30 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | LDWP | 38.506706 | -112.9175 | 2026-09 |
| 66657/STEUB | Steubenville Solar | STEUB | 66657 | OH | Jefferson | BQ Energy Development | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 43 | 43 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.351722 | -80.67036 | 2026-09 |
| 68229/DEMRK | SR Denmark | DEMRK | 68229 | TN | Madison | SR Denmark, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 42 | 42 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | TVA | 35.563633 | -88.93254 | 2026-09 |
| 64188/PV | Shepherd's Run Solar | PV | 64188 | NY | Columbia | Shepherd's Run Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 42 | 42 | 2027-11 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.16141 | -73.57453 | 2026-09 |
| 69294/OTS | Oregon Trail Solar | OTS | 69294 | OR | Gilliam | Avangrid Power LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 41 | 41 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | BPAT | 45.553436 | -120.1861 | 2026-09 |
| 70225/SES | Shutler Energy Storage | SES | 70225 | OR | Gilliam | Avangrid Power LLC | IPP Non-CHP | Batteries | MWH | BA | 41 | 41 | 2028-03 | 2028 | (U) Under construction, less than or equal to 50 percent complete | AVRN | 45.54 | -120.18 | 2026-09 |
| 62892/SONR2 | EDPR CA Solar Park VI LLC (CA) Hybrid | SONR2 | 62892 | CA | Fresno | EDPR CA Solar Park VI LLC | IPP Non-CHP | Batteries | MWH | BA | 40 | 40 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 36.62543 | -120.3789 | 2026-09 |
| 68054/SNSB | Sunnyside Solar Energy Center | SNSB | 68054 | WI | Dane | Madison Gas & Electric Co | Electric Utility | Batteries | MWH | BA | 40 | 40 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 42.985244 | -89.43607 | 2026-09 |
| 69522/1 | Brewster Solar | 1 | 69522 | FL | Polk | Tampa Electric Co | Electric Utility | Solar Photovoltaic | SUN | PV | 40 | 40 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | TEC | 27.74188 | -81.96187 | 2026-09 |
| 70306/21 | Westfield Solar, LLC | 21 | 70306 | NC | Hoke | Headwater Energy, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 40 | 40 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CPLE | 34.943 | -79.242 | 2026-09 |
| 70092/2BLUE | Two Blues Solar, LLC | 2BLUE | 70092 | IL | Perry | Two Blues Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 40 | 40 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 38.1633 | -89.37 | 2026-09 |
| 69539/TRAB | Tracy BESS | TRAB | 69539 | CA | San Joaquin | Middle River Power | IPP Non-CHP | Batteries | MWH | BA | 40 | 40 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 37.711459 | -121.4895 | 2026-09 |
| 69799/G6B01 | Project Matador Gas Plant (PMG) | G6B01 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 40 | 38.7 | 2027-06 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/G6B02 | Project Matador Gas Plant (PMG) | G6B02 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 40 | 38.7 | 2027-06 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/G6B03 | Project Matador Gas Plant (PMG) | G6B03 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 40 | 38.7 | 2027-06 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69978/STPV | Station Solar | STPV | 69978 | IL | Mercer | Birch Creek Development | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 40 | 40 | 2027-08 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 41.0777 | -90.55 | 2026-09 |
| 63806/PGR28 | West River Solar, LLC | PGR28 | 63806 | NC | Guilford | West River Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 40 | 40 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | DUK | 36.043671 | -79.64174 | 2026-09 |
| 68035/SYTOB | Syracuse and Tours Renewable Energy | SYTOB | 68035 | CA | Kern | Vesper Energy Development LLC | IPP Non-CHP | Batteries | MWH | BA | 40 | 40 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | CISO | 34.951078 | -118.3083 | 2026-09 |
| 68035/SYTOR | Syracuse and Tours Renewable Energy | SYTOR | 68035 | CA | Kern | Vesper Energy Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 40 | 40 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | CISO | 34.951078 | -118.3083 | 2026-09 |
| 69741/PV2 | Cooperative Solar Two-Fayette | PV2 | 69741 | KY | Fayette | East Kentucky Power Coop, Inc | Electric Utility | Solar Photovoltaic | SUN | PV | 40 | 40 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 38.035403 | -84.31579 | 2026-09 |
| 69771/CCSP1 | Clark Creek Solar Plant | CCSP1 | 69771 | NC | Lincoln | Duke Energy Carolinas, LLC | Electric Utility | Solar Photovoltaic | SUN | PV | 40 | 40 | 2028-02 | 2028 | (L) Regulatory approvals pending. Not under construction | CPLW | 35.532689 | -81.24866 | 2026-09 |
| 69743/KUIHE | Kuihelani Phase 2 | KUIHE | 69743 | HI | Maui | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 40 | 40 | 2028-11 | 2028 | (L) Regulatory approvals pending. Not under construction | HECO | 20.8026 | -156.4984 | 2026-09 |
| 57703/02B | Cheyenne Prairie Generating Station | 02B | 57703 | WY | Laramie | Black Hills Service Company LLC | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 40 | 40 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 41.123611 | -104.72 | 2026-09 |
| 57703/03A | Cheyenne Prairie Generating Station | 03A | 57703 | WY | Laramie | Black Hills Service Company LLC | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 40 | 40 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 41.123611 | -104.72 | 2026-09 |
| 57703/03B | Cheyenne Prairie Generating Station | 03B | 57703 | WY | Laramie | Black Hills Service Company LLC | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 40 | 40 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | WACM | 41.123611 | -104.72 | 2026-09 |
| 67221/NY128 | Foothills Solar (NY) | NY128 | 67221 | NY | Fulton | Boralex US Operations LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 40 | 40 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 43.113678 | -74.24503 | 2026-09 |
| 67966/NEWJ1 | New Jay PV & BESS | NEWJ1 | 67966 | IN | Jay | Hodson Greendefine Jay Desoto LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 39 | 39 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.369376 | -85.18392 | 2026-09 |
| 69890/UNIT3 | Marshall Energy Center | UNIT3 | 69890 | MO | Saline | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 38 | 33.7 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | SWPP | 39.12358 | -93.20592 | 2026-09 |
| 69890/UNIT4 | Marshall Energy Center | UNIT4 | 69890 | MO | Saline | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 38 | 33.7 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | SWPP | 39.12358 | -93.20592 | 2026-09 |
| 69869/UNIT1 | Hannibal Energy Center | UNIT1 | 69869 | MO | Marion | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 38 | 32.2 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 39.70965 | -91.44026 | 2026-09 |
| 69869/UNIT2 | Hannibal Energy Center | UNIT2 | 69869 | MO | Marion | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 38 | 32.2 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 39.70965 | -91.44026 | 2026-09 |
| 69102/U1 | Toronto Power Plant | U1 | 69102 | SD | Deuel | Western Minnesota Mun Pwr Agny | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 36.3 | 35.6 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 44.594752 | -96.62219 | 2026-09 |
| 69102/U2 | Toronto Power Plant | U2 | 69102 | SD | Deuel | Western Minnesota Mun Pwr Agny | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 36.3 | 35.6 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 44.594752 | -96.62219 | 2026-09 |
| 69102/U3 | Toronto Power Plant | U3 | 69102 | SD | Deuel | Western Minnesota Mun Pwr Agny | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 36.3 | 35.6 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 44.594752 | -96.62219 | 2026-09 |
| 69102/U4 | Toronto Power Plant | U4 | 69102 | SD | Deuel | Western Minnesota Mun Pwr Agny | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 36.3 | 35.6 | 2029-12 | 2029 | (L) Regulatory approvals pending. Not under construction | MISO | 44.594752 | -96.62219 | 2026-09 |
| 70093/WSPV1 | Wallace Solar - (TX) | WSPV1 | 70093 | TX | Culberson | Delaware Ranch Solar, LLC | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 36 | 36 | 2027-03 | 2027 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.917641 | -104.3148 | 2026-09 |
| 61364/HHB | Hu Honua Bioenergy Facility | HHB | 61364 | HI | Hawaii | Hu Honua Bioenergy, LLC | IPP Non-CHP | Other Waste Biomass | OBS | ST | 36 | 32 | 2027-12 | 2027 | (V) Under construction, more than 50 percent complete | HECO | 19.843504 | -155.0871 | 2026-09 |
| 69977/BBPV | Blue Branch Solar | BBPV | 69977 | IL | Johnson | Birch Creek Development | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 35.9 | 35.9 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 37.467778 | -88.96889 | 2026-09 |
| 68461/KEYBC | Key Energy Storage | KEYBC | 68461 | CA | Fresno | Key Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 35 | 35 | 2027-04 | 2027 | (T) Regulatory approvals received. Not under construction | CISO | 36.13681 | -120.1312 | 2026-09 |
| 1167/10 | Muscatine Plant #1 | 10 | 1167 | IA | Muscatine | Board of Water Electric & Communications | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 35 | 32.8 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 41.3917 | -91.0569 | 2026-09 |
| 67977/QUACR | Quaker Creek Farm Solar | QUACR | 67977 | NC | Alamance | Quaker Creek Farm Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 34.9 | 34.9 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | DUK | 36.156688 | -79.32292 | 2026-09 |
| 64168/GEN | Bear Branch Solar | GEN | 64168 | NC | Stokes | Bear Branch Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 34.5 | 34.5 | 2027-01 | 2027 | (TS) Construction complete, but not yet in commercial operation | DUK | 36.340427 | -80.12974 | 2026-09 |
| 66850/BEAC1 | Beaver Creek Solar | BEAC1 | 66850 | PA | Franklin | Urban Grid Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 34.2 | 34.2 | 2027-06 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 40.086625 | -77.66283 | 2026-09 |
| 66363/GEN1B | Black Walnut Solar, LLC | GEN1B | 66363 | NC | Jones | Cypress Creek Renewables | IPP Non-CHP | Batteries | MWH | BA | 32 | 32 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | DUK | 35.050032 | -77.15218 | 2026-09 |
| 68871/TIMIB | Timber Mill Solar | TIMIB | 68871 | NC | Jones | Cypress Creek Renewables | IPP Non-CHP | Batteries | MWH | BA | 32 | 32 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CPLE | 34.96634 | -77.21299 | 2026-09 |
| 66385/GEN1B | Panther Branch Solar, LLC | GEN1B | 66385 | NC | Duplin | Cypress Creek Renewables | IPP Non-CHP | Batteries | MWH | BA | 32 | 32 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | DUK | 35.145344 | -78.15963 | 2026-09 |
| 68673/SLW_S | Sand Luis West | SLW_S | 68673 | CA | Fresno | Origis Energy USA, Inc | IPP Non-CHP | Batteries | MWH | BA | 31.3 | 31.3 | 2028-11 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 36.1676 | -120.054 | 2026-09 |
| 2161/BAT1 | James River Power Station | BAT1 | 2161 | MO | Greene | City Utilities of Springfield - (MO) | Electric Utility | Batteries | MWH | BA | 31 | 31 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | SWPP | 37.108611 | -93.26194 | 2026-09 |
| 60434/PV1 | Baxter Creek Solar | PV1 | 60434 | NC | Davie | Duke Energy Carolinas, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 30 | 30 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | DUK | 35.865502 | -80.55309 | 2026-09 |
| 66066/WAIBA | AES Waiawa Phase 2 Solar | WAIBA | 66066 | HI | Honolulu | AES Distributed Energy | IPP Non-CHP | Batteries | MWH | BA | 30 | 30 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | HECO | 21.43026 | -157.9779 | 2026-09 |
| 66066/WAIPV | AES Waiawa Phase 2 Solar | WAIPV | 66066 | HI | Honolulu | AES Distributed Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 30 | 30 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | HECO | 21.43026 | -157.9779 | 2026-09 |
| 64216/309SJ | Rockmont Solar and Storage Project | 309SJ | 64216 | NM | San Juan | 201LC 8me LLC | IPP Non-CHP | Batteries | MWH | BA | 30 | 30 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PNM | 36.776579 | -108.3751 | 2026-09 |
| 65930/10 | Redbud Run Solar | 10 | 65930 | VA | Frederick | Dominion Renewable Energy | Electric Utility | Solar Photovoltaic | SUN | PV | 30 | 30 | 2028-10 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.21157 | -78.08417 | 2026-09 |
| 65981/TXSD2 | Second Division Solar | TXSD2 | 65981 | TX | Brazoria | Lightsource Renewable Energy Asset Management, LLC | IPP Non-CHP | Batteries | MWH | BA | 30 | 30 | 2031-12 | 2031 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.170545 | -95.74157 | 2026-09 |
| 70090/SNPDR | Snapdragon Solar, LLC | SNPDR | 70090 | IL | Perry | Snapdragon Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 28 | 28 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 38.1703 | -89.5532 | 2026-09 |
| 68043/ROBSS | Robeson Solar I | ROBSS | 68043 | NC | Robeson | AES Clean Energy | IPP Non-CHP | Batteries | MWH | BA | 28 | 28 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | CPLE | 34.614574 | -78.93468 | 2026-09 |
| 59969/GEN01 | Windhub Solar B, LLC | GEN01 | 59969 | CA | Kern | Windhub Solar B, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 26.4 | 20 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 35.0133 | -118.2698 | 2026-09 |
| 67669/ABESS | Arlington Battery Energy Storage System | ABESS | 67669 | WA | Snohomish | PUD No 1 of Snohomish County - (WA) | Electric Utility | Batteries | MWH | BA | 25 | 25 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | BPAT | 48.15617 | -122.1437 | 2026-09 |
| 68672/CHA_B | Chalan | CHA_B | 68672 | CA | Kern | Origis Energy USA, Inc | IPP Non-CHP | Batteries | MWH | BA | 25 | 25 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 35.7803 | -119.911 | 2026-09 |
| 70303/20 | Midfield Solar, LLC | 20 | 70303 | NC | Columbus | Headwater Energy, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 25 | 25 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CPLE | 34.394 | -78.771 | 2026-09 |
| 69024/GLNB1 | Glenarm BESS Plant | GLNB1 | 69024 | CA | Los Angeles | Glenarm BESS LLC | Electric Utility | Batteries | MWH | BA | 25 | 25 | 2027-06 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 34.12739 | -118.1477 | 2026-09 |
| 70049/NUCPV | Sierra Solar | NUCPV | 70049 | AZ | Mohave | Sierra Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 25 | 25 | 2027-06 | 2027 | (T) Regulatory approvals received. Not under construction | WALC | 35.129649 | -114.0803 | 2026-09 |
| 66695/HRSPN | Horsepen Branch Solar | HRSPN | 66695 | VA | Louisa | Horsepen Branch Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 25 | 25 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.961 | -77.792 | 2026-09 |
| 68528/77 | Dynamo Solar LLC | 77 | 68528 | CA | Napa | Laketricity USA Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 24.5 | 24.5 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 38.229106 | -122.2937 | 2026-09 |
| 68240/SS3PV | Solar Star 3 | SS3PV | 68240 | CA | Kern | Solar Star 3, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 24 | 24 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.84166 | -118.4551 | 2026-09 |
| 68241/SS4PV | Solar Star 4 | SS4PV | 68241 | CA | Kern | Solar Star 4, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 24 | 24 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.84166 | -118.4551 | 2026-09 |
| 66978/MS1 | MPW Solar 1 | MS1 | 66978 | IA | Muscatine | MPW Solar 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 24 | 24 | 2028-01 | 2028 | (T) Regulatory approvals received. Not under construction | MISO | 41.3849 | -91.0964 | 2026-09 |
| 70261/WS02 | Westside - (NM) | WS02 | 70261 | NM | San Juan | Saddle Butte Energy Farmington, LLC | IPP Non-CHP | Natural Gas Internal Combustion Engine | NG | IC | 24 | 24 | 2028-01 | 2028 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 36.752288 | -108.3148 | 2026-09 |
| 69890/UNIT1 | Marshall Energy Center | UNIT1 | 69890 | MO | Saline | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 23.1 | 19.9 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 39.12358 | -93.20592 | 2026-09 |
| 69890/UNIT2 | Marshall Energy Center | UNIT2 | 69890 | MO | Saline | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 23.1 | 19.9 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 39.12358 | -93.20592 | 2026-09 |
| 68240/SS3BT | Solar Star 3 | SS3BT | 68240 | CA | Kern | Solar Star 3, LLC | IPP Non-CHP | Batteries | MWH | BA | 23 | 23 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.84166 | -118.4551 | 2026-09 |
| 68241/SS4BT | Solar Star 4 | SS4BT | 68241 | CA | Kern | Solar Star 4, LLC | IPP Non-CHP | Batteries | MWH | BA | 23 | 23 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.84166 | -118.4551 | 2026-09 |
| 70546/JAR-3 | Jarratt Energy Facility | JAR-3 | 70546 | VA | Greensville | Torch Operating Company, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 22.4 | 22.4 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 36.822306 | -77.51345 | 2026-09 |
| 69628/GBPV1 | GBG SOLAR | GBPV1 | 69628 | TX | Midland | Greater Bryant G Solar, LLC | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 22.2 | 17.7 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.92835 | -102.1617 | 2026-09 |
| 69806/GWBS1 | Gaskell West Storage 1, LLC | GWBS1 | 69806 | CA | Kern | Matrix Renewables | IPP Non-CHP | Batteries | MWH | BA | 21.6 | 21.6 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 34.833541 | -118.5469 | 2026-09 |
| 70495/WEL02 | Welcome Solar II | WEL02 | 70495 | PA | Crawford | Welcome Solar II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 21 | 21 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.527468 | -80.40419 | 2026-09 |
| 70496/WEL03 | Welcome Solar III | WEL03 | 70496 | PA | Crawford | Welcome Solar III, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 21 | 21 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.530575 | -80.39229 | 2026-09 |
| 70240/PFNON | PF Onsite BESS | PFNON | 70240 | PA | Luzerne | PF Onsite Generation LLC | IPP Non-CHP | Batteries | MWH | BA | 21 | 21 | 2027-06 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 40.918616 | -76.07934 | 2026-09 |
| 63088/ROONR | Rooney Ranch | ROONR | 63088 | CA | Alameda | Viracocha Wind LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 21 | 21 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 37.737366 | -121.6521 | 2026-09 |
| 69760/RIG1 | Rock Island Generation Project | RIG1 | 69760 | TX | Colorado | Kerrville Public Utility Board Public Facility Corp | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 20.3 | 19.9 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.55068 | -96.53675 | 2026-09 |
| 69760/RIG2 | Rock Island Generation Project | RIG2 | 69760 | TX | Colorado | Kerrville Public Utility Board Public Facility Corp | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 20.3 | 19.9 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.55068 | -96.53675 | 2026-09 |
| 69760/RIG3 | Rock Island Generation Project | RIG3 | 69760 | TX | Colorado | Kerrville Public Utility Board Public Facility Corp | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 20.3 | 19.9 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.55068 | -96.53675 | 2026-09 |
| 69760/RIG4 | Rock Island Generation Project | RIG4 | 69760 | TX | Colorado | Kerrville Public Utility Board Public Facility Corp | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 20.3 | 19.9 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.55068 | -96.53675 | 2026-09 |
| 69760/RIG5 | Rock Island Generation Project | RIG5 | 69760 | TX | Colorado | Kerrville Public Utility Board Public Facility Corp | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 20.3 | 19.9 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.55068 | -96.53675 | 2026-09 |
| 69760/RIG6 | Rock Island Generation Project | RIG6 | 69760 | TX | Colorado | Kerrville Public Utility Board Public Facility Corp | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 20.3 | 19.9 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.55068 | -96.53675 | 2026-09 |
| 69535/NS1 | Nutes Solar | NS1 | 69535 | NH | Strafford | Walden Renewables Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 43.375125 | -71.023 | 2026-09 |
| 70232/EVERG | Evergreen Energy Center, LLC | EVERG | 70232 | VA | Loudoun | East Point Energy, LLC | IPP Non-CHP | Batteries | MWH | BA | 20 | 20 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 39.044885 | -77.58191 | 2026-09 |
| 68054/SNSS | Sunnyside Solar Energy Center | SNSS | 68054 | WI | Dane | Madison Gas & Electric Co | Electric Utility | Solar Photovoltaic | SUN | PV | 20 | 20 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 42.985244 | -89.43607 | 2026-09 |
| 64255/VBESS | Vonore Battery Energy Storage System | VBESS | 64255 | TN | Monroe | Tennessee Valley Authority | Electric Utility | Batteries | MWH | BA | 20 | 20 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | TVA | 35.61543 | -84.27489 | 2026-09 |
| 70231/BETHL | Bethlehem Energy Center, LLC - (VA) | BETHL | 70231 | VA | Prince William | East Point Energy, LLC | IPP Non-CHP | Batteries | MWH | BA | 20 | 20 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 38.781889 | -77.5426 | 2026-09 |
| 70233/RAILR | Railroad Energy Center, LLC | RAILR | 70233 | VA | Prince William | East Point Energy, LLC | IPP Non-CHP | Batteries | MWH | BA | 20 | 20 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 38.781689 | -77.54202 | 2026-09 |
| 70234/REID | Reid Energy Center, LLC | REID | 70234 | VA | Prince William | East Point Energy, LLC | IPP Non-CHP | Batteries | MWH | BA | 20 | 20 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 38.729874 | -77.59242 | 2026-09 |
| 62823/Q584 | SunEast Dog Corners Solar Project | Q584 | 62823 | NY | Cayuga | Altus Power America Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | NYIS | 42.744301 | -76.66531 | 2026-09 |
| 63862/Q#828 | SunEast Valley Solar Project | Q#828 | 63862 | NY | Tioga | Altus Power America Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.083795 | -76.2477 | 2026-09 |
| 62816/Q670 | SunEast Skyline Solar Project | Q670 | 62816 | NY | Oneida | SunEast Skyline Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 43.063069 | -75.45195 | 2026-09 |
| 64037/Q#913 | SunEast Manchester Solar Project | Q#913 | 64037 | NY | Ontario | SunEast Manchester Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2027-06 | 2027 | (T) Regulatory approvals received. Not under construction | NYIS | 42.958318 | -77.19503 | 2026-09 |
| 63901/Q#865 | SunEast Flat Hill Solar Project | Q#865 | 63901 | NY | Herkimer | Altus Power America Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | NYIS | 43.044363 | -74.79632 | 2026-09 |
| 50736/FSS13 | Pure Hedge LLC | FSS13 | 50736 | CT | Windham | Pure Hedge LLC | IPP Non-CHP | Batteries | MWH | BA | 20 | 20 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 41.712448 | -71.82225 | 2026-09 |
| 62895/Q581 | SunEast Hills Solar Project | Q581 | 62895 | NY | Herkimer | Hills Solar NY LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | NYIS | 43.068296 | -74.84923 | 2026-09 |
| 63863/Q#885 | SunEast Grassy Knoll Solar Project | Q#885 | 63863 | NY | Herkimer | Grassy Knoll Solar NY LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | NYIS | 43.065379 | -74.84372 | 2026-09 |
| 70395/BESS1 | Pace Road Battery Storage | BESS1 | 70395 | FL | Polk | Tampa Electric Co | Electric Utility | Batteries | MWH | BA | 20 | 20 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | TEC | 28.136235 | -81.82978 | 2026-09 |
| 62896/Q586 | SunEast Watkins Road Solar Project | Q586 | 62896 | NY | Herkimer | Watkins Road Solar NY LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | NYIS | 43.06127 | -75.05584 | 2026-09 |
| 65901/6 | Hatchery Solar | 6 | 65901 | NY | Livingston | Hatchery Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | NYIS | 42.976583 | -77.76974 | 2026-09 |
| 64911/CSRB1 | South Ripley Solar | CSRB1 | 64911 | NY | Chautauqua | Repsol Renewables NA | IPP Non-CHP | Batteries | MWH | BA | 20 | 20 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | NYIS | 42.198116 | -79.75789 | 2026-09 |
| 65821/HNYBA | Honey Creek Solar | HNYBA | 65821 | IN | White | Leeward Asset Management, LLC | IPP Non-CHP | Batteries | MWH | BA | 20 | 20 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.7971 | -86.8572 | 2026-09 |
| 65931/3 | Clear View Solar | 3 | 65931 | NY | Steuben | Clear View Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | NYIS | 42.57062 | -77.46378 | 2026-09 |
| 68278/21066 | Greater Wise Solar Project | 21066 | 68278 | VA | Wise | BQ Energy Development | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | LGEE | 36.932469 | -82.6769 | 2026-09 |
| 69667/FHS1 | Fair Haven Solar | FHS1 | 69667 | VT | Rutland | Freepoint Commodities LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | ISNE | 43.636 | -73.279 | 2026-09 |
| 70261/WS03 | Westside - (NM) | WS03 | 70261 | NM | San Juan | Saddle Butte Energy Farmington, LLC | IPP Non-CHP | Natural Gas Internal Combustion Engine | NG | IC | 20 | 20 | 2028-05 | 2028 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 36.752288 | -108.3148 | 2026-09 |
| 64036/ENX08 | Caden Energix New Kent, LLC | ENX08 | 64036 | VA | New Kent | Caden Energix New Kent, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2028-08 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 37.49004 | -77.0616 | 2026-09 |
| 66682/NY10 | KCE NY 10, LLC | NY10 | 66682 | NY | Erie | Key Capture Energy | IPP Non-CHP | Batteries | MWH | BA | 20 | 20 | 2028-10 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.907908 | -78.66011 | 2026-09 |
| 68072/BRIDL | Bridleton Solar | BRIDL | 68072 | VA | Henrico | Dominion Renewable Energy | Electric Utility | Solar Photovoltaic | SUN | PV | 20 | 20 | 2028-10 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 37.46 | -77.27 | 2026-09 |
| 64064/SHAFT | Shaftsbury Solar | SHAFT | 64064 | VT | Bennington | Freepoint Commodities LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | ISNE | 42.96463 | -73.16841 | 2026-09 |
| 65934/7 | Highbanks Solar | 7 | 65934 | NY | Livingston | Highbanks Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 20 | 20 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.737227 | -77.91431 | 2026-09 |
| 65709/TRNR | Turner Meadow Solar Station | TRNR | 65709 | ME | Androscoggin | Turner Meadow Solar Station, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 19.8 | 19.8 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | ISNE | 44.229478 | -70.28027 | 2026-09 |
| 69799/TM001 | Project Matador Gas Plant (PMG) | TM001 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 18.9 | 18 | 2027-09 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/TM002 | Project Matador Gas Plant (PMG) | TM002 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 18.9 | 18 | 2027-09 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/TM003 | Project Matador Gas Plant (PMG) | TM003 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 18.9 | 18 | 2027-09 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/TM004 | Project Matador Gas Plant (PMG) | TM004 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 18.9 | 18 | 2027-09 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/TM005 | Project Matador Gas Plant (PMG) | TM005 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 18.9 | 18 | 2027-09 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/TM006 | Project Matador Gas Plant (PMG) | TM006 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 18.9 | 18 | 2027-09 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 69799/TM007 | Project Matador Gas Plant (PMG) | TM007 | 69799 | TX | Carson | Fermi America | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 18.9 | 18 | 2027-09 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 35.283762 | -101.569 | 2026-09 |
| 68453/1 | KYMEA Energy Center I | 1 | 68453 | KY | Hopkins | Kentucky Municipal Energy Agency | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.8 | 18.8 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | LGEE | 37.319733 | -87.55111 | 2026-09 |
| 68453/2 | KYMEA Energy Center I | 2 | 68453 | KY | Hopkins | Kentucky Municipal Energy Agency | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.8 | 18.8 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | LGEE | 37.319733 | -87.55111 | 2026-09 |
| 68453/3 | KYMEA Energy Center I | 3 | 68453 | KY | Hopkins | Kentucky Municipal Energy Agency | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.8 | 18.8 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | LGEE | 37.319733 | -87.55111 | 2026-09 |
| 68453/4 | KYMEA Energy Center I | 4 | 68453 | KY | Hopkins | Kentucky Municipal Energy Agency | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.8 | 18.8 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | LGEE | 37.319733 | -87.55111 | 2026-09 |
| 389/RICE1 | El Centro Hybrid | RICE1 | 389 | CA | Imperial | Imperial Irrigation District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.8 | 18.6 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | IID | 32.802222 | -115.54 | 2026-09 |
| 389/RICE2 | El Centro Hybrid | RICE2 | 389 | CA | Imperial | Imperial Irrigation District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.8 | 18.6 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | IID | 32.802222 | -115.54 | 2026-09 |
| 389/RICE3 | El Centro Hybrid | RICE3 | 389 | CA | Imperial | Imperial Irrigation District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.8 | 18.6 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | IID | 32.802222 | -115.54 | 2026-09 |
| 389/RICE4 | El Centro Hybrid | RICE4 | 389 | CA | Imperial | Imperial Irrigation District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.8 | 18.6 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | IID | 32.802222 | -115.54 | 2026-09 |
| 389/RICE5 | El Centro Hybrid | RICE5 | 389 | CA | Imperial | Imperial Irrigation District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.8 | 18.6 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | IID | 32.802222 | -115.54 | 2026-09 |
| 389/RICE6 | El Centro Hybrid | RICE6 | 389 | CA | Imperial | Imperial Irrigation District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.8 | 18.6 | 2029-09 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | IID | 32.802222 | -115.54 | 2026-09 |
| 69726/L1 | Liberty Station | L1 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69726/L10 | Liberty Station | L10 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69726/L11 | Liberty Station | L11 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69726/L12 | Liberty Station | L12 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69726/L2 | Liberty Station | L2 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69726/L3 | Liberty Station | L3 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69726/L4 | Liberty Station | L4 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69726/L5 | Liberty Station | L5 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69726/L6 | Liberty Station | L6 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69726/L7 | Liberty Station | L7 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69726/L8 | Liberty Station | L8 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69726/L9 | Liberty Station | L9 | 69726 | KY | Casey | East Kentucky Power Coop, Inc | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 17.8 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 37.369331 | -84.95767 | 2026-09 |
| 69808/R01 | Princeton Road Station | R01 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/R02 | Princeton Road Station | R02 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/R03 | Princeton Road Station | R03 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/R04 | Princeton Road Station | R04 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/R05 | Princeton Road Station | R05 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/R06 | Princeton Road Station | R06 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/R07 | Princeton Road Station | R07 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/R08 | Princeton Road Station | R08 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/R09 | Princeton Road Station | R09 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/R10 | Princeton Road Station | R10 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/R11 | Princeton Road Station | R11 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 69808/R12 | Princeton Road Station | R12 | 69808 | NE | Lancaster | Nebraska Public Power District | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 18.1 | 18.1 | 2029-06 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 40.570394 | -96.78647 | 2026-09 |
| 70108/PIKE | PIKE Solar | PIKE | 70108 | IL | Fayette | Pike Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 18 | 18 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 38.9577 | -89.169 | 2026-09 |
| 70260/SCIPI | Scipio Solar | SCIPI | 70260 | NY | Cayuga | Altus Power America Management, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 18 | 18 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | NYIS | 42.78732 | -76.32378 | 2026-09 |
| 69782/CW216 | Cartwright Solar II | CW216 | 69782 | OR | Crook | Cartwright Solar II LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 17.6 | 17.6 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | BPAT | 44.244 | -120.938 | 2026-09 |
| 65305/BESS | Powells Creek Solar - Hybrid | BESS | 65305 | VA | Halifax | Powells Creek Farm Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 17.5 | 17.5 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 36.55467 | -79.0286 | 2026-09 |
| 65369/TMSS | Topsham Meadow Solar Station | TMSS | 65369 | ME | Sagadahoc | Topsham Meadow Solar Station LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 17.2 | 17.2 | 2028-10 | 2028 | (L) Regulatory approvals pending. Not under construction | ISNE | 43.975183 | -70.0113 | 2026-09 |
| 65371/WBSS | West Baldwin Solar Station | WBSS | 65371 | ME | Cumberland | West Baldwin Solar Station LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 17.1 | 17.1 | 2028-12 | 2028 | (T) Regulatory approvals received. Not under construction | ISNE | 43.867403 | -70.7866 | 2026-09 |
| 50666/GEN2 | Pasco Cnty Solid Waste Resource Recovery | GEN2 | 50666 | FL | Pasco | Pasco County - (FL) | IPP Non-CHP | Municipal Solid Waste | MSW | ST | 17 | 15 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | FPC | 28.3681 | -82.5583 | 2026-09 |
| 63652/SNDHB | Sand Hill B | SNDHB | 63652 | CA | Alameda | Viracocha Wind LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 17 | 17 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 37.755007 | -121.5968 | 2026-09 |
| 55478/IC01 | Lange Generating Station | IC01 | 55478 | SD | Pennington | Black Hills Power, Inc. | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 16.6 | 16.3 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | WACM | 44.1218 | -103.2641 | 2026-09 |
| 55478/IC02 | Lange Generating Station | IC02 | 55478 | SD | Pennington | Black Hills Power, Inc. | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 16.6 | 16.3 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | WACM | 44.1218 | -103.2641 | 2026-09 |
| 55478/IC03 | Lange Generating Station | IC03 | 55478 | SD | Pennington | Black Hills Power, Inc. | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 16.6 | 16.3 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | WACM | 44.1218 | -103.2641 | 2026-09 |
| 55478/IC04 | Lange Generating Station | IC04 | 55478 | SD | Pennington | Black Hills Power, Inc. | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 16.6 | 16.3 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | WACM | 44.1218 | -103.2641 | 2026-09 |
| 55478/IC05 | Lange Generating Station | IC05 | 55478 | SD | Pennington | Black Hills Power, Inc. | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 16.6 | 16.3 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | WACM | 44.1218 | -103.2641 | 2026-09 |
| 55478/IC06 | Lange Generating Station | IC06 | 55478 | SD | Pennington | Black Hills Power, Inc. | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 16.6 | 16.3 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | WACM | 44.1218 | -103.2641 | 2026-09 |
| 69868/UNIT1 | Fulton Energy Center | UNIT1 | 69868 | MO | Callaway | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 16.5 | 15.1 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 38.8676 | -91.94778 | 2026-09 |
| 65366/EMSS | Emery Meadow Solar Station | EMSS | 65366 | ME | York | Emery Meadow Solar Station, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 16.4 | 16.4 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | ISNE | 43.643433 | -70.55837 | 2026-09 |
| 1024/8 | Crawfordsville Power Plant | 8 | 1024 | IN | Montgomery | Crawfordsville Energy LLC | IPP Non-CHP | Natural Gas Fired Combined Cycle | NG | CS | 16.3 | 16.3 | 2027-03 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 40.048889 | -86.8992 | 2026-09 |
| 70546/JAR-1 | Jarratt Energy Facility | JAR-1 | 70546 | VA | Greensville | Torch Operating Company, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 16.3 | 16.3 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 36.822306 | -77.51345 | 2026-09 |
| 3338/3 | Aberdeen CT | 3 | 3338 | SD | Brown | NorthWestern Energy - (SD) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 16 | 15 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 45.429884 | -98.49396 | 2026-09 |
| 3338/4 | Aberdeen CT | 4 | 3338 | SD | Brown | NorthWestern Energy - (SD) | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 16 | 15 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 45.429884 | -98.49396 | 2026-09 |
| 69602/90918 | Essex VT BESS 1 | 90918 | 69602 | VT | Chittenden | Essex VT BESS 1 LLC | IPP Non-CHP | Batteries | MWH | BA | 16 | 16 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 44.483701 | -73.10717 | 2026-09 |
| 70261/WS01 | Westside - (NM) | WS01 | 70261 | NM | San Juan | Saddle Butte Energy Farmington, LLC | IPP Non-CHP | Natural Gas Internal Combustion Engine | NG | IC | 16 | 16 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 36.752288 | -108.3148 | 2026-09 |
| 59572/PV1 | Cotton Solar | PV1 | 59572 | SC | Dillon | Cotton Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 16 | 16 | 2027-06 | 2027 | (T) Regulatory approvals received. Not under construction | CPLE | 34.455 | -79.41028 | 2026-09 |
| 67954/BRPV1 | BAI-Boyles Run-Phase I | BRPV1 | 67954 | PA | Northumberland | Boyles Run Solar I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 15.9 | 15.9 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.771847 | -76.78119 | 2026-09 |
| 67955/BRPV2 | BAI-Boyles Run-Phase 2 | BRPV2 | 67955 | PA | Northumberland | Boyles Run Solar II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 15.9 | 15.9 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.771847 | -76.78119 | 2026-09 |
| 66785/ELVAK | Elevate Arthur Kill | ELVAK | 66785 | NY | Richmond | Lighthouse Arthur Kill, LLC | IPP Non-CHP | Batteries | MWH | BA | 15.1 | 15.1 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | NYIS | 40.590066 | -74.19836 | 2026-09 |
| 68560/MARJT | SR Marion Junction | MARJT | 68560 | AL | Dallas | SR Marion Junction, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 15 | 15 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | TVA | 32.418685 | -87.36171 | 2026-09 |
| 10328/GEN11 | T B Simon Power Plant | GEN11 | 10328 | MI | Ingham | Michigan State University | Commercial CHP | Natural Gas Fired Combustion Turbine | NG | GT | 15 | 15 | 2028-01 | 2028 | (U) Under construction, less than or equal to 50 percent complete | MISO | 42.7178 | -84.4836 | 2026-09 |
| 67879/ENX26 | Stony Creek Solar | ENX26 | 67879 | PA | Somerset | Stony Creek Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 15 | 15 | 2028-10 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 40.222386 | -78.8812 | 2026-09 |
| 70546/JAR-2 | Jarratt Energy Facility | JAR-2 | 70546 | VA | Greensville | Torch Operating Company, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 14.9 | 14.9 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 36.822306 | -77.51345 | 2026-09 |
| 60642/1 | M&G Resins USA | 1 | 60642 | TX | Nueces | CC Polymers LLC | Industrial Non-CHP | All Other | WH | OT | 14.3 | 11.7 | 2028-12 | 2028 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 27.833756 | -97.49652 | 2026-09 |
| 60642/2 | M&G Resins USA | 2 | 60642 | TX | Nueces | CC Polymers LLC | Industrial Non-CHP | All Other | WH | OT | 14.3 | 11.7 | 2028-12 | 2028 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 27.833756 | -97.49652 | 2026-09 |
| 70203/GEN1 | Bealeton Solar | GEN1 | 70203 | VA | Fauquier | TerraForm Power Operating, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 14.2 | 14 | 2028-11 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 38.555832 | -77.77828 | 2026-09 |
| 61912/MHSOL | McGinness Hills 3 | MHSOL | 61912 | NV | Lander | Ormat Nevada Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 14 | 14 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NEVP | 39.5963 | -116.8942 | 2026-09 |
| 69771/CCBS1 | Clark Creek Solar Plant | CCBS1 | 69771 | NC | Lincoln | Duke Energy Carolinas, LLC | Electric Utility | Batteries | MWH | BA | 14 | 14 | 2028-02 | 2028 | (L) Regulatory approvals pending. Not under construction | CPLW | 35.532689 | -81.24866 | 2026-09 |
| 1239/13 | Riverton | 13 | 1239 | KS | Cherokee | Empire District Electric Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 13.5 | 13.6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | SWPP | 37.072616 | -94.6987 | 2026-09 |
| 1239/14 | Riverton | 14 | 1239 | KS | Cherokee | Empire District Electric Co | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 13.5 | 13.6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | SWPP | 37.072616 | -94.6987 | 2026-09 |
| 63126/SNDHA | Sand Hill A | SNDHA | 63126 | CA | Alameda | Viracocha Wind LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 13.5 | 13.5 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 37.743809 | -121.6078 | 2026-09 |
| 70409/ENX41 | Hera Solar | ENX41 | 70409 | VA | Tazewell | Hera Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 13.3 | 13.3 | 2028-06 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 36.167141 | -81.50336 | 2026-09 |
| 70296/MTBAT | Milltown Onsite BESS | MTBAT | 70296 | NJ | Middlesex | Milltown Onsite Generation, LLC | IPP Non-CHP | Batteries | MWH | BA | 13.2 | 13.2 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 40.453346 | -74.43502 | 2026-09 |
| 67836/GSP1 | Gibson Solar Project - Hybrid | GSP1 | 67836 | CA | Yolo | Emeren US, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 13 | 13 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | CISO | 38.678386 | -121.9876 | 2026-09 |
| 67836/GSP2 | Gibson Solar Project - Hybrid | GSP2 | 67836 | CA | Yolo | Emeren US, LLC | IPP Non-CHP | Batteries | MWH | BA | 13 | 13 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | CISO | 38.678386 | -121.9876 | 2026-09 |
| 65302/BESS | Salt City Solar Project - Hybrid | BESS | 65302 | OH | Ross | Salt City Solar LLC | IPP Non-CHP | Batteries | MWH | BA | 12.5 | 12.5 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.41473 | -82.96285 | 2026-09 |
| 65304/BESS | ENGIE Solidago Solar Project - Hybrid | BESS | 65304 | DE | New Castle | ENGIE Solidago Solar LLC | IPP Non-CHP | Batteries | MWH | BA | 12.5 | 12.5 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.395187 | -75.7535 | 2026-09 |
| 65307/SUNB | Sunnybrook Solar Project - Hybrid | SUNB | 65307 | VA | Halifax | Sunnybrook Farm Solar, LLC | IPP Non-CHP | Batteries | MWH | BA | 12.5 | 12.5 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 36.798717 | -78.83961 | 2026-09 |
| 67253/761 | Cherry Valley | 761 | 67253 | IL | Boone | Greenbacker Renewable Energy Corporation | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 12.5 | 12.5 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 42.240017 | -88.93076 | 2026-09 |
| 70410/ENX42 | Willow Solar | ENX42 | 70410 | VA | Franklin | Willow Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 12 | 12 | 2027-06 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 36.968749 | -79.93001 | 2026-09 |
| 58639/BESS8 | KRS I Anahola Solar Hybrid | BESS8 | 58639 | HI | Kauai | Kauai Island Utility Cooperative | Electric Utility | Batteries | MWH | BA | 12 | 12 | 2027-07 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | 22.131667 | -159.3031 | 2026-09 | |
| 58640/BESS7 | KRS II Koloa Solar | BESS7 | 58640 | HI | Kauai | Kauai Island Utility Cooperative | Electric Utility | Batteries | MWH | BA | 12 | 12 | 2027-07 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | 21.900833 | -159.45 | 2026-09 | |
| 57472/CTG | TBE-Montgomery LLC | CTG | 57472 | NY | Orange | TBE Montgomery LLC | IPP Non-CHP | Other Waste Biomass | OBG | CT | 12 | 11.6 | 2039-12 | 2039 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 41.4885 | -74.2262 | 2026-09 |
| 69870/BAT1 | Parkwood BESS | BAT1 | 69870 | NC | Union | North Carolina El Member Corp | Electric Utility | Batteries | MWH | BA | 11.6 | 11.6 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | DUK | 34.891701 | -80.63255 | 2026-09 |
| 66870/DAVS | Davis Solar (WV) | DAVS | 66870 | WV | Tucker | Monongahela Power Co | Electric Utility | Solar Photovoltaic | SUN | PV | 11.5 | 11.5 | 2028-12 | 2028 | (L) Regulatory approvals pending. Not under construction | PJM | 39.155005 | -79.44334 | 2026-09 |
| 69552/90916 | Danville VA BESS 2 | 90916 | 69552 | VA | Pittsylvania | Danville VA BESS 2 LLC | IPP Non-CHP | Batteries | MWH | BA | 11 | 11 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 36.6052 | -79.4358 | 2026-09 |
| 70542/WHI1 | Mount Whitney BESS | WHI1 | 70542 | TX | Waller | Mount Whitney BESS LLC | IPP Non-CHP | Batteries | MWH | BA | 11 | 9.9 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 30.159658 | -95.92763 | 2026-09 |
| 70543/DEN1 | Denali Energy Storage | DEN1 | 70543 | TX | Austin | Denali Energy Storage LLC | IPP Non-CHP | Batteries | MWH | BA | 11 | 9.9 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 29.632317 | -96.07565 | 2026-09 |
| 69864/COBA1 | Colorado Clean Energy Center (BESS) | COBA1 | 69864 | TX | Colorado | On Energy Storage | IPP Non-CHP | Batteries | MWH | BA | 10.1 | 10.1 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.649 | -96.51519 | 2026-09 |
| 69865/CLBA1 | Columbus Clean Energy Center (BESS) | CLBA1 | 69865 | TX | Colorado | On Energy Storage | IPP Non-CHP | Batteries | MWH | BA | 10.1 | 10.1 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.6789 | -96.53042 | 2026-09 |
| 69866/MGBA1 | Matagorda Clean Energy Center (BESS) | MGBA1 | 69866 | TX | Matagorda | On Energy Storage | IPP Non-CHP | Batteries | MWH | BA | 10.1 | 10.1 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 28.99489 | -96.12536 | 2026-09 |
| 67283/6569 | Six Flags Magic Mountain | 6569 | 67283 | CA | Los Angeles | Magic Mountain Parkway Solar Project 2023, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 10 | 10 | 2026-09 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.428209 | -118.5993 | 2026-09 |
| 69226/KNBA1 | Knapp BESS | KNBA1 | 69226 | TX | Scurry | GoldenMax Energy Inc | IPP Non-CHP | Batteries | MWH | BA | 10 | 10 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 32.6913 | -101.0515 | 2026-09 |
| 69252/HABA1 | Harlingen #1 BESS 1 | HABA1 | 69252 | TX | Cameron | Harlingen ESS Assets LLC | IPP Non-CHP | Batteries | MWH | BA | 10 | 10 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 26.206111 | -97.70842 | 2026-09 |
| 69253/NEBA1 | North Edinburg BESS 1 | NEBA1 | 69253 | TX | Hidalgo | Edinburg ESS Assets LLC | IPP Non-CHP | Batteries | MWH | BA | 10 | 10 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 26.347194 | -98.18844 | 2026-09 |
| 69465/CSTSP | City of Detroit Castle Solar | CSTSP | 69465 | MI | Wayne | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 10 | 10 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 42.411333 | -83.01867 | 2026-09 |
| 69665/ORCH | Orchard BESS | ORCH | 69665 | TX | Fort Bend | IEP Tejas Verde, LLC | IPP Non-CHP | Batteries | MWH | BA | 10 | 10 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.539579 | -95.95732 | 2026-09 |
| 66410/596 | Grizzly Ridge Solar | 596 | 66410 | TX | Hamilton | Grizzly Ridge Solar LLC | IPP Non-CHP | Batteries | MWH | BA | 10 | 10 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.738177 | -98.21374 | 2026-09 |
| 68439/17184 | NorCal FPV 1 | 17184 | 68439 | CA | Alameda | Madison Energy Investments LLC | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 10 | 10 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 37.6778 | -121.8275 | 2026-09 |
| 70560/GWF-1 | Grey Wolf | GWF-1 | 70560 | TX | Winkler | ET Genco LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 10 | 10 | 2027-03 | 2027 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.769814 | -103.2694 | 2026-09 |
| 70561/WT2-1 | WT2 | WT2-1 | 70561 | TX | Winkler | ET Genco LLC | IPP Non-CHP | Natural Gas Fired Combustion Turbine | NG | GT | 10 | 10 | 2027-05 | 2027 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.83611 | -103.305 | 2026-09 |
| 67858/DILL1 | Dill Holdings LLC | DILL1 | 67858 | NC | Iredell | Dill Holdings LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 10 | 10 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | DUK | 35.966645 | -80.71882 | 2026-09 |
| 70533/NASH | Nash Solar | NASH | 70533 | TX | Brazoria | Ellomay USA Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 10 | 10 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.253813 | -95.59608 | 2026-09 |
| 64616/1 | South Portland ESS, LLC | 1 | 64616 | ME | Cumberland | South Portland ESS, LLC | IPP Non-CHP | Batteries | MWH | BA | 10 | 10 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | ISNE | 43.622939 | -70.33098 | 2026-09 |
| 68566/SIPSY | SR Sipsey | SIPSY | 68566 | AL | Fayette | SR Sipsey, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 10 | 10 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | TVA | 33.694556 | -87.81805 | 2026-09 |
| 68988/SHB01 | Sherco LDES | SHB01 | 68988 | MN | Sherburne | Northern States Power Co - Minnesota | Electric Utility | Batteries | MWH | BA | 10 | 10 | 2028-05 | 2028 | (T) Regulatory approvals received. Not under construction | MISO | 45.374997 | -93.89719 | 2026-09 |
| 64171/1 | Tygart Hydropower | 1 | 64171 | WV | Taylor | Agilitas Energy, Inc. | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 10 | 3 | 2029-01 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 39.279354 | -80.00891 | 2026-09 |
| 64171/2 | Tygart Hydropower | 2 | 64171 | WV | Taylor | Agilitas Energy, Inc. | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 10 | 3 | 2029-01 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 39.279354 | -80.00891 | 2026-09 |
| 64171/3 | Tygart Hydropower | 3 | 64171 | WV | Taylor | Agilitas Energy, Inc. | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 10 | 3 | 2029-01 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 39.279354 | -80.00891 | 2026-09 |
| 69702/PI-1 | Pike Island Hydroelectric Project | PI-1 | 69702 | OH | Jefferson | Pike Island Hydropower Corporation | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 10 | 10 | 2029-01 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 40.151 | -80.70569 | 2026-09 |
| 69702/PI-2 | Pike Island Hydroelectric Project | PI-2 | 69702 | OH | Jefferson | Pike Island Hydropower Corporation | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 10 | 10 | 2029-01 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 40.151 | -80.70569 | 2026-09 |
| 69701/NC-1 | New Cumberland Hydroelectric Project | NC-1 | 69701 | WV | Hancock | Current Hydro Project 19, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 10 | 10 | 2029-04 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 40.52821 | -80.62574 | 2026-09 |
| 69701/NC-2 | New Cumberland Hydroelectric Project | NC-2 | 69701 | WV | Hancock | Current Hydro Project 19, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 10 | 10 | 2029-04 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 40.52821 | -80.62574 | 2026-09 |
| 70559/BESS2 | Mammoth | BESS2 | 70559 | WV | Kanawha | MN8 Energy LLC | IPP Non-CHP | Batteries | MWH | BA | 10 | 10 | 2029-06 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 38.20845 | -81.30893 | 2026-09 |
| 67570/3004 | Cedar Hill ESS | 3004 | 67570 | TX | Dallas | Cedar Hill ESS Assets, LLC | IPP Non-CHP | Batteries | MWH | BA | 10 | 10 | 2030-06 | 2030 | (L) Regulatory approvals pending. Not under construction | ERCO | 32.612139 | -96.92511 | 2026-09 |
| 69318/APPLE | Apple BESS | APPLE | 69318 | TX | Ector | Apple Infra, LLC | IPP Non-CHP | Batteries | MWH | BA | 9.9 | 9.9 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.675697 | -102.3638 | 2026-09 |
| 69338/LEAKY | Regis Leakey | LEAKY | 69338 | TX | Real | Regis Leakey LLC | IPP Non-CHP | Batteries | MWH | BA | 9.9 | 9.9 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 29.681012 | -99.76172 | 2026-09 |
| 65834/SDBTD | Saddleback BESS2 | SDBTD | 65834 | TX | Reeves | HEN Infrastructure, L.L.C. | IPP Non-CHP | All Other | OTH | IC | 9.9 | 9.9 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.332883 | -103.4984 | 2026-09 |
| 69340/MEDIN | Regis Medina | MEDIN | 69340 | TX | Bandera | Regis Medina LLC | IPP Non-CHP | Batteries | MWH | BA | 9.9 | 9.9 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 29.807877 | -99.25467 | 2026-09 |
| 69534/TOR_B | Torrecillas Energy Storage | TOR_B | 69534 | TX | Webb | Torrecillas Energy Storage, LLC | IPP Non-CHP | Batteries | MWH | BA | 9.9 | 9.9 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 27.618936 | -98.83924 | 2026-09 |
| 69246/BSOU1 | BESS TX Camarine - BSHOU001 | BSOU1 | 69246 | TX | Harris | Prologis Logistics Services Incorporated BESS | IPP Non-CHP | Batteries | MWH | BA | 9.9 | 9.9 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 29.86648 | -95.43066 | 2026-09 |
| 70549/DARST | CF BESS NINE | DARST | 70549 | TX | Guadalupe | CF BESS Nine, LLC | IPP Non-CHP | Batteries | MWH | BA | 9.9 | 9.9 | 2027-01 | 2027 | (L) Regulatory approvals pending. Not under construction | ERCO | 29.586397 | -97.77525 | 2026-09 |
| 65811/CYSTD | Coyote Springs (TX) | CYSTD | 65811 | TX | Reeves | HEN Infrastructure, L.L.C. | IPP Non-CHP | Petroleum Liquids | DFO | IC | 9.9 | 9.9 | 2027-02 | 2027 | (T) Regulatory approvals received. Not under construction | ERCO | 31.39471 | -103.6303 | 2026-09 |
| 69902/HOCKL | Hockley | HOCKL | 69902 | TX | Harris | Hockley LLC | IPP Non-CHP | Batteries | MWH | BA | 9.9 | 9.9 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 30.021964 | -95.84826 | 2026-09 |
| 65897/INPKY | Industrial Parkway Storage | INPKY | 65897 | CA | Santa Barbara | RPCA Storage 1, LLC | IPP Non-CHP | Batteries | MWH | BA | 9.8 | 9.8 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 34.907345 | -120.4465 | 2026-09 |
| 68255/SHELB | SR Shelby | SHELB | 68255 | TN | Shelby | SR Shelby, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 9.8 | 9.8 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | TVA | 35.353292 | -89.81498 | 2026-09 |
| 59596/PV1 | Rhubarb One SC | PV1 | 59596 | SC | Marion | SolRiver Capital LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 9.6 | 9.6 | 2027-06 | 2027 | (L) Regulatory approvals pending. Not under construction | CPLE | 34.151111 | -79.41 | 2026-09 |
| 59027/GEN 1 | Mahoney Lake Hydroelectric | GEN 1 | 59027 | AK | Ketchikan Gateway | Ketchikan Electric Company | Electric Utility | Conventional Hydroelectric | WAT | HY | 9.6 | 9.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | 55.419444 | -131.5378 | 2026-09 | |
| 69903/EBERN | East Bernard | EBERN | 69903 | TX | Wharton | East Bernard LLC | IPP Non-CHP | Batteries | MWH | BA | 9.5 | 9.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 29.52854 | -96.07052 | 2026-09 |
| 69904/PLEDG | Pledger | PLEDG | 69904 | TX | Wharton | Pledger LLC | IPP Non-CHP | Batteries | MWH | BA | 9.5 | 9.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ERCO | 29.187719 | -95.91223 | 2026-09 |
| 69357/PV1 | Asheville Solar | PV1 | 69357 | NC | Buncombe | Duke Energy Progress - (NC) | Electric Utility | Solar Photovoltaic | SUN | PV | 9.5 | 9.5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CPLW | 35.470591 | -82.54223 | 2026-09 |
| 69819/TRNTN | Trenton Solar - (OH) | TRNTN | 69819 | OH | Butler | ENGIE Distributed Renewables Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 9.5 | 9.5 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 39.455321 | -84.46788 | 2026-09 |
| 68284/PE-1 | Puuloa Energy | PE-1 | 68284 | HI | Honolulu | Puuloa Energy LLC | IPP Non-CHP | Other Waste Biomass | OBL | IC | 9.4 | 9.4 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.347833 | -157.9506 | 2026-09 |
| 68284/PE-10 | Puuloa Energy | PE-10 | 68284 | HI | Honolulu | Puuloa Energy LLC | IPP Non-CHP | Other Waste Biomass | OBL | IC | 9.4 | 9.4 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.347833 | -157.9506 | 2026-09 |
| 68284/PE-11 | Puuloa Energy | PE-11 | 68284 | HI | Honolulu | Puuloa Energy LLC | IPP Non-CHP | Other Waste Biomass | OBL | IC | 9.4 | 9.4 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.347833 | -157.9506 | 2026-09 |
| 68284/PE-2 | Puuloa Energy | PE-2 | 68284 | HI | Honolulu | Puuloa Energy LLC | IPP Non-CHP | Other Waste Biomass | OBL | IC | 9.4 | 9.4 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.347833 | -157.9506 | 2026-09 |
| 68284/PE-3 | Puuloa Energy | PE-3 | 68284 | HI | Honolulu | Puuloa Energy LLC | IPP Non-CHP | Other Waste Biomass | OBL | IC | 9.4 | 9.4 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.347833 | -157.9506 | 2026-09 |
| 68284/PE-4 | Puuloa Energy | PE-4 | 68284 | HI | Honolulu | Puuloa Energy LLC | IPP Non-CHP | Other Waste Biomass | OBL | IC | 9.4 | 9.4 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.347833 | -157.9506 | 2026-09 |
| 68284/PE-5 | Puuloa Energy | PE-5 | 68284 | HI | Honolulu | Puuloa Energy LLC | IPP Non-CHP | Other Waste Biomass | OBL | IC | 9.4 | 9.4 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.347833 | -157.9506 | 2026-09 |
| 68284/PE-6 | Puuloa Energy | PE-6 | 68284 | HI | Honolulu | Puuloa Energy LLC | IPP Non-CHP | Other Waste Biomass | OBL | IC | 9.4 | 9.4 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.347833 | -157.9506 | 2026-09 |
| 68284/PE-7 | Puuloa Energy | PE-7 | 68284 | HI | Honolulu | Puuloa Energy LLC | IPP Non-CHP | Other Waste Biomass | OBL | IC | 9.4 | 9.4 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.347833 | -157.9506 | 2026-09 |
| 68284/PE-8 | Puuloa Energy | PE-8 | 68284 | HI | Honolulu | Puuloa Energy LLC | IPP Non-CHP | Other Waste Biomass | OBL | IC | 9.4 | 9.4 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.347833 | -157.9506 | 2026-09 |
| 68284/PE-9 | Puuloa Energy | PE-9 | 68284 | HI | Honolulu | Puuloa Energy LLC | IPP Non-CHP | Other Waste Biomass | OBL | IC | 9.4 | 9.4 | 2029-04 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.347833 | -157.9506 | 2026-09 |
| 50969/GEN10 | MU Combined Heat and Power Plant | GEN10 | 50969 | MO | Boone | Curators of the University of Missouri | Commercial CHP | Natural Gas Steam Turbine | NG | ST | 9 | 8 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 38.9461 | -92.3328 | 2026-09 |
| 66618/FL5 | Fish Lake Geothermal | FL5 | 66618 | NV | Esmeralda | Fish Lake Geothermal LLC | IPP Non-CHP | Geothermal | GEO | ST | 9 | 6.8 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NEVP | 37.860925 | -118.0341 | 2026-09 |
| 57472/STG | TBE-Montgomery LLC | STG | 57472 | NY | Orange | TBE Montgomery LLC | IPP Non-CHP | Other Waste Biomass | OBG | CA | 9 | 7.4 | 2039-12 | 2039 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 41.4885 | -74.2262 | 2026-09 |
| 69695/CCM-1 | Colonel Charles D. Maynard Project | CCM-1 | 69695 | AR | Jefferson | Maynard Hydroelectric LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 8.6 | 8.6 | 2031-11 | 2031 | (L) Regulatory approvals pending. Not under construction | MISO | 34.411873 | -92.10319 | 2026-09 |
| 69695/CCM-2 | Colonel Charles D. Maynard Project | CCM-2 | 69695 | AR | Jefferson | Maynard Hydroelectric LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 8.6 | 8.6 | 2031-11 | 2031 | (L) Regulatory approvals pending. Not under construction | MISO | 34.411873 | -92.10319 | 2026-09 |
| 69695/CCM-3 | Colonel Charles D. Maynard Project | CCM-3 | 69695 | AR | Jefferson | Maynard Hydroelectric LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 8.6 | 8.6 | 2031-11 | 2031 | (L) Regulatory approvals pending. Not under construction | MISO | 34.411873 | -92.10319 | 2026-09 |
| 70305/23 | Tanglewood Solar, LLC | 23 | 70305 | NC | Pasquotank | Headwater Energy, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 8.4 | 8.4 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CPLE | 36.25 | -76.3 | 2026-09 |
| 66901/WRS | Wylie Ridge Solar | WRS | 66901 | WV | Hancock | Monongahela Power Co | Electric Utility | Solar Photovoltaic | SUN | PV | 8.4 | 8.4 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 40.452683 | -80.57255 | 2026-09 |
| 68558/LOTT | SR Lott | LOTT | 68558 | AL | Mobile | SR Lott, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 8.3 | 8.3 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | SOCO | 30.940181 | -88.29926 | 2026-09 |
| 62391/NA1 | Overton Hydroelectric Project | NA1 | 62391 | LA | Rapides | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 8.1 | 5.5 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 31.185978 | -92.29309 | 2026-09 |
| 62391/NA2 | Overton Hydroelectric Project | NA2 | 62391 | LA | Rapides | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 8.1 | 5.5 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 31.185978 | -92.29309 | 2026-09 |
| 62391/NA3 | Overton Hydroelectric Project | NA3 | 62391 | LA | Rapides | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 8.1 | 5.5 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 31.185978 | -92.29309 | 2026-09 |
| 62391/NA4 | Overton Hydroelectric Project | NA4 | 62391 | LA | Rapides | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 8.1 | 5.5 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 31.185978 | -92.29309 | 2026-09 |
| 62391/NA5 | Overton Hydroelectric Project | NA5 | 62391 | LA | Rapides | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 8.1 | 5.5 | 2028-08 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 31.185978 | -92.29309 | 2026-09 |
| 62391/NA6 | Overton Hydroelectric Project | NA6 | 62391 | LA | Rapides | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 8.1 | 5.5 | 2028-08 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 31.185978 | -92.29309 | 2026-09 |
| 70466/NSP | Nine Springs Solar | NSP | 70466 | WI | Dane | Madison Gas & Electric Co | Electric Utility | Solar Photovoltaic | SUN | PV | 8 | 8 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 43.029352 | -89.36307 | 2026-09 |
| 54918/TM02 | Ergon Refining Vicksburg | TM02 | 54918 | MS | Warren | Ergon Refining Inc | Industrial CHP | Natural Gas Fired Combustion Turbine | NG | GT | 7.9 | 7.9 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 32.388271 | -90.90834 | 2026-09 |
| 54918/TM03 | Ergon Refining Vicksburg | TM03 | 54918 | MS | Warren | Ergon Refining Inc | Industrial CHP | Natural Gas Fired Combustion Turbine | NG | GT | 7.9 | 7.9 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 32.388271 | -90.90834 | 2026-09 |
| 69992/BA1 | Sherwood Forest BESS | BA1 | 69992 | LA | Orleans | Entergy New Orleans, LLC | Electric Utility | Batteries | MWH | BA | 7.7 | 7.7 | 2027-07 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 30.01266 | -89.94403 | 2026-09 |
| 54224/CTG1 | Franklin Heating Station | CTG1 | 54224 | MN | Olmsted | Franklin Heating Station | Commercial CHP | Natural Gas Fired Combined Cycle | NG | CT | 7.5 | 7.3 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 44.020576 | -92.4656 | 2026-09 |
| 62425/NA1 | Sardis Lake Hydroelectric Project | NA1 | 62425 | MS | Panola | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 7.5 | 5.5 | 2028-10 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 34.399125 | -89.77246 | 2026-09 |
| 62425/NA2 | Sardis Lake Hydroelectric Project | NA2 | 62425 | MS | Panola | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 7.5 | 5.5 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 34.399125 | -89.77246 | 2026-09 |
| 55369/BESS1 | Hamakua Energy Plant | BESS1 | 55369 | HI | Hawaii | Hamakua Energy LP | IPP Non-CHP | Batteries | MWH | BA | 7.5 | 7.5 | 2030-11 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | 20.0939 | -155.4711 | 2026-09 | |
| 70333/KBPV1 | Keenesburg | KBPV1 | 70333 | CO | Weld | ENGIE Distributed Renewables Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 7.2 | 7.2 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 40.187364 | -104.5061 | 2026-09 |
| 66002/MVSBA | AES Mountain View Solar | MVSBA | 66002 | HI | Honolulu | AES Distributed Energy | IPP Non-CHP | Batteries | MWH | BA | 7 | 7 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | HECO | 21.45799 | -158.1767 | 2026-09 |
| 66002/MVSPV | AES Mountain View Solar | MVSPV | 66002 | HI | Honolulu | AES Distributed Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 7 | 7 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | HECO | 21.45799 | -158.1767 | 2026-09 |
| 70465/NFREC | New Florence Renewable Energy Center | NFREC | 70465 | MO | Montgomery | Union Electric Co - (MO) | Commercial Non-CHP | Solar Photovoltaic | SUN | PV | 7 | 7 | 2026-11 | 2026 | (P) Planned for installation, but regulatory approvals not initiated | MISO | 38.8908 | -91.4186 | 2026-09 |
| 70119/GEN1 | Raceway Solar - (CO) | GEN1 | 70119 | CO | Morgan | Raceway Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 7 | 7 | 2027-04 | 2027 | (L) Regulatory approvals pending. Not under construction | SWPP | 40.262222 | -103.8292 | 2026-09 |
| 69466/GRESP | City of Detroit Greenfield | GRESP | 69466 | MI | Wayne | DTE Electric Company | Electric Utility | Solar Photovoltaic | SUN | PV | 7 | 7 | 2027-09 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 42.420589 | -83.09909 | 2026-09 |
| 62400/NA1 | Montgomery L&D Hydroelectric Project | NA1 | 62400 | PA | Beaver | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6.8 | 5.5 | 2028-10 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.652478 | -80.38687 | 2026-09 |
| 62400/NA2 | Montgomery L&D Hydroelectric Project | NA2 | 62400 | PA | Beaver | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6.8 | 5.5 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.652478 | -80.38687 | 2026-09 |
| 62400/NA3 | Montgomery L&D Hydroelectric Project | NA3 | 62400 | PA | Beaver | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6.8 | 5.5 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.652478 | -80.38687 | 2026-09 |
| 62433/NA1 | Emsworth L&D Hydroelectric Project | NA1 | 62433 | PA | Allegheny | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6.8 | 5 | 2030-10 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.50305 | -80.08944 | 2026-09 |
| 62433/NA2 | Emsworth L&D Hydroelectric Project | NA2 | 62433 | PA | Allegheny | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6.8 | 5 | 2030-11 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.50305 | -80.08944 | 2026-09 |
| 62433/NA3 | Emsworth L&D Hydroelectric Project | NA3 | 62433 | PA | Allegheny | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6.8 | 5 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.50305 | -80.08944 | 2026-09 |
| 62434/NA3 | Emsworth BC Hydroelectric Project | NA3 | 62434 | PA | Allegheny | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6.8 | 5 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.50083 | -80.10306 | 2026-09 |
| 60588/JHI01 | Sweetheart Lake Hydroelectric Facility | JHI01 | 60588 | AK | Juneau | Juneau Hydropower, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6.6 | 6.6 | 2028-01 | 2028 | (L) Regulatory approvals pending. Not under construction | 57.9449 | -133.6867 | 2026-09 | |
| 60588/JHI02 | Sweetheart Lake Hydroelectric Facility | JHI02 | 60588 | AK | Juneau | Juneau Hydropower, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6.6 | 6.6 | 2028-01 | 2028 | (L) Regulatory approvals pending. Not under construction | 57.9449 | -133.6867 | 2026-09 | |
| 60588/JHI03 | Sweetheart Lake Hydroelectric Facility | JHI03 | 60588 | AK | Juneau | Juneau Hydropower, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6.6 | 6.6 | 2028-01 | 2028 | (L) Regulatory approvals pending. Not under construction | 57.9449 | -133.6867 | 2026-09 | |
| 68285/PS-1 | Puuloa Solar | PS-1 | 68285 | HI | Honolulu | Puuloa Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 6.4 | 6.4 | 2027-11 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.351522 | -157.9269 | 2026-09 |
| 66618/FL4 | Fish Lake Geothermal | FL4 | 66618 | NV | Esmeralda | Fish Lake Geothermal LLC | IPP Non-CHP | Geothermal | GEO | ST | 6.2 | 4.3 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NEVP | 37.860925 | -118.0341 | 2026-09 |
| 63972/TR1 | Two Rivers Wind Facility | TR1 | 63972 | WY | Carbon | Two Rivers Wind LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 6.1 | 6.1 | 2028-10 | 2028 | (L) Regulatory approvals pending. Not under construction | PACE | 41.97508 | -106.1805 | 2026-09 |
| 69516/HAMM | Hamms Landfill | HAMM | 69516 | NJ | Sussex | NJR Clean Energy Ventures Corporation | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 6 | 6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.1015 | -74.6706 | 2026-09 |
| 70467/PHS | Pine Hill Solar | PHS | 70467 | WI | Dane | Madison Gas & Electric Co | Electric Utility | Solar Photovoltaic | SUN | PV | 6 | 6 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 43.06999 | -89.6452 | 2026-09 |
| 70468/20265 | Big Rapids Solar WI, LLC | 20265 | 70468 | WI | Marathon | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 6 | 6 | 2026-12 | 2026 | (L) Regulatory approvals pending. Not under construction | MISO | 44.815532 | -90.07455 | 2026-09 |
| 70469/20261 | Campbellsport Solar WI, LLC | 20261 | 70469 | WI | Fond Du Lac | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 6 | 6 | 2026-12 | 2026 | (L) Regulatory approvals pending. Not under construction | MISO | 43.583212 | -88.27886 | 2026-09 |
| 70470/20262 | Honey Creek Solar WI, LLC | 20262 | 70470 | WI | Walworth | Wisconsin Electric Power Co | Electric Utility | Solar Photovoltaic | SUN | PV | 6 | 6 | 2026-12 | 2026 | (L) Regulatory approvals pending. Not under construction | MISO | 42.790988 | -88.50094 | 2026-09 |
| 70471/20263 | Germantown - Rockfield Rd Solar WI, LLC | 20263 | 70471 | WI | Washington | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 6 | 6 | 2026-12 | 2026 | (L) Regulatory approvals pending. Not under construction | MISO | 43.257821 | -88.1316 | 2026-09 |
| 70472/20268 | Lime Kiln Solar, LLC | 20268 | 70472 | WI | Washington | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 6 | 6 | 2026-12 | 2026 | (L) Regulatory approvals pending. Not under construction | MISO | 43.277345 | -88.0684 | 2026-09 |
| 70473/20267 | Little Rose Solar WI, LLC | 20267 | 70473 | WI | Marathon | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 6 | 6 | 2026-12 | 2026 | (L) Regulatory approvals pending. Not under construction | MISO | 44.800623 | -90.1303 | 2026-09 |
| 70476/20260 | Root River Solar WI, LLC | 20260 | 70476 | WI | Racine | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 6 | 6 | 2026-12 | 2026 | (L) Regulatory approvals pending. Not under construction | MISO | 42.818594 | -87.93895 | 2026-09 |
| 70478/20259 | Tichigan Solar WI, LLC | 20259 | 70478 | WI | Racine | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 6 | 6 | 2026-12 | 2026 | (L) Regulatory approvals pending. Not under construction | MISO | 42.732266 | -88.16411 | 2026-09 |
| 68285/PS-2 | Puuloa Solar | PS-2 | 68285 | HI | Honolulu | Puuloa Solar LLC | IPP Non-CHP | Batteries | MWH | BA | 6 | 6 | 2027-11 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | HECO | 21.351522 | -157.9269 | 2026-09 |
| 69867/SHEII | SR Shelby II, LLC | SHEII | 69867 | TN | Shelby | SR Shelby II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 6 | 6 | 2028-02 | 2028 | (T) Regulatory approvals received. Not under construction | TVA | 35.353646 | -89.8109 | 2026-09 |
| 62388/NA1 | Grays Landing L&D Hydroelectric Project | NA1 | 62388 | PA | Greene | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6 | 4.5 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.823738 | -79.92302 | 2026-09 |
| 62388/NA2 | Grays Landing L&D Hydroelectric Project | NA2 | 62388 | PA | Greene | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6 | 4.5 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.823738 | -79.92302 | 2026-09 |
| 62404/NA1 | Monongahela L&D4 Hydroelectric Project | NA1 | 62404 | PA | Washington | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6 | 4.5 | 2028-10 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.145943 | -79.90095 | 2026-09 |
| 62385/NA1 | Maxwell L&D Hydroelectric Project | NA1 | 62385 | PA | Fayette | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6 | 4.5 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.002401 | -79.95883 | 2026-09 |
| 62404/NA2 | Monongahela L&D4 Hydroelectric Project | NA2 | 62404 | PA | Washington | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6 | 4.5 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.145943 | -79.90095 | 2026-09 |
| 62385/NA2 | Maxwell L&D Hydroelectric Project | NA2 | 62385 | PA | Fayette | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6 | 4.5 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.002401 | -79.95883 | 2026-09 |
| 62434/NA1 | Emsworth BC Hydroelectric Project | NA1 | 62434 | PA | Allegheny | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6 | 3 | 2030-11 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.50083 | -80.10306 | 2026-09 |
| 62434/NA2 | Emsworth BC Hydroelectric Project | NA2 | 62434 | PA | Allegheny | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 6 | 4 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.50083 | -80.10306 | 2026-09 |
| 67265/CTG-1 | CHP Plant | CTG-1 | 67265 | DC | District of Columbia | Howard University | IPP CHP | Natural Gas Fired Combustion Turbine | NG | GT | 5.7 | 5.3 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 38.92033 | -77.021 | 2026-09 |
| 68543/3850B | Town of Sharon Portfolio -Mt St Landfill | 3850B | 68543 | MA | Norfolk | Mountain Street Solar Project 2019, LLC | IPP Non-CHP | Batteries | MWH | BA | 5.7 | 5.7 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | ISNE | 42.102685 | -71.15906 | 2026-09 |
| 59091/GEN1 | Braddock Lock and Dam | GEN1 | 59091 | PA | Allegheny | Lock+ Hydro Friends Fund XLII, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 5.3 | 5.3 | 2027-03 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 40.388889 | -79.85889 | 2026-09 |
| 63677/STURB | Sturbridge Road Solar | STURB | 63677 | MA | Worcester | Madison Energy Investments LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | ISNE | 42.174611 | -72.01786 | 2026-09 |
| 68975/17340 | Washington Street Solar 1 LLC | 17340 | 68975 | IL | Mclean | Washington Street Solar 1 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 40.477287 | -89.04986 | 2026-09 |
| 69551/90915 | Holyoke MA BESS 1 | 90915 | 69551 | MA | Hampden | Holyoke MA BESS 1 LLC | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 42.16774 | -72.64898 | 2026-09 |
| 69844/HORSE | Horseshoe Solar Project, LLC | HORSE | 69844 | IL | Montgomery | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 39.14706 | -89.4426 | 2026-09 |
| 69931/BJORN | Bjorn | BJORN | 69931 | WI | Barron | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 45.395931 | -91.881 | 2026-09 |
| 70176/KIESE | Kieser | KIESE | 70176 | IL | McLean | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 40.4396 | -89.0078 | 2026-09 |
| 70386/BESS1 | Chicopee BESS | BESS1 | 70386 | MA | Hampden | Uriel Renovables S.A | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 42.173653 | -72.6119 | 2026-09 |
| 70387/BESS1 | Framingham BESS | BESS1 | 70387 | MA | Middlesex | Uriel Renovables S.A | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 42.313107 | -71.38953 | 2026-09 |
| 70563/HIBIS | Hibiscus Solar, LLC | HIBIS | 70563 | IL | Macoupin | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 39.06927 | -90.14414 | 2026-09 |
| 67279/6572 | Borrego - Highland Ave | 6572 | 67279 | MA | Bristol | Highland Ave Solar 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 41.661525 | -71.05998 | 2026-09 |
| 67279/6572B | Borrego - Highland Ave | 6572B | 67279 | MA | Bristol | Highland Ave Solar 1, LLC | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 41.661525 | -71.05998 | 2026-09 |
| 67637/GILLD | Gillard | GILLD | 67637 | IL | Grundy | 38DN Asset Management LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.19401 | -88.29454 | 2026-09 |
| 67643/SOLIT | Solitude | SOLIT | 67643 | IL | LaSalle | 38DN Asset Management LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.130185 | -89.04407 | 2026-09 |
| 69178/11237 | Cherry Solar 1 | 11237 | 69178 | IL | Bureau | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 41.450314 | -89.22483 | 2026-09 |
| 69180/11254 | Cold Springs | 11254 | 69180 | NY | Onondaga | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | NYIS | 43.137912 | -76.27779 | 2026-09 |
| 69182/11225 | KA 340 | 11225 | 69182 | IL | Kankakee | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.245 | -87.753 | 2026-09 |
| 69310/23220 | SL Pembroke 2 | 23220 | 69310 | NY | Genesee | SL Pembroke 2, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.028056 | -78.45694 | 2026-09 |
| 69384/MALL2 | Mallory South PV II | MALL2 | 69384 | NY | Oswego | Mallory South PV II LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.2669 | -76.137 | 2026-09 |
| 69603/90917 | Ipswich MA BESS 1 | 90917 | 69603 | MA | Essex | Ipswich MA BESS 1 LLC | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 42.716353 | -70.84202 | 2026-09 |
| 69756/23212 | SL Dunkirk | 23212 | 69756 | NY | Chautauqua | SL Dunkirk, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 42.463685 | -79.34316 | 2026-09 |
| 70294/EAST | NL IL 2700 East | EAST | 70294 | IL | Livingston | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.050261 | -88.42827 | 2026-09 |
| 70295/LAKE | NL IL Lake | LAKE | 70295 | IL | Lake | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 42.464881 | -87.88974 | 2026-09 |
| 70440/BRACE | NL IL Braceville | BRACE | 70440 | IL | Grundy | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.230511 | -88.25037 | 2026-09 |
| 70464/BAT1 | Blackman Battery Energy Storage System | BAT1 | 70464 | MO | Greene | City Utilities of Springfield - (MO) | Electric Utility | Batteries | MWH | BA | 5 | 5 | 2026-11 | 2026 | (T) Regulatory approvals received. Not under construction | SWPP | 37.163516 | -93.22325 | 2026-09 |
| 70562/BUNGA | Bungalow Solar, LLC | BUNGA | 70562 | IL | Tazewell | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 40.630326 | -89.44935 | 2026-09 |
| 70565/TREN1 | Trenton CSG 1 LLC | TREN1 | 70565 | IL | Clinton | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 38.588043 | -89.68674 | 2026-09 |
| 70580/OLSTG | NL IL Old Stage | OLSTG | 70580 | IL | Grundy | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.311417 | -88.58678 | 2026-09 |
| 67609/21599 | NY ELBA 7195 OAK ORCHARD RD - Genesee 1 | 21599 | 67609 | NY | Genesee | NY CDG Genesee 1 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 43.064414 | -78.18456 | 2026-09 |
| 69159/DIEL | SV CSG Diel 1 | DIEL | 69159 | IL | Richland | SV CSG Diel 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 38.70762 | -88.22238 | 2026-09 |
| 69205/11249 | Lodi I | 11249 | 69205 | NY | Schuyler | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 42.588337 | -76.84425 | 2026-09 |
| 69206/11250 | Lodi II | 11250 | 69206 | NY | Schuyler | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 42.586527 | -76.84413 | 2026-09 |
| 69218/11247 | Vienna | 11247 | 69218 | NY | Oneida | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 43.23835 | -75.69039 | 2026-09 |
| 69383/MALL1 | Mallory South PV I | MALL1 | 69383 | NY | Oswego | Mallory South PV I LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.2669 | -76.137 | 2026-09 |
| 69814/SUNSO | SV CSG Sun Trust Solar | SUNSO | 69814 | IL | Kane | SV CSG Sun Trust Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 42.0969 | -88.3865 | 2026-09 |
| 69815/KINGS | SV CSG Kingston Solar 1 | KINGS | 69815 | IL | DeKalb | SV CSG Kingston Solar 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 42.0971 | -88.7318 | 2026-09 |
| 69837/FALCH | Falconhead Solar, LLC | FALCH | 69837 | IL | Will | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.43149 | -87.63821 | 2026-09 |
| 69882/USMID | USS Middle Solar | USMID | 69882 | IL | Grundy | USS Middle Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.413923 | -88.44451 | 2026-09 |
| 69883/USJOR | USS Jornada Solar | USJOR | 69883 | NM | Dona Ana | USS Jornada Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PNM | 32.431485 | -106.6832 | 2026-09 |
| 69997/FASTA | Fast Ave Solar LLC | FASTA | 69997 | IL | Tazewell | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 40.534803 | -89.28959 | 2026-09 |
| 70001/HARPC | Harper Creek Solar, LLC | HARPC | 70001 | IL | Jefferson | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 38.301552 | -88.91451 | 2026-09 |
| 70382/GEN3 | Mazaska Garden | GEN3 | 70382 | MN | Rice | Bullrock-NxtGenREA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 44.48723 | -93.13416 | 2026-09 |
| 70474/20266 | Lyndon Solar WI, LLC | 20266 | 70474 | WI | Sheboygan | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (L) Regulatory approvals pending. Not under construction | MISO | 43.662209 | -87.95873 | 2026-09 |
| 70475/20264 | Maple Creek Solar WI, LLC | 20264 | 70475 | WI | Outagamie | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (L) Regulatory approvals pending. Not under construction | MISO | 44.436056 | -88.73581 | 2026-09 |
| 70493/FMCS | Four Mile Creek | FMCS | 70493 | IL | Jefferson | Four Mile Creek Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 38.326636 | -88.75427 | 2026-09 |
| 70499/NP | North Pana | NP | 70499 | IL | Christian | North Pana Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 39.410586 | -89.0835 | 2026-09 |
| 70500/PAW | Pawpaw (IL) | PAW | 70500 | IL | White | Pawpaw Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 37.941607 | -88.34041 | 2026-09 |
| 70501/SCS1 | South Cherry Solar 1 | SCS1 | 70501 | IL | Bureau | South Cherry Solar 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 41.41675 | -89.21233 | 2026-09 |
| 70517/1400E | NL IL 1400 East | 1400E | 70517 | IL | Livingston | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.0858 | -88.6618 | 2026-09 |
| 70548/WRDEN | Cenergy IL - Worden | WRDEN | 70548 | IL | Madison | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 38.93278 | -89.82896 | 2026-09 |
| 66497/BHBA1 | Bensonhurst Energy Storage 1 LLC | BHBA1 | 66497 | NY | Kings | Convergent Energy and Power LP | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 40.636787 | -73.93435 | 2026-09 |
| 68543/3850G | Town of Sharon Portfolio -Mt St Landfill | 3850G | 68543 | MA | Norfolk | Mountain Street Solar Project 2019, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | ISNE | 42.102685 | -71.15906 | 2026-09 |
| 69035/PI36 | Pivot Solar 36 | PI36 | 69035 | CO | Weld | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | WACM | 40.346119 | -104.7314 | 2026-09 |
| 69262/HILL1 | Hillsboro Solar Project | HILL1 | 69262 | TX | Hill | Ellomay USA Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 32.029636 | -97.14555 | 2026-09 |
| 69262/HILL2 | Hillsboro Solar Project | HILL2 | 69262 | TX | Hill | Ellomay USA Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | ERCO | 32.029636 | -97.14555 | 2026-09 |
| 69372/KNOXS | Knox II PV | KNOXS | 69372 | NY | Albany | Knox II PV LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | NYIS | 42.67591 | -74.07563 | 2026-09 |
| 70009/WILL1 | Willis Solar 1, LLC - (IL) | WILL1 | 70009 | IL | Macoupin | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 39.118354 | -89.84199 | 2026-09 |
| 70102/PS33 | Pivot Solar 33 LLC | PS33 | 70102 | CO | Weld | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PSCO | 40.32508 | -104.731 | 2026-09 |
| 70177/ALLEN | Allen CSG | ALLEN | 70177 | IL | Peoria | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 40.9166 | -89.5273 | 2026-09 |
| 70376/IL52 | Pivot Energy IL 52 | IL52 | 70376 | IL | McHenry | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 42.329332 | -88.41144 | 2026-09 |
| 70586/RAVEN | Raven Sol Solar CSG | RAVEN | 70586 | NM | Hidalgo | Raven Sol Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PNM | 32.3704 | -108.6905 | 2026-09 |
| 70587/GONZO | Gonzo Sol Solar CSG | GONZO | 70587 | NM | Union | Gonzo Sol Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PNM | 36.444384 | -103.191 | 2026-09 |
| 67639/LLEAF | Leatherleaf | LLEAF | 67639 | NY | Genesee | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 43.048657 | -78.03491 | 2026-09 |
| 68855/TRP01 | Tracy Renewable Power Plant | TRP01 | 68855 | CA | San Joaquin | Tracy Renewable Energy, LLC | IPP Non-CHP | Other Waste Biomass | AB | ST | 5 | 3 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 37.77158 | -121.4251 | 2026-09 |
| 69181/11150 | Hillview | 11150 | 69181 | NY | Warren | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | NYIS | 43.29864 | -73.56023 | 2026-09 |
| 70100/IL070 | Pivot Energy IL 70 LLC | IL070 | 70100 | IL | Boone | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 42.227709 | -88.8679 | 2026-09 |
| 68215/BRAES | Braley Hill North Solar | BRAES | 68215 | MA | Plymouth | Agilitas Energy, Inc. | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | ISNE | 41.776 | -70.904 | 2026-09 |
| 68215/BRAPV | Braley Hill North Solar | BRAPV | 68215 | MA | Plymouth | Agilitas Energy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | ISNE | 41.776 | -70.904 | 2026-09 |
| 68218/RANES | Randall Lane Solar | RANES | 68218 | MA | Plymouth | Agilitas Energy, Inc. | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | ISNE | 41.663 | -70.844 | 2026-09 |
| 68218/RANPV | Randall Lane Solar | RANPV | 68218 | MA | Plymouth | Agilitas Energy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | ISNE | 41.663 | -70.844 | 2026-09 |
| 70002/MACED | Macedon CSG LLC | MACED | 70002 | NY | Wayne | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 43.083573 | -77.26768 | 2026-09 |
| 70025/CINC1 | Cincinnati CSG 1 LLC | CINC1 | 70025 | IL | Tazewell | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 40.526203 | -89.63886 | 2026-09 |
| 70026/CINC2 | Cincinnati CSG 2 LLC | CINC2 | 70026 | IL | Tazewell | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 40.526203 | -89.63886 | 2026-09 |
| 70030/FABIU | Fabius CSG LLC | FABIU | 70030 | NY | Onondaga | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.830007 | -76.06217 | 2026-09 |
| 70378/GEN5 | Crane Creek Garden | GEN5 | 70378 | MN | Waseca | Bullrock-NxtGenREA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 44.09501 | -93.65467 | 2026-09 |
| 70554/PV1 | EESolar29 | PV1 | 70554 | MN | Stearns | EESolar29 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 45.684973 | -94.21776 | 2026-09 |
| 67257/BVEB1 | Bear Valley Battery Plant | BVEB1 | 67257 | CA | San Bernardino | Bear Valley Electric Service | Electric Utility | Batteries | MWH | BA | 5 | 5 | 2027-04 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.25 | -116.86 | 2026-09 |
| 68520/MNDA4 | Madena 4 | MNDA4 | 68520 | CA | Placer | ZGlobal Inc | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2027-04 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 38.977582 | -121.3765 | 2026-09 |
| 68934/EAST1 | SV CSG East St Louis | EAST1 | 68934 | IL | St Clair | SV CSG East St Louis LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 38.6056 | -90.0705 | 2026-09 |
| 68863/PV1 | Bloomfield Solar | PV1 | 68863 | NY | Saratoga | Bloomfield Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.989691 | -73.88121 | 2026-09 |
| 70007/RICHR | Richmond Road Solar LLC | RICHR | 70007 | VA | James City | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-06 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 37.39976 | -76.82053 | 2026-09 |
| 70210/PV1 | Cypert - Fallsburg I | PV1 | 70210 | NY | Sullivan | NY Fallsburg II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 41.783296 | -74.60056 | 2026-09 |
| 67645/TWNDA | Varnsen | TWNDA | 67645 | IL | Winnebago | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-07 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 42.315822 | -89.31315 | 2026-09 |
| 70401/CLEM | Clems Way Solar | CLEM | 70401 | MA | Bristol | CleanCapital Holdings | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-07 | 2027 | (T) Regulatory approvals received. Not under construction | ISNE | 41.732 | -70.894 | 2026-09 |
| 70437/GROTN | Groton Flanders Road Landfill | GROTN | 70437 | CT | New London | NJR Clean Energy Ventures Corporation | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 41.35 | -72.05 | 2026-09 |
| 69825/MADCR | Madden Creek Solar | MADCR | 69825 | IL | Piatt | Madden Creek Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-08 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 40.201889 | -88.46611 | 2026-09 |
| 70402/LOGN | Logging Swamp North | LOGN | 70402 | MA | Plymouth | CleanCapital Holdings | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-08 | 2027 | (T) Regulatory approvals received. Not under construction | ISNE | 41.775 | -70.881 | 2026-09 |
| 70404/LOGS | Logging Swamp South | LOGS | 70404 | MA | Plymouth | CleanCapital Holdings | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-08 | 2027 | (T) Regulatory approvals received. Not under construction | ISNE | 41.774 | -70.88 | 2026-09 |
| 69894/13PV1 | E 1300 Street Solar LLC | 13PV1 | 69894 | IL | Henry | HQCA Energy Solutions, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 41.310529 | -90.18478 | 2026-09 |
| 70134/243 | Westhampton - NY 0243 (Giaquinto 1) | 243 | 70134 | NY | Suffolk | CVE US NY Westhampton 243 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.83636 | -72.69044 | 2026-09 |
| 69859/MURP1 | Murphysboro 1 | MURP1 | 69859 | IL | Jackson | Navisun LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 37.794585 | -89.35141 | 2026-09 |
| 70027/CORT2 | Cortland CSG 2 LLC | CORT2 | 70027 | NY | Cortland | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.54409 | -75.99276 | 2026-09 |
| 70130/141 | Suffolk - VA 0141 (Johnson South) | 141 | 70130 | VA | Suffolk City | CVE US VA Suffolk 141 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | TVA | 36.70257 | -76.79211 | 2026-09 |
| 70132/426 | Waynesboro - VA 0426 (Patterson B) | 426 | 70132 | VA | Augusta | CVE US VA Patterson 426 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 38.14701 | -78.87457 | 2026-09 |
| 58151/STG03 | Central Utility Plant - Texas A&M | STG03 | 58151 | TX | Brazos | Texas A&M, Utilities & Energy Services | Commercial CHP | Natural Gas Fired Combined Cycle | NG | CA | 5 | 5 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ERCO | 30.617778 | -96.34333 | 2026-09 |
| 64615/1 | Sanford ESS, LLC | 1 | 64615 | ME | York | Sanford ESS, LLC | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | ISNE | 43.407648 | -70.71209 | 2026-09 |
| 67647/KINGL | Kinglet | KINGL | 67647 | VA | Stafford | Cypress Creek Renewables | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 38.350511 | -77.47619 | 2026-09 |
| 68859/PV1 | Endicott | PV1 | 68859 | NY | Broome | Endicott NY Solar Farm, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.139575 | -76.09664 | 2026-09 |
| 68861/PV1 | Tully 4 | PV1 | 68861 | NY | Onondaga | CP Tully Four LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.810918 | -76.12014 | 2026-09 |
| 68862/PV1 | Emerson NY | PV1 | 68862 | NY | Columbia | Emerson Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.275414 | -73.73512 | 2026-09 |
| 69158/REEDR | SV CSG Reeder Solar | REEDR | 69158 | IL | Knox | SV CSG Reeder Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 40.92886 | -90.49347 | 2026-09 |
| 69817/SANNE | SV CSG St Anne 1 | SANNE | 69817 | IL | Kankakee | SV CSG St Anne 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 41.041 | -87.6999 | 2026-09 |
| 69948/MANTB | SV CSG Manteno | MANTB | 69948 | IL | Kankakee | SV CSG Manteno, LLC | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 41.221257 | -87.88186 | 2026-09 |
| 69948/MANTO | SV CSG Manteno | MANTO | 69948 | IL | Kankakee | SV CSG Manteno, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 41.221257 | -87.88186 | 2026-09 |
| 69949/BLOMB | SV CSG Bloomington | BLOMB | 69949 | IL | McLean | SV CSG Bloomington, LLC | IPP Non-CHP | Batteries | MWH | BA | 5 | 5 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 40.465889 | -89.03208 | 2026-09 |
| 69949/BLOOM | SV CSG Bloomington | BLOOM | 69949 | IL | McLean | SV CSG Bloomington, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 40.465889 | -89.03208 | 2026-09 |
| 69816/WILSN | SV CSG Wilson School Solar | WILSN | 69816 | IL | Kane | SV CSG Wilson School Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2028-01 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 42.053991 | -88.35269 | 2026-09 |
| 69821/SROX | SV CSG South Roxana | SROX | 69821 | IL | Madison | SV CSG South Roxana, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2028-01 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 38.811582 | -90.0515 | 2026-09 |
| 64067/AUBPV | Auburn PV - BD Solar Auburn LLC | AUBPV | 64067 | ME | Androscoggin | BD Solar Auburn LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | ISNE | 44.05 | -70.3 | 2026-09 |
| 64071/LJNPV | Lewiston Jn PV - BD Solar Lewiston Jn LL | LJNPV | 64071 | ME | Androscoggin | BD Solar Lewiston Junction LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2028-03 | 2028 | (L) Regulatory approvals pending. Not under construction | ISNE | 44.05 | -70.3 | 2026-09 |
| 62430/NA1 | Grenada Lake Hydroelectric Project | NA1 | 62430 | MS | Grenada | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 5 | 4 | 2028-04 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 33.808842 | -89.77246 | 2026-09 |
| 62430/NA2 | Grenada Lake Hydroelectric Project | NA2 | 62430 | MS | Grenada | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 5 | 4 | 2028-05 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 33.808842 | -89.77246 | 2026-09 |
| 68864/PV1 | Bridgewater 2 | PV1 | 68864 | NY | Saratoga | Bridgewater Solar 2, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.831613 | -73.67479 | 2026-09 |
| 68865/PV1 | Bridgewater 1 | PV1 | 68865 | NY | Saratoga | Bridgewater Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 5 | 5 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.831613 | -73.67479 | 2026-09 |
| 68277/1 | Brookings Solar | 1 | 68277 | SD | Brookings | Western Minnesota Mun Pwr Agny | Electric Utility | Solar Photovoltaic | SUN | PV | 4.9 | 4.9 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | SWPP | 44.340596 | -96.72945 | 2026-09 |
| 68392/IL2PV | IL2 - W109 | IL2PV | 68392 | IL | Will | Madison Energy Investments LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.9 | 4.9 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.470454 | -88.02366 | 2026-09 |
| 70010/167 | Pescara 1 | 167 | 70010 | NY | Orleans | Pescara 1 Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.9 | 4.9 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.304517 | -78.2196 | 2026-09 |
| 70011/168 | Pescara 2 | 168 | 70011 | NY | Orleans | Pescara 2 Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.9 | 4.9 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.30713 | -78.22121 | 2026-09 |
| 70242/215 | Riverhead - CVE | 215 | 70242 | NY | Suffolk | CVE US NY Riverhead 215 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.9 | 4.9 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 40.94233 | -72.71824 | 2026-09 |
| 68208/LRZBR | City of Little Rock Solar Array | LRZBR | 68208 | AR | Pulaski | City of Little Rock - (AR) | Electric Utility | Solar Photovoltaic | SUN | PV | 4.9 | 4.9 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 34.69761 | -92.21437 | 2026-09 |
| 70491/11558 | Hacadam Hill Solar | 11558 | 70491 | NY | Herkimer | Hacadam Hill Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.9 | 4.9 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.015718 | -75.19334 | 2026-09 |
| 70327/ND012 | Heron Clean Energy, LLC | ND012 | 70327 | NY | Kings | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.9 | 4.9 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.618159 | -73.93242 | 2026-09 |
| 70442/11224 | KN216 | 11224 | 70442 | IL | Kane | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.9 | 4.9 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 41.852991 | -88.43975 | 2026-09 |
| 70490/11886 | Grassy Grove Solar East | 11886 | 70490 | NY | St Lawrence | Grassy Grove Solar East, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.9 | 4.9 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 44.612392 | -75.15269 | 2026-09 |
| 70328/ND013 | Jamaica Community Energy, LLC | ND013 | 70328 | NY | Kings | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.9 | 4.9 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.637975 | -73.92817 | 2026-09 |
| 68870/PV1 | Watson 2 | PV1 | 68870 | NY | Broome | NY Union II, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.9 | 4.9 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.124945 | -75.99177 | 2026-09 |
| 64541/1 | Potic Solar | 1 | 64541 | NY | Greene | FPS Potic Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.9 | 4.9 | 2027-07 | 2027 | (L) Regulatory approvals pending. Not under construction | NYIS | 42.29559 | -73.9012 | 2026-09 |
| 70312/ND022 | Lobelia Clean Energy LLC | ND022 | 70312 | NY | Bronx | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.9 | 4.9 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.853531 | -73.89531 | 2026-09 |
| 70313/ND024 | Lobelia 4452 Clean Energy LLC | ND024 | 70313 | NY | Bronx | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.9 | 4.9 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.853722 | -73.89525 | 2026-09 |
| 70322/ND025 | Wintergreen Clean Energy, LLC | ND025 | 70322 | NY | Bronx | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.9 | 4.9 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.812557 | -73.89 | 2026-09 |
| 70323/ND027 | Wintergreen B Clean Energy LLC | ND027 | 70323 | NY | Bronx | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.9 | 4.9 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.812516 | -73.89011 | 2026-09 |
| 70324/ND023 | Wintergreen C Clean Energy LLC | ND023 | 70324 | NY | Bronx | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.9 | 4.9 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.812516 | -73.89011 | 2026-09 |
| 70325/ND026 | Wintergreen D Clean Energy LLC | ND026 | 70325 | NY | Bronx | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.9 | 4.9 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.812516 | -73.89011 | 2026-09 |
| 70308/ND030 | Blue Aster Clean Energy LLC | ND030 | 70308 | NY | Kings | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.9 | 4.9 | 2027-08 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.674137 | -73.90102 | 2026-09 |
| 70309/ND031 | Blue Aster B Clean Energy LLC | ND031 | 70309 | NY | Kings | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.9 | 4.9 | 2027-08 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.674137 | -73.90102 | 2026-09 |
| 70310/ND028 | Blue Aster C Clean Energy LLC | ND028 | 70310 | NY | Kings | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.9 | 4.9 | 2027-08 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.674137 | -73.90102 | 2026-09 |
| 67749/TWISS | Pistachio Road 1726-WD | TWISS | 67749 | CA | Kern | Russell Pacific LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.8 | 4.8 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 35.70789 | -119.8917 | 2026-09 |
| 68230/DESAR | SR Des Arc | DESAR | 68230 | AR | Prairie | SR Des Arc, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.8 | 4.8 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 34.977439 | -91.52516 | 2026-09 |
| 67134/MARSH | SR Marshall, LLC | MARSH | 67134 | MS | Marshall | SR Marshall, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.8 | 4.8 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | TVA | 34.959526 | -89.58856 | 2026-09 |
| 68256/SBAST | SR South Bastrop | SBAST | 68256 | LA | Morehouse | SR South Bastrop, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.8 | 4.8 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 32.747456 | -91.91091 | 2026-09 |
| 68257/WINN | SR Winnsboro | WINN | 68257 | LA | Franklin | SR Winnsboro, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.8 | 4.8 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 32.159745 | -91.67586 | 2026-09 |
| 68869/PV1 | Watson 1 | PV1 | 68869 | NY | Broome | NY Union I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.8 | 4.8 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.124945 | -75.99177 | 2026-09 |
| 70116/GEN1 | La Junta Solar | GEN1 | 70116 | CO | Otero | Clay Creek Energy, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.8 | 4.8 | 2027-04 | 2027 | (L) Regulatory approvals pending. Not under construction | WACM | 38.038 | -103.5237 | 2026-09 |
| 70117/GEN1 | Lamar Solar | GEN1 | 70117 | CO | Prowers | Clay Creek Energy, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.8 | 4.8 | 2027-04 | 2027 | (L) Regulatory approvals pending. Not under construction | WACM | 38.043192 | -102.5922 | 2026-09 |
| 68557/FORRC | SR Forrest City | FORRC | 68557 | AR | St Francis | SR Forrest City, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.8 | 4.8 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 34.984256 | -90.78602 | 2026-09 |
| 68569/ULM | SR Ulm | ULM | 68569 | AR | Prairie | SR Ulm, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.8 | 4.8 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 34.577902 | -91.45184 | 2026-09 |
| 68570/WHELN | SR West Helena | WHELN | 68570 | AR | Phillips | SR West Helena, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.8 | 4.8 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 34.552639 | -90.68421 | 2026-09 |
| 69704/RC-1 | R.C. Byrd L&D Hydroelectric Project | RC-1 | 69704 | WV | Mason | Ohio Power and Light LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 4.8 | 4.8 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 38.68 | -82.179 | 2026-09 |
| 69704/RC-2 | R.C. Byrd L&D Hydroelectric Project | RC-2 | 69704 | WV | Mason | Ohio Power and Light LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 4.8 | 4.8 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 38.68 | -82.179 | 2026-09 |
| 69704/RC-3 | R.C. Byrd L&D Hydroelectric Project | RC-3 | 69704 | WV | Mason | Ohio Power and Light LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 4.8 | 4.8 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 38.68 | -82.179 | 2026-09 |
| 69704/RC-4 | R.C. Byrd L&D Hydroelectric Project | RC-4 | 69704 | WV | Mason | Ohio Power and Light LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 4.8 | 4.8 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 38.68 | -82.179 | 2026-09 |
| 69704/RC-5 | R.C. Byrd L&D Hydroelectric Project | RC-5 | 69704 | WV | Mason | Ohio Power and Light LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 4.8 | 4.8 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 38.68 | -82.179 | 2026-09 |
| 69704/RC-6 | R.C. Byrd L&D Hydroelectric Project | RC-6 | 69704 | WV | Mason | Ohio Power and Light LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 4.8 | 4.8 | 2029-02 | 2029 | (L) Regulatory approvals pending. Not under construction | PJM | 38.68 | -82.179 | 2026-09 |
| 66618/FL3 | Fish Lake Geothermal | FL3 | 66618 | NV | Esmeralda | Fish Lake Geothermal LLC | IPP Non-CHP | Geothermal | GEO | ST | 4.7 | 3.4 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NEVP | 37.860925 | -118.0341 | 2026-09 |
| 70048/AIREX | City of Milwaukee- Airport Expansion | AIREX | 70048 | WI | Milwaukee | WEC: City of Milwaukee - Airport Expansion | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.6 | 4.6 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 42.930271 | -87.88801 | 2026-09 |
| 70585/TRIGO | Trigo Sol Solar CSG | TRIGO | 70585 | NM | Valencia | Trigo Sol Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.6 | 4.6 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PNM | 34.659066 | -106.7352 | 2026-09 |
| 69195/LONTB | Longtown Energy Storage | LONTB | 69195 | SC | Fairfield | Duke Energy Carolinas, LLC | Electric Utility | Batteries | MWH | BA | 4.5 | 4.5 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | DUK | 34.416433 | -80.86814 | 2026-09 |
| 69828/MEXIC | Mexico PV, LLC | MEXIC | 69828 | NY | Oswego | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.5 | 4.5 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.429675 | -76.16547 | 2026-09 |
| 69932/CSTLO | Castle Rock Lake Solar | CSTLO | 69932 | WI | Juneau | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.5 | 4.5 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 43.972048 | -90.06761 | 2026-09 |
| 70488/BOBW | IL - Renewable Properties - Bobcat - Wes | BOBW | 70488 | IL | Lake | RPIL Solar 14, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.5 | 4.5 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 42.463396 | -87.92959 | 2026-09 |
| 69174/11238 | Arlington 1 | 11238 | 69174 | IL | Bureau | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.5 | 4.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 41.454037 | -89.29509 | 2026-09 |
| 69175/11239 | Arlington 2 | 11239 | 69175 | IL | Bureau | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.5 | 4.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 41.454503 | -89.29475 | 2026-09 |
| 69207/11215 | Osman Trust | 11215 | 69207 | IL | McHenry | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.5 | 4.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 42.267124 | -88.45245 | 2026-09 |
| 70357/PS58 | Pivot Solar 58 LLC | PS58 | 70357 | CO | Weld | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.5 | 4.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PSCO | 40.474398 | -104.623 | 2026-09 |
| 70498/LS3 | Ladd Solar 3 | LS3 | 70498 | IL | Bureau | Ladd Solar 3, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.5 | 4.5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 41.40225 | -89.22147 | 2026-09 |
| 68972/11253 | Gilman Solar LLC | 11253 | 68972 | IL | Iroquois | Gilman Solar LLC PV | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.5 | 4.5 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 40.764392 | -87.99916 | 2026-09 |
| 68243/BEAR | SR Bear Creek | BEAR | 68243 | AL | Marion | SR Bear Creek, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.5 | 4.5 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | SOCO | 34.275559 | -87.70564 | 2026-09 |
| 62401/NA1 | Allegheny L&D2 Hydroelectric Project | NA1 | 62401 | PA | Allegheny | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 4.5 | 2.5 | 2030-11 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.89444 | -79.91361 | 2026-09 |
| 62401/NA2 | Allegheny L&D2 Hydroelectric Project | NA2 | 62401 | PA | Allegheny | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 4.5 | 2.5 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 40.89444 | -79.91361 | 2026-09 |
| 70311/ND020 | Eastern BlueBird Clean Energy LLC | ND020 | 70311 | NY | Bronx | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.4 | 4.4 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.884948 | -73.82901 | 2026-09 |
| 70315/ND021 | Northern Cardinal Clean Energy, LLC | ND021 | 70315 | NY | Bronx | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 4.4 | 4.4 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.884948 | -73.82901 | 2026-09 |
| 56615/G200 | Rancho Penasquitos | G200 | 56615 | CA | San Diego | San Diego County Water Auth | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 4.3 | 4.1 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 32.93695 | -117.1137 | 2026-09 |
| 69276/23219 | SL Ashville 2 | 23219 | 69276 | NY | Chautauqua | SL Ashville 2, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.3 | 4.3 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 42.071667 | -79.41167 | 2026-09 |
| 69473/23211 | SL Brockport | 23211 | 69473 | NY | Monroe | SL Brockport, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.3 | 4.3 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.201111 | -77.89806 | 2026-09 |
| 69889/USGOL | USS Gold Solar | USGOL | 69889 | NM | Luna | USS Gold Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.3 | 4.3 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PNM | 32.26144 | -107.7778 | 2026-09 |
| 68567/SUNST | SR Sunset | SUNST | 68567 | LA | St Landry | SR Sunset, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.3 | 4.3 | 2027-12 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 30.421588 | -92.07507 | 2026-09 |
| 70516/PV1 | Fry Ontario Solar Project | PV1 | 70516 | OR | Malheur | Fry Foods, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4.2 | 4.2 | 2027-03 | 2027 | (TS) Construction complete, but not yet in commercial operation | IPCO | 44.0926 | -117.0344 | 2026-09 |
| 52021/GEN3 | ITT Cogen Facility | GEN3 | 52021 | IL | Cook | ITT Energy Tech Partners, LLC | Commercial CHP | Natural Gas Internal Combustion Engine | NG | IC | 4.1 | 4.1 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 41.83442 | -87.62847 | 2026-09 |
| 52021/GEN4 | ITT Cogen Facility | GEN4 | 52021 | IL | Cook | ITT Energy Tech Partners, LLC | Commercial CHP | Natural Gas Internal Combustion Engine | NG | IC | 4.1 | 4.1 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 41.83442 | -87.62847 | 2026-09 |
| 68195/DEAVE | Delaware Ave Solar | DEAVE | 68195 | DE | Kent | Delaware Ave Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 38.930578 | -75.57075 | 2026-09 |
| 70201/PS50 | Pivot Solar 50 LLC | PS50 | 70201 | CO | Weld | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PSCO | 40.3657 | -104.6336 | 2026-09 |
| 70242/216 | Riverhead - CVE | 216 | 70242 | NY | Suffolk | CVE US NY Riverhead 215 LLC | IPP Non-CHP | Batteries | MWH | BA | 4 | 4 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 40.94233 | -72.71824 | 2026-09 |
| 70380/GEN4 | Kraemer Garden | GEN4 | 70380 | MN | Stearns | Bullrock-NxtGenREA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 45.53123 | -94.24932 | 2026-09 |
| 69204/11241 | Little Creek | 11241 | 69204 | IL | McDonough | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 40.564286 | -90.88035 | 2026-09 |
| 69309/23215 | SL Pembroke | 23215 | 69309 | NY | Genesee | SL Pembroke, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.028056 | -78.45694 | 2026-09 |
| 70510/MCD4 | McDonough Solar 4 LLC | MCD4 | 70510 | IL | McDonough | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 40.447671 | -90.7127 | 2026-09 |
| 70550/9014 | Meadow Creek VA BESS 1 | 9014 | 70550 | VA | Craig | Meadow Creek VA BESS 1 LLC | IPP Non-CHP | Batteries | MWH | BA | 4 | 4 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 37.4897 | -80.1189 | 2026-09 |
| 70551/90915 | Piney River VA BESS 1 | 90915 | 70551 | VA | Nelson | Piney River VA BESS 1 LLC | IPP Non-CHP | Batteries | MWH | BA | 4 | 4 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 37.7187 | -79.0054 | 2026-09 |
| 70552/90913 | Colleen VA BESS 1 | 90913 | 70552 | VA | Nelson | Colleen VA BESS 1 LLC | IPP Non-CHP | Batteries | MWH | BA | 4 | 4 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 37.7103 | -78.9463 | 2026-09 |
| 70553/90912 | Salem VA BESS 1 | 90912 | 70553 | VA | Salem City | Salem VA BESS 1 LLC | IPP Non-CHP | Batteries | MWH | BA | 4 | 4 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 37.2892 | -80.03 | 2026-09 |
| 68196/RIFPV | Rifle Range Road Solar | RIFPV | 68196 | DE | Sussex | Rifle Range Road Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 38.725699 | -75.57144 | 2026-09 |
| 69620/WTS2 | Waterton Solar II | WTS2 | 69620 | CO | Douglas | Public Service Co of Colorado | Electric Utility | Solar Photovoltaic | SUN | PV | 4 | 4 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 39.5 | -105.07 | 2026-09 |
| 70504/PV1 | EESolar33 | PV1 | 70504 | MN | Steele | EESolar33 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 44.122066 | -93.27361 | 2026-09 |
| 70374/CSC52 | Chaberton Solar Crestone | CSC52 | 70374 | DE | Kent | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 38.946876 | -75.57677 | 2026-09 |
| 70104/PS53 | Pivot Solar 53 LLC | PS53 | 70104 | CO | Adams | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | PSCO | 39.748549 | -104.6673 | 2026-09 |
| 68219/SNIES | Snipatuit Road Solar | SNIES | 68219 | MA | Plymouth | Agilitas Energy, Inc. | IPP Non-CHP | Batteries | MWH | BA | 4 | 4 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | ISNE | 41.768 | -70.882 | 2026-09 |
| 68219/SNIPV | Snipatuit Road Solar | SNIPV | 68219 | MA | Plymouth | Agilitas Energy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | ISNE | 41.768 | -70.882 | 2026-09 |
| 69293/WTS1 | Waterton Solar I | WTS1 | 69293 | CO | Douglas | Public Service Co of Colorado | Electric Utility | Solar Photovoltaic | SUN | PV | 4 | 4 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 39.5 | -105.07 | 2026-09 |
| 65710/PTNM | Putnam Meadow Solar Station | PTNM | 65710 | CT | Windham | Putnam Meadow Solar Station, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2027-04 | 2027 | (L) Regulatory approvals pending. Not under construction | ISNE | 41.902261 | -71.91154 | 2026-09 |
| 68211/GRER | Grears Corner Solar | GRER | 68211 | DE | New Castle | Grears Corner Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2027-05 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 39.380083 | -75.70611 | 2026-09 |
| 70461/PLNFD | Plainfield Solar One | PLNFD | 70461 | CT | Windham | NJR Clean Energy Ventures Corporation | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 41.65 | -71.95 | 2026-09 |
| 66513/18229 | MA Acushnet 540R Main St | 18229 | 66513 | MA | Bristol | TJA 540R Main St. Acushnet, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2027-06 | 2027 | (L) Regulatory approvals pending. Not under construction | ISNE | 41.702987 | -70.8888 | 2026-09 |
| 65146/VCP16 | CT Airport Authority Solar One | VCP16 | 65146 | CT | Hartford | CAA CT Solar One, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 4 | 4 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | ISNE | 41.933776 | -72.6714 | 2026-09 |
| 69593/1 | MCCo BESS Generating Facility | 1 | 69593 | OH | Cuyahoga | The Medical Center Company | IPP Non-CHP | Batteries | MWH | BA | 3.9 | 3.9 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.3026 | -81.3604 | 2026-09 |
| 69593/2 | MCCo BESS Generating Facility | 2 | 69593 | OH | Cuyahoga | The Medical Center Company | IPP Non-CHP | Batteries | MWH | BA | 3.9 | 3.9 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.3026 | -81.3604 | 2026-09 |
| 69593/3 | MCCo BESS Generating Facility | 3 | 69593 | OH | Cuyahoga | The Medical Center Company | IPP Non-CHP | Batteries | MWH | BA | 3.9 | 3.9 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.3026 | -81.3604 | 2026-09 |
| 69593/4 | MCCo BESS Generating Facility | 4 | 69593 | OH | Cuyahoga | The Medical Center Company | IPP Non-CHP | Batteries | MWH | BA | 3.9 | 3.9 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.3026 | -81.3604 | 2026-09 |
| 68936/NAP1 | SV CSG Naplate | NAP1 | 68936 | IL | LaSalle | SV CSG Naplate, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.9 | 3.9 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 41.332158 | -88.88482 | 2026-09 |
| 68519/MDNA3 | Madena 3 | MDNA3 | 68519 | CA | Yuba | ZGlobal Inc | IPP Non-CHP | Batteries | MWH | BA | 3.9 | 3.9 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 39.026009 | -121.5441 | 2026-09 |
| 69137/ALP2 | Althea Avenue Solar | ALP2 | 69137 | CA | Fresno | RPCA Solar 8, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.9 | 3.9 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 36.893121 | -120.6569 | 2026-09 |
| 69871/BAT1 | Tanglewood BESS | BAT1 | 69871 | NC | Pasquotank | North Carolina El Member Corp | Electric Utility | Batteries | MWH | BA | 3.9 | 3.9 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 36.272111 | -76.30127 | 2026-09 |
| 69872/BAT1 | Windsor BESS | BAT1 | 69872 | NC | Bertie | North Carolina El Member Corp | Electric Utility | Batteries | MWH | BA | 3.9 | 3.9 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 36.025838 | -76.98179 | 2026-09 |
| 70320/ND018 | Water Willow A Clean Energy LLC | ND018 | 70320 | NY | Queens | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 3.9 | 3.9 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.708897 | -73.77939 | 2026-09 |
| 70321/ND019 | Water Willow B Clean Energy LLC | ND019 | 70321 | NY | Queens | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 3.9 | 3.9 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.708897 | -73.77939 | 2026-09 |
| 69275/23210 | SL Ashville | 23210 | 69275 | NY | Chautauqua | SL Ashville, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.8 | 3.8 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 42.071667 | -79.41167 | 2026-09 |
| 69935/GILMN | Gilman | GILMN | 69935 | WI | Chippewa | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.8 | 3.8 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 45.119204 | -90.87405 | 2026-09 |
| 70019/23221 | SL Portland Community 2, LLC | 23221 | 70019 | NY | Chautauqua | SL Portland Community 2, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.8 | 3.8 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.37773 | -79.45972 | 2026-09 |
| 7907/4 | Pine Flat | 4 | 7907 | CA | Fresno | Kings River Conservation Dist | Electric Utility | Conventional Hydroelectric | WAT | HY | 3.8 | 3.8 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | CISO | 36.8326 | -119.327 | 2026-09 |
| 70326/ND014 | Coral Honeysuckle Clean Energy LLC | ND014 | 70326 | NY | Queens | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 3.7 | 3.7 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | NYIS | 40.679023 | -73.82032 | 2026-09 |
| 70329/ND015 | Linden Clean Energy, LLC | ND015 | 70329 | NY | Queens | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 3.7 | 3.7 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | NYIS | 40.679074 | -73.82041 | 2026-09 |
| 69811/ANGEL | SV CSG Angelly 1 | ANGEL | 69811 | IL | Saline | SV CSG Angelly 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.6 | 3.6 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 37.7164 | -88.5303 | 2026-09 |
| 70497/GF1 | Greenfield Solar 1 (IL) | GF1 | 70497 | IL | Greene | Greenfield Solar 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.6 | 3.6 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 39.360626 | -90.25397 | 2026-09 |
| 70202/PS56 | Pivot Solar 56 LLC | PS56 | 70202 | CO | Weld | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.6 | 3.6 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PSCO | 40.350547 | -104.7226 | 2026-09 |
| 69472/18198 | NYSolar06 | 18198 | 69472 | NY | Erie | NYSolar06, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.5 | 3.5 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.021667 | -78.98806 | 2026-09 |
| 70103/PS43 | Pivot Solar 43 LLC | PS43 | 70103 | CO | Adams | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.5 | 3.5 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PSCO | 39.748549 | -104.6673 | 2026-09 |
| 70018/23216 | SL Portland Community, LLC | 23216 | 70018 | NY | Chautauqua | SL Portland Community, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.5 | 3.5 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.383832 | -79.4718 | 2026-09 |
| 69810/MAHOM | SV CSG Mahomet | MAHOM | 69810 | IL | Champaign | SV CSG Mahomet, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.5 | 3.5 | 2028-01 | 2028 | (L) Regulatory approvals pending. Not under construction | MISO | 40.193189 | -88.37984 | 2026-09 |
| 2185/HAU9 | Hauser | HAU9 | 2185 | MT | Lewis and Clark | NorthWestern Energy (MT Hydro) | Electric Utility | Conventional Hydroelectric | WAT | HY | 3.5 | 3.5 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | NWMT | 46.765941 | -111.8873 | 2026-09 |
| 65060/VCP02 | Hope Solar One | VCP02 | 65060 | RI | Providence | Hope Solar One, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.5 | 3.5 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | ISNE | 41.729285 | -71.63759 | 2026-09 |
| 2185/HAU12 | Hauser | HAU12 | 2185 | MT | Lewis and Clark | NorthWestern Energy (MT Hydro) | Electric Utility | Conventional Hydroelectric | WAT | HY | 3.5 | 3.5 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | NWMT | 46.765941 | -111.8873 | 2026-09 |
| 70228/LOCKW | AC IL - Lockport West | LOCKW | 70228 | IL | Will | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.4 | 3.4 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.5944 | -88.0624 | 2026-09 |
| 54224/EG11 | Franklin Heating Station | EG11 | 54224 | MN | Olmsted | Franklin Heating Station | Commercial CHP | Petroleum Liquids | DFO | IC | 3.4 | 3.4 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 44.020576 | -92.4656 | 2026-09 |
| 54224/EG12 | Franklin Heating Station | EG12 | 54224 | MN | Olmsted | Franklin Heating Station | Commercial CHP | Petroleum Liquids | DFO | IC | 3.4 | 3.4 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 44.020576 | -92.4656 | 2026-09 |
| 54224/EG13 | Franklin Heating Station | EG13 | 54224 | MN | Olmsted | Franklin Heating Station | Commercial CHP | Petroleum Liquids | DFO | IC | 3.4 | 3.4 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 44.020576 | -92.4656 | 2026-09 |
| 54224/EG14 | Franklin Heating Station | EG14 | 54224 | MN | Olmsted | Franklin Heating Station | Commercial CHP | Petroleum Liquids | DFO | IC | 3.4 | 3.4 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 44.020576 | -92.4656 | 2026-09 |
| 54224/EG15 | Franklin Heating Station | EG15 | 54224 | MN | Olmsted | Franklin Heating Station | Commercial CHP | Petroleum Liquids | DFO | IC | 3.4 | 3.4 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 44.020576 | -92.4656 | 2026-09 |
| 68884/PV1 | Glen Mary | PV1 | 68884 | NY | Tioga | NY Tioga IV, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.4 | 3.4 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.128604 | -76.27895 | 2026-09 |
| 69271/STAG1 | Staghorn Gas | STAG1 | 69271 | TX | Ward | RPC Merchant, LLC | IPP Non-CHP | Natural Gas Internal Combustion Engine | NG | IC | 3.3 | 3.3 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.457838 | -103.0847 | 2026-09 |
| 69271/STAG2 | Staghorn Gas | STAG2 | 69271 | TX | Ward | RPC Merchant, LLC | IPP Non-CHP | Natural Gas Internal Combustion Engine | NG | IC | 3.3 | 3.3 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.457838 | -103.0847 | 2026-09 |
| 69271/STAG3 | Staghorn Gas | STAG3 | 69271 | TX | Ward | RPC Merchant, LLC | IPP Non-CHP | Natural Gas Internal Combustion Engine | NG | IC | 3.3 | 3.3 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 31.457838 | -103.0847 | 2026-09 |
| 69854/GLWAY | TJA-NY-1806 Perth Rd Galway, LLC | GLWAY | 69854 | NY | Saratoga | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.3 | 3.3 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | NYIS | 43.017403 | -74.05131 | 2026-09 |
| 70457/DEVIZ | DeVillez | DEVIZ | 70457 | IL | Saline | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.3 | 3.3 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 37.7685 | -88.5155 | 2026-09 |
| 69881/USHER | USS Hermanas Solar | USHER | 69881 | NM | Luna | USS Hermanas Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.3 | 3.3 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PNM | 32.210444 | -107.8114 | 2026-09 |
| 70439/PV1 | SR 415 - NY Avoca I | PV1 | 70439 | NY | Steuben | NY Avoca I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.3 | 3.3 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.401191 | -77.41787 | 2026-09 |
| 70317/ND029 | Roseate Tern Clean Energy LLC | ND029 | 70317 | NY | Bronx | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 3.3 | 3.3 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.715572 | -73.88673 | 2026-09 |
| 66618/FL1 | Fish Lake Geothermal | FL1 | 66618 | NV | Esmeralda | Fish Lake Geothermal LLC | IPP Non-CHP | Geothermal | GEO | ST | 3.3 | 2.1 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NEVP | 37.860925 | -118.0341 | 2026-09 |
| 66618/FL2 | Fish Lake Geothermal | FL2 | 66618 | NV | Esmeralda | Fish Lake Geothermal LLC | IPP Non-CHP | Geothermal | GEO | ST | 3.3 | 2.9 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NEVP | 37.860925 | -118.0341 | 2026-09 |
| 69861/NORR2 | Norris City 2 | NORR2 | 69861 | IL | White | Navisun LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.2 | 3.2 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 38.020585 | -88.27321 | 2026-09 |
| 70227/LOCKE | AC IL - Lockport East | LOCKE | 70227 | IL | Will | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.1 | 3.1 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.6044 | -88.0603 | 2026-09 |
| 70339/IL55B | Pivot Energy IL 55 LLC | IL55B | 70339 | IL | McHenry | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3.1 | 3.1 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 42.339848 | -88.50452 | 2026-09 |
| 54224/DG9 | Franklin Heating Station | DG9 | 54224 | MN | Olmsted | Franklin Heating Station | Commercial CHP | Petroleum Liquids | DFO | IC | 3.1 | 3.1 | 2028-01 | 2028 | (T) Regulatory approvals received. Not under construction | MISO | 44.020576 | -92.4656 | 2026-09 |
| 68070/ALBER | Alberta Solar | ALBER | 68070 | VA | Brunswick | Dominion Renewable Energy | Electric Utility | Solar Photovoltaic | SUN | PV | 3 | 3 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 36.841728 | -77.91051 | 2026-09 |
| 69937/MNDVI | Mondovi | MNDVI | 69937 | WI | Buffalo | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 44.569282 | -91.70856 | 2026-09 |
| 70486/WHWIL | IL - Renewable Properties - Bobcat - Whi | WHWIL | 70486 | IL | Grundy | RPIL Solar 9, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.470074 | -88.42523 | 2026-09 |
| 66552/MH162 | EnerSmart Mesa Heights Sub Station | MH162 | 66552 | CA | San Diego | EnerSmart Storage | IPP Non-CHP | Batteries | MWH | BA | 3 | 3 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 32.82412 | -117.1513 | 2026-09 |
| 68018/MRCDB | Merced BESS | MRCDB | 68018 | CA | Merced | ZGlobal Inc | IPP Non-CHP | Batteries | MWH | BA | 3 | 3 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 36.989396 | -120.8775 | 2026-09 |
| 69562/MINNE | Minneola Solar | MINNE | 69562 | CA | San Bernardino | Minneola Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 34.846914 | -116.7698 | 2026-09 |
| 69855/POMFR | Pomfret PV, LLC | POMFR | 69855 | NY | Chautauqua | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | NYIS | 42.447083 | -79.35516 | 2026-09 |
| 69884/USMED | USS Meadow Lake Solar | USMED | 69884 | NM | Valencia | USS Meadow Lake Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PNM | 34.79756 | -106.6542 | 2026-09 |
| 69996/HEMLK | Penn Hemlock Solar LLC | HEMLK | 69996 | PA | Snyder | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.693001 | -77.10099 | 2026-09 |
| 70004/MONRO | Monroe Route 35 Solar LLC | MONRO | 70004 | PA | Juniata | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.685584 | -77.13704 | 2026-09 |
| 70006/PERRR | Perry Route 104 Solar LLC | PERRR | 70006 | PA | Snyder | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.740172 | -77.01011 | 2026-09 |
| 70487/TABER | NJ - CS Energy - Tabernacle Sands Solar | TABER | 70487 | NJ | Burlington | Tabernacle Sand Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 39.810889 | -74.69672 | 2026-09 |
| 70494/FMCS2 | Four Mile Creek Solar Two | FMCS2 | 70494 | IL | Jefferson | Four Mile Creek Solar Two, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 38.326811 | -88.75557 | 2026-09 |
| 2678/ENG13 | Plant No 1 Freeport | ENG13 | 2678 | NY | Nassau | Village of Freeport - (NY) | Electric Utility | Landfill Gas | LFG | IC | 3 | 3 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.6561 | -73.5922 | 2026-09 |
| 68140/CH547 | Melrose Park 2-SLCHI547 | CH547 | 68140 | IL | Cook | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.9809 | -87.8633 | 2026-09 |
| 69427/WAXWI | Waxwing Solar CSG | WAXWI | 69427 | CO | Pueblo | Waxwing Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PSCO | 38.2963 | -104.5525 | 2026-09 |
| 70477/20269 | Stone Elephant Solar WI, LLC | 20269 | 70477 | WI | Jefferson | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-01 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 42.852196 | -88.56412 | 2026-09 |
| 69369/BARTE | Bartell South PV I | BARTE | 69369 | NY | Onondaga | Bartell South PV I LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | NYIS | 43.208874 | -76.12219 | 2026-09 |
| 69749/U1 | Scholl Canyon | U1 | 69749 | CA | Los Angeles | City of Glendale - (CA) | Electric Utility | Landfill Gas | LFG | IC | 3 | 2.8 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | LDWP | 34.15638 | -118.1927 | 2026-09 |
| 69749/U2 | Scholl Canyon | U2 | 69749 | CA | Los Angeles | City of Glendale - (CA) | Electric Utility | Landfill Gas | LFG | IC | 3 | 2.8 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | LDWP | 34.15638 | -118.1927 | 2026-09 |
| 69749/U3 | Scholl Canyon | U3 | 69749 | CA | Los Angeles | City of Glendale - (CA) | Electric Utility | Landfill Gas | LFG | IC | 3 | 2.8 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | LDWP | 34.15638 | -118.1927 | 2026-09 |
| 69749/U4 | Scholl Canyon | U4 | 69749 | CA | Los Angeles | City of Glendale - (CA) | Electric Utility | Landfill Gas | LFG | IC | 3 | 2.8 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | LDWP | 34.15638 | -118.1927 | 2026-09 |
| 70008/WPERR | West Perry Planing Mill Road Solar LLC | WPERR | 70008 | PA | Snyder | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.689203 | -77.14223 | 2026-09 |
| 1263/9 | Belleville | 9 | 1263 | KS | Republic | City of Belleville - (KS) | Electric Utility | Petroleum Liquids | DFO | IC | 3 | 3 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | SWPP | 39.832769 | -97.63204 | 2026-09 |
| 69998/WHTCH | Franklin White Church Road Solar LLC | WHTCH | 69998 | PA | Snyder | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.780457 | -77.08402 | 2026-09 |
| 69999/GREEB | Greenwood Bottom Road Solar LLC | GREEB | 69999 | PA | Columbia | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.117527 | -76.48308 | 2026-09 |
| 70000/GREER | Greenwood Route 254 Solar LLC | GREER | 70000 | PA | Columbia | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.130477 | -76.51152 | 2026-09 |
| 70003/TAYLR | Madison Taylor Road Solar LLC | TAYLR | 70003 | PA | Columbia | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.112516 | -76.538 | 2026-09 |
| 70564/SALER | Salem Route 11 Solar LLC | SALER | 70564 | PA | Luzerne | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-03 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 41.072294 | -76.2001 | 2026-09 |
| 65828/1666 | Chidsey Hill Road Solar | 1666 | 65828 | NY | Steuben | NY Pulteney I, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | NYIS | 42.573062 | -77.16598 | 2026-09 |
| 68216/CUSES | Cushman Road Solar | CUSES | 68216 | MA | Plymouth | ReWild Renewables, LLC | IPP Non-CHP | Batteries | MWH | BA | 3 | 3 | 2027-05 | 2027 | (L) Regulatory approvals pending. Not under construction | ISNE | 41.732 | -70.875 | 2026-09 |
| 68216/CUSPV | Cushman Road Solar | CUSPV | 68216 | MA | Plymouth | ReWild Renewables, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-05 | 2027 | (L) Regulatory approvals pending. Not under construction | ISNE | 41.732 | -70.875 | 2026-09 |
| 69560/MAGNO | Sunrise Magnolia DE | MAGNO | 69560 | DE | Kent | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 39.071366 | -75.49303 | 2026-09 |
| 70005/SHOOF | Penn Shoofly Solar LLC | SHOOF | 70005 | PA | Columbia | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-05 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 41.115059 | -76.4738 | 2026-09 |
| 70105/GDNAB | Gardenia 1 | GDNAB | 70105 | CA | Kings | ZGlobal Inc | IPP Non-CHP | Batteries | MWH | BA | 3 | 3 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.790785 | -119.8777 | 2026-09 |
| 70105/GDNAS | Gardenia 1 | GDNAS | 70105 | CA | Kings | ZGlobal Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 35.790785 | -119.8777 | 2026-09 |
| 56895/7 | Ameresco Ox Mountain | 7 | 56895 | CA | San Mateo | AMERESCO Ox Mountain Energy LLC | IPP Non-CHP | Landfill Gas | LFG | IC | 3 | 2.8 | 2027-09 | 2027 | (L) Regulatory approvals pending. Not under construction | CISO | 37.5 | -122.4 | 2026-09 |
| 69994/MONTR | Montour Tower Drive Solar LLC | MONTR | 69994 | PA | Columbia | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-09 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 40.981975 | -76.52315 | 2026-09 |
| 70170/429 | Jones - PA 0429 (Rhodes South) | 429 | 70170 | PA | Elk | CVE US PA Jones 429 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-10 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.56421 | -78.69733 | 2026-09 |
| 69160/OTTA1 | SV CSG Ottawa 1 | OTTA1 | 69160 | IL | LaSalle | SV CSG Ottawa 1 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-11 | 2027 | (L) Regulatory approvals pending. Not under construction | MISO | 41.340799 | -88.77689 | 2026-09 |
| 69995/MUNCL | Muncy Creek Lime Bluff Road Solar | MUNCL | 69995 | PA | Lycoming | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 41.22184 | -76.75467 | 2026-09 |
| 70075/409 | Bigler - PA 0409 (Flango 1) | 409 | 70075 | PA | Clearfield | CVE US PA Bigler 409 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.803436 | -78.42275 | 2026-09 |
| 70079/151 | Buckingham - PA 0151 (Crea) | 151 | 70079 | PA | Wayne | CVE US PA BUCKINGHAM 151 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.86605 | -78.42275 | 2026-09 |
| 70080/396 | Burrell - PA 0396 (Copeland) | 396 | 70080 | PA | Armstrong | CVE US PA Burrell 396 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.65921 | -79.43822 | 2026-09 |
| 70081/379 | CVE US PA Dayton 379 | 379 | 70081 | PA | Armstrong | CVE US PA Dayton 379 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.89056 | -79.27027 | 2026-09 |
| 70083/399 | Jones - PA 0399 (Rhodes) | 399 | 70083 | PA | Elk | CVE US PA Jones 399 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.564214 | -78.69733 | 2026-09 |
| 70166/385 | Unity - PA 0385 (Soccerhound) | 385 | 70166 | PA | Clearfield | CVE US PA Latrobe 385 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.25174 | -79.35354 | 2026-09 |
| 70171/187 | Wetmore - PA 0187 (Chittester) | 187 | 70171 | PA | McKean | CVE US PA Kane 187 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.66753 | -78.73295 | 2026-09 |
| 70172/383 | Kittanning - PA 0383 (Hoeter) | 383 | 70172 | PA | Armstrong | CVE US PA Kittanning 383 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-11 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.82161 | -79.33393 | 2026-09 |
| 70077/437 | Bigler - PA 0437 (Flango 3) | 437 | 70077 | PA | Clearfield | CVE US PA Bigler 437 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.80344 | -78.42275 | 2026-09 |
| 70120/185 | New Alexandria - PA 0185 (Weimer) | 185 | 70120 | PA | Westmoreland | CVE US PA New Alexandria 185 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.40255 | -79.42805 | 2026-09 |
| 70169/486 | Monroe - PA 0486 (Acey) | 486 | 70169 | PA | Clarion | CVE US PA Monroe 486 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.13178 | -79.4476 | 2026-09 |
| 1263/7A | Belleville | 7A | 1263 | KS | Republic | City of Belleville - (KS) | Electric Utility | Petroleum Liquids | DFO | IC | 3 | 3 | 2028-01 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | SWPP | 39.832769 | -97.63204 | 2026-09 |
| 70076/436 | Bigler - PA 0436 (Flango 2) | 436 | 70076 | PA | Clearfield | CVE US PA Bigler 436 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2028-02 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.80344 | -78.42252 | 2026-09 |
| 70024/BEAVE | Beaver Gross Road Solar LLC | BEAVE | 70024 | PA | Snyder | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 40.747397 | -77.18922 | 2026-09 |
| 70028/CONRR | Delaware Conrath Road Solar LLC | CONRR | 70028 | PA | Northumberland | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 41.113012 | -76.85038 | 2026-09 |
| 69970/MPLRA | Maple Ridge A | MPLRA | 69970 | PA | Franklin | ENGIE Distributed Renewables Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2028-04 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PJM | 39.901992 | -77.578 | 2026-09 |
| 69971/MPLRB | Maple Ridge B | MPLRB | 69971 | PA | Franklin | ENGIE Distributed Renewables Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2028-04 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PJM | 39.901992 | -77.578 | 2026-09 |
| 70032/KEEFE | Liberty Keefer Mill Road Solar LLC | KEEFE | 70032 | PA | Montour | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2028-06 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 41.030468 | -76.68827 | 2026-09 |
| 62386/NA1 | Opekiska L&D Hydroelectric Project | NA1 | 62386 | WV | Monongalia | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 3 | 2 | 2028-08 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.564917 | -80.05114 | 2026-09 |
| 62386/NA2 | Opekiska L&D Hydroelectric Project | NA2 | 62386 | WV | Monongalia | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 3 | 2 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.564917 | -80.05114 | 2026-09 |
| 65313/ES | Elm Spring Solar 1 | ES | 65313 | VA | Augusta | Antares Group Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 38.0945 | -78.9595 | 2026-09 |
| 70164/406 | Kittanning - PA 0406 (Hoeter B) | 406 | 70164 | PA | Armstrong | CVE US PA Kittanning 406 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2028-12 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.82161 | -79.33393 | 2026-09 |
| 70165/407 | Kittanning - PA 0407 (Hoeter C) | 407 | 70165 | PA | Armstrong | CVE US PA Kittanning 407 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2028-12 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.82161 | -79.33393 | 2026-09 |
| 65312/SV | Shenvalee Solar | SV | 65312 | VA | Augusta | Antares Group Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 3 | 3 | 2029-12 | 2029 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 38.0249 | -79.0335 | 2026-09 |
| 69220/11253 | West Genesee | 11253 | 69220 | NY | Onondaga | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.9 | 2.9 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.165134 | -76.41876 | 2026-09 |
| 54808/STG1 | New York University Central Plant | STG1 | 54808 | NY | New York | New York University | Commercial Non-CHP | Natural Gas Fired Combined Cycle | NG | CA | 2.9 | 1.8 | 2027-07 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 40.7899 | -73.9233 | 2026-09 |
| 67770/30200 | Pittsburg RV Solar | 30200 | 67770 | CA | Contra Costa | Pittsburg RV & Boat Storage, LLC | Commercial Non-CHP | Solar Photovoltaic | SUN | PV | 2.8 | 2.9 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 38.01155 | -121.8453 | 2026-09 |
| 70538/BRH | Belchertown Solar PV + Battery Project | BRH | 70538 | MA | Hampshire | Agilitas Energy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.8 | 2.8 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 42.3 | -72.37 | 2026-09 |
| 70538/BRHBA | Belchertown Solar PV + Battery Project | BRHBA | 70538 | MA | Hampshire | Agilitas Energy, Inc. | IPP Non-CHP | Batteries | MWH | BA | 2.8 | 2.8 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 42.3 | -72.37 | 2026-09 |
| 70334/IL55B | Pivot Energy IL 55b LLC | IL55B | 70334 | IL | McHenry | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.8 | 2.8 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 42.3455 | -88.50561 | 2026-09 |
| 69804/MEPV1 | Menard 1 | MEPV1 | 69804 | IL | Menard | ENGIE Distributed Renewables Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.8 | 2.8 | 2027-09 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 40.089 | -89.723 | 2026-09 |
| 68110/MILAN | SR Milan | MILAN | 68110 | TN | Gibson | SR Milan, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.8 | 2.8 | 2028-07 | 2028 | (T) Regulatory approvals received. Not under construction | TVA | 35.945285 | -88.75989 | 2026-09 |
| 69196/NEBOB | Nebo Energy Storage | NEBOB | 69196 | NC | Burke | Duke Energy Carolinas, LLC | Electric Utility | Batteries | MWH | BA | 2.7 | 2.7 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | DUK | 35.791718 | -81.85104 | 2026-09 |
| 54808/GR1 | New York University Central Plant | GR1 | 54808 | NY | New York | New York University | Commercial Non-CHP | Natural Gas Internal Combustion Engine | NG | IC | 2.6 | 2.6 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 40.7899 | -73.9233 | 2026-09 |
| 70012/IN609 | Redlands DC 9 - sline609 | IN609 | 70012 | CA | San Bernardino | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.6 | 2.6 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 34.083141 | -117.2035 | 2026-09 |
| 70375/CLIN5 | Clinton Solar 5 | CLIN5 | 70375 | IL | Clinton | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.6 | 2.6 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 38.595381 | -89.18656 | 2026-09 |
| 70503/PV1 | EESolar22 | PV1 | 70503 | MN | Le Sueur | EESolar22 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.6 | 2.6 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 44.248616 | -93.96164 | 2026-09 |
| 58903/UNIT1 | Marseilles Lock and Dam Hydro | UNIT1 | 58903 | IL | LaSalle | Marseilles Land and Water Company | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.6 | 2.6 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 41.327778 | -88.70111 | 2026-09 |
| 58903/UNIT2 | Marseilles Lock and Dam Hydro | UNIT2 | 58903 | IL | LaSalle | Marseilles Land and Water Company | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.6 | 2.6 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 41.327778 | -88.70111 | 2026-09 |
| 58903/UNIT3 | Marseilles Lock and Dam Hydro | UNIT3 | 58903 | IL | LaSalle | Marseilles Land and Water Company | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.6 | 2.6 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 41.327778 | -88.70111 | 2026-09 |
| 58903/UNIT4 | Marseilles Lock and Dam Hydro | UNIT4 | 58903 | IL | LaSalle | Marseilles Land and Water Company | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.6 | 2.6 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 41.327778 | -88.70111 | 2026-09 |
| 70123/224 | Petersburg - VA 0224 (Murphy) | 224 | 70123 | VA | Chesterfield | CVE US VA Petersburg 224 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.6 | 2.6 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 37.24348 | -77.43647 | 2026-09 |
| 70126/467 | Roulette - PA 0467 | 467 | 70126 | PA | Potter | CVE US PA Roulette 467 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.6 | 2.6 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.777 | -78.1995 | 2026-09 |
| 69371/HALIF | Middle Road Solar Partners | HALIF | 69371 | PA | Dauphin | Middle Road Solar Partners LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 40.516 | -76.937 | 2026-09 |
| 69592/PSKBS | NL NY- Pulaski | PSKBS | 69592 | NY | Orange | Standard Solar | IPP Non-CHP | Batteries | MWH | BA | 2.5 | 2.5 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | NYIS | 41.334309 | -74.40401 | 2026-09 |
| 69592/PSKPV | NL NY- Pulaski | PSKPV | 69592 | NY | Orange | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | NYIS | 41.334309 | -74.40401 | 2026-09 |
| 70031/ZEBRA | Zebrawood Solar, LLC | ZEBRA | 70031 | IL | Hancock | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 40.613821 | -91.28497 | 2026-09 |
| 55027/1600B | Papillion Creek Wastewater | 1600B | 55027 | NE | Sarpy | City of Omaha - (NE) | Commercial CHP | Natural Gas Internal Combustion Engine | NG | IC | 2.5 | 2.4 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 41.0772 | -95.87 | 2026-09 |
| 55027/1600C | Papillion Creek Wastewater | 1600C | 55027 | NE | Sarpy | City of Omaha - (NE) | Commercial CHP | Natural Gas Internal Combustion Engine | NG | IC | 2.5 | 2.4 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 41.0772 | -95.87 | 2026-09 |
| 55027/1600D | Papillion Creek Wastewater | 1600D | 55027 | NE | Sarpy | City of Omaha - (NE) | Commercial CHP | Natural Gas Internal Combustion Engine | NG | IC | 2.5 | 2.4 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 41.0772 | -95.87 | 2026-09 |
| 69377/NEWFR | New Freedom Solar Partners | NEWFR | 69377 | PA | York | New Freedom Solar Partners LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 39.745 | -76.696 | 2026-09 |
| 69934/FALUN | Falun | FALUN | 69934 | WI | Burnett | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 45.779061 | -92.5306 | 2026-09 |
| 69936/KALMR | Kalmar | KALMR | 69936 | MN | Olmsted | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 44.024642 | -92.578 | 2026-09 |
| 69940/TEEPL | Teeple Creek | TEEPL | 69940 | IA | Allamakee | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 43.234672 | -91.50468 | 2026-09 |
| 52149/GEN21 | West Point (PA) | GEN21 | 52149 | PA | Montgomery | Merck & Co Inc-West Point | Industrial CHP | Natural Gas Internal Combustion Engine | NG | IC | 2.5 | 2.5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 40.217963 | -75.29882 | 2026-09 |
| 68935/ROX1 | SV CSG Roxana 1 | ROX1 | 68935 | IL | Madison | SV CSG Roxana 1 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 38.836055 | -90.03685 | 2026-09 |
| 70489/17405 | Bakers Falls Solar | 17405 | 70489 | NY | Saratoga | Bakers Falls Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 42.283387 | -73.60827 | 2026-09 |
| 70502/SRS2 | Sunset Road Solar 2 | SRS2 | 70502 | IL | Macoupin | Sunset Road Solar 2, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 39.158531 | -89.77262 | 2026-09 |
| 70205/BURS2 | Bureau Solar 2 LLC | BURS2 | 70205 | IL | Bureau | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 41.463853 | -89.46756 | 2026-09 |
| 70336/NCBP1 | NCBP ONE, LLC | NCBP1 | 70336 | MD | Prince Georges | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 38.8698 | -76.7394 | 2026-09 |
| 69176/11218 | Bonacci 1 | 11218 | 69176 | IL | Champaign | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 40.083997 | -88.16215 | 2026-09 |
| 69177/11218 | Bonacci 2 | 11218 | 69177 | IL | Champaign | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 40.083997 | -88.16215 | 2026-09 |
| 69268/COYA1 | Coyanosa Gas | COYA1 | 69268 | TX | Pecos | RPC Merchant, LLC | IPP Non-CHP | Natural Gas Internal Combustion Engine | NG | IC | 2.5 | 2.5 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.275177 | -103.1126 | 2026-09 |
| 69268/COYA2 | Coyanosa Gas | COYA2 | 69268 | TX | Pecos | RPC Merchant, LLC | IPP Non-CHP | Natural Gas Internal Combustion Engine | NG | IC | 2.5 | 2.5 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.275177 | -103.1126 | 2026-09 |
| 69268/COYA3 | Coyanosa Gas | COYA3 | 69268 | TX | Pecos | RPC Merchant, LLC | IPP Non-CHP | Natural Gas Internal Combustion Engine | NG | IC | 2.5 | 2.5 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.275177 | -103.1126 | 2026-09 |
| 69268/COYA4 | Coyanosa Gas | COYA4 | 69268 | TX | Pecos | RPC Merchant, LLC | IPP Non-CHP | Natural Gas Internal Combustion Engine | NG | IC | 2.5 | 2.5 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ERCO | 31.275177 | -103.1126 | 2026-09 |
| 69373/LITTL | Little Falls PV | LITTL | 69373 | NY | Herkimer | Little Falls PV LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | NYIS | 42.98791 | -74.86305 | 2026-09 |
| 68212/MDLN | Maryland Line Road Solar | MDLN | 68212 | DE | New Castle | Maryland Line Road Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2027-05 | 2027 | (L) Regulatory approvals pending. Not under construction | PJM | 39.372 | -75.763 | 2026-09 |
| 935/8 | Bushnell | 8 | 935 | IL | McDonough | City of Bushnell - (IL) | Electric Utility | Petroleum Liquids | DFO | IC | 2.5 | 2.5 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 40.548586 | -90.51381 | 2026-09 |
| 68144/CH305 | Northlake 5-SLCHI305 | CH305 | 68144 | IL | Cook | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2027-06 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 41.929004 | -87.91716 | 2026-09 |
| 66340/PV1 | Canyonville Solar LLC (CSG) | PV1 | 66340 | OR | Douglas | SolRiver Capital LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | PACW | 42.956886 | -123.2618 | 2026-09 |
| 70082/404 | Dayton - PA 0404 (Good East) | 404 | 70082 | PA | Armstrong | CVE US PA Dayton 404 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.5 | 2.5 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.89056 | -79.27027 | 2026-09 |
| 62402/NA1 | Arkabutla Lake Hydroelectric Project | NA1 | 62402 | MS | DeSoto | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.5 | 1.5 | 2028-06 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 34.757926 | -90.12569 | 2026-09 |
| 62402/NA2 | Arkabutla Lake Hydroelectric Project | NA2 | 62402 | MS | DeSoto | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.5 | 1.5 | 2028-07 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 34.757926 | -90.12569 | 2026-09 |
| 62387/NA1 | Morgantown L&D Hydroelectric Project | NA1 | 62387 | WV | Monongalia | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.5 | 1.5 | 2028-08 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.619589 | -79.96811 | 2026-09 |
| 69668/BCIC1 | Brigham City Gas | BCIC1 | 69668 | UT | Box Elder | Brigham City Corporation | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 2.5 | 2.5 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PACE | 41.507163 | -112.0027 | 2026-09 |
| 69668/BCIC2 | Brigham City Gas | BCIC2 | 69668 | UT | Box Elder | Brigham City Corporation | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 2.5 | 2.5 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PACE | 41.507163 | -112.0027 | 2026-09 |
| 69668/BCIC3 | Brigham City Gas | BCIC3 | 69668 | UT | Box Elder | Brigham City Corporation | Electric Utility | Natural Gas Internal Combustion Engine | NG | IC | 2.5 | 2.5 | 2028-08 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PACE | 41.507163 | -112.0027 | 2026-09 |
| 62387/NA2 | Morgantown L&D Hydroelectric Project | NA2 | 62387 | WV | Monongalia | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.5 | 1.5 | 2028-09 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.619589 | -79.96811 | 2026-09 |
| 62432/NA1 | Enid Lake Hydroelectric Project | NA1 | 62432 | MS | Panola | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.5 | 1.5 | 2028-10 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 34.158065 | -89.90553 | 2026-09 |
| 62384/NA1 | Point Marion L&D Hydroelectric Project | NA1 | 62384 | PA | Fayette | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.5 | 1.5 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.726855 | -79.91013 | 2026-09 |
| 62432/NA2 | Enid Lake Hydroelectric Project | NA2 | 62432 | MS | Panola | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.5 | 1.5 | 2028-11 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | TVA | 34.158065 | -89.90553 | 2026-09 |
| 62384/NA2 | Point Marion L&D Hydroelectric Project | NA2 | 62384 | PA | Fayette | Rye Development | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 2.5 | 1.5 | 2028-12 | 2028 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 39.726855 | -79.91013 | 2026-09 |
| 70372/LERMI | Lerdo Middle | LERMI | 70372 | CA | Kern | Wonderful Renewable Energy, LLC. | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 2.4 | 2.4 | 2026-09 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 35.50622 | -119.162 | 2026-09 |
| 69375/LYSAN | Lysander III PV | LYSAN | 69375 | NY | Onondaga | Lysander III PV LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.4 | 2.4 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | NYIS | 43.219759 | -76.38847 | 2026-09 |
| 70012/BA609 | Redlands DC 9 - sline609 | BA609 | 70012 | CA | San Bernardino | Prologis Logistics Services Incorporated | IPP Non-CHP | Batteries | MWH | BA | 2.4 | 2.4 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 34.083141 | -117.2035 | 2026-09 |
| 70458/SAPHI | Sapphire Solar NY | SAPHI | 70458 | NY | Jefferson | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.4 | 2.4 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 43.9543 | -76.0739 | 2026-09 |
| 69767/NCBP7 | NCBP Seven | NCBP7 | 69767 | MD | Prince Georges | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.4 | 2.4 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 38.8692 | -76.7368 | 2026-09 |
| 70452/OCS62 | Buckaroo Solar 1 | OCS62 | 70452 | OR | Umatilla | Buckaroo Solar 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.4 | 2.4 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | PACW | 45.660992 | -118.7721 | 2026-09 |
| 70168/485 | Monroe - PA 0485 (Lawrence) | 485 | 70168 | PA | Clarion | CVE US PA Monroe 485 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.4 | 2.4 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.11339 | -79.4146 | 2026-09 |
| 61592/WT1 | Cody Road Wind Farm | WT1 | 61592 | NY | Madison | Green Power Energy LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 2.4 | 2.4 | 2029-07 | 2029 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.967145 | -75.75592 | 2026-09 |
| 61592/WT2 | Cody Road Wind Farm | WT2 | 61592 | NY | Madison | Green Power Energy LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 2.4 | 2.4 | 2029-07 | 2029 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.967145 | -75.75592 | 2026-09 |
| 61592/WT3 | Cody Road Wind Farm | WT3 | 61592 | NY | Madison | Green Power Energy LLC | IPP Non-CHP | Onshore Wind Turbine | WND | WT | 2.4 | 2.4 | 2029-07 | 2029 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 42.967145 | -75.75592 | 2026-09 |
| 69939/SPOON | Spooner | SPOON | 69939 | WI | Washburn | OneEnergy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.3 | 2.3 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 45.84628 | -91.8634 | 2026-09 |
| 70370/R4701 | Ranch 4701 | R4701 | 70370 | CA | Kern | Wonderful Renewable Energy, LLC. | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 2.3 | 2.3 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 35.742656 | -119.0809 | 2026-09 |
| 68571/7481 | Lowe's - 1440 - Rockford, IL RDC (POI 1) | 7481 | 68571 | IL | Winnebago | South Springfield Avenue Solar Project 2022, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.3 | 2.3 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 42.239075 | -89.13187 | 2026-09 |
| 68572/7824 | Lowe's - 1440 - Rockford, IL RDC (POI 2) | 7824 | 68572 | IL | Winnebago | South Springfield Avenue II Solar Project 2022, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.3 | 2.3 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 42.239075 | -89.13187 | 2026-09 |
| 70555/ZIONP | Cenergy IL - Zion Park District | ZIONP | 70555 | IL | Lake | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.3 | 2.3 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 42.4645 | -87.8476 | 2026-09 |
| 65070/A04 | Austin TX GigaFactory | A04 | 65070 | TX | Travis | Tesla Inc. | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 2.3 | 2.3 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 30.22021 | -97.61968 | 2026-09 |
| 66516/19500 | TX Dallas 7750 Dynasty Drive | 19500 | 66516 | TX | Dallas | Catalyze Dallas 7750 Dynasty Drive Microgrid, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.3 | 2.3 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | ERCO | 32.652269 | -96.75577 | 2026-09 |
| 66830/P5376 | Harrah's Atlantic City - POI 1 (Meeting | P5376 | 66830 | NJ | Atlantic | Distributed Solar Development, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.3 | 2.3 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 39.384389 | -74.42627 | 2026-09 |
| 70319/ND016 | Warbler Clean Energy LLC | ND016 | 70319 | NY | Bronx | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 2.3 | 2.3 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.815404 | -73.86023 | 2026-09 |
| 70316/ND017 | Piping Plover Clean Energy, LLC | ND017 | 70316 | NY | Bronx | NineDot Holdings, LLC | IPP Non-CHP | Batteries | MWH | BA | 2.3 | 2.3 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.815382 | -73.86015 | 2026-09 |
| 1267/15 | Chanute 1 | 15 | 1267 | KS | Neosho | City of Chanute (KS) | Electric Utility | Petroleum Liquids | DFO | IC | 2.2 | 2 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 37.683333 | -95.45472 | 2026-09 |
| 1267/16 | Chanute 1 | 16 | 1267 | KS | Neosho | City of Chanute (KS) | Electric Utility | Petroleum Liquids | DFO | IC | 2.2 | 2 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 37.683333 | -95.45472 | 2026-09 |
| 1267/17 | Chanute 1 | 17 | 1267 | KS | Neosho | City of Chanute (KS) | Electric Utility | Petroleum Liquids | DFO | IC | 2.2 | 2 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | SWPP | 37.683333 | -95.45472 | 2026-09 |
| 70101/PPA29 | Pivot Energy PPA 29 LLC | PPA29 | 70101 | CA | Placer | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.2 | 2.2 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 38.828466 | -121.3049 | 2026-09 |
| 2308/6 | Tecumseh | 6 | 2308 | NE | Johnson | City of Tecumseh - (NE) | Electric Utility | Petroleum Liquids | DFO | IC | 2.1 | 2.1 | 2027-08 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 40.3664 | -96.19 | 2026-09 |
| 2308/7 | Tecumseh | 7 | 2308 | NE | Johnson | City of Tecumseh - (NE) | Electric Utility | Petroleum Liquids | DFO | IC | 2.1 | 2.1 | 2027-08 | 2027 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 40.3664 | -96.19 | 2026-09 |
| 69818/NCREK | SV CSG North Creek 1 | NCREK | 69818 | IL | Livingston | SV CSG North Creek 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2.1 | 2.1 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 40.916213 | -88.60821 | 2026-09 |
| 67283/6569B | Six Flags Magic Mountain | 6569B | 67283 | CA | Los Angeles | Magic Mountain Parkway Solar Project 2023, LLC | IPP Non-CHP | Batteries | MWH | BA | 2 | 2 | 2026-09 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.428209 | -118.5993 | 2026-09 |
| 70574/14237 | Sandoval 2 | 14237 | 70574 | IL | Clinton | Nautilus Solar Solutions | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-09 | 2026 | (L) Regulatory approvals pending. Not under construction | MISO | 38.589399 | -89.14667 | 2026-09 |
| 1291/17 | Iola | 17 | 1291 | KS | Allen | City of Iola - (KS) | Electric Utility | Petroleum Liquids | DFO | IC | 2 | 2 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 37.923076 | -95.42557 | 2026-09 |
| 1291/18 | Iola | 18 | 1291 | KS | Allen | City of Iola - (KS) | Electric Utility | Petroleum Liquids | DFO | IC | 2 | 2 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 37.923076 | -95.42557 | 2026-09 |
| 1291/19 | Iola | 19 | 1291 | KS | Allen | City of Iola - (KS) | Electric Utility | Petroleum Liquids | DFO | IC | 2 | 2 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 37.923076 | -95.42557 | 2026-09 |
| 1291/20 | Iola | 20 | 1291 | KS | Allen | City of Iola - (KS) | Electric Utility | Petroleum Liquids | DFO | IC | 2 | 2 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | SWPP | 37.923076 | -95.42557 | 2026-09 |
| 63541/BCRV1 | Solar Carver 1 Hybrid | BCRV1 | 63541 | MA | Plymouth | Solar Carver 1, LLC | IPP Non-CHP | Batteries | MWH | BA | 2 | 2 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | ISNE | 41.824474 | -70.75292 | 2026-09 |
| 63541/SCRV1 | Solar Carver 1 Hybrid | SCRV1 | 63541 | MA | Plymouth | Solar Carver 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | ISNE | 41.824474 | -70.75292 | 2026-09 |
| 67857/MCDOW | McDowell Creek Solar LLC | MCDOW | 67857 | NC | Mecklenburg | McDowell Creek Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | DUK | 35.394168 | -80.94389 | 2026-09 |
| 68139/CH102 | McCook 2-SLCHI102 | CH102 | 68139 | IL | Cook | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.803083 | -87.81935 | 2026-09 |
| 70182/PV1 | Steger | PV1 | 70182 | IL | Cook | Steger Road Solar 1 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.4701 | -87.5793 | 2026-09 |
| 70206/PS57 | Pivot Solar 57 LLC | PS57 | 70206 | CO | Mesa | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PSCO | 39.051557 | -108.4522 | 2026-09 |
| 70393/S1 | Stephenson County IL S1 | S1 | 70393 | IL | Stephenson | SolAmerica Energy / Stephenson County IL S1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 42.304234 | -89.58015 | 2026-09 |
| 70448/22258 | Keithsburg North Solar LLC PV | 22258 | 70448 | IL | Mercer | Keithsburg North Solar, LLC PV | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | MISO | 41.120819 | -90.94078 | 2026-09 |
| 66511/18262 | CA Riverside 2356 Fleetwood Dr. | 18262 | 66511 | CA | Riverside | Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.012142 | -117.3811 | 2026-09 |
| 66511/B8262 | CA Riverside 2356 Fleetwood Dr. | B8262 | 66511 | CA | Riverside | Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC | IPP Non-CHP | Batteries | MWH | BA | 2 | 2 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.012142 | -117.3811 | 2026-09 |
| 66768/694 | Hogs Bay | 694 | 66768 | ME | Hancock | Greenbacker Renewable Energy Corporation | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | ISNE | 44.57579 | -68.19965 | 2026-09 |
| 68933/CORB | SV CSG Corbell | CORB | 68933 | IL | Williamson | SV CSG Corbell, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | MISO | 37.758343 | -89.05748 | 2026-09 |
| 70373/SDF1A | 100a Swiss Dale Farm | SDF1A | 70373 | MD | Cecil | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 39.661976 | -76.05111 | 2026-09 |
| 70537/DOWII | Downsville II | DOWII | 70537 | MD | Washington | AES Clean Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 39.5922 | -77.78 | 2026-09 |
| 65130/PV2 | City of Bowie | PV2 | 65130 | MD | Prince Georges | Tesla Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 38.904641 | -76.68877 | 2026-09 |
| 68465/22324 | Imperator Solar | 22324 | 68465 | CA | Kern | Imperator Solar, LLC | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 35.4932 | -119.1659 | 2026-09 |
| 69885/USMOU | USS Mourning | USMOU | 69885 | IL | Schuyler | USS Mourning Lane | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.160741 | -90.59832 | 2026-09 |
| 70350/RT40 | IL - Forefront Ameren- Route 40 | RT40 | 70350 | IL | Peoria | IL Solar Route 40 Project2, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 40.923873 | -89.63042 | 2026-09 |
| 70353/TRU1 | IL-Forefront Ameren-Truitt 1 | TRU1 | 70353 | IL | Peoria | IL Solar Truitt Project1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 40.929207 | -89.64177 | 2026-09 |
| 70354/TRU2 | IL-Forefront Ameren-Truitt 2 | TRU2 | 70354 | IL | Peoria | IL Solar Truitt Project2, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 40.929207 | -89.64177 | 2026-09 |
| 70508/4786A | 4786A George Washington, LLC | 4786A | 70508 | MD | Garrett | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 39.30012 | -79.41319 | 2026-09 |
| 70509/4786B | 4786B George Washington, LLC | 4786B | 70509 | MD | Garrett | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 39.3312 | -79.41319 | 2026-09 |
| 70523/BA005 | Marley Neck 3 - SLBAL005 | BA005 | 70523 | MD | Anne Arundel | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 39.194143 | -76.55178 | 2026-09 |
| 70196/DEL22 | DEL022-30423B Thorogoods Rd, LLC | DEL22 | 70196 | DE | Sussex | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 38.569503 | -75.26468 | 2026-09 |
| 70198/FLOR2 | CF IL Solar Marigold Lane, Flora2 LLC | FLOR2 | 70198 | IL | Clay | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 38.632489 | -88.43829 | 2026-09 |
| 63535/GEN02 | Solar BESS Hybrid | GEN02 | 63535 | GA | Cobb | Cobb Electric Membership Corporation | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 2 | 2 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | SOCO | 33.979348 | -84.55613 | 2026-09 |
| 63535/GEN03 | Solar BESS Hybrid | GEN03 | 63535 | GA | Cobb | Cobb Electric Membership Corporation | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 2 | 2 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | SOCO | 33.979348 | -84.55613 | 2026-09 |
| 63535/GEN04 | Solar BESS Hybrid | GEN04 | 63535 | GA | Cobb | Cobb Electric Membership Corporation | Electric Utility | Natural Gas Fired Combustion Turbine | NG | GT | 2 | 2 | 2027-05 | 2027 | (V) Under construction, more than 50 percent complete | SOCO | 33.979348 | -84.55613 | 2026-09 |
| 70460/WILS1 | Willington Solar One, LLC | WILS1 | 70460 | CT | Tolland | NJR Clean Energy Ventures Corporation | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 41.92 | -72.27 | 2026-09 |
| 61037/APPL | Apple Hill Solar | APPL | 61037 | VT | Bennington | Ecos Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 42.9077 | -73.2041 | 2026-09 |
| 66513/B8229 | MA Acushnet 540R Main St | B8229 | 66513 | MA | Bristol | TJA 540R Main St. Acushnet, LLC | IPP Non-CHP | Batteries | MWH | BA | 2 | 2 | 2027-06 | 2027 | (L) Regulatory approvals pending. Not under construction | ISNE | 41.702987 | -70.8888 | 2026-09 |
| 69215/11216 | Sommer | 11216 | 69215 | IL | Massac | Generate Capital | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2027-08 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 37.205915 | -88.8179 | 2026-09 |
| 67741/I | OIT BESS | I | 67741 | OR | Klamath | PacifiCorp | Electric Utility | Batteries | MWH | BA | 2 | 2 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PACW | 42.259366 | -121.7864 | 2026-09 |
| 68858/PV1 | Cavern | PV1 | 68858 | NY | Clinton | Cavern Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 44.711557 | -73.54126 | 2026-09 |
| 68860/PV1 | Tully 5 | PV1 | 68860 | NY | Onondaga | CP Tully Five LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | NYIS | 42.810918 | -76.12014 | 2026-09 |
| 70078/438 | Bigler - PA 0438 (Flango 4) | 438 | 70078 | PA | Clearfield | CVE US PA Bigler 438 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 2 | 2 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.80344 | -78.42275 | 2026-09 |
| 68122/CH526 | Bensenville 2-SLCHI526 | CH526 | 68122 | IL | DuPage | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.9 | 1.9 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.971289 | -87.95462 | 2026-09 |
| 70335/PS42 | Pivot Solar 42 LLC | PS42 | 70335 | CO | Larimer | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.9 | 1.9 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PSCO | 40.692398 | -104.9833 | 2026-09 |
| 69591/20525 | 20525 Nordhoff PV (North) | 20525 | 69591 | CA | Los Angeles | Amiscope Nordhoff, LP | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.9 | 1.9 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | LDWP | 34.235572 | -118.5811 | 2026-09 |
| 68119/CH307 | Aurora 7-SLCHI307 | CH307 | 68119 | IL | Kane | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.9 | 1.9 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.79698 | -88.26809 | 2026-09 |
| 69222/5381 | American Canyon RV Boat Storage | 5381 | 69222 | CA | Napa | Napa Junction RV Storage LLC | Commercial Non-CHP | Solar Photovoltaic | SUN | PV | 1.9 | 1.9 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 38.198033 | -122.257 | 2026-09 |
| 68129/CH603 | Cicero 3-SLCHI603 | CH603 | 68129 | IL | Cook | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.9 | 1.9 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.86464 | -87.75757 | 2026-09 |
| 69554/BELMO | BPL NJ - Belmont | BELMO | 69554 | NJ | Somerset | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.8 | 1.8 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 40.530503 | -74.54493 | 2026-09 |
| 69807/WNSRL | Windsor Locks | WNSRL | 69807 | CT | Hartford | ENGIE Distributed Renewables Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.8 | 1.8 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | ISNE | 41.928086 | -72.68693 | 2026-09 |
| 70337/PS71 | Pivot Solar 71 LLC | PS71 | 70337 | CO | Morgan | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.8 | 1.8 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PSCO | 40.267178 | -103.6512 | 2026-09 |
| 68787/23889 | NorCal FPV 1 (Pond 2) | 23889 | 68787 | CA | Alameda | NorCal FPV 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.8 | 1.8 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 37.6779 | -121.8276 | 2026-09 |
| 70115/GEN1 | Fort Lyon Solar | GEN1 | 70115 | CO | Bent | Clay Creek Energy, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.8 | 1.8 | 2027-04 | 2027 | (L) Regulatory approvals pending. Not under construction | WACM | 38.081 | -103.133 | 2026-09 |
| 70118/GEN1 | Trinidad Solar | GEN1 | 70118 | CO | Las Animas | Clay Creek Energy, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.8 | 1.8 | 2027-04 | 2027 | (L) Regulatory approvals pending. Not under construction | WACM | 37.185879 | -104.4924 | 2026-09 |
| 68138/CH321 | Internationale Ctr 11-SLCHI321 | CH321 | 68138 | IL | DuPage | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.8 | 1.8 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.70053 | -88.02744 | 2026-09 |
| 68044/RODA1 | Rodatherm Milford 1 | RODA1 | 68044 | UT | Beaver | Rodatherm Energy Corporation | IPP Non-CHP | Geothermal | GEO | BT | 1.8 | 1.2 | 2028-01 | 2028 | (U) Under construction, less than or equal to 50 percent complete | PACE | 38.572873 | -112.9786 | 2026-09 |
| 70428/DRIVS | Bakersfield Driver | DRIVS | 70428 | CA | Kern | Pacifico Bakersfield Driver LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.7 | 1.7 | 2026-09 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 35.562181 | -119.202 | 2026-09 |
| 69888/USFLE | USS Fletcher Solar | USFLE | 69888 | NM | Hidalgo | USS Fletcher Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.7 | 1.7 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PNM | 32.366814 | -108.6934 | 2026-09 |
| 68132/CH701 | Elk Grove 1-SLCHI701 | CH701 | 68132 | IL | Cook | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.7 | 1.7 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 42.010416 | -87.958 | 2026-09 |
| 68541/7169 | Palmdale Water District HQ | 7169 | 68541 | CA | Los Angeles | East Avenue Q Solar Project 2022, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.7 | 1.7 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.587916 | -118.0931 | 2026-09 |
| 68127/CH424 | Bensenville Ind Park 4-SLCHI424 | CH424 | 68127 | IL | Cook | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.7 | 1.7 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 41.983893 | -87.95172 | 2026-09 |
| 69766/KHLS | Kalaeloa Home Lands Solar | KHLS | 69766 | HI | Honolulu | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.7 | 1.7 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | HECO | 21.310594 | -158.0863 | 2026-09 |
| 68118/CH404 | Addison 11-SLCHI404 | CH404 | 68118 | IL | DuPage | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.6 | 1.6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.930327 | -88.04848 | 2026-09 |
| 68130/CH211 | Des Plaines 11-SLCHI211 | CH211 | 68130 | IL | Cook | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.6 | 1.6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 42.015 | -87.915 | 2026-09 |
| 69711/6672 | L3 Harris San Diego | 6672 | 69711 | CA | San Diego | Balboa Avenue I Solar Project 2023, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.6 | 1.6 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 32.822588 | -117.1352 | 2026-09 |
| 70451/OCS24 | Tutuilla Solar | OCS24 | 70451 | OR | Umatilla | Tutuilla Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.6 | 1.6 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PACW | 45.63153 | -119.685 | 2026-09 |
| 70507/NN036 | Prologis - SLNNJ036 - Community Solar | NN036 | 70507 | NJ | Union | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.6 | 1.6 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.66225 | -74.1644 | 2026-09 |
| 68141/CH302 | Northlake 2-SLCHI302 | CH302 | 68141 | IL | Cook | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.6 | 1.6 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.9118 | -87.9081 | 2026-09 |
| 69385/GEN1 | Hastings Generating Facility | GEN1 | 69385 | MI | Barry | NAPS - Hastings LLC | IPP Non-CHP | Landfill Gas | LFG | IC | 1.6 | 1.6 | 2027-04 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 42.67856 | -85.29629 | 2026-09 |
| 10748/FUTR1 | Marina Landfill Gas | FUTR1 | 10748 | CA | Monterey | Monterey Regional Waste Mgmt | Commercial Non-CHP | Landfill Gas | LFG | IC | 1.6 | 1.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 36.7131 | -121.7686 | 2026-09 |
| 10748/FUTR2 | Marina Landfill Gas | FUTR2 | 10748 | CA | Monterey | Monterey Regional Waste Mgmt | Commercial Non-CHP | Landfill Gas | LFG | IC | 1.6 | 1.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 36.7131 | -121.7686 | 2026-09 |
| 10748/FUTR3 | Marina Landfill Gas | FUTR3 | 10748 | CA | Monterey | Monterey Regional Waste Mgmt | Commercial Non-CHP | Landfill Gas | LFG | IC | 1.6 | 1.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 36.7131 | -121.7686 | 2026-09 |
| 10748/FUTR4 | Marina Landfill Gas | FUTR4 | 10748 | CA | Monterey | Monterey Regional Waste Mgmt | Commercial Non-CHP | Landfill Gas | LFG | IC | 1.6 | 1.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 36.7131 | -121.7686 | 2026-09 |
| 69242/PV1 | AB Van Nuys | PV1 | 69242 | CA | Los Angeles | Roscoe Boulevard Operating, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.6 | 1.6 | 2027-12 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | LDWP | 34.220959 | -118.4768 | 2026-09 |
| 69791/NJUDC | BPL NJ - Union Distribution Center | NJUDC | 69791 | NJ | Union | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.5 | 1 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 40.6834 | -74.2422 | 2026-09 |
| 70445/PV1 | W 167th St | PV1 | 70445 | IL | Cook | 555 W 167th St Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.5 | 1.5 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 41.59009 | -87.63044 | 2026-09 |
| 66475/18263 | CA Bloomington 2551 S Lilac Avenue Micro | 18263 | 66475 | CA | San Bernardino | Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.5 | 1.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.05523 | -117.3778 | 2026-09 |
| 66475/B8263 | CA Bloomington 2551 S Lilac Avenue Micro | B8263 | 66475 | CA | San Bernardino | Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC | IPP Non-CHP | Batteries | MWH | BA | 1.5 | 1.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.05523 | -117.3778 | 2026-09 |
| 69753/13790 | 50 Meister Ave | 13790 | 69753 | NJ | Somerset | Meister Avenue Branchburg Solar Project 2024, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.5 | 1.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 40.600337 | -74.69818 | 2026-09 |
| 69813/ARGEN | Argenta Solar | ARGEN | 69813 | IL | Macon | Argenta Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.5 | 1.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 39.989915 | -88.81196 | 2026-09 |
| 2316/6 | Wisner | 6 | 2316 | NE | Cuming | City of Wisner (NE) | Electric Utility | Petroleum Liquids | DFO | IC | 1.5 | 1.5 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | SWPP | 41.988069 | -96.91599 | 2026-09 |
| 65072/GA3 | Fremont CA AutoFactory | GA3 | 65072 | CA | Alameda | Tesla Inc. | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 1.5 | 1.5 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | CISO | 37.49254 | -121.9446 | 2026-09 |
| 69805/RFRD7 | Rockford Plant 7 | RFRD7 | 69805 | IL | Winnebago | ENGIE Distributed Renewables Development LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.5 | 1.5 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 42.232527 | -89.02408 | 2026-09 |
| 70106/JADEB | Jade Solar 3 | JADEB | 70106 | CA | Madera | ZGlobal Inc | IPP Non-CHP | Batteries | MWH | BA | 1.5 | 1.5 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 37.056528 | -119.9805 | 2026-09 |
| 70106/JADES | Jade Solar 3 | JADES | 70106 | CA | Madera | ZGlobal Inc | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.5 | 1.5 | 2027-06 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 37.056528 | -119.9805 | 2026-09 |
| 69862/GALF | Galva School | GALF | 69862 | IL | Henry | Navisun LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.5 | 1.5 | 2027-10 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | PJM | 41.179241 | -90.04677 | 2026-09 |
| 70114/363 | New Alexandria - PA 0363 (Weimer North) | 363 | 70114 | PA | Westmoreland | CVE US PA New Alexandria 363 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.5 | 1.5 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.40255 | -79.42806 | 2026-09 |
| 68120/CH513 | Bensenville 13-SLCHI513 | CH513 | 68120 | IL | DuPage | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.4 | 1.4 | 2026-10 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.987884 | -87.95258 | 2026-09 |
| 69891/LA100 | Torrance Dis Ctr 2 - SLLAX100 | LA100 | 69891 | CA | Los Angeles | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.4 | 1.4 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 33.84516 | -118.3164 | 2026-09 |
| 70099/IL007 | Pivot Energy IL 7 LLC | IL007 | 70099 | IL | Logan | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.4 | 1.4 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 40.268856 | -89.23746 | 2026-09 |
| 70456/PV1 | W Belmont Ave | PV1 | 70456 | IL | Cook | 9100 W Belmont Ave, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.4 | 1.4 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.9378 | -87.85318 | 2026-09 |
| 70524/BA006 | Marley Neck 4 - SLBAL006 | BA006 | 70524 | MD | Anne Arundel | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.4 | 1.4 | 2026-11 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 39.193805 | -76.55171 | 2026-09 |
| 65072/STAMP | Fremont CA AutoFactory | STAMP | 65072 | CA | Alameda | Tesla Inc. | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 1.4 | 1.4 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 37.49254 | -121.9446 | 2026-09 |
| 70338/NCB10 | NCBP TEN, LLC | NCB10 | 70338 | MD | Prince Georges | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.4 | 1.4 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 38.867 | -76.7386 | 2026-09 |
| 68143/CH304 | Northlake 4-SLCHI304 | CH304 | 68143 | IL | Cook | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.4 | 1.4 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.92302 | -87.91646 | 2026-09 |
| 68133/CH151 | Elk Grove 51-SLCHI151 | CH151 | 68133 | IL | DuPage | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.4 | 1.4 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 42.00096 | -87.95782 | 2026-09 |
| 68502/PV1 | Vienna Walbec Customer Hosted | PV1 | 68502 | WI | Dane | Wisconsin Power & Light Co | Electric Utility | Solar Photovoltaic | SUN | PV | 1.4 | 1.4 | 2027-12 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 43.208435 | -89.41019 | 2026-09 |
| 70029/EWIN1 | East Windsor Solar 1 LLC | EWIN1 | 70029 | NJ | Mercer | Dimension Energy LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.4 | 1.4 | 2028-03 | 2028 | (T) Regulatory approvals received. Not under construction | PJM | 40.274397 | -74.50169 | 2026-09 |
| 63622/OES01 | OES Biogas Power | OES01 | 63622 | CA | San Bernardino | Organic Energy Solutions, Inc. | IPP CHP | Other Waste Biomass | OBG | IC | 1.3 | 1.3 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 34.17325 | -117.3464 | 2026-09 |
| 63622/OES02 | OES Biogas Power | OES02 | 63622 | CA | San Bernardino | Organic Energy Solutions, Inc. | IPP CHP | Other Waste Biomass | OBG | IC | 1.3 | 1.3 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 34.17325 | -117.3464 | 2026-09 |
| 68793/LA710 | Bandini - SLLAX710 | LA710 | 68793 | CA | Los Angeles | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.3 | 1.3 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 33.983566 | -118.1348 | 2026-09 |
| 68121/CH414 | Bensenville 14-SLCHI414 | CH414 | 68121 | IL | DuPage | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.3 | 1.3 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 41.982829 | -87.94589 | 2026-09 |
| 68137/CH910 | Glendale Heights 10-SLCHI910 | CH910 | 68137 | IL | DuPage | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.3 | 1.3 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.929422 | -88.07008 | 2026-09 |
| 68236/LA680 | South Bay Dis Ctr 6-SLLAX680 | LA680 | 68236 | CA | Los Angeles | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.3 | 1.3 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 33.8439 | -118.2242 | 2026-09 |
| 68792/LA680 | Fordyce - SLLAX680 | LA680 | 68792 | CA | Los Angeles | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.3 | 1.3 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 33.8439 | -118.2242 | 2026-09 |
| 69860/MURP2 | Murphysboro 2 | MURP2 | 69860 | IL | Jackson | Navisun LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.3 | 1.3 | 2027-10 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 37.794585 | -89.35141 | 2026-09 |
| 69790/EZMLC | Elizabeth Metropolitan Logistics Center | EZMLC | 69790 | NJ | Union | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.2 | 1.2 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 40.68403 | -74.20623 | 2026-09 |
| 68789/LA104 | South Bay Dis Ctr 12 - SLLAX104 | LA104 | 68789 | CA | Los Angeles | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.2 | 1.2 | 2026-11 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 33.842873 | -118.2245 | 2026-09 |
| 68124/CH411 | Bensenville Ind Park 11 | CH411 | 68124 | IL | DuPage | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.2 | 1.2 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.986194 | -87.94525 | 2026-09 |
| 68135/CH802 | Franklin Park 2-SLCHI802 | CH802 | 68135 | IL | Cook | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.2 | 1.2 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.946509 | -87.85944 | 2026-09 |
| 68123/CH410 | Bensenville Ind Park 10-SLCHI410 | CH410 | 68123 | IL | DuPage | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.2 | 1.2 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | PJM | 41.984507 | -87.94587 | 2026-09 |
| 69211/PV1 | San Pedro Public Market (SPPM) | PV1 | 69211 | CA | Los Angeles | SPPM Operating, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.2 | 1.2 | 2027-06 | 2027 | (U) Under construction, less than or equal to 50 percent complete | LDWP | 33.731297 | -118.2795 | 2026-09 |
| 69697/CW-1 | CW Bill Young Hydropower Project | CW-1 | 69697 | PA | Allegheny | C.W. Bill Young Hydropower Group, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.2 | 1.2 | 2031-10 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.54028 | -79.81556 | 2026-09 |
| 69697/CW-2 | CW Bill Young Hydropower Project | CW-2 | 69697 | PA | Allegheny | C.W. Bill Young Hydropower Group, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.2 | 1.2 | 2031-10 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.54028 | -79.81556 | 2026-09 |
| 69697/CW-3 | CW Bill Young Hydropower Project | CW-3 | 69697 | PA | Allegheny | C.W. Bill Young Hydropower Group, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.2 | 1.2 | 2031-10 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.54028 | -79.81556 | 2026-09 |
| 69697/CW-4 | CW Bill Young Hydropower Project | CW-4 | 69697 | PA | Allegheny | C.W. Bill Young Hydropower Group, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.2 | 1.2 | 2031-10 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.54028 | -79.81556 | 2026-09 |
| 69697/CW-5 | CW Bill Young Hydropower Project | CW-5 | 69697 | PA | Allegheny | C.W. Bill Young Hydropower Group, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.2 | 1.2 | 2031-10 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.54028 | -79.81556 | 2026-09 |
| 69697/CW-6 | CW Bill Young Hydropower Project | CW-6 | 69697 | PA | Allegheny | C.W. Bill Young Hydropower Group, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.2 | 1.2 | 2031-10 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.54028 | -79.81556 | 2026-09 |
| 69697/CW-7 | CW Bill Young Hydropower Project | CW-7 | 69697 | PA | Allegheny | C.W. Bill Young Hydropower Group, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.2 | 1.2 | 2031-10 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.54028 | -79.81556 | 2026-09 |
| 70207/PS60 | Pivot Solar 60 LLC | PS60 | 70207 | CO | Weld | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.1 | 1.1 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PSCO | 40.474398 | -104.623 | 2026-09 |
| 69533/21938 | CA National City Terminal Ave | 21938 | 69533 | CA | San Diego | Catalyze National City Terminal Avenue Microgrid, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.1 | 1.1 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 32.654 | -117.119 | 2026-09 |
| 68126/CH402 | Bensenville Ind Park 2-SLCHI402 | CH402 | 68126 | IL | DuPage | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.1 | 1.1 | 2027-01 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.983957 | -87.95383 | 2026-09 |
| 69895/Gy1a2 | Gateway#1&2 (Newark CA) | Gy1a2 | 69895 | CA | Alameda | Coast Energy Holdings, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.1 | 1.1 | 2027-04 | 2027 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 37.540903 | -122.0617 | 2026-09 |
| 69706/4149C | Bishop Ranch - BR 3-GG | 4149C | 69706 | CA | Contra Costa | Camino Ramon BR 3-GG Solar Project 2020, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.1 | 1.1 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 37.767242 | -121.9582 | 2026-09 |
| 70128/479 | Roulette - PA 0479 | 479 | 70128 | PA | Potter | CVE US PA Roulette 479 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1.1 | 1.1 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.777 | -78.1995 | 2026-09 |
| 69698/DAS-1 | Dashields Hydroelectric Project | DAS-1 | 69698 | PA | Allegheny | Dashields Hydropower Corporations | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.1 | 1.1 | 2030-08 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 40.549546 | -80.20544 | 2026-09 |
| 69698/DAS-2 | Dashields Hydroelectric Project | DAS-2 | 69698 | PA | Allegheny | Dashields Hydropower Corporations | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.1 | 1.1 | 2030-08 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 40.549546 | -80.20544 | 2026-09 |
| 69698/DAS-3 | Dashields Hydroelectric Project | DAS-3 | 69698 | PA | Allegheny | Dashields Hydropower Corporations | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.1 | 1.1 | 2030-08 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 40.549546 | -80.20544 | 2026-09 |
| 69698/DAS-4 | Dashields Hydroelectric Project | DAS-4 | 69698 | PA | Allegheny | Dashields Hydropower Corporations | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.1 | 1.1 | 2030-08 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 40.549546 | -80.20544 | 2026-09 |
| 69698/DAS-5 | Dashields Hydroelectric Project | DAS-5 | 69698 | PA | Allegheny | Dashields Hydropower Corporations | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.1 | 1.1 | 2030-08 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 40.549546 | -80.20544 | 2026-09 |
| 69698/DAS-6 | Dashields Hydroelectric Project | DAS-6 | 69698 | PA | Allegheny | Dashields Hydropower Corporations | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.1 | 1.1 | 2030-08 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 40.549546 | -80.20544 | 2026-09 |
| 69698/DAS-7 | Dashields Hydroelectric Project | DAS-7 | 69698 | PA | Allegheny | Dashields Hydropower Corporations | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.1 | 1.1 | 2030-08 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 40.549546 | -80.20544 | 2026-09 |
| 69698/DAS-8 | Dashields Hydroelectric Project | DAS-8 | 69698 | PA | Allegheny | Dashields Hydropower Corporations | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1.1 | 1.1 | 2030-08 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 40.549546 | -80.20544 | 2026-09 |
| 65045/VCP14 | Emery Shute Solar One | VCP14 | 65045 | ME | Waldo | VCP Realty, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2026-09 | 2026 | (V) Under construction, more than 50 percent complete | ISNE | 44.535591 | -68.86433 | 2026-09 |
| 69983/GRTKN | Novel Gertken Solar LLC | GRTKN | 69983 | MN | Stearns | Novel Gertken Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2026-09 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 45.618191 | -94.4891 | 2026-09 |
| 63506/BCRV3 | Solar Carver 3 Hybrid | BCRV3 | 63506 | MA | Plymouth | Solar Carver 3, LLC | IPP Non-CHP | Batteries | MWH | BA | 1 | 1 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | ISNE | 41.84206 | -70.7699 | 2026-09 |
| 63506/SCRV3 | Solar Carver 3 Hybrid | SCRV3 | 63506 | MA | Plymouth | Solar Carver 3, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | ISNE | 41.84206 | -70.7699 | 2026-09 |
| 68783/NY009 | NY CDG 009 | NY009 | 68783 | NY | Suffolk | NY CDG 009 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | NYIS | 40.808538 | -72.95773 | 2026-09 |
| 69305/FITZH | Enterprise MN - Fitzthum | FITZH | 69305 | MN | Stearns | Standard Solar | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | MISO | 45.644581 | -94.22744 | 2026-09 |
| 69616/USLYN | USS Lyndon Solar LLC | USLYN | 69616 | IL | Whiteside | United States Solar Corporation | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.659472 | -89.92079 | 2026-09 |
| 69886/USSWA | USS Swank Solar | USSWA | 69886 | IL | Henry | USS Swank Solar LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2026-10 | 2026 | (V) Under construction, more than 50 percent complete | PJM | 41.1615 | -90.0285 | 2026-09 |
| 68542/7170G | Palmdale Water District 6MG Tank | 7170G | 68542 | CA | Los Angeles | East Avenue South Solar Project 2022, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.558047 | -118.1187 | 2026-09 |
| 64098/3 | Tesla Reno GigaFactory | 3 | 64098 | NV | Storey | Tesla Inc. | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | NEVP | 39.539511 | -119.4392 | 2026-09 |
| 64291/B4 | Lincoln Medical and Mental Health Center | B4 | 64291 | NY | Bronx | Lincoln Medical and Mental Health Center | Commercial Non-CHP | Petroleum Liquids | DFO | IC | 1 | 1 | 2026-12 | 2026 | (U) Under construction, less than or equal to 50 percent complete | NYIS | 40.816971 | -73.92411 | 2026-09 |
| 70505/1055 | VS HR Warner NEM, LLC | 1055 | 70505 | CA | Orange | Valta Energy | Commercial Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 33.7162 | -117.9345 | 2026-09 |
| 64865/BLILE | Novel Blilie Solar LLC | BLILE | 64865 | MN | Wilkin | Novel Blilie Solar, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 46.630077 | -96.75811 | 2026-09 |
| 69812/BROWN | SV CSG Brownstown 1 | BROWN | 69812 | IL | Fayette | SV CSG Brownstown 1, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-02 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 38.971573 | -89.01849 | 2026-09 |
| 70381/GEN1 | Carver Garden | GEN1 | 70381 | MN | Rice | Bullrock-NxtGenREA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-02 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 44.29848 | -93.2408 | 2026-09 |
| 68217/FEAES | Featherbed Lane South Solar | FEAES | 68217 | MA | Plymouth | Agilitas Energy, Inc. | IPP Non-CHP | Batteries | MWH | BA | 1 | 1 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | ISNE | 41.761 | -70.896 | 2026-09 |
| 68217/FEAPV | Featherbed Lane South Solar | FEAPV | 68217 | MA | Plymouth | Agilitas Energy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-03 | 2027 | (V) Under construction, more than 50 percent complete | ISNE | 41.761 | -70.896 | 2026-09 |
| 70301/BOHRE | MN CSG 2019-57 | BOHRE | 70301 | MN | Blue Earth | MN CSG 2019-57 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-03 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 44.224001 | -93.9787 | 2026-09 |
| 70379/GEN2 | Fuller Garden | GEN2 | 70379 | MN | Sherburne | Bullrock-NxtGenREA | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-03 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 45.45357 | -94.00707 | 2026-09 |
| 69034/PMI2 | Pivot Energy Minnesota Solar 2 | PMI2 | 69034 | MN | Kandiyohi | Pivot Energy | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-04 | 2027 | (V) Under construction, more than 50 percent complete | MISO | 44.935059 | -95.19906 | 2026-09 |
| 69724/PIKE | Pike County Solar | PIKE | 69724 | IL | Pike | Illinois Rural Electric Coop | Electric Utility | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-04 | 2027 | (T) Regulatory approvals received. Not under construction | MISO | 39.6189 | -90.8461 | 2026-09 |
| 69786/CV209 | Stockton 9 - slcva209 | CV209 | 69786 | CA | San Joaquin | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-04 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 37.89233 | -121.2667 | 2026-09 |
| 69609/EB702 | San Leandro 10 - sleba702 | EB702 | 69609 | CA | Alameda | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 37.71422 | -122.182 | 2026-09 |
| 67565/CEC01 | East Road Storage Project | CEC01 | 67565 | CA | Mendocino | Form Energy Inc. | IPP Non-CHP | Batteries | MWH | BA | 1 | 1 | 2027-06 | 2027 | (T) Regulatory approvals received. Not under construction | CISO | 39.25 | -123.196 | 2026-09 |
| 69785/CV801 | Stockton 1 - slcva801 | CV801 | 69785 | CA | San Joaquin | Prologis Logistics Services Incorporated | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-07 | 2027 | (U) Under construction, less than or equal to 50 percent complete | CISO | 37.93997 | -121.2265 | 2026-09 |
| 2038/BA1 | Cambridge CT Hybrid | BA1 | 2038 | MN | Isanti | Great River Energy | Electric Utility | Batteries | MWH | BA | 1 | 0.8 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | MISO | 45.601 | -93.2081 | 2026-09 |
| 70167/408 | Latrobe - PA 0408 (Soccerhound B) | 408 | 70167 | PA | Clearfield | CVE US PA Latrobe 408 LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 1 | 1 | 2027-12 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 40.25174 | -79.35354 | 2026-09 |
| 69699/DI-1 | Dresden Island Hydroelectric Project | DI-1 | 69699 | IL | Grundy | Northern Illinois Hydropower, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1 | 1 | 2030-12 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 41.401926 | -88.28172 | 2026-09 |
| 69699/DI-10 | Dresden Island Hydroelectric Project | DI-10 | 69699 | IL | Grundy | Northern Illinois Hydropower, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1 | 1 | 2030-12 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 41.401926 | -88.28172 | 2026-09 |
| 69699/DI-2 | Dresden Island Hydroelectric Project | DI-2 | 69699 | IL | Grundy | Northern Illinois Hydropower, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1 | 1 | 2030-12 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 41.401926 | -88.28172 | 2026-09 |
| 69699/DI-3 | Dresden Island Hydroelectric Project | DI-3 | 69699 | IL | Grundy | Northern Illinois Hydropower, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1 | 1 | 2030-12 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 41.401926 | -88.28172 | 2026-09 |
| 69699/DI-4 | Dresden Island Hydroelectric Project | DI-4 | 69699 | IL | Grundy | Northern Illinois Hydropower, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1 | 1 | 2030-12 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 41.401926 | -88.28172 | 2026-09 |
| 69699/DI-5 | Dresden Island Hydroelectric Project | DI-5 | 69699 | IL | Grundy | Northern Illinois Hydropower, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1 | 1 | 2030-12 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 41.401926 | -88.28172 | 2026-09 |
| 69699/DI-6 | Dresden Island Hydroelectric Project | DI-6 | 69699 | IL | Grundy | Northern Illinois Hydropower, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1 | 1 | 2030-12 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 41.401926 | -88.28172 | 2026-09 |
| 69699/DI-7 | Dresden Island Hydroelectric Project | DI-7 | 69699 | IL | Grundy | Northern Illinois Hydropower, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1 | 1 | 2030-12 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 41.401926 | -88.28172 | 2026-09 |
| 69699/DI-8 | Dresden Island Hydroelectric Project | DI-8 | 69699 | IL | Grundy | Northern Illinois Hydropower, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1 | 1 | 2030-12 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 41.401926 | -88.28172 | 2026-09 |
| 69699/DI-9 | Dresden Island Hydroelectric Project | DI-9 | 69699 | IL | Grundy | Northern Illinois Hydropower, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 1 | 1 | 2030-12 | 2030 | (L) Regulatory approvals pending. Not under construction | PJM | 41.401926 | -88.28172 | 2026-09 |
| 68600/7236G | Las Virgenes MWD - Composting Plant | 7236G | 68600 | CA | Los Angeles | Las Virgenes Road Solar Project 2022, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 0.9 | 0.9 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.126481 | -118.6981 | 2026-09 |
| 69713/9985C | Sanger USD - Sanger West HS | 9985C | 69713 | CA | Fresno | South Fowler Avenue Solar Project 2023, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 0.9 | 0.9 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 36.709291 | -119.6814 | 2026-09 |
| 64758/MANB | Manorville II | MANB | 64758 | NY | Suffolk | Agilitas Energy, Inc. | IPP Non-CHP | Batteries | MWH | BA | 0.8 | 0.8 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | NYIS | 40.834 | -72.7819 | 2026-09 |
| 69694/AL4-1 | Allegheny Lock and Dam 4 | AL4-1 | 69694 | PA | Allegheny | Allegheny Hydro Group Lock and Dam 4, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.8 | 0.8 | 2031-02 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.613718 | -79.71829 | 2026-09 |
| 69694/AL4-2 | Allegheny Lock and Dam 4 | AL4-2 | 69694 | PA | Allegheny | Allegheny Hydro Group Lock and Dam 4, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.8 | 0.8 | 2031-02 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.613718 | -79.71829 | 2026-09 |
| 69694/AL4-3 | Allegheny Lock and Dam 4 | AL4-3 | 69694 | PA | Allegheny | Allegheny Hydro Group Lock and Dam 4, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.8 | 0.8 | 2031-02 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.613718 | -79.71829 | 2026-09 |
| 69694/AL4-4 | Allegheny Lock and Dam 4 | AL4-4 | 69694 | PA | Allegheny | Allegheny Hydro Group Lock and Dam 4, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.8 | 0.8 | 2031-02 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.613718 | -79.71829 | 2026-09 |
| 69694/AL4-5 | Allegheny Lock and Dam 4 | AL4-5 | 69694 | PA | Allegheny | Allegheny Hydro Group Lock and Dam 4, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.8 | 0.8 | 2031-02 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.613718 | -79.71829 | 2026-09 |
| 69694/AL4-6 | Allegheny Lock and Dam 4 | AL4-6 | 69694 | PA | Allegheny | Allegheny Hydro Group Lock and Dam 4, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.8 | 0.8 | 2031-02 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.613718 | -79.71829 | 2026-09 |
| 69694/AL4-7 | Allegheny Lock and Dam 4 | AL4-7 | 69694 | PA | Allegheny | Allegheny Hydro Group Lock and Dam 4, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.8 | 0.8 | 2031-02 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.613718 | -79.71829 | 2026-09 |
| 69694/AL4-8 | Allegheny Lock and Dam 4 | AL4-8 | 69694 | PA | Allegheny | Allegheny Hydro Group Lock and Dam 4, Inc | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.8 | 0.8 | 2031-02 | 2031 | (L) Regulatory approvals pending. Not under construction | PJM | 40.613718 | -79.71829 | 2026-09 |
| 62749/1 | Heidelberg Hydroelectric Project | 1 | 62749 | KY | Lee | Lock 14 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 37.552399 | -83.77001 | 2026-09 |
| 62749/2 | Heidelberg Hydroelectric Project | 2 | 62749 | KY | Lee | Lock 14 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 37.552399 | -83.77001 | 2026-09 |
| 62749/5 | Heidelberg Hydroelectric Project | 5 | 62749 | KY | Lee | Lock 14 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 37.552399 | -83.77001 | 2026-09 |
| 62749/6 | Heidelberg Hydroelectric Project | 6 | 62749 | KY | Lee | Lock 14 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 37.552399 | -83.77001 | 2026-09 |
| 69706/4149B | Bishop Ranch - BR 3-GG | 4149B | 69706 | CA | Contra Costa | Camino Ramon BR 3-GG Solar Project 2020, LLC | IPP Non-CHP | Batteries | MWH | BA | 0.6 | 0.6 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 37.767242 | -121.9582 | 2026-09 |
| 69708/4150B | Bishop Ranch - BR 3-HH | 4150B | 69708 | CA | Contra Costa | Camino Ramon BR 3-HH Solar Project 2020, LLC | IPP Non-CHP | Batteries | MWH | BA | 0.6 | 0.6 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 37.766297 | -121.9582 | 2026-09 |
| 69708/4150C | Bishop Ranch - BR 3-HH | 4150C | 69708 | CA | Contra Costa | Camino Ramon BR 3-HH Solar Project 2020, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 0.6 | 0.6 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 37.766297 | -121.9582 | 2026-09 |
| 69710/4148B | Bishop Ranch - BR 3-FF | 4148B | 69710 | CA | Contra Costa | Camino Ramon BR 3-FF Solar Project 2020, LLC | IPP Non-CHP | Batteries | MWH | BA | 0.6 | 0.6 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 37.768388 | -121.959 | 2026-09 |
| 69710/4148C | Bishop Ranch - BR 3-FF | 4148C | 69710 | CA | Contra Costa | Camino Ramon BR 3-FF Solar Project 2020, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 0.6 | 0.6 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 37.768388 | -121.959 | 2026-09 |
| 62390/6 | KY No. 11 L&D Hydroelectric Project | 6 | 62390 | KY | Estill | Lock 11 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 37.78401 | -84.10329 | 2026-09 |
| 62390/NA1 | KY No. 11 L&D Hydroelectric Project | NA1 | 62390 | KY | Estill | Lock 11 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 37.78401 | -84.10329 | 2026-09 |
| 62390/NA2 | KY No. 11 L&D Hydroelectric Project | NA2 | 62390 | KY | Estill | Lock 11 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 37.78401 | -84.10329 | 2026-09 |
| 62390/NA5 | KY No. 11 L&D Hydroelectric Project | NA5 | 62390 | KY | Estill | Lock 11 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 37.78401 | -84.10329 | 2026-09 |
| 64758/MAN | Manorville II | MAN | 64758 | NY | Suffolk | Agilitas Energy, Inc. | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 0.6 | 0.6 | 2027-12 | 2027 | (L) Regulatory approvals pending. Not under construction | NYIS | 40.834 | -72.7819 | 2026-09 |
| 62748/1 | Evelyn Hydroelectric Project | 1 | 62748 | KY | Lee | Lock 13 Hydro Partners | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2029-12 | 2029 | (T) Regulatory approvals received. Not under construction | PJM | 37.601982 | -83.83297 | 2026-09 |
| 62748/2 | Evelyn Hydroelectric Project | 2 | 62748 | KY | Lee | Lock 13 Hydro Partners | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2029-12 | 2029 | (T) Regulatory approvals received. Not under construction | PJM | 37.601982 | -83.83297 | 2026-09 |
| 62748/5 | Evelyn Hydroelectric Project | 5 | 62748 | KY | Lee | Lock 13 Hydro Partners | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2029-12 | 2029 | (T) Regulatory approvals received. Not under construction | PJM | 37.601982 | -83.83297 | 2026-09 |
| 62748/6 | Evelyn Hydroelectric Project | 6 | 62748 | KY | Lee | Lock 13 Hydro Partners | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.6 | 0.6 | 2029-12 | 2029 | (T) Regulatory approvals received. Not under construction | PJM | 37.601982 | -83.83297 | 2026-09 |
| 68600/7236B | Las Virgenes MWD - Composting Plant | 7236B | 68600 | CA | Los Angeles | Las Virgenes Road Solar Project 2022, LLC | IPP Non-CHP | Batteries | MWH | BA | 0.5 | 0.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.126481 | -118.6981 | 2026-09 |
| 69713/9985B | Sanger USD - Sanger West HS | 9985B | 69713 | CA | Fresno | South Fowler Avenue Solar Project 2023, LLC | IPP Non-CHP | Batteries | MWH | BA | 0.5 | 0.5 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 36.709291 | -119.6814 | 2026-09 |
| 65072/GVSRS | Fremont CA AutoFactory | GVSRS | 65072 | CA | Alameda | Tesla Inc. | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 0.5 | 0.5 | 2026-12 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 37.49254 | -121.9446 | 2026-09 |
| 68235/C34BB | Romeoville 34 - SLCHI234 - BSCHI234 | C34BB | 68235 | IL | Will | Prologis Logistics Services Incorporated | IPP Non-CHP | Batteries | MWH | BA | 0.5 | 0.5 | 2027-05 | 2027 | (U) Under construction, less than or equal to 50 percent complete | PJM | 41.597 | -88.11 | 2026-09 |
| 65072/VSRS | Fremont CA AutoFactory | VSRS | 65072 | CA | Alameda | Tesla Inc. | Industrial Non-CHP | Solar Photovoltaic | SUN | PV | 0.4 | 0.4 | 2026-12 | 2026 | (TS) Construction complete, but not yet in commercial operation | CISO | 37.49254 | -121.9446 | 2026-09 |
| 70428/DRIVB | Bakersfield Driver | DRIVB | 70428 | CA | Kern | Pacifico Bakersfield Driver LLC | IPP Non-CHP | Batteries | MWH | BA | 0.3 | 0.3 | 2026-09 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 35.562181 | -119.202 | 2026-09 |
| 68542/7170B | Palmdale Water District 6MG Tank | 7170B | 68542 | CA | Los Angeles | East Avenue South Solar Project 2022, LLC | IPP Non-CHP | Batteries | MWH | BA | 0.3 | 0.3 | 2026-11 | 2026 | (V) Under construction, more than 50 percent complete | CISO | 34.558047 | -118.1187 | 2026-09 |
| 58168/TURB4 | Energy Center | TURB4 | 58168 | CA | San Bernardino | University of Redlands | Commercial CHP | Natural Gas Fired Combustion Turbine | NG | GT | 0.3 | 0.3 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.063056 | -117.1639 | 2026-09 |
| 58168/TURB5 | Energy Center | TURB5 | 58168 | CA | San Bernardino | University of Redlands | Commercial CHP | Natural Gas Fired Combustion Turbine | NG | GT | 0.3 | 0.3 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.063056 | -117.1639 | 2026-09 |
| 58168/TURB6 | Energy Center | TURB6 | 58168 | CA | San Bernardino | University of Redlands | Commercial CHP | Natural Gas Fired Combustion Turbine | NG | GT | 0.3 | 0.3 | 2030-12 | 2030 | (P) Planned for installation, but regulatory approvals not initiated | CISO | 34.063056 | -117.1639 | 2026-09 |
| 62749/3 | Heidelberg Hydroelectric Project | 3 | 62749 | KY | Lee | Lock 14 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.2 | 0.2 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 37.552399 | -83.77001 | 2026-09 |
| 62749/4 | Heidelberg Hydroelectric Project | 4 | 62749 | KY | Lee | Lock 14 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.2 | 0.2 | 2026-10 | 2026 | (TS) Construction complete, but not yet in commercial operation | PJM | 37.552399 | -83.77001 | 2026-09 |
| 69706/4149R | Bishop Ranch - BR 3-GG | 4149R | 69706 | CA | Contra Costa | Camino Ramon BR 3-GG Solar Project 2020, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 0.2 | 0.2 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 37.767242 | -121.9582 | 2026-09 |
| 69708/4150R | Bishop Ranch - BR 3-HH | 4150R | 69708 | CA | Contra Costa | Camino Ramon BR 3-HH Solar Project 2020, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 0.2 | 0.2 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 37.766297 | -121.9582 | 2026-09 |
| 69710/4148R | Bishop Ranch - BR 3-FF | 4148R | 69710 | CA | Contra Costa | Camino Ramon BR 3-FF Solar Project 2020, LLC | IPP Non-CHP | Solar Photovoltaic | SUN | PV | 0.2 | 0.2 | 2027-07 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 37.768388 | -121.959 | 2026-09 |
| 62390/NA3 | KY No. 11 L&D Hydroelectric Project | NA3 | 62390 | KY | Estill | Lock 11 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.2 | 0.2 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 37.78401 | -84.10329 | 2026-09 |
| 62390/NA4 | KY No. 11 L&D Hydroelectric Project | NA4 | 62390 | KY | Estill | Lock 11 Hydro Partners, LLC | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.2 | 0.2 | 2027-11 | 2027 | (T) Regulatory approvals received. Not under construction | PJM | 37.78401 | -84.10329 | 2026-09 |
| 62748/3 | Evelyn Hydroelectric Project | 3 | 62748 | KY | Lee | Lock 13 Hydro Partners | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.2 | 0.2 | 2029-12 | 2029 | (T) Regulatory approvals received. Not under construction | PJM | 37.601982 | -83.83297 | 2026-09 |
| 62748/4 | Evelyn Hydroelectric Project | 4 | 62748 | KY | Lee | Lock 13 Hydro Partners | IPP Non-CHP | Conventional Hydroelectric | WAT | HY | 0.2 | 0.2 | 2029-12 | 2029 | (T) Regulatory approvals received. Not under construction | PJM | 37.601982 | -83.83297 | 2026-09 |
| 70101/PA29B | Pivot Energy PPA 29 LLC | PA29B | 70101 | CA | Placer | Pivot Energy | IPP Non-CHP | Batteries | MWH | BA | 0.1 | 0.1 | 2027-01 | 2027 | (V) Under construction, more than 50 percent complete | CISO | 38.828466 | -121.3049 | 2026-09 |